Att L-6 Vol 3 Site Manning Matrix.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Contractor Logistics Support (CLS) Follow-On, FY 27-30
Solicitation number
N0001926R1000
Issued by

About this file

This file is a Site Manning Matrix template for contractor staffing proposals on a Contractor Logistics Support (CLS) Follow-On contract supporting the U.S. Marine Corps MQ-9A Unmanned Aircraft System (UAS). The matrix serves as an appendix (Attachment L-6, Volume 3) for offerors to propose their organizational structure and resource allocation across multiple squadron locations.

The template is structured with separate tabs for aircrew and maintenance personnel at four Marine squadron sites: VMUT-2, VMX-1, VMU-1, and VMU-3. For aircrew positions, offerors must specify the labor category (e.g., Pilot), number of Full-Time Equivalents (FTEs), productive hours per FTE per ordering period, daily on-site personnel count, total proposed productive hours, and qualifications including SLR and C-Band/ATLC certifications, with corresponding Contract Line Item Numbers (CLINs). For maintenance positions, offerors must provide labor category (e.g., Mech Level 1, Mech Level 2), FTEs, productive hours per FTE, daily on-site personnel, total proposed productive hours, CLIN assignment, operational location designation (MOB, FOB, or Expeditionary Site), and associated squadron. The sample data provided shows 2 pilots per squadron and varying maintenance technician levels (2 Mech Level 1 and 4 Mech Level 2 personnel per location), with maintenance personnel distributed between Main Operating Base and Expeditionary Sites. This template establishes the framework for offerors to detail their proposed staffing for O-Level maintenance and aircrew services at CONUS and OCONUS locations throughout the contract period.

View the file

Other files

File Type Posted
CLS_Next_RFP_QA_PDF_2_23_26.pdf PDF
Attachment 1_CLS Next Draft Performance Work Statement (PWS)_18 Feb 2026.docx DOCX document
Attachment 4_DD254 N00019-26-R-1000 PMA-266_signed_03 December 2025.pdf PDF
Attachment 8_Wage Determination (NC_HI _AZ)_03 Dec 2025.pdf PDF
Section L MQ-9 Instructions Conditions Notices to Offerors or Quoters.docx DOCX document
Att L-1 Vol 1 KA Tables.xlsx XLSX spreadsheet
Solicitation - N0001926R1000_Final.pdf PDF
Attachment 3_PMA-266 Corrective Action Request Process_04 December 2025.docx DOCX document
Attachment 5_MQ-9 Enterprise PPP (Including Annexes A-O)_01 July 2024.pdf PDF
Attachment 6_Cost and Software Data Reporting (CSDR)_22 January 2025.pdf PDF
Attachment 9_RFP CSP.pdf PDF
Exhibit A_Contract Data Requirements List (CDRLS)_020426.pdf PDF
Att L-3 Vol 2 PP-1 PP Cont Data.xlsx XLSX spreadsheet
Att L-4 Vol 3 CRM.xlsx XLSX spreadsheet
Att L-5 Vol 3 PFBM.xlsx XLSX spreadsheet
Section M MQ-9 Evaluation Factors for Award.docx DOCX document
Attachment 2_Corrective Action Process Form_04 December 2025.pdf PDF
Att L-8 Vol 5 SBPCD.xlsx XLSX spreadsheet
Attachment 7_Resource Distribution Table (RDT)_22 January 2025.xlsx XLSX spreadsheet
Att L-2 Vol 2 PPQ.docx DOCX document
Att L-7 Vol 4 Price Model.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS

POCs:

AIRCREW TABS

1. Company Name: Enter the name of your company.

2. Labor Category Title: Specify the labor category (e.g., Pilot, Technician, etc.).

3. Offeror Proposed Number of Full Time Equivalents (FTEs): Indicate the total number of personnel proposed for this labor category.

4. Productive Hours Per FTE per Ordering Period: Time that an employee would be working and completing tasks in direct support of flight operations on this contract (e.g., Excluding Annual Leave, Sick Leave, Holidays, Training).

5. Daily On Site: Enter the number of personnel who will be physically present on-site daily.

6. Total Proposed Productive Hours per Ordering Period: Provide the total number of productive hours proposed for this labor category.

7. SLR (Y/N): Indicate whether the personnel are SLR-qualified (Yes or No).

8. C-Band/ATLC (Y/N): Indicate whether the personnel are C-Band/ATLC-qualified (Yes or No).

9. CLIN: Enter the applicable CLIN (Contract Line Item Number) for this labor category.

MAINTENANCE TABS

1. Company Name: Enter the name of your company.

2. Labor Category Title: Specify the labor category (e.g., Mech Level 1, Mech Level 2, etc.).

3. Offeror Proposed Number of Full Time Equivalents (FTEs): Indicate the total number of personnel proposed for this labor category.

4. Productive Hours Per FTE: Time that an employee would be working and completing tasks in direct support of maintenance on this contract. (e.g., Excluding Annual Leave, Sick Leave, Holidays, Training).

5. Daily On Site: Enter the number of personnel who will be physically present on-site daily.

6. Total Proposed Productive Hours: Provide the total number of productive hours proposed for this labor category.

7. CLIN: Enter the applicable CLIN (Contract Line Item Number) for this labor category.

8. Location: Specify the location as MOB (Main Operating Base), FOB (Forward Operating Base), or Expeditionary Site (ES).

9. Squadron: Indicate the squadron associated with this labor category (e.g., VMU-1, VMU-3, etc.).

VMUT-2 Aircrew

Offeror Name:
Company NameLabor Category TitleOfferor Proposed Number of FTEsProductive Hours Per FTE per Ordering PeriodDaily on siteTotal Proposed Productive Hours per Ordering PeriodSLR (Y/N)C-Band/ ATLC (Y/N)CLIN
SAMPLE COMPANYPilot210YNX005
20
0
0
0
0
0
0
0
0
0

VMUT-2 Maint Offeror Name:

Company NameLabor Category TitleOfferor Proposed Number of FTEsProductive Hours Per FTE per Ordering PeriodDaily on siteTotal Proposed Productive Hours per Ordering PeriodCLIN
SAMPLE COMPANYMech Level 1210X002
SAMPLE COMPANYMech Level 2420X004
0
0
0
0
0
0
0
0
0

VMX-1 Aircrew Offeror Name:

Company NameLabor Category TitleOfferor Proposed Number of FTEsProductive Hours Per FTE per Ordering PeriodDaily on siteTotal Proposed Productive Hours per Ordering PeriodSLR (Y/N)C-Band/ ATLC (Y/N)CLIN
SAMPLE COMPANYPilot210YNX005
0
0
0
0
0
0
0
0
0
0

VMX-1 Maint Offeror Name:

Company NameLabor Category TitleOfferor Proposed Number of FTEsProductive Hours Per FTE per Ordering PeriodDaily on siteTotal Proposed Productive Hours per Ordering PeriodCLIN
SAMPLE COMPANYMech Level 1210X002
SAMPLE COMPANYMech Level 2420X004
0
0
0
0
0
0
0
0
0

VMU-1 Aircrew Offeror Name:

Company NameLabor Category TitleOfferor Proposed Number of FTEsProductive Hours Per FTE per Ordering PeriodDaily on siteTotal Proposed Productive Hours per Ordering PeriodSLR (Y/N)C-Band/ ATLC (Y/N)CLIN
SAMPLE COMPANYPilot210YNX005
0
0
0
0
0
0
0
0
0
0

VMU-1 Maint Offeror Name:

Company NameLabor Category TitleOfferor Proposed Number of FTEsProductive Hours Per FTE per Ordering PeriodDaily on siteTotal Proposed Productive Hours per Ordering PeriodCLINLocation (indicate MOB/FOB/Expeditionary Site (ES))
SAMPLE COMPANYMech Level 1210X002MOB
SAMPLE COMPANYMech Level 2420X004ES
0
0
0
0
0
0
0
0
0

VMU-3 Aircrew Offeror Name:

Company NameLabor Category TitleOfferor Proposed Number of FTEsProductive Hours Per FTE per Ordering PeriodDaily on siteTotal Proposed Productive Hours per Ordering PeriodSLR (Y/N)C-Band/ ATLC (Y/N)CLIN
SAMPLE COMPANYPilot210YNX005
0
0
0
0
0
0
0
0
0
0

VMU-3 Maint Offeror Name:

Company NameLabor Category TitleOfferor Proposed Number of FTEsProductive Hours Per FTE per Ordering PeriodDaily on siteTotal Proposed Productive Hours per Ordering PeriodCLINLocation (indicate MOB/FOB/Expeditionary Site (ES))
SAMPLE COMPANYMech Level 1210X002MOB
SAMPLE COMPANYMech Level 2420X004ES
0
0
0
0
0
0
0
0
0

File details come from the government source that posted it. Updated .