Am4 Attach04 20200212 COS DEICE IFC PLANS.pdf
PDF 43 MB Posted
- Attached to
- USFS Colorado Springs Air Tanker Base
- Solicitation number
- 1282BH20R0003
About this file
This document provides details on a federal solicitation for services at the USDA Forest Service Colorado Springs Air Tanker Base. Solicitation number 1282BH20R0003 seeks offers to provide support services at the base, as issued by the Department of Agriculture Forest Service Rocky Mountain Region. Services required include construction, maintenance, and operations support. The closing date for receipt of proposals is February 12, 2020. The period of performance covers one base year with four optional additional years. The solicitation is set aside for small businesses.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Know what's below.
before you dig.Call
R
737 HAZARD
737 HAZARD
737 HAZARD 737 HAZARD
737 HAZARD
737 H
AZAR
D
PHASING SCHEDULE
W
W
W
W
W
TAXILANE CENTERLINE PROFILE
S
SS
S
S
8''SS 8''SS 8''SS 8''SS
S
S S
S
8''SS
S
S S
S
12''W
12''W 12''W 12''W12''W 12''W
W
W
W
W
S S
S
S
8''SS 8''SS 8''SS 8''SS 8''SS
S
S
12''W 12''W 12''W 12''W 12''W 12''W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
12''W 12''W12''W
W
W
W
W
W
W
W
W
W
W
S
S
12''W
8''SS 8''SS 8''SS 8''SS 8''SS
12''W 12''W 12''W 12''W 12''W 12''W
S
S S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W
A
B B
D D
C C
B
R
IC
A
TIO
N U
SFF
B
R
IC
A
TIO
N U
SFF
1 2
SS
S
S
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
S
S
S
S
S
S
S
S
S
S
8''SS 8''SS
S
S
S
S
S
S
S
S
S
S
12''W 12''W
12''W 12''W 12''W 12''W 12''W 12''W12''W 12''W 12''W
12''W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
UNAUTHORIZED PERSONNEL
PROHIBITED
VIOLATORS WILL BE PROSECUTED TO
THE FULL EXTENT OF THE LAW
1+00.00
2+00.00
3+00.00
4+00.00
6+00.00
5+00.00
7+00.00
8+00.00
9+00.00
10+00.00
E
FIXTURE &
REFLECTOR
LOCATION TABLE
FIXTURE &
REFLECTOR
LOCATION TABLE
FIXTURE &
REFLECTOR
LOCATION TABLE
FIXTURE &
REFLECTOR
LOCATION TABLE
FIXTURE &
REFLECTOR
LOCATION TABLE
DEICE
DEICE
1 2 3
1 322
DEICE
DEICE
OFFICE
GENERATOR ROOM
CCR ROOM
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
12''W 12''W12''W
W
W
W
W
W
W
W
W
W
W
L
E C
T R
I C
A L
4" MIN
PLAN VIEW
SECTION VIEW
ELECTRICAL
COVER
10A
PAD AND CONDUIT DETAILS
6'-0"
PRECAST PAD
2 (ITEM #194-115-102)
APPROX WEIGHT= 2000 LBS
INSERTS (4)
SIDE LIFTING
25"
6'-0"
20"
(SEE NOTE 5)
11"
4"
6"
GROUND
ROD
6"
3"
5'-0"
45-150 kVA TRANSFORMER PAD
(SEE NOTE 5)
WITH END BELL (LOOP
4" PRIMARY CONDUIT
FEED OPTION DASHED)
6"
SECONDARY BARRIER
IN TRANSFORMER
35"
15"
(SEE NOTE 5)
1 1
2 2
3 3 3
16"
(SEE NOTE 5)
22"
LINE OF MINIMUM
SECONDARY
COMPARTMENT
SIZE (SEE NOTE 5)
NOTE
NO FIELD BENDING OF CONDUIT IS ALLOWED,
ONLY FACTORY BENDS ARE ACCEPTABLE.
3 3 3
2 2
ROW 1
ROW 2
ROW 3
1-1/2" CT METERING
CONDUIT WITH END
BELL AT FRONT LEFT
OR RIGHT OF
SECONDARY
CONDUITS, WHEN
REQUIRED (TYPICAL)
(9) 3-1/2" DUCTS WITH BELL ENDS (SEE NOTE 3)
DETAIL SHOWN IS BASED ON MAXIMUM
SECONDARY CONDUIT DETAIL
6'-0"
PRECAST PAD
2 (ITEM #194-115-102)
APPROX WEIGHT= 2000 LBS
INSERTS (4)
SIDE LIFTING
25"
6'-0"
13"
35"
22"
(SEE NOTE 6)
11"
4"
6"
GROUND
ROD
6"
6"
5'-0"
4" PRIMARY CONDUIT
WITH END BELL (LOOP
FEED OPTION DASHED)
6"
300-2500 kVA TRANSFORMER PAD
(SEE NOTE 6 & 18)
ELECTRIC DISTRIBUTION CONSTRUCTION STANDARDS
APPROVED AS OF:
3-12-2018
PADMOUNT 12.5KV 3-PHASE TRANSFORMER INSTALLATIONS 7-6 PG. 2/3
3 3
4 4
22"
IN TRANSFORMER
SECONDARY BARRIER
1-1/2" CT METERING
CONDUIT WITH END BELL
AT FRONT LEFT OR RIGHT
OF SECONDARY CONDUITS,
WHEN REQUIRED (TYPICAL)
SECONDARY CONDUIT DETAIL
DETAIL SHOWN IS BASED ON MAXIMUM
(16) 3-1/2" DUCTS WITH BELL ENDS (SEE NOTE 3)
3 3
4 4
ROW 1
ROW 2
ROW 3
ROW 4
W
TRENCHING GUIDE
FINAL GRADE
24" MIN
30" MAX
30" MIN
42" MAX
42" MIN
60" MAX
A
NESC
18"
MIN
NESC
24"
MIN
NESC
30"
MIN
NOTE:
SEE NOTES 6 & 7 FOR DEPTH
INSPECTION REQUIREMENTS
B
COLORADO SPRINGS UTILITIES ELECTRIC
REQUIRED STANDARD MINIMUM CONDUIT/
CABLE COVER
12" MIN
NESC MINIMUM COVER IS 24"
(COLORADO SPRINGS UTILITIES
ADOPTED A LARGER MINIMUM COVER
FOR ALL VOLTAGES TO ACCOUNT
FOR POTENTIAL GRADE CHANGES).
30" TYP
SERVICE
GAS
NESC MINIMUM COVER ABOVE TOP OF
CABLES (OR DIRECT BURIED DUCT-
COLORADO SPRINGS UTILITIES STANDARD)
PER NESC RULE 352D2 (WITHOUT
SUPPLEMENTAL PROTECTION- SEE NOTE 2,
REQUIRES WRITTEN AUTHORIZATION FROM
A COLORADO SPRINGS UTILITIES ELECTRIC
DEPARTMENT REPRESENTATIVE).
FINAL GRADE
6"
12"-18"
600 VOLT SECONDARY
SERVICE
FIGURE- B
TYPICAL TRENCH CROSSING DEPTHS
CABLE/ CIRCUIT
TYPE
C
FIGURE- A
TYPICAL TRENCH DEPTHS
E-LOK TRANSITION
COUPLING AND PLUG
TRANSITION COUPLINGS PROVIDED
BY COLORADO SPRINGS UTILITIES
SIZE AND TYPE
2" E-LOK
6" E-LOK
4" E-LOK
2" FLEX, 2-CLAMP
4" FLEX, 2-CLAMP
6" FLEX, 2-CLAMP
NOTES:
ITEM NUMBER
194-214-218
194-214-220
194-214-230
194-214-407
194-214-408
194-214-410
42" MIN
60" MAX
SEE NOTE 4
FIGURE- C
BORED-IN STUB CONFIGURATION
1. Trench width to be a minimum of 3" on each side of conduit or conductor, to provide for proper compaction (see table above).
2. Duct shall have a 3" minimum concrete envelope when CSU minimum cover depths are not achieved. Ducts shall also be installed with plastic base spacers to maintain a consistent 3" of concrete below duct. See Electric Distribution
Construction Standard (EDCS) 11-2 & 11-3.
3. See EDCS 18-304 for clearances required by NESC from UG electric conduit/cable to other UG facilities (communication, water, sewer, foundations, sub-structures, etc).
4. Colorado Springs Utilities requires an E-LOK type transition coupling at plugged end of bore, to be relocated to nearest
42" depth of stub (typically within 6'-10') and used for attachment of contractor supplied pipe. Contractor has the option of picking up bored pipe at 42" depth or digging parallel and lowering end of stub if direction of contractor's ditch allows.
5. Colorado Springs Utilities acknowledges difficulties in blowing and pulling wire in ducts of dissimilar inside diameters, and accepts this responsibility if contractor supplied pipe meets Electric Distribution Construction Standard 11-3 and is installed properly.
6. If required depth of trench or bored-in conduit cannot be met by CSU contractor, new proposed depth must be approved in advance by CSU inspector. Inspector must be notified a minimum of three days in advance of bore start time. Inspector may require utility or other locate documentation to verify existing infrastructure depths. Potholing may be required at any time, at the discretion of the CSU inspector, to prove any bore depth. Conduit will be required for any installation that exceeds CSU minimum or maximum depth as shown in Figure A. See also ELESS 8.06 and 10.01h for service inspection responsibilities.
7. CSU contractor to submit bore log to CSU inspector within 7 days of completion of bore installation.
ELECTRIC DISTRIBUTION CONSTRUCTION STANDARDS
APPROVED AS OF:
12-15-2016 non-100 series items treated as such.
- Denotes minor material items for all
TRENCHING, BACKFILL/COMPACTION, CONCRETE MIXES, & AGGREGATE BASE COURSE MATERIALS
11-1 PG. 1/6
42" MIN
60" MAX
PL
6'-10' TYP
SPECIFIED TERMINAL POINT
OF BORED-IN DUCT (SUCH
AS PROPERTY LINE)
A
C
B
TYPICAL TRENCH
WIDTH
STREETLIGHT FEEDS
SECONDARY
PRIMARY 24"
6"
6"
MAXIMUM VOLTAGE
MAX. 150 VOLTS PHASE TO GROUND
601-50,000 VOLTS PHASE-TO-PHASE
0-600 VOLTS PHASE-TO-PHASE
NOTE:
SEE FIGURE- A FOR TYPICAL
DEPTH REQUIREMENTS
FOUNDATION COMPACTION SPECIFICATION FOR PADMOUNTED EQUIPMENT
1. Colorado Springs Utilities recommends experienced personnel who understand the importance of moisture for compacting soils and the characteristics of expansive soils.
2. Before any backfilling or compaction operations are started, inspect all conduit spacings and riser heights. Make sure they meet the construction standard specified for the equipment to be installed.
3. All pads pre-cast or poured on site shall project a minimum of 4" above grade.
4. Excavate a minimum of twelve inches beyond perimeter of pad and a minimum of 36" deep.
5. The first twelve inches of backfill shall be free from stones, rock, or other material that might damage the cable or conduit. Selected backfill shall contain no soil material larger than 1/2" in diameter.
6. When suitable, as determined by soils test, use native material compacted in accordance with the following:
a. For cohesive soils, compact to 87% maximum Modified Proctor dry density at ± 2% of optimum moisture content (or 92% maximum
Standard Proctor dry density at ±2% of optimum moisture content).
b. For cohesionless soils, compact to 85% maximum Modified Proctor dry density at -5% to +3% of optimum moisture content (or 90% maximum Standard Proctor dry density at -5% to +3% of optimum moisture content). Prior to and during compaction, materials shall have a moisture content as required to obtain the specified density. Thickness of horizontal layers after compacting shall not be more than 9".
c. For expansive soils, remove and replace with CDOT Class 5 or 6 soil and compact per 6b above (see gradation specifications on page 6).
7. After successful completion of the above steps, call the Colorado Springs Utilities Inspector who will arrange for compaction tests. This shall be done and approved before a concrete pad will be poured or a precast pad installed.
8. All equipment pads supporting Colorado Springs Utilities equipment shall have compaction tests and records kept by the Colorado Springs Utilities Inspector.
ELECTRIC DISTRIBUTION CONSTRUCTION STANDARDS
APPROVED AS OF:
4-18-2016
TRENCHING, BACKFILL/COMPACTION, CONCRETE MIXES, & AGGREGATE BASE COURSE MATERIALS
11-1 PG. 3/6
ON 750 KVA & LARGER:
EXTERNALLY OPERATED,
NOTE:
DE-ENERGIZED TAP
+-CHANGER 5%
SEE APPLICABLE MATERIAL
TYPE & ARRANGEMENT
SPECIFICATION FOR FUSE
TRANSFORMER TANK
H1A
H2A
H3A
TANK GROUND LUGS
H1B
H2B
H3B
F
F
LINK
H0
X0 (OR
H0/X0)
GROUND
STRAP
GROUND EYES TO THE GROUND BUS
BOND PRIMARY CABLE CONCENTRICS,
LOOP FEED OPTION
DRIVEN GROUND ROD
ONE LINE SCHEMATIC
NOTES:
1. All conduits shall be installed by the customer to Colorado Springs Utilities specifications. Refer to EDCS 11-3 for specifications on primary conduit, and EDCS 11-1 for primary/secondary conduit depths, trench backfilling and compaction, and pad compaction requirements.
2. For radial feed installation of a loop-type transformer, both primary conduits shall be installed. If one is not used, it shall be stubbed and capped at least 2' out from the front edge of the pad with an 8" UG marker installed above the end.
3. Placement of multiple secondary conduits shall be by rows from back to front, example: row 1 first, then row 2, etc. Fill back row first prior to starting the next row forward, filling front row last or used for future use.
4. Do not pour concrete in the conduit window opening unless an older style transformer is issued (see note 6). Pea gravel may routinely be used as a filler if needed.
5. For 45-150 kVA transformers, frame 9 secondary conduits maximum (3 rows of 3 conduits). Each row to fit within 15" maximum width from right side of window opening, and within 16" maximum depth from back side of window opening. The distance from the secondary compartment to the center of the primary conduit shall be 22" maximum, 10" minimum. This framing arrangement works with both current and older style transformer secondary compartment dimensions. See page 2.
6. For 300-2500 kVA older style transformers, frame 16 secondary conduits maximum (4 rows of 4 conduits). Each row to fit within 22" maximum width from right side of window opening, and within 22" maximum depth from back side window opening. This framing arrangement works with current style transformer secondary compartment dimensions. See page 2.
7. If an older style transformer is issued and it does not completely cover the window opening, form and fill the exposed area of window and under cabinet with concrete. This keeps energized equipment from being accessible from the outside, maintains cabinet security and supports the cabinet.
8. All vertical primary conduit bends shall have a minimum 36" radius. For primary 4" conduit runs with three (maximum allowed) 90° bends and/or a length of 300' and longer, the vertical conduit bend into the transformer pad shall be Fiberglass or GRC material. Otherwise, primary 4" conduit runs with two or less 90° bends and a length of less than 300', the vertical conduit bend into the transformer pad may be PVC material. (See ELESS book, Appendix C, Table 3 for 4" 90°, 36" radius fiberglass elbow material requirements).
9. Field Engineer to specify EDCS 19-9 for pads poured-in-place when access with precast pad is not available.
10. NESC-314B: Conductive-material ducts and riser guards that enclose electric supply lines, or are exposed to contact with open supply conductors, shall be effectively grounded.
11. When terminating three phase loop feed transformers, cables using conduit on the left side shall be terminated to the HxA bushings. Cables using conduit on the right side shall be terminated to HxB bushings to prevent crossing of primary cables.
12. All secondary conductors shall be installed and terminated by customer to Colorado Springs Utilities EDCS 7-15.
13. Leave slack in secondary and primary cables to permit transformer removal and replacement for maintenance, train primary cables to permit parking elbows.
14. Leave sufficient slack on concentric neutrals to allow removing elbows without disconnecting neutrals.
15. Ground loop in all cases shall be installed in front of primary cables.
16. CAUTION: Ground strap on neutral bushing shall remain connected to tank in all cases (except for XO bushing in special cases, such as 2400V motor loads), tank will be energized to primary voltage if primary neutral tank grounds are disconnected and one open primary phase exists on the source side of the transformer without H0 bushings.
17. NESC Rule 384C: Bond all above ground metallic supply and communication enclosures that are separated by 6 feet or less. Use minimum #6 bare copper wire direct buried a minimum 18" below grade, to a suitable bolted or screw connection that can be temporarily opened when locating cables. Treat open ground connections as energized!
18. For secondary voltage over 480V, refer to manufacturer's drawings to determine suitable pad size, see also pads in 7-7.
19. It is the customer's responsibility to seal the customer's secondary ducts from water entering the customer's equipment or building that originate from a Colorado Springs Utilities' transformer or vault.
20. No conduit field bends are allowed, only factory conduit bends are acceptable.
ELECTRIC DISTRIBUTION CONSTRUCTION STANDARDS
APPROVED AS OF:
4-12-2018
PADMOUNT 12.5KV 3-PHASE TRANSFORMER INSTALLATIONS 7-6 PG. 3/3
CUSTOMERS INSTALLING
ANY METAL CONDUIT SHALL
EFFECTIVELY GROUND THEM
IN PAD (SEE NOTE 10)
BUSHING INSERT GROUND TABS & ELBOW
LOOP MIN #4 CU FOR
USE AS GROUND BUS
H1
LINK & COMMON H0/X0 BUSHING)
KVA (SMALLER SIZES HAVE INTERNAL
H0 ONLY PRESENT ON SOME 500-2500
H2
X1,X2,X3
PHASOR DIAGRAM
X0H0
H3 X1 X3
X2
DRIVE-ON GALV. CAP
SCREW-IN
BUMPER POST
4"
4"
ITEM #194-111-100 (SEE
SCREW-IN BUMPER POST,
NOTE 1)
FOR DRAIN-OFF
1" UP-SLOPE
NOTES:
4'
1. Barricade post to be installed plumb and level across the tops from one to another when two are used.
3'
2. Post is galvanized- no painting required.
3. Post can be filled with sack mix of concrete.
4. Post requires 3,000-4,000 ft-lbs. installation torque.
5. Use bands of reflective tape (Item #100-136-012) on top of posts to warn motorists, cyclists, etc. The first band should be no lower than 8" from the top of the post.
8"
THREE BANDS OF 4"
REFLECTIVE TAPE
SPACED 4" APART
(ITEM #100-136-012)
4"
4'
4" OR 6" IPS X 6' - 6" STEEL
GRC PIPE, ITEM
#194-218-114 (SEE NOTE 2)
2"-3" UP-SLOPE
FOR DRAIN-OFF
4'
NOTE:
USE 2" TAPE TO STORE 10"
EYEBOLT WHEN NOT USED
FOR LIFTING (SEE DETAIL)
2"-3" UP-SLOPE
FOR DRAIN-OFF
3500 PSI CONCRETE
(SEE NOTE 4)
3'
2-1/2'
3500 PSI CONCRETE
(SEE NOTE 4)
6"
REMOVABLE
CAPPED-PIPE BUMPER POST
PIPE BUMPER POST
CONCRETE-FILLED
BE USED ONLY WHEN SCREW-IN BUMPER
THIS IS NON-PREFERRED POST AND WILL
POST CANNOT BE USED.
NOTES:
1. Bumper posts to be installed plumb and level across the tops from one to another when two are used.
2. Use scrap 4" or 6" GRC pipe and paint with two coats of silver or yellow paint, unless conduit piece is new.
3. Dig 20" x 36" hole- conduit to be centered in hole.
4. Concrete for anchoring posts to be 3500 psi T&D
Mix #2, approximately 8.3 Cu.Ft./Pole (see EDCS
11-1, pg 5).
5. For removable post (Item #194-111-150) assemble with scrap 4" PVC duct sleeve, 10"x
1/2" eyebolt, 4" PVC pipe plug, 2" black tape and
4" orange reflective tape as shown.
6. Use bands of reflective tape on top of posts to warn motorists, cyclists, etc. (Item #100-136-012).
The first band should be no lower than 4" from the top of the post.
7. Intermediate posts across at least one side
(preferably the front) of the apparatus shall be of the removable type, all others can be permanent.
CUID EXAMPLE:
ELECTRIC DISTRIBUTION CONSTRUCTION STANDARDS
APPROVED AS OF:
9-1-2016
E.BUMPER-POST-SCREW-IN
BUMPER POST INSTALLATIONS 15-2 PG. 1/2
THIS POST IS USED BETWEEN PERMANENT POSTS
WHEN THE DISTANCE BETWEEN THE PERMANENT
POSTS EXCEED 6' AND POST PLACEMENT MAY
INTERFERE WITH EQUIPMENT OPERATION.
SLEEVE (4" PVC DUCT
WITH 4" PVC PLUG)
INSTALL 4" PVC SLEEVE
2" MIN - 3" MAX ABOVE
CONCRETE UP-SLOPE
FILL WITH 3500 PSI CONCRETE
MIX AND VIBRATE TO
ELIMINATE AIR POCKETS,
ROUND TOP FOR DRAINAGE.
4"
THIS IS THE PREFERRED POST TO BE USED
(USE CONCRETE-FILLED BUMPER POST IF
USE IS IMPRACTICAL DUE TO PROXIMITY
TO BURIED LINES OR SUBSTRUCTURES).
THREE BANDS OF 4" TAPE
SPACED 4" APART (ITEM
ITEM #194-111-150 (SEE
3" IPS X 7' STEEL GRC PIPE,
#100-136-012)
NOTE 5)
3" GRC CAP
4"
TRAFFIC FREE ZONE
2' 6'
WOOD POLE
GUY WIRES
DIRECTION OF
18"
GUY WIRE ANCHOR
ALONG OVERHEAD DOWN GUYS
BUMPER POST PLACEMENT
PLACE BUMPER POSTS NEXT TO DOWN GUYS
LOCATED IN PARKING LOTS OR ALLEYS
PERMANENT
BUMPER POSTS
6'
2'
TRAFFIC FREE ZONE
2'
6' (MAX)
FRONT
6' (MAX)
FRONT
2'
6' (MAX)
FRONT
TRAFFIC FREE ZONE
6' (MAX)
6' (MAX)
1 REMOVABLE
BUMPER POST PLACEMENT
AROUND PADMOUNT APPARATUS
BUMPER POST
6' (MAX)
A
SEE NOTE 5
B
A
B
SEE NOTE 5
REMOVABLE BUMPER POST PLACEMENT
NOTES:
1. Barrier posts shall be set at the corners of pad-mounted apparatus adjacent to traffic areas. The posts are to be placed a minimum of 2' to the side and 2' from the corner of the concrete pad and will allow the door(s) of the apparatus to be opened to the locking positions.
2. If the distance between two corner posts exceeds 6', an intermediate post(s) should be added between the existing posts.
3. Intermediate posts across the front of the apparatus shall be of the removable type to allow full access to the apparatus.
4. If the distance between the corner of the apparatus and the traffic free area exceeds 6', a barrier post will be installed at the corner of the apparatus adjacent to the traffic free zone.
5. Intermediate (removable) posts shall be placed in line with equipment doors so as not interfere when doors are fully opened.
ELECTRIC DISTRIBUTION CONSTRUCTION STANDARDS
APPROVED AS OF:
9-1-2016
BUMPER POST INSTALLATIONS 15-2 PG. 2/2
| C001 COVER SHEET |
| C002 INDEX OF DRAWINGS |
| C003 SUMMARY OF CONTRACT QUANTITIES |
| C004 SAFETY & SECURITY NOTES AND DETAILS |
| C005 CONTRACT LAYOUT PLAN AND GENERAL NOTES |
| C006 CONSTRUCTION ACCESS LAYOUT AND OVERALL PHASING PLAN |
| C007 PHASING PLAN PHASE 1 &1A CONCURRENT |
| C008 PHASING PLAN 1, 1A, & 1B CONCURRENT |
| C009 PHASING PLAN PHASE 1 |
| C010 PAVEMENT MARKING OBLITERATION PLAN |
| C020 HORIZONTAL & VERTICAL CONTROL & BORING LOCATION PLAN |
| C101 DEMOLITION PLAN |
| C110 DEMOLITION DETAILS |
| C201 GEOMETRY AND PAVING PLAN |
| C210 TYPICAL PAVEMENT SECTIONS AND DETAILS (SHEET 1 OF 3) |
| C211 TYPICAL PAVEMENT SECTIONS AND DETAILS (SHEET 2 OF 3) |
| C212 TYPICAL PAVEMENT SECTIONS AND DETAILS (SHEET 3 OF 3) |
| C301 TAXILANE CONNECTOR PLAN AND PROFILE |
| C451 EROSION CONTROL PLAN (SHEET 1 OF 2) |
| C452 EROSION CONTROL PLAN (SHEET 2 OF 2) |
| C453 EROSION CONTROL DETAILS AND NOTES |
| C501 GRADING AND DRAINAGE PLAN (SHEET 1 OF 3) |
| C502 GRADING AND DRAINAGE PLAN (SHEET 2 OF 3) |
| C503 GRADING AND DRAINAGE PLAN (SHEET 3 OF 3) |
| C504 DETENTION POND GRADING PLAN |
| C510 UNDERDRAIN DETAILS |
| C511 DRAINAGE DETAILS (SHEET 1 OF 6) |
| C512 DRAINAGE DETAILS (SHEET 2 OF 6) |
| C513 DRAINAGE DETAILS (SHEET 3 OF 6) |
| C514 DRAINAGE DETAILS (SHEET 4 OF 6) |
| C515 DRAINAGE DETAILS (SHEET 5 OF 6) |
| C516 DRANAGE DETAILS (SHEET 6 OF 6) |
| C520 TRENCH DRAIN DETAILS |
| C525 POND DETAILS (SHEET 1 OF 5) |
| C526 POND DETAILS (SHEET 2 OF 5) |
| C527 POND DETAILS (SHEET 3 OF 5) |
| C528 POND DETAILS (SHEET 4 OF 5) |
| C529 POND DETAILS (SHEET 5 OF 5) |
| C530 DEICE POND INFRASTRUCTURE (SHEET 1 OF 3) |
| C531 DEICE POND INFRASTRUCTURE (SHEET 2 OF 3) |
| C532 DEICE POND INFRASTRUCTURE (SHEET 3 OF 3) |
| C535 PIPE PROFILES (SHEET 1 OF 2) |
| C536 PIPE PROFILES (SHEET 2 OF 2) |
| C601 CONCRETE JOINT ELEVATION PLANS(SHEET 1 OF 4) |
| C602 CONCRETE JOINT ELEVATION PLANS(SHEET 2 OF 4) |
| C603 CONCRETE JOINT ELEVATION PLANS(SHEET 3 OF 4) |
| C604 CONCRETE JOINT ELEVATION PLANS(SHEET 4 OF 4) |
| C610 CONCRETE JOINT LAYOUT PLAN |
| C660 CONCRETE JOINT DETAILS (SHEET 1 OF 2) |
| C661 CONCRETE JOINT DETAILS (SHEET 2 OF 2) |
| C701 PAVEMENT MARKING PLAN (SHEET 1 OF 3) |
| C702 PAVEMENT MARKING PLAN (SHEET 2 OF 3) |
| C703 PAVEMENT MARKING PLAN (SHEET 3 OF 3) |
| C710 PAVEMENT MARKING DETAILS |
| C801 FENCE PLAN |
| C810 FENCE DETAILS |
| X101 DEICE APRON CROSS SECTION KEY MAP |
| X102 DEICE APRON CROSS SECTIONS (SHEET 1 OF 5) |
| X103 DEICE APRON CROSS SECTIONS (SHEET 2 OF 5) |
| X104 DEICE APRON CROSS SECTIONS (SHEET 3 OF 5) |
| X105 DEICE APRON CROSS SECTIONS (SHEET 4 OF 5) |
| X106 DEICE APRON CROSS SECTIONS (SHEET 5 OF 5) |
| E001 AIRFIELD ELECTRICAL LEGEND, NOTES,ANDABBREVIATIONS |
| E101 AIRFIELD ELECTRICAL DEMOLITION PLAN |
| E201 AIRFIELD LIGHTING & SIGNAGE PLAN |
| E401 ELECTRICAL DETAILS (SHEET 1 OF 6) |
| E402 ELECTRICAL DETAILS (SHEET 2 OF 6) |
| E403 ELECTRICAL DETAILS (SHEET 3 OF 6) |
| E404 ELECTRICAL DETAILS (SHEET 4 OF 6) |
| E405 ELECTRICAL DETAILS (SHEET 5 OF 6) |
| E406 ELECTRICAL DETAILS (SHEET 6 OF 6) |
| ES201 PROPOSED HIGH MAST LIGHTING PLAN |
| ES202 PROPOSED HIGH MAST LIGHTING PHOTOMETRIC PLAN |
| ES401 SITE ELECTRICAL DETAILS (SHEET 1 OF 5) |
| ES402 SITE ELECTRICAL DETAILS (SHEET 2 OF 5) |
| ES403 SITE ELECTRICAL DETAILS (SHEET 3 OF 5) |
| ES404 SITE ELECTRICAL DETAILS (SHEET 4 OF 5) |
| ES405 SITE ELECTRICAL DETAILS (SHEET 5 OF 5) |
File details come from the government source that posted it. Updated .