This document is a Request for Proposal (RFP) for a construction project to expand and relocate the dental clinic at the VA Northern California Healthcare System Fairfield VA Clinic located on Travis AFB, California. The project is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a total estimated value between $10-20 million. The RFP includes a base bid and three deductive alternates, and requires the contractor to provide all tools, equipment, materials, labor, and supervision to complete the project. Proposals are due by 4:00 PM PDT on September 20, 2024 and must include technical, price, and administrative volumes. The Government will evaluate proposals based on project experience, schedule, past performance, and price, with the technical factors being more important than price. Award will be made to the offeror providing the best value to the Government.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C77624R0085 Attachments
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C77624R0085
X 08-07-2024
TBD
612-164 36C776 Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131 Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490
Independence OH 44131
LATOYA GREENE
216-447-8300 In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.
The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the construction project, in accordance with the attached Specifications and Drawings.
The project is located at the VA Northern California Healthcare System Fairfield VA Clinic 103 Bodin Circle Travis AFB, CA 94535
VAAR Magnitude of Construction: Between $10,000,000 - $20,000,000
All invoices must reference PO #: TBD
X X
52.211-10 X
16:00
PDT
09-20-2024 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C776 Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
VAFSC
Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429
Joelle Mascarenas PCAC Contracting Officer
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 6 |
| ITEM INFORMATION | 6 |
| INFORMATION REGARDING PROPOSAL MATERIAL, BID GUARANTEE AND BONDS | 8 |
| 1.1 BID MATERIAL: | 8 |
| 1.2 BID GUARANTEE: | 8 |
| 1.3 PAYMENT & PERFORMANCE BONDS: | 8 |
| 1.4 TAXES: | 8 |
| INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO OFFERORS | 9 |
| 2.1 AVAILABILITY OF SOLICITATION DOCUMENTS | 9 |
| 2.2 REQUEST FOR PROPOSAL: | 9 |
| 2.3 SDVOSB SET-ASIDE | 9 |
| 2.4 PRE-PROPOSAL SITE VISIT: | 9 |
| 2.5 TECHNICAL QUESTIONS: | 9 |
| 2.6 AMENDMENTS | 10 |
| 2.7 PREPARATION OF PROPOSALS | 10 |
| 2.8 PROPOSAL REQUIREMENTS | 10 |
| 2.9 DETERMINATION OF RESPONSIBILITY | 16 |
| 2.10 VETS 4212 | 16 |
| 2.11 SYSTEM FOR AWARD MANAGEMENT (SAM) | 16 |
| 2.12 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS) | 16 |
| 2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS | 17 |
| 2.14 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, OR PROJECT MANAGER | 17 |
| 2.15 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 17 |
| 2.16 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023) | 18 |
| 2.17 52.216-1 TYPE OF CONTRACT (APR 1984) | 18 |
| 2.18 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 18 |
| 2.19 52.228-1 BID GUARANTEE (SEP 1996) | 19 |
| 2.20 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 20 |
| 2.21 52.233-2 SERVICE OF PROTEST (SEP 2006) | 20 |
| 2.22 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 21 |
| 2.23 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 21 |
| 2.24 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 21 |
| 2.25 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 22 |
| 2.26 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR 2019) | 22 |
| 2.27 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (FEB 2023) | 23 |
| REPRESENTATIONS AND CERTIFICATIONS | 25 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024) | 25 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 29 |
| 3.3 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION (OCT 2020) | 31 |
| 3.4 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 32 |
| 3.5 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 33 |
| 3.6 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 34 |
| GENERAL CONDITIONS | 37 |
| 4.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 37 |
| 4.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021) | 40 |
| 4.3 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION (DEC 2023) | 41 |
| 4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 45 |
| 4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (FEB 2024) | 45 |
| 4.6 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) | 48 |
| 4.7 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (JUN 2020)(DEVIATION APR 2020) | 49 |
| Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes: | 50 |
| 4.8 52.236-4 PHYSICAL DATA (APR 1984) | 50 |
| 4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS | 51 |
| 4.10 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) | 51 |
| 4.11 VAAR 852.211-76 LIQUIDATED DAMAGES – REIMBURSEMENT FOR DATA BREACH COSTS (FEB 2023) | 52 |
| 4.12 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 53 |
| 4.13 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 56 |
| 4.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 57 |
| 4.15 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 58 |
| 4.16 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 59 |
| 4.17 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 60 |
| 4.18 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (APR 2019) | 60 |
| 4.19 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY (FEB 2023) | 61 |
| 4.20 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 61 |
| 4.21 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 63 |
| 4.22 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 63 |
| 4.23 MANDATORY WRITTEN DISCLOSURES | 64 |
| 4.24 IT CONTRACT SECURITY | 64 |
| 4.25 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 74 |
| 4.26 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 74 |
| 4.27 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 75 |
| 4.28 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019) | 75 |
| 4.29 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 76 |
| 4.30 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS– CPM) (NOV 2018) | 76 |
| 4.31 VAAR 852.246-71 REJECTED GOODS (OCT 2018) | 80 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
BASE BID
Contract Period: Base POP Begin:
POP End:
0001AA
| 1.00 |
| JB |
| __________________ |
| __________________ |
Item I, General Construction
0001AB
| 1.00 |
| JB |
| __________________ |
| __________________ |
Item II, Electrical Work
0001AC
| 1.00 |
| JB |
| __________________ |
| __________________ |
Item III, Mechanical, Plumbing Work
| 1.00 |
| JB |
| __________________ |
| __________________ |
Deduction Alternate 1: Remove all work and materials for exterior sunshades and associated supports
| 1.00 |
| JB |
| __________________ |
| __________________ |
Deduction Alternate 2:
a. Remove mechanical screen and EIFS.
b. Remove portico.
c. Remove all work and materials for outdoor stairs to roof and replace with simple metal ladder.
d. Remove all sidewalks around building and include a 3-feet-by-3-feet landing pad adjacent to doors 1, 6, 34, 35, and 38, outside of building.
e. Remove all built-in and pre-fabricated casework, exception of materials for kiosk equipment and outdoor entrance columns at door 1; VA to provide and install modular casework in lieu.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Deduction Alternate 3:
a. Remove all interior finish work including ACT ceiling, lighting fixtures, interior partitions, painting on walls, and floor finishes within rooms 1010, 1012, 1016, 1017, 1019, 1021, 1023, 1025, 1027, 1029, 1030, 1031, 1032, 1033, 1034, 1036, 1038, 1C03, 1C07, and area of room 1C02 adjacent to rooms 1017 and 1019, rooms 1C03, and 1C07 (flush with South wall of rooms 1035 and 1037).
b. Include a warm lite shell with all rough-in electrical, mechanical, communication, and plumbing work through said disciplines with associated conduits, where required; remove work for said disciplines in areas described under 1.2.B.3.a. Keep fire sprinkler system, covering at deck level, do not lower to ACT height.
c. Provide Level 2 drywall finish along all exterior perimeters of areas described under 1.2.B.3.a.
d. Provide Level 4 drywall finish along interior wall perimeters of areas described under 1.2.B.3.a.
e. Include door along East side of room 1C04 along wall described under 1.2.B.3.f. for access to and storage within area described under 1.2.B.3.a.
f. Remove door 27, include a minimum 3-foot wide opening along West wall of room 1035 so rooms 1035A and 1037A are accessible.
g. Door 30 to remain for access to and storage within area described under 1.2.B.3.a.
| GRAND TOTAL |
| __________________ |
NOTICE
1. Line Item 0001 (Base), including 3 subCLINs, contains all the work for this project. Line Items 0002-0004 may be awarded at the government’s discretion. Each Line Item (deduct) 0002-0004 is listed in descending order of importance and removes a portion of the work. The intent is to award the base bid items. However, if the bid price exceeds the funds available for Line Item 0001, then Line Items 0002 through Line Item 0004 will be applied, based on availability of funding.
1. Offerors must provide a lump sum price for all Line Items. Failure to do so may render the offer as nonresponsive.
1. Award will be made on Grand Total (Line Item 0001- 0004 TBD).
1. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.
1. Contractor is required to fill in their Unique Entity Identifier number associate with SAM.gov in Block No. 14 on Standard Form (SF) 1442.
1. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.
Page 1 of Page 1 of
INFORMATION REGARDING PROPOSAL MATERIAL, BID GUARANTEE AND BONDS
1.1 BID MATERIAL:
Proposal materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Request For Proposal (RFP). The VA will not provide printed copies of drawings or specifications. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.
1.2 BID GUARANTEE:
A Bid Guarantee, Standard Form 24 (SF 24), is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the proposal being deemed unacceptable. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
1.3 PAYMENT & PERFORMANCE BONDS:
The offeror to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds shall be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds - Construction. Copies of SFs 25A and 25 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
1.4 TAXES:
Contractor must take into account FAR 52.229-3; “Federal, State and Local Taxes” and its Special Note in their pricing. The FAR clause and its Special Note provide guidance on taxes being applied to pricing.
INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS
All solicitation-related documents will be published to Contract Opportunities at https://sam.gov/.
2.2 REQUEST FOR PROPOSAL:
This is a Request for Proposal (RFP) in accordance with FAR Part 15. The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value to the Government. A responsibility determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.
The Government reserves the right to award without discussions based upon the initial evaluation of the proposals but reserves the right to open discussions if determined to be necessary. All proposals shall be subject to evaluation by a team of Government personnel. The proposals will be evaluated in accordance with the criteria provided in the solicitation. Using the tradeoff process under best value, it may be in the Government's best interest to consider award to other than the lowest price Offeror or other than highest rated Offeror. The intent is to award to the Offeror that offers the best value to the Government. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirements. Proposed pricing is an evaluation factor. All evaluation factors other than price, when combined are significantly more important than price. Factors 1 – 3 are of descending order importance.
1. Project Experience (Technical)
2. Schedule (Technical)
3. Past Performance (Non-Price)
4. Price
2.3 SDVOSB SET-ASIDE
This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSBs will not be considered. All SDVOSBs must be listed as “certified” by the Small Business Administration (SBA) Veteran Small Business Certification (VetCert). Offerors must be certified in the SBA VetCert database (Veteran Small Business Certification (sba.gov)) at the time of proposal submission and time of award. Failure to be certified at the time of proposal submission and time of award will result in the offeror’s proposal being unacceptable.
2.4 PRE-PROPOSAL SITE VISIT:
A formal site visit has been scheduled for this project. This will be the only opportunity for potential bidders to visit the site. See FAR Clause 52.236-27 of this solicitation for further information.
All potential bidders, subcontractors and suppliers are strongly encouraged to attend this site visit.
2.5 TECHNICAL QUESTIONS:
Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to LaToya Greene. Questions shall be submitted only via e-mail to: LaToya.Greene@va.gov and joelle.mascarenas@va.gov. The subject line must read: “Dental Clinic Expansion and Relocation of Fairfield-Minor Construction - Technical Questions.” Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS September 4, 2024, at 8:00 AM PT.
2.6 AMENDMENTS
Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.
2.7 PREPARATION OF PROPOSALS
The Government will not pay for any costs incurred in the preparation and submission of proposals.
2.8 PROPOSAL REQUIREMENTS
A. General:
1. Proposal Submission: Offerors shall submit their proposals via email to latoya.green@va.gov and joelle.mascarenas@va.gov. Proposals shall be based on solicitation document issued for RFP number 36C77624R0085. Proposals will be in the format stipulated in this document. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442. There will be no public opening of the proposals. Only e-mail proposals will be accepted. Hard-copy proposals will not be accepted.
B. Proposal Format:
1. Technical, Price and Administrative sections of the Offerors proposals will be evaluated independently; therefore, the Offeror shall submit the proposal in three (3) Volumes: Volume I Technical, Volume II Price and Volume III Administrative. In order that the Volume I Technical may be evaluated strictly on the merit of the material submitted, the contractor shall include NO price information in Volume I. Offeror shall separate Volumes I, II and III. Each volume must be labeled with the Offeror's organization, business address, and VA Solicitation Number. The volumes shall be submitted in electronic format as searchable PDF documents. The proposal, in its entirety, shall not exceed three (3) emails (one email for each volume) of 5MB each. Include page numbers and the company name in the header or footer of each page.
2. Volume I Technical: Offerors shall format the Volume I Technical proposal as listed below. The specific evaluation criteria and methodology for Volume I is contained in Sections C and Section E.
a. The offer, including title page, detailed table of contents, preface shall be submitted in one (1) PDF document for Volume I Technical and shall not exceed a total of FIFTY (50) pages (title page, table of contents and preface are excluded from the page limits) in Microsoft Times New Roman 12 font. The Offeror shall not include any price or price related material in the Volume I proposal. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.
b. A page is defined as each face of an 8.5 X 11-inch sheet of paper with 1-inch margins around the page perimeter containing information. Note, submission of the project schedule only, can be submitted by utilizing larger paper (11 X 17 inch). All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. Note, this does not apply for the submission of the project schedule. The background color of each page of the submission shall be white or ivory stock only and each page shall count as one (1) page. Excess pages will not be evaluated. Text lines will be single-spaced, and proposals shall be submitted using Times New Roman, with font no smaller than 12-point with normal proportional spacing. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Times New Roman are permissible in the presentation of graphic material only.
c. The Offeror’s responses shall clearly address each evaluation factor listed in this solicitation. Failure to submit in the format required and clearly address those factors may result in this offer being rated unacceptable.
3. Volume II Price: Offerors shall format the Volume II Price proposal as listed below. The specific evaluation criteria and methodology for Volume II is contained in Sections D and E.
a. Offerors shall complete the Price Schedule in part A of this solicitation.
b. Offerors shall ensure the Signed Standard Form (SF) 1442 is provided. Offerors shall acknowledge receiving amendments by filling out section 19 of the SF 1442.
c. In addition to the Price Schedule, offerors shall submit a complete breakdown of the Division Pricing for Line Items (0001 - 0004).
d. Bid Guarantee: The Offeror shall furnish a bid guarantee as stipulated in the solicitation (see FAR 52.228-1). Pricing shall be Firm Fixed Price. The bid guarantee shall be provided on Standard Form 24. The bid bond shall be submitted as part of the electronic submission. In accordance with Class Deviation from the Federal Acquisition Regulation to Eliminate Hard Copy Original Documents, Signatures, Notarization, Seals on Bonds, and Other Seals for Certain Contract Requirements issued by the VA Executive Director, Office of Acquisition and Logistics and the Senior Procurement Executive on May 11, 2020, the requirement for an original bond, with the original signatures, notarization and seals has been eliminated.
e. Failure to furnish the required bid guarantee on the proper form and for the proper amount by the time specified in Block 13 of SF 1442, may result in rejection of the proposal.
4. Volume III Administrative Information: Offerors shall include the following in Volume III. All of the below information must be provided. An Offeror may be considered unacceptable if these items are not provided in the proposal.
a. Representations & Certifications:
As the provision at FAR 52.204-7 is included in the solicitation, FAR 52.204-8 (d) applies and the fill-in for FAR 52.204-8 (b)(2) does not need to be completed. The offeror is required to complete the annual representations and certifications electronically at https://www.sam.gov.
b. Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:
Offeror shall provide their response to FAR 52.204-24 (d) Representation.
c. Information Regarding Responsibility Matters:
Offeror shall provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.
d. Violation of Arms Controls Treaties or Agreements:
Offeror shall provide their response to FAR 52.209-13 (b) Violation of Arms Controls Treaties or Agreements.
e. Tax on Certain Foreign Procurements – Notice and Representation:
The offeror shall provide their response to FAR 52.229-11 (d).
f. Post Award Small Business Program Representations:
Offeror shall provide their response to FAR 52.219-28 (h), if applicable.
g. Limitations on Subcontracting:
The offeror shall complete and sign the VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction required in VAAR 852.219-75 and return it with their proposal submission is attached as a separate document (Limitations on Subcontracting). The completed and signed form will become part of the official award documentation.
h. Notice to SDVOSB Joint Venture/Mentor Protegee: Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal, may result in the rejection of the proposal.
C. Technical Proposal Requirements: The proposal shall address the following submission requirements for Factor 1 Project Experience, Factor 2 Schedule, and Factor 3 Past Performance.
1. Factor 1, Project Experience (Technical): Offerors shall provide up to five prior projects that demonstrate experience in similar size, scope, and complexity of the subject project. Project samples shall demonstrate similar challenges to include, but not limited to new construction with phasing over a long duration, limited staging, and laydown near the project site, staffing a long-duration project that includes some evenings and weekends, and providing uninterrupted service lines (water, gas, electricity) for a medical facility. If the Offeror is a Joint Venture (JV), project experience shall be submitted for projects performed by each individual entity, and by the Joint Venture itself, if available. Total PDF pages for factor 1 shall not exceed 25 pages, including any photos, narratives, and performance evaluations the offeror may choose to include to demonstrate project experience.
Include all of the following:
· Experience that demonstrates previous performance on at least two (2), new-build construction projects that are $10-20M in value, have a POP duration of at least 530 days, and be performed for an active medical center requiring uninterrupted utility service lines.
· Experience that demonstrates previous performance on at least one (1) construction project that has been executed on an active military installation or base with daily security screening preplanned of all personnel planned to come on base.
· Experience that demonstrates previous performance on at least one (1) construction project that required limited staging and laydown area near the project site.
· Experience that demonstrates previous performance on at least one (1) construction project demonstrating experience working on a clinical renovation or new clinical construction project, particularly with civil work, working with medical gases.
· Experience that demonstrates previous performance on at least one (1) construction project demonstrating experience with effective management, problem solving, communication, coordination, and organization with multi-discipline divisions of work.
2. Factor 2, Schedule (Technical): Submit your proposed construction schedule for THIS SPECIFIC PROJECT showing completion within the required period of performance contained in this solicitation with accompanying schedule narrative. Provide an order of work element of the subject project to include phasing, submittals, mobilization, excavation, construction, punch list, de-mobilization. Provide a risk plan of the subject project including identification, implication, and mitigation. Provided a list of long-lead time materials and concurrent tasks of the subject project needed for successful completion of project within the POP. Provide a communication plan that includes the Offeror’s staff and project owner staff for daily, weekly, and monthly updates. Submit your schedule in Gantt Chart format and include specific activities required for this project and a clear critical path with major milestones and applicable predecessor activities. In your accompanying narrative, explain schedule logic, critical path activities, proposed phasing and sequencing of work, and key considerations and constraints. General Contractor should account for daily security screening and planning access to the site in their schedule.
3. Factor 3 Past Performance (Non-Price): Submit Past Performance information for the same projects submitted under Project Experience (Factor 1). Offerors may submit a Past Performance Questionnaire using the solicitation attachment (PPQ) or a Contractor Performance Assessment Reporting System (CPARS) rating report. If unable to provide past performance from the projects cited in Factor 1, the contractor shall provide current and relevant information regarding an Offeror’s actions under previously awarded contracts. This shall include a maximum of five (5) construction projects for the Offeror that best demonstrate their past performance on relevant projects in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as “new construction in an active medical campus, military installation/base, or related environment involving, but not limited to phasing over a long duration, limited staging, and laydown near the project site, staffing a long-duration project that includes some evenings and weekends, and providing uninterrupted utility services (water, gas, electricity) for a medical facility. Projects shall have a minimum value of $7,000,000.00 and be at least 50% completed. Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP. If the Offeror is a Joint Venture (JV), past performance shall be submitted for projects performed by each individual entity, and by the Joint Venture itself, if available.
D. Volume II – Price Proposal Requirements
a. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation Offer and Award (Construction, Alteration, or Repair) and the Pricing Schedule located on PAGE 6 when submitting price offers. Submit a bid guarantee as stipulated in the solicitation.
b. In addition to the pricing schedule, Offerors shall submit a complete Breakdown of the Division Pricing for Line Items 0001-0004. The Division Pricing may be used to determine price reasonableness.
c. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s Specifications/Drawings or pricing requirements or otherwise preclude the Government from evaluating the offer, which shall render the offer unacceptable.
E. Evaluation Methodology:
The Technical proposal shall address the following evaluation factors, which are cited below.
1. Factor 1, Project Experience (Technical): Offeror’s construction project experience demonstrating (1) capability to successfully complete relevant projects of similar size (magnitude between $10-$20M), scope and complexity to this solicitation; (2) strong technical knowledge and skill required for this solicitation, particularly with civil work, working with medical gases, constructing or working on anything clinical related, working on an active medical facility, and consideration working on an active military installation/base that requires daily check in and identification of all vehicles and personnel coming on site, and (3) effective management, problem solving, communication, coordination, and organization with multi-discipline divisions of work, present lower levels of risk and will be more favorably rated. Those offerors not demonstrating these attributes present higher levels of risk and will be less favorably rated; (4) offerors demonstrating more self-performance (or similarly situated status) will be more favorably rated. Anything dental related will be rated higher than clinical.
NOTE: The same projects evaluated for experience under this factor shall also be evaluated for Past Performance (Factor #3).
2. Factor 2, Schedule (Technical): Construction schedules and narrative descriptions documenting: (1) a construction schedule that is realistic, appropriate, and efficient; (2) clear and efficient critical path and logical sequencing; (3) accounts for procurement lead-time, subcontractor/trade coordination, daily check-in/ security screening, on-site storage and staging, resource and time constraints; and (4) demonstrates risk mitigation and successful completion within the required period of performance, present lower levels of risk and will be more favorably rated. Schedules which do not demonstrate these attributes present higher levels of risk and will be less favorably rated.
3. Factor 3, Past Performance: Past performance demonstrating higher levels of success and quality on recent and relevant projects similar in scope and magnitude to this solicitation present lower levels of risk and will be more favorably rated. Offerors should make every attempt to provide past performance for projects cited in Factor 1 by furnishing a Past Performance Questionnaire completed by the customer or a CPARS rating, if applicable and available. Offerors will be rated higher for any past performance related to working on an active military base or clinical project.
Contractors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. Past performance evaluations may also be conducted using information obtained from CPARS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representative(s), Contractor Performance Assessment Reporting System (CPARS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
4. Factor 4 Price: The total evaluated price will be determined by the Offeror's price provided on the Price Schedule including all base and option line items.
Note: If none of the offerors are within the available funding limitation or is otherwise determined to be other than fair and reasonable, the VA reserves the right to enter into discussions with those offerors who are determined to be within the competitive range.
2.9 DETERMINATION OF RESPONSIBILITY
A Determination of Responsibility will be conducted for the apparent successful offeror prior to award of the project. The above information, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. NOTE: Any information received by the Government that would be cause for a negative Determination of Responsibility may make the offeror ineligible for award.
2.10 VETS 4212
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification prior to awarding the project.
2.11 SYSTEM FOR AWARD MANAGEMENT (SAM)
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://sam.gov/ and enter all mandatory information into the system. Offerors are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements (see FAR 52.204-7).
2.12 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS) As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement, VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is available to all Federal agencies and is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438-1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative.
For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform all work as identified in the solicitation documents. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.
2.14 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, OR PROJECT MANAGER
Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager,” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”
2.15 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.204-7 |
| SYSTEM FOR AWARD MANAGEMENT |
| OCT 2018 |
| 52.204-16 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING |
| AUG 2020 |
| 52.204-22 |
| ALTERNATIVE LINE ITEM PROPOSAL |
| JAN 2017 |
| 52.211-6 |
| BRAND NAME OR EQUAL |
| AUG 1999 |
| 52.214-34 |
| SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE |
| APR 1991 |
| 52.214-35 |
| SUBMISSION OF OFFERS IN U.S. CURRENCY |
| APR 1991 |
| 52.215-1 |
| INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION |
| NOV 2021 |
| 52.225-12 |
| NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS |
| MAY 2014 |
| 52.229-11 |
| TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION |
| JUN 2020 |
| 52.236-28 |
| PREPARATION OF PROPOSALS—CONSTRUCTION |
| OCT 1997 |
2.16 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.
(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.
(End of Clause)
2.17 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.18 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 17.1 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Fairfield Solano County California (End of Provision)
2.19 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be percent of the bid price or , whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.20 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
(End of Provision)
2.21 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Joelle Mascarenas
Hand-Carried Address:
See below
Mailing Address:
Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490
Independence OH 44131
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.22 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation.