Att 07 - Dental Final Spec 1 of 2.pdf

PDF 10 MB Posted

Attached to
Y1DA--Project 612-164 - Dental Expansion and Relocation Northern California VAMC Located on Travis AFB, California
Solicitation number
36C77624R0085
Issued by

About this file

The provided document is the Dental Final Specification for Project 612-164 - Dental Expansion and Relocation Northern California VAMC Located on Travis AFB, California. This solicitation, numbered 36C77624R0085, is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The project involves the dental expansion and relocation of the Northern California VAMC on Travis AFB in California. The specification details the required dental equipment, exam room layout, cabinetry, plumbing, electrical, and other technical requirements for the project. Key deliverables include the construction of dental operatories, support spaces, and installation of specialized dental equipment. No specific response or award dates are provided in this document, as it appears to be a technical specification rather than the full solicitation.

View the file

Other files

File Type Posted
Dental Expansion and Relocation RFI-Questions 9.27.2024.pdf PDF
36C77624R0085 0005.docx DOCX document
3 Dental Final Spec 2 of 3.pdf PDF
4 Dental Final Spec 3 of 3.pdf PDF
5 Prelim Contractor Construct Fence Area.pdf PDF
RevJA_Brand Name_All Redacted.pdf PDF
2 Dental Final Spec 1 of 3.pdf PDF
6 Prelim Contractor Laydown Area.pdf PDF
1 Dental Expansion and Relocation_Responses to Questions.pdf PDF
36C77624R0085 Amd 04.docx DOCX document
36C77624R0085 Amd 03.docx DOCX document
S04 - Site Visit Agenda.doc DOC document
Dental Pre-Bid Site Walk Attendence 20240829.pdf PDF
Amd 02 Dental Expansion and Relocation RFI-Questions.pdf PDF
36C77624R0085 Amd 02.docx DOCX document
36C77624R0085 Amd 01.docx DOCX document
Amd 01 Dental Expansion and Relocation-Questions.xlsx XLSX spreadsheet
Att 15-Dental Final Support Doc 7 of 8.pdf PDF
Att 02 - Dental Final Drawing 2 of 6.pdf PDF
Att 09-Dental Final Support Doc 1 of 8.pdf PDF
Att 04 - Dental Final Drawing 4 of 6.pdf PDF
Att 05 - Dental Final Drawing 5 of 6.pdf PDF
Att 16-Dental Final Support Doc 8 of 8.pdf PDF
Att 01 - Dental Final Drawing 1 of 6.pdf PDF
Att 19-Limitations on Subcontracting.docx DOCX document
Att 21-Division Cost Breakdown.xlsx XLSX spreadsheet
Att 03 - Dental Final Drawing 3 of 6.pdf PDF
Att 08 - Dental Final Spec 2 of 2.pdf PDF
Att 06 - Dental Final Drawing 6 of 6.pdf PDF
36C77624R0085_1 FINAL.docx DOCX document
Att 17b-DBIDS Enrollment QR.pdf PDF
Att 14-Dental Final Support Doc 6 of 8.pdf PDF
Att 18-DBA WD CA20240007 0726.pdf PDF
Att 17c-DVES - Slide Deck.pptx PPTX presentation
Att 13-Dental Final Support Doc 5 of 8.pdf PDF
Att 20-PPQ form.docx DOCX document
Att 17a-Site Visit Information.docx DOCX document
Att 11-Dental Final Support Doc 3 of 8.pdf PDF
Att 10-Dental Final Support Doc 2 of 8.pdf PDF
Att 12-Dental Final Support Doc 4 of 8.pdf PDF
Att 22-JA_Brand Name_redacted.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications

August 10, 2022

Prepared by:

K. F. DAVIS ENGINEERING, INC.

530 La Gonda Way, Suite E, Danville, California 94526

Tel. (925) 743-8884 ~ Fax (925) 743-8325 www.KFDE.com http://www.kfde.com/

VA FAIRFIELD RELOCATE AND EXPAND DENTAL CLINIC TO FAIRFIELD

Specification Index

1 | P a g e

VOLUME I

SPECIFICATION SECTIONS: DESCRIPTION:

01 00 00(PROVIDED BY VA)..................................GENERAL REQUIREMENTS

01 32 16(PROVIDED BY VA).....................................PROJECT SCHEDULES

01 33 23(PROVIDED BY VA)...............SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

01 35 26(PROVIDED BY VA)...................................SAFETY REQUIREMENTS

01 45 00(PROVIDED BY VA).......................................QUALITY CONTROL

01 57 19(PROVIDED BY VA)......................TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.1(PROVIDED BY VA)..................TRAVIS AFB, ENVIRONMENTAL CONTROLS

01 74 19(PROVIDED BY VA).........................CONSTRUCTION WASTE MANAGEMENT

01 45 29...........................................TESTING LABORATORY SERVICES

01 81 13.................................SUSTAINABLE CONSTRUCTION REQUIREMENTS

01 91 00....................................GENERAL COMMISSIONING REQUIREMENTS

02 41 00............................................................DEMOLITION

03 30 00................................................CAST-IN-PLACE CONCRETE

05 12 00..............................................STRUCTURAL STEEL FRAMING

05 31 00.........................................................STEEL DECKING

05 36 00...............................................COMPOSITE METAL DECKING

05 40 00.............................................COLD-FORMED METAL FRAMING

05 50 00.....................................................METAL FABRICATION

05 51 00..........................................................METAL STAIRS

06 10 00.......................................................ROUGH CARPENTRY

06 16 63................................................CEMENTITIOUS SHEATHING

07 08 00...............................FACILITY EXTERIOR CLOSURE COMMISSIONING

07 11 13..................................................BITUMOUS DAMPROOFING

07 21 13....................................................THERMAL INSULATION

07 22 00..............................................ROOF AND DECK INSULATION

07 24 00 ...............................EXTERIOR INSULATION AND FINISH SYSTEMS

07 40 00.............................................ROOFING AND SIDING PANELS

07 54 23................................THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

07 60 00..............................................FLASHING AND SHEET METAL

07 72 00......................................................ROOF ACCESSORIES

07 84 00..........................................................FIRESTOPPING

01 35 26(PROVIDED BY VA)...................................SAFETY REQUIREMENTS

01 45 00(PROVIDED BY VA).......................................QUALITY CONTROL

01 57 19(PROVIDED BY VA)......................TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.1(PROVIDED BY VA)..................TRAVIS AFB, ENVIRONMENTAL CONTROLS

01 74 19(PROVIDED BY VA).........................CONSTRUCTION WASTE MANAGEMENT

01 45 29...........................................TESTING LABORATORY SERVICES

01 81 13.................................SUSTAINABLE CONSTRUCTION REQUIREMENTS

01 91 00....................................GENERAL COMMISSIONING REQUIREMENTS

02 41 00............................................................DEMOLITION

03 30 00................................................CAST-IN-PLACE CONCRETE

05 12 00..............................................STRUCTURAL STEEL FRAMING

05 31 00.........................................................STEEL DECKING

05 36 00...............................................COMPOSITE METAL DECKING

05 40 00.............................................COLD-FORMED METAL FRAMING

05 50 00.....................................................METAL FABRICATION

05 51 00..........................................................METAL STAIRS

06 10 00.......................................................ROUGH CARPENTRY

06 16 63................................................CEMENTITIOUS SHEATHING

07 08 00...............................FACILITY EXTERIOR CLOSURE COMMISSIONING

07 11 13..................................................BITUMOUS DAMPROOFING

07 21 13....................................................THERMAL INSULATION

07 22 00..............................................ROOF AND DECK INSULATION

07 24 00 ...............................EXTERIOR INSULATION AND FINISH SYSTEMS

07 40 00.............................................ROOFING AND SIDING PANELS

07 54 23................................THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

.1 TRAVIS AFB, SAFETY REQUIREMENTS...................1(PROVIDED BY VA)

01 32 16(PROVIDED BY VA).....................................PROJECT SCHEDULES

01 33 23(PROVIDED BY VA)...............SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

01 35 26(PROVIDED BY VA)...................................SAFETY REQUIREMENTS

01 31 23.13 20 NAVFAC, eCMS00(PROVIDED BY VA)

01 00 00.1(PROVIDED BY VA) TRAVIS AFB, GENERAL REQUIREMENTS

....................T

02 41 00............................................................DEMOLITION 01 45 29...........................................TESTING LABORATORY SERVICES

01 45 29...........................................TESTING LABORATORY SERVICES

01 81 13.................................SUSTAINABLE CONSTRUCTION REQUIREMENTS

01 91 00....................................GENERAL COMMISSIONING REQUIREMENTS

01 57 19(PROVIDED BY VA)......................TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.1(PROVIDED BY VA)..................TRAVIS AFB, ENVIRONMENTAL CONTROLS

01 74 19(PROVIDED BY VA).........................CONSTRUCTION WASTE MANAGEMENT

2 | P a g e

07 92 00........................................................JOINT SEALANTS

08 11 13.........................................HOLLOW METAL DOORS AND FRAMES

08 14 00...................................................INTERIOR WOOD DOORS

08 17 10............................................INTEGRATED DOOR ASSEMBLIES

08 31 13...............................................ACCESS DOORS AND FRAMES

08 41 13.............................ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13.11.......................................SIDE-HINGED ALUMINUM WINDOWS

08 71 00.........................................................DOOR HARDWARE

08 71 13..............................................AUTOMATIC DOOR OPERATORS

08 80 00...............................................................GLAZING

08 90 00.....................................................LOUVERS AND VENTS

09 05 16.............................SUBSURFACE PREPARATION FOR FLOOR FINISHES

09 06 00.................................................SCHEDULE FOR FINISHES

09 22 16..........................................NON-STRUCTURAL METAL FRAMING

09 29 00..........................................................GYPSUM BOARD

09 30 13............................................CERAMIC / PORCELAIN TILING

09 51 00...................................................ACOUSTICAL CEILINGS

09 65 13........................................RESILIENT BASE AND ACCESSORIES

09 65 19...............................................RESILIENT TILE FLOORING

09 67 23.60.......RESINOUS URETHANE AND EPOXY MORTAR FLOORING (RES 6A, RES 6B)

09 68 00.............................................................CARPETING

09 91 00..............................................................PAINTING

09 96 59........RESINOUS SPECIALTY GLAZED COATING SYSTEMS FOR WALLS, CEILINGS,

WALLBOARD, AND BLOCK CMU (RES W1, RES W2

10 14 00...............................................................SIGNAGE

10 21 13...................................................TOILET COMPARTMENTS

10 21 23................................................CUBICLE CURTAIN TRACKS

10 26 00..............................................WALL AND DOOR PROTECTION

10 28 00.................................TOILET, BATH, AND LAUNDRY ACCESSORIES

10 44 13............................................FIRE EXTINGUISHER CABINETS

11 73 00..................................CEILING MOUNTED PATIENT LIFT SYSTEMS

12 32 00..........................................MANUFACTURERED WOOD CASEWORK

12 36 00...........................................................COUNTERTOPS

13 05 41 .........SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

07 92 00........................................................JOINT SEALANTS

08 11 13.........................................HOLLOW METAL DOORS AND FRAMES

08 14 00...................................................INTERIOR WOOD DOORS

08 17 10............................................INTEGRATED DOOR ASSEMBLIES

08 31 13...............................................ACCESS DOORS AND FRAMES

08 41 13.............................ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13.11.......................................SIDE-HINGED ALUMINUM WINDOWS

08 71 00.........................................................DOOR HARDWARE

08 71 13..............................................AUTOMATIC DOOR OPERATORS

08 80 00...............................................................GLAZING

08 90 00.....................................................LOUVERS AND VENTS

09 05 16.............................SUBSURFACE PREPARATION FOR FLOOR FINISHES

09 06 00.................................................SCHEDULE FOR FINISHES

09 22 16..........................................NON-STRUCTURAL METAL FRAMING

09 29 00..........................................................GYPSUM BOARD

09 30 13............................................CERAMIC / PORCELAIN TILING

09 51 00...................................................ACOUSTICAL CEILINGS

09 65 13........................................RESILIENT BASE AND ACCESSORIES

09 65 19...............................................RESILIENT TILE FLOORING

09 67 23.60.......RESINOUS URETHANE AND EPOXY MORTAR FLOORING (RES 6A, RES 6B)

09 68 00.............................................................CARPETING

09 91 00..............................................................PAINTING

09 96 59........RESINOUS SPECIALTY GLAZED COATING SYSTEMS FOR WALLS, CEILINGS,

WALLBOARD, AND BLOCK CMU (RES W1, RES W2

10 14 00...............................................................SIGNAGE

10 21 13...................................................TOILET COMPARTMENTS

10 21 23................................................CUBICLE CURTAIN TRACKS

10 26 00..............................................WALL AND DOOR PROTECTION

10 28 00.................................TOILET, BATH, AND LAUNDRY ACCESSORIES

10 44 13............................................FIRE EXTINGUISHER CABINETS

11 73 00..................................CEILING MOUNTED PATIENT LIFT SYSTEMS

07 60 00..............................................FLASHING AND SHEET METAL

07 72 00......................................................ROOF ACCESSORIES

07 84 00..........................................................FIRESTOPPING

3 | P a g e

13 49 00..................................................RADIATION PROTECTION

21 05 11..............................COMMON WORK RESULTS FOR FIRE SUPPRESSION

21 08 00.............................COMMISSIONING OF FIRE SUPPRESSION SYSTEMS

21 13 13.............................................WET-PIPE SPRINKLER SYSTEM

VOLUME II

22 05 11......................................COMMON WORK RESULTS FOR PLUMBING

22 05 23...............................GENERAL DUTY VALVES FOR PLUBMING PIPING

22 07 11.................................................PLUBMING INSTALLATION

22 08 00................................................PLUMBING COMMISSIONING

22 11 00...........................................FACILITY WATER DISTRIBUTION

22 13 00.........................................FACILITY SANITARY VENT PIPING

22 14 00...............................................FACILITY STORM DRAINAGE

22 33 00.....................................ELECTRONIC DOMESTIC WATER HEATERS

22 40 00......................................................PLUMBING FIXTURE

22 61 13.74.......................................DENTAL COMPRESSED-AIR PIPING

22 61 19.74....................................DENTAL COMPRESSED-AIR EQUIPMENT

22 62 19.74............................DENTAL VACUUM AND EVACTUATION EQUIPMENT

22 63 00 .................GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES

23 05 11 .........................................COMMON WORK RESULTS FOR HVAC

23 05 12 ..................................GENERAL MOTOR REQUIREMENTS FOR HVAC

23 05 41 ..............NOISE & VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT

23 05 93............................TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 11 ......................................................HVAC INSULATION

23 08 00 ..........................................COMISSIOING OF HVAC SYSTEMS

23 09 23...............................DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 23 00 ...................................................REFRIGERANT PIPING

23 31 00 ..............................................HVAC DUCTWORK & CASINGS

23 34 00 ............................................................HVAC FANS

23 36 00 ...................................................AIR TERMINAL UNITS

13 49 00..................................................RADIATION PROTECTION

21 05 11..............................COMMON WORK RESULTS FOR FIRE SUPPRESSION

21 08 00.............................COMMISSIONING OF FIRE SUPPRESSION SYSTEMS

21 13 13.............................................WET-PIPE SPRINKLER SYSTEM

VOLUME II

22 05 11......................................COMMON WORK RESULTS FOR PLUMBING

22 05 23...............................GENERAL DUTY VALVES FOR PLUBMING PIPING

22 07 11.................................................PLUBMING INSTALLATION

22 08 00................................................PLUMBING COMMISSIONING

22 11 00...........................................FACILITY WATER DISTRIBUTION

22 13 00.........................................FACILITY SANITARY VENT PIPING

22 14 00...............................................FACILITY STORM DRAINAGE

22 33 00.....................................ELECTRONIC DOMESTIC WATER HEATERS

22 40 00......................................................PLUMBING FIXTURE

22 61 13.74.......................................DENTAL COMPRESSED-AIR PIPING

22 61 19.74....................................DENTAL COMPRESSED-AIR EQUIPMENT

22 62 19.74............................DENTAL VACUUM AND EVACTUATION EQUIPMENT

22 63 00 .................GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES

23 05 11 .........................................COMMON WORK RESULTS FOR HVAC

23 05 12 ..................................GENERAL MOTOR REQUIREMENTS FOR HVAC

23 05 41 ..............NOISE & VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT

23 05 93............................TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 11 ......................................................HVAC INSULATION

23 08 00 ..........................................COMISSIOING OF HVAC SYSTEMS

23 09 23...............................DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 23 00 ...................................................REFRIGERANT PIPING

12 32 00..........................................MANUFACTURERED WOOD CASEWORK

12 36 00...........................................................COUNTERTOPS

13 05 41 .........SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

4 | P a g e

23 37 00 .................................................AIR OUTLETS & INLETS

23 40 00.............................................HVAC AIR CLEANING DEVICES

23 81 00..................................DECENTRALIZED UNITARY HVAC EQUIPMENT

26 05 11.............................REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

26 05 19....................LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26..........................GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 33 .............................RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26 05 41...................................UNDERGROUND ELECTRICAL CONSTRUCTION

26 05 73......................OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

26 08 00....................................COMMISSIONING OF ELECTRICAL SYSTEM

26 09 23.....................................................LIGHTING CONTROLS

26 22 00..............................................LOW-VOLTAGE TRANSFORMERS

26 24 13.............................................DISTRIBUTION SWITCHBOARDS

26 24 16...........................................................PANELBOARDS

26 27 26........................................................WIRING DEVICES

26 29 21................................ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 43 13..............................................SURGE PROTECTIVE DEVICES

26 51 00.....................................................INTERIOR LIGHTING

26 56 00.....................................................EXTERIOR LIGHTING

27 05 11.........................REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS

27 05 26......................GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

27 05 33.........................RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS

27 08 00...............................COMMISSIONING OF COMMUNICATIONS SYSTEMS

27 10 00..............................CONTROL, COMMUNICATION AND SIGNAL WIRING

27 11 00......................................TELECOMMUNICATIONS ROOM FITTINGS

27 15 00.....................................COMMUNICATIONS STRUCTURED CABLING

28 05 00................COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

28 05 13..............CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

28 05 26..............GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

28 05 28.33..........CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY

28 08 00......................COMMISSIONING OF ELECTRONIC AND SECURITY SYSTEMS

28 13 00.................................................ACCESS CONTROL SYSTEM

28 23 00....................................................VIDEO SURVEILLANCE

28 31 00.....................................................FIRE ALARM SYSTEM

23 37 00 .................................................AIR OUTLETS & INLETS

23 40 00.............................................HVAC AIR CLEANING DEVICES

23 81 00..................................DECENTRALIZED UNITARY HVAC EQUIPMENT

26 05 11.............................REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

26 05 19....................LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26..........................GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 33 .............................RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26 05 41...................................UNDERGROUND ELECTRICAL CONSTRUCTION

26 05 73......................OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

26 08 00....................................COMMISSIONING OF ELECTRICAL SYSTEM

26 09 23.....................................................LIGHTING CONTROLS

26 22 00..............................................LOW-VOLTAGE TRANSFORMERS

26 24 13.............................................DISTRIBUTION SWITCHBOARDS

26 24 16...........................................................PANELBOARDS

26 27 26........................................................WIRING DEVICES

26 29 21................................ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 43 13..............................................SURGE PROTECTIVE DEVICES

26 51 00.....................................................INTERIOR LIGHTING

26 56 00.....................................................EXTERIOR LIGHTING

27 05 11.........................REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS

27 05 26......................GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

27 05 33.........................RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS

27 08 00...............................COMMISSIONING OF COMMUNICATIONS SYSTEMS

27 10 00..............................CONTROL, COMMUNICATION AND SIGNAL WIRING

27 11 00......................................TELECOMMUNICATIONS ROOM FITTINGS

27 15 00.....................................COMMUNICATIONS STRUCTURED CABLING

28 05 00................COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

28 05 13..............CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

28 05 26..............GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

28 05 28.33..........CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY

28 08 00......................COMMISSIONING OF ELECTRONIC AND SECURITY SYSTEMS

23 31 00 ..............................................HVAC DUCTWORK & CASINGS

23 34 00 ............................................................HVAC FANS

23 36 00 ...................................................AIR TERMINAL UNITS

5 | P a g e

31 20 11................................................EARTHWORK (SHORT FORM)

32 05 23.........................CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

32 12 16........................................................ASPHALT PAVING

32 17 23.....................................................PAVEMENT MARKINGS

32 31 13...........................................CHAIN LINK FENCES AND GATES

33 10 00.......................................................WATER UTILITIES

33 30 00..............................................SANITARY SEWER UTILITIES

33 40 00 ................................................STORM SEWER UTILITIES

APPENDIX ..............GEOTECHNICAL ENGINEERING REPORT, DATED NOVEMBER 5, 2018

--END OF TABLE OF CONTENTS--

32 12 16........................................................ASPHALT PAVING

32 17 23.....................................................PAVEMENT MARKINGS

32 31 13...........................................CHAIN LINK FENCES AND GATES

33 10 00.......................................................WATER UTILITIES

32 12 16........................................................ASPHALT PAVING

32 17 23.....................................................PAVEMENT MARKINGS

32 31 13...........................................CHAIN LINK FENCES AND GATES

33 10 00.......................................................WATER UTILITIES

32 12 16........................................................ASPHALT PAVING

32 17 23.....................................................PAVEMENT MARKINGS

32 31 13...........................................CHAIN LINK FENCES AND GATES

33 10 00.......................................................WATER UTILITIES

--END OF TABLE OF CONTENTS-- APPENDIX ..............GEOTECHNICAL ENGINEERING REPORT, DATED NOVEMBER 5, 2018

A DEDUCTIONS

B DBIDS

...........................................CHAIN LINK FE.....................................................PA

...........................................CHAIN LINK FE.....................................................PA..................................................................................................CHAIN LINK FE.....................................................PA

...........................................CHAIN LINK FE.....................................................PA

28 13 00.................................................ACCESS CONTROL SYSTEM

28 23 00....................................................VIDEO SURVEILLANCE

28 31 00.....................................................FIRE ALARM SYSTEM

ADDITIONAL CONTRACTOR REQUIREMENTSAPPENDIX C

.............GEOTECHNICAL ENGINEER--END OF TABLE OF C.............GEOTECHNICAL ENGINEER

VANCHCS MASTER SPECIFICATION

01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEM(S)

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.4 CONSTRUCTION PROJECT SCHEDULE

1.5 CONSTRUCTION SAFETY REQUIREMENTS

1.6 CONSTRUCTION SECURITY REQUIREMENTS

1.7 CONSTRUCTION QUALITY CONTROL PLAN

1.8 CONSTRUCTION SCHEDULE OF VALUES

1.9 NAME BRAND ITEMS

1.10 OPERATIONS AND STORAGE AREAS

1.11 ALTERATIONS

1.12 DISPOSAL AND RETENTION

1.13 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, AND UTILITIES

1.14 RESTORATION

1.15 PHYSICAL DATA

1.16 PROFESSIONAL SURVEYING SERVICES

1.17 LAYOUT OF WORK

1.18 AS-BUILT DRAWINGS

1.19 USE OF ROADWAYS

1.20 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.21 TEMPORARY USE OF EXISTING ELEVATORS

1.22 TEMPORARY USE OF NEW ELEVATORS

1.23 TEMPORARY TOILETS

1.24 AVAILABILITY AND USE OF UTILITY SERVICES

1.25 NEW TELEPHONE EQUIPMENT

1.26 TESTS

1.27 INSTRUCTIONS

1.28 GOVERNMENT-FURNISHED PROPERTY

1.29 RELOCATED EQUIPMENT AND/OR ITEMS

1.30 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT

1.31 CONSTRUCTION SIGN

1.32 SAFETY SIGN

1.33 REQUIRED USE OF SUBMITTAL EXCHANGE

1.34 PHOTOGRAPHIC DOCUMENTATION

1.35 FINAL ELEVATION DIGITAL IMAGES

1.36 HISTORIC PRESERVATION

1.37 GUARANTEE PERIOD OF SERVICES

01 00 00 - 2

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 GENERAL INTENTION

A. Contractor shall furnish all labor, materials, equipment, supervision, and necessary engineering to perform the work as required by the project specifications and drawings. This shall include, but not limited to, completely preparing site for building operations, all demolition activities and/or removal of existing structures required to perform the work, foundations, superstructure, mechanical, electrical, plumbing, special systems, landscaping, and other site improvements.

B. Visits to the site by Bidders may be made only by appointment with the

Contracting Officer.

C. Offices of ‘K.F. DAVIS ENGINEERS’, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by the Contractor, the Contractor shall notify the COR in sufficient time to allow COR witnessing of testing laboratory personnel proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general Contractor and Subcontractors shall comply with

VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.2 STATEMENT OF BID ITEM(S)

A. Required construction items within bid:

1. Item I, General Construction: Work includes labor, materials, equipment, and supervision to perform the required site preparations

(grading and removal of existing structures), development of roads, parking lot, sidewalks, utilities, a 12,530 BGSF building, and other general construction items. First order of business upon commencing of construction is to construct parking lot and all utilities associated with its construction; said parking lot is located East of proposed building, across from roadway and accommodates loss of parking stalls

01 00 00 - 3 due to location of new building. SEE CIVIL, LANDSCAPING, ARCHITECTURAL, STRUCTURAL DRAWINGS.

2. Item II, Electrical Work: Work includes labor, materials, equipment, and supervision to perform the required installation of an electrical system (normal power, power for life safety and equipment) fed from existing electrical vaults on the East and West side of the proposed building, power distribution, interior and exterior lighting, light control panel, fire alarm system, and other electrical construction items. SEE ELECTRICAL DRAWINGS.

3. Item III, Mechanical, Plumbing Work:

a. Work includes all labor, materials, equipment, and supervision to perform the required chilled water supply and return piping, hot water piping, fire sprinkler system, plumbing and process gases, HVAC distribution, and other mechanical construction items. SEE

MECHANICAL, PLUMBING DRAWINGS.

b. Work includes all labor, materials, equipment, and supervision to perform the required to:

i. Remove DV from wall cleanout to dental chair utility floor box in all operatory, recovery, and oral surgery rooms. SEE PLUMBING

DRAWINGS AND APPENDIX B.

ii. Include DV from wall cleanout to dental 12 o’clock rear cabinet in all operatory, recovery, and oral surgery rooms. SEE PLUMBING

DRAWINGS AND APPENDIX B.

iii. Install DA per plans in all operatory, recover, and oral surgery rooms. SEE PLUMBING DRAWINGS.

iv. Include DA from wall to dental 12 o’clock rear cabinet in all operatory, recovery, and oral surgery rooms. SEE PLUMBING

DRAWINGS AND APPENDIX B.

B. Deduction will be made in ascending order as listed, as needed:

1. Deduction Alternate 1: Remove all work and materials for exterior sunshades and associated supports. SEE STRUCTURAL, ARCHITECTURAL

DRAWINGS, AND APPENDIX A.

2. Deduction Alternate 2:

a. Remove mechanical screen and EIFS. SEE ARCHITECTURAL DRAWINGS AND

APPENDIX A.

b. Remove portico. SEE ARCHITECTURAL DRAWINGS AND APPENDIX A.

c. Remove all work and materials for outdoor stairs to roof and replace with simple metal ladder. SEE ARCHITECTURAL DRAWINGS AND APPENDIX A.

01 00 00 - 4

d. Remove all sidewalks around building and include a 3-feet-by-3-feet landing pad adjacent to doors 1, 6, 34, 35, and 38, outside of building. SEE CIVIL AND ARCHITECTURAL DRAWINGS AND APPENDIX A.

e. Remove all built-in and pre-fabricated casework, exception of materials for kiosk equipment and outdoor entrance columns at door

1; VA to provide and install modular casework in lieu. SEE

ARCHITECTURAL DRAWINGS AND APPENDIX A.

3. Deduction Alternate 3:

a. Remove all interior finish work including ACT ceiling, lighting fixtures, interior partitions, painting on walls, and floor finishes within rooms 1010, 1012, 1016, 1017, 1019, 1021, 1023, 1025, 1027, 1029, 1030, 1031, 1032, 1033, 1034, 1036, 1038, 1C03, 1C07, and area of room 1C02 adjacent to rooms 1017 and 1019, rooms 1C03, and 1C07

(flush with South wall of rooms 1035 and 1037). SEE ARCHITECTURAL

DRAWINGS AND APPENDIX A.

b. Include a warm lite shell with all rough-in electrical, mechanical, communication, and plumbing work through said disciplines with associated conduits, where required; remove work for said disciplines in areas described under 1.2.B.3.a. Keep fire sprinkler system, covering at deck level, do not lower to ACT height. SEE

ELECTRICAL, MECHANICAL, PLUMBING DRAWINGS, AND APPENDIX A.

c. Provide Level 2 drywall finish along all exterior perimeters of areas described under 1.2.B.3.a. SEE ARCHITECTURAL DRAWINGS AND

APPENDIX A:

i. Provide Level 2 drywall finish along North side of rooms 1017 and

1019, exterior walls of rooms 1017 and 1019. SEE ARCHITECTURAL

DRAWINGS AND APPENDIX A.

ii. Provide Level 2 drywall finish along East side of room 1019 between Northeast corner of room 1019 and Northwest corner of room 1021, exterior wall of room 1019. SEE ARCHITECTURAL DRAWINGS

AND APPENDIX A.

iii. Provide Level 2 drywall finish along North side of room 1021, exterior wall of room 1021. SEE ARCHITECTURAL DRAWINGS AND

APPENDIX A.

iv. Provide Level 2 drywall finish along East side of rooms 1012, 1021, 1023, 1025, 1027, 1029, 1031, and 1033, exterior walls of rooms 1012, 1021, 1023, 1025, 1027, 1029, 1031, and 1033. SEE

ARCHITECTURAL DRAWINGS AND APPENDIX A.

01 00 00 - 5

v. Provide Level 2 drywall finish along East side of room 1038 between West side of wall at door 34 location and Southeast corner of room 1038, exterior wall of room 1038. SEE

ARCHITECTURAL DRAWINGS AND APPENDIX A.

vi. Provide Level 2 drywall finish along South side of rooms 1032, 1034, 1036, 1038, and 1C07

d. Provide Level 4 drywall finish along interior wall perimeters of areas described under 1.2.B.3.a. SEE ARCHITECTURAL DRAWINGS AND

APPENDIX A:

i. Provide Level 4 drywall finish along West side of room 1017, continue wall due South from Southwest corner of room 1017 through room 1C02 and along West side of room 1010 to North wall of room 1018; paint West side of wall (e.g. interior of room

1015, continue painting along same side of wall through room 1C02 to exterior wall of room 1008, interior of room 1008 and 1004.)

SEE ARCHITECTURAL DRAWINGS AND APPENDIX A.

ii. Provide Level 4 drywall finish along South side of room 1010, interior walls of rooms 1018 and 1014; paint South side of wall, interior walls of rooms 1018 and 1014. SEE ARCHITECTURAL DRAWINGS

AND APPENDIX A.

iii. Provide Level 4 drywall finish along East side of room 1014, interior wall of room 1014; extend wall due South from Southeast corner of room 1014 to North wall of room 1016. Paint West side of wall, interior wall of room 1014 and 1C04. SEE ARCHITECTURAL

DRAWINGS AND APPENDIX A.

iv. Provide Level 4 drywall finish along North side of room 1016 between wall described under 1.2.B.3.f. and Northeast corner of room 1016, interior wall of room 1016; paint South side of wall, interior wall of room 1016. SEE ARCHITECTURAL DRAWINGS AND

APPENDIX A.

v. Provide Level 4 drywall finish along East side of room 1016 between Northeast corner of room 1016 and Southwest corner of room 1012, interior wall of room 1016; paint West side of wall, interior wall of room 1016. SEE ARCHITECTURAL DRAWINGS AND

APPENDIX A.

vi. Provide Level 4 drywall finish along North side of rooms 1040A and 1040B, interior walls of rooms 1040A and 1040B; paint South

01 00 00 - 6 side of wall, interior walls of rooms 1040A and 1040B. SEE

ARCHITECTURAL DRAWINGS AND APPENDIX A.

vii. Provide Level 4 drywall finish along East side of room 1038 between Northeast corner of room 1038 and West side of wall at door 34 location, interior of room 1040; paint East side of wall, interior of room 1040. SEE ARCHITECTURAL DRAWINGS AND APPENDIX A.

viii. Provide Level 4 drywall finish along North side of rooms 1038 and 1C07, extend wall due West to East wall of room 1028, interior wall of rooms 1040, 1037, 1035, and 1C05; paint North side of wall, interior of rooms 1040, 1037, 1035, and 1C05. SEE

ARCHITECTURAL DRAWINGS AND APPENDIX A.

ix. Provide Level 4 drywall finish along East side of room 1028 between Southeast corner of room 1028 and wall mentioned in

1.2.B.3.k., interior wall of room 1028; paint West side of wall, interior wall of room 1028. SEE ARCHITECTURAL DRAWINGS AND

APPENDIX A.

x. Provide Level 4 drywall finish along South side of room 1028, interior of room 1028; paint North side of wall, interior wall of room 1028. SEE ARCHITECTURAL DRAWINGS AND APPENDIX A.

xi. Provide Level 4 drywall finish along East side of room 1030 between Northeast corner of room 1030 and Southwest corner of room 1028, interior of room 1028; paint East side of wall, interior wall of room 1028. SEE ARCHITECTURAL DRAWINGS AND

APPENDIX A.

xii. Provide Level 4 drywall finish along North side of room 1030, interior of rooms 1000B, 1C06, and 1C00; paint North side of wall, interior wall of rooms 1000B, 1C06, and 1C00. SEE

ARCHITECTURAL DRAWINGS AND APPENDIX A.

xiii. Provide Level 4 drywall finish along East side of room 1041, interior wall of room 1041; paint West side of wall, interior wall of room 1041. SEE ARCHITECTURAL DRAWINGS AND APPENDIX A.

e. Include door along East side of room 1C04 along wall described under

1.2.B.3.f. for access to and storage within area described under

1.2.B.3.a. SEE ARCHITECTURAL DRAWINGS AND APPENDIX A.

f. Remove door 27, include a minimum 3-foot wide opening along West wall of room 1035 so rooms 1035A and 1037A are accessible. SEE

ARCHITECTURAL DRAWINGS AND APPENDIX A.

01 00 00 - 7

g. Door 30 to remain for access to and storage within area described under 1.2.B.3.a. SEE ARCHITECTURAL DRAWINGS AND APPENDIX A.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractors expense.

1.4 CONSTRUCTION PROJECT SCHEDULE

A. Contractor shall submit a prepared work schedule for approval and arrange with the COTR the sequence of work. Phasing of work may be required for completion of this project and shall be planned thoroughly by the

Contractor. Project will require night and weekend work to accomplish specific tasks (i.e. any work that will be disruptive to current daily operations will need to be scheduled during nights and weekends). Work areas shall remain protected, per the project Specifications, from employee and patient access throughout the contract period. 100% of ALL project submittals shall be approved prior to the construction start date.

Work hours will consist of an 8.5-hour period established by the

Contracting Officer between Monday through Friday excluding Government holidays.

Work outside regular working hours requires Contracting Officer approval.

Make application for work outside regular working hour requests 15 calendar days prior to such work to allow arrangements to be made by the

Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contact person, contact person’s contact information, contract number, and project title. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

B. General Contractor schedule shall account for time required to obtain approval on all submittals prior to ‘breaking ground’ for construction work. Submitted project schedule shall show expected submittal period.

General Contractor shall note that it will generally take 14 days for AE review, followed by an additional 5 to 14 days for Department of Veterans

Affairs to review and approve submittals, depending on the content.

C. Refer to section 01 32 16, PROJECT SCHEDULES, for project scheduling requirements.

01 00 00 - 8

1.5 CONSTRUCTION SAFETY REQUIREMENTS

A. The General Contractor shall develop a plan for both the area of work and the interaction of the work with the facility per OSHA, AIA, and VA guidelines. The Infection Prevention Measures, as set forth in the VA

Infection Control Risk Assessment, shall be included in the Safety Plan.

The Interim Life Safety Measures (ILSM), as set forth in the project ILSM, shall also be implemented in the Safety Plan. The General Contractor shall submit a copy of their Daily Safety Inspection form. The Safety Plan shall be a submittal and approved by the designated VA COR prior to the start of construction. Contractor shall note that the required training of all personnel shall be specific for ‘Construction Safety’, (29 CFR 1926), NOT

‘General Industry’ safety training, (29 CFR 1910). Contractor shall reference project Specifications for in depth safety and documentation requirements such as hazard analyses and respective hazard mitigation techniques to be required for specific work activities. Some general safety precautions are listed below:

1. Work shall be conducted in a manner to afford maximum protection to

Contractors, VA employees, patients, public guests, existing building infrastructure, and to prevent unreasonable delay or interference with normal hospital operations.

2. Provide fire extinguishers that are readily available at all times.

Provide additional fire detection equipment as required to meet VA guidelines and the project ILSM.

3. It will be the obligation of the Contractor to maintain clean work site. Material and tools shall be kept within designated areas and trash will be removed daily.

4. It will be the responsibility of the Contractor to seek and obtain any required permits for construction, which includes but not limited to

NESHAPS Permit, Dust Permit, etc. Reference project Specifications for details.

B. Refer to section 01 35 26, SAFETY REQUIREMENTS, for safety and infection control requirements.

1.6 CONSTRUCTION SECURITY REQUIREMENTS

A. Contractor selected must have experience working on a base.

B. Contractor must comply with employment restrictions such that Contractor must not employ any person for any work required by this contract who:

1. Is a non-immigrant as described in section 101(a)(15)(H)(ii) of the

Immigration and Nationality Act 8 USC 1101(a)(15)(H)(ii)

01 00 00 - 9

2. Is an alien having a residence in a foreign country which employed person has no intention of abandoning and whom is coming to the United

States to perform temporary services or labor.

C. Submit for approval at least 15 days prior to the desired date of entry an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:

1. Name

2. Date and place of birth

3. Citizenship

4. Home address

5. Social security number

6. Current pass expiration date

7. Naturalization or Alien Registration number

8. Passport number, place of issue, and expiration date

The request for personnel passes must be accompanied with the following certification:

“I hereby certify that all personnel on this list are either born U.S.

citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated.”

Signature/Firm Name

D. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-

Contractors working on the project and their employees also comply with these regulations.

E. Security Procedures:

1. General Contractors employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

01 00 00 - 10

4. VA reserves the right to close down or shut down the project site and order General Contractors employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

5. For installation access, obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS).

Requirements for Contractor employee registration and transition for employees currently under Navy Commercial Access Control System (NCACS) are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.

6. For One-Day Passes, personnel applying for One-Day passes at the Base

Visitor Control Office are subject to daily mandatory vehicle inspection and will have limited access to the installation. The

Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS. Participation in the DBIDS is not mandatory.

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html. DBIDS is not needed if the

Contractor has a contract with Travis Air Force Base (Travis AFB) and has their own sponsor.

a. Present a letter or official award document (i.e. DD FORM 1155 or SF

1442) from the Contracting Officer that provides the purpose for access to the base Visitor Control Center representative.

b. Present a valid identification (e.g. passport or Real ID Act-compliant state driver’s license).

c. Provide completed SECNAV FORM 5512/1 to the Base Visitor Control

Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.

d. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential and will be allowed to proceed to worksite.

Or

a. Submit DBIDS to Derrick Shelton, site manager, Derrick.Shelton@va.gov a few days before the visit. Name on the form needs to match exactly as name on IDs.

b. Once form is completed, take a screenshot of the confirmation page with the QR code. Send the screenshot to Derrick Shelton. If there

01 00 00 - 11 are multiple names, include table with company, first, last, visit date, duration (days), applicable QR code. See Appendix B.

7. For Long Term Pass Requests:

DBIDS is not needed if the Contractor has a contract with Travis AFB and has their own sponsor.

a. Initiate long term pass requests with the Government Engineering

Technician at least 14 working days in advance of long-term access to worksite.

b. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes

Contractor employee photo, fingerprints, base restrictions, and several other assessments.

c. Upon successful completion of DBIDS enrollment process, the

Contractor employee will be issued a DBIDS credential and will be allowed t proceed to worksite.

d. DBIDS eligibility requirements throughout the length of the contract the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges.

DBIDS access privileges will be immediately suspended or revised if at any time a Contractor employee becomes ineligible. An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.

e. DBIDS notification requirements:

i. Immediately report instances of lost or stolen badges to the

Contracting Officer.

ii. Immediately collect DBIDS credentials and notify the Contracting

Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly turned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

F. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative COR for the

01 00 00 - 12 purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.

G. Document Control:

1. Before starting any work, the General Contractor/ Subcontractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the

Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

H. Records Management Requirements: The following standard items relate to records generated in executing the contract and should be included in a typical Electronic Information Systems (EIS) procurement contract:

1. Citations to pertinent laws, codes, and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552);

Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.

01 00 00 - 13

2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of

1974 or that which is generally protected by the Freedom of Information

Act.

5. Contractor shall not create or maintain any records containing any

Government Agency records that are not specifically tied to or authorized by the contract.

6. The Government Agency owns the rights to all data/records produced as part of this contract.

7. The Government Agency owns the rights to all electronic information

(electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

8. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format

[paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .