2 Dental Final Spec 1 of 3.pdf
PDF 4 MB Posted
- Solicitation number
- 36C77624R0085
About this file
This document is the specification index for the VA Fairfield Relocate and Expand Dental Clinic to Fairfield project. It includes a detailed table of contents listing the various specification sections covering the general construction, electrical, mechanical, and plumbing work required.
The project involves the construction of a new 12,530 BGSF building, including site preparation, roads, utilities, and other general construction. Key requirements include electrical systems, HVAC, plumbing, and specialized dental equipment and piping. Alternate deductive bids are also included for items such as exterior sunshades, mechanical screens, and interior finishes. The contractor is required to follow strict security, quality control, and scheduling requirements for the project, which is located at Travis AFB in California. The solicitation number is 36C77624R0085.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
August 10, 2022
Prepared by:
K. F. DAVIS ENGINEERING, INC.
530 La Gonda Way, Suite E, Danville, California 94526
Tel. (925) 743-8884 ~ Fax (925) 743-8325 www.KFDE.com http://www.kfde.com/
VA FAIRFIELD RELOCATE AND EXPAND DENTAL CLINIC TO FAIRFIELD
Specification Index
1 | P a g e
VOLUME I
SPECIFICATION SECTIONS: DESCRIPTION:
01 00 00(PROVIDED BY VA)..................................GENERAL REQUIREMENTS
01 32 16(PROVIDED BY VA).....................................PROJECT SCHEDULES
01 33 23(PROVIDED BY VA)...............SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
01 35 26(PROVIDED BY VA)...................................SAFETY REQUIREMENTS
01 45 00(PROVIDED BY VA).......................................QUALITY CONTROL
01 57 19(PROVIDED BY VA)......................TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.1(PROVIDED BY VA)..................TRAVIS AFB, ENVIRONMENTAL CONTROLS
01 74 19(PROVIDED BY VA).........................CONSTRUCTION WASTE MANAGEMENT
01 45 29...........................................TESTING LABORATORY SERVICES
01 81 13.................................SUSTAINABLE CONSTRUCTION REQUIREMENTS
01 91 00....................................GENERAL COMMISSIONING REQUIREMENTS
02 41 00............................................................DEMOLITION
03 30 00................................................CAST-IN-PLACE CONCRETE
05 12 00..............................................STRUCTURAL STEEL FRAMING
05 31 00.........................................................STEEL DECKING
05 36 00...............................................COMPOSITE METAL DECKING
05 40 00.............................................COLD-FORMED METAL FRAMING
05 50 00.....................................................METAL FABRICATION
05 51 00..........................................................METAL STAIRS
06 10 00.......................................................ROUGH CARPENTRY
06 16 63................................................CEMENTITIOUS SHEATHING
07 08 00...............................FACILITY EXTERIOR CLOSURE COMMISSIONING
07 11 13..................................................BITUMOUS DAMPROOFING
07 21 13....................................................THERMAL INSULATION
07 22 00..............................................ROOF AND DECK INSULATION
07 24 00 ...............................EXTERIOR INSULATION AND FINISH SYSTEMS
07 40 00.............................................ROOFING AND SIDING PANELS
07 54 23................................THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
07 60 00..............................................FLASHING AND SHEET METAL
07 72 00......................................................ROOF ACCESSORIES
07 84 00..........................................................FIRESTOPPING
01 35 26(PROVIDED BY VA)...................................SAFETY REQUIREMENTS
01 45 00(PROVIDED BY VA).......................................QUALITY CONTROL
01 57 19(PROVIDED BY VA)......................TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.1(PROVIDED BY VA)..................TRAVIS AFB, ENVIRONMENTAL CONTROLS
01 74 19(PROVIDED BY VA).........................CONSTRUCTION WASTE MANAGEMENT
01 45 29...........................................TESTING LABORATORY SERVICES
01 81 13.................................SUSTAINABLE CONSTRUCTION REQUIREMENTS
01 91 00....................................GENERAL COMMISSIONING REQUIREMENTS
02 41 00............................................................DEMOLITION
03 30 00................................................CAST-IN-PLACE CONCRETE
05 12 00..............................................STRUCTURAL STEEL FRAMING
05 31 00.........................................................STEEL DECKING
05 36 00...............................................COMPOSITE METAL DECKING
05 40 00.............................................COLD-FORMED METAL FRAMING
05 50 00.....................................................METAL FABRICATION
05 51 00..........................................................METAL STAIRS
06 10 00.......................................................ROUGH CARPENTRY
06 16 63................................................CEMENTITIOUS SHEATHING
07 08 00...............................FACILITY EXTERIOR CLOSURE COMMISSIONING
07 11 13..................................................BITUMOUS DAMPROOFING
07 21 13....................................................THERMAL INSULATION
07 22 00..............................................ROOF AND DECK INSULATION
07 24 00 ...............................EXTERIOR INSULATION AND FINISH SYSTEMS
07 40 00.............................................ROOFING AND SIDING PANELS
07 54 23................................THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
.1 TRAVIS AFB, SAFETY REQUIREMENTS...................1(PROVIDED BY VA)
01 32 16(PROVIDED BY VA).....................................PROJECT SCHEDULES
01 33 23(PROVIDED BY VA)...............SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
01 35 26(PROVIDED BY VA)...................................SAFETY REQUIREMENTS
01 31 23.13 20 NAVFAC, eCMS00(PROVIDED BY VA)
01 00 00.1(PROVIDED BY VA) TRAVIS AFB, GENERAL REQUIREMENTS
....................T
02 41 00............................................................DEMOLITION 01 45 29...........................................TESTING LABORATORY SERVICES
01 45 29...........................................TESTING LABORATORY SERVICES
01 81 13.................................SUSTAINABLE CONSTRUCTION REQUIREMENTS
01 91 00....................................GENERAL COMMISSIONING REQUIREMENTS
01 57 19(PROVIDED BY VA)......................TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.1(PROVIDED BY VA)..................TRAVIS AFB, ENVIRONMENTAL CONTROLS
01 74 19(PROVIDED BY VA).........................CONSTRUCTION WASTE MANAGEMENT
2 | P a g e
07 92 00........................................................JOINT SEALANTS
08 11 13.........................................HOLLOW METAL DOORS AND FRAMES
08 14 00...................................................INTERIOR WOOD DOORS
08 17 10............................................INTEGRATED DOOR ASSEMBLIES
08 31 13...............................................ACCESS DOORS AND FRAMES
08 41 13.............................ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13.11.......................................SIDE-HINGED ALUMINUM WINDOWS
08 71 00.........................................................DOOR HARDWARE
08 71 13..............................................AUTOMATIC DOOR OPERATORS
08 80 00...............................................................GLAZING
08 90 00.....................................................LOUVERS AND VENTS
09 05 16.............................SUBSURFACE PREPARATION FOR FLOOR FINISHES
09 06 00.................................................SCHEDULE FOR FINISHES
09 22 16..........................................NON-STRUCTURAL METAL FRAMING
09 29 00..........................................................GYPSUM BOARD
09 30 13............................................CERAMIC / PORCELAIN TILING
09 51 00...................................................ACOUSTICAL CEILINGS
09 65 13........................................RESILIENT BASE AND ACCESSORIES
09 65 19...............................................RESILIENT TILE FLOORING
09 67 23.60.......RESINOUS URETHANE AND EPOXY MORTAR FLOORING (RES 6A, RES 6B)
09 68 00.............................................................CARPETING
09 91 00..............................................................PAINTING
09 96 59........RESINOUS SPECIALTY GLAZED COATING SYSTEMS FOR WALLS, CEILINGS,
WALLBOARD, AND BLOCK CMU (RES W1, RES W2
10 14 00...............................................................SIGNAGE
10 21 13...................................................TOILET COMPARTMENTS
10 21 23................................................CUBICLE CURTAIN TRACKS
10 26 00..............................................WALL AND DOOR PROTECTION
10 28 00.................................TOILET, BATH, AND LAUNDRY ACCESSORIES
10 44 13............................................FIRE EXTINGUISHER CABINETS
11 73 00..................................CEILING MOUNTED PATIENT LIFT SYSTEMS
12 32 00..........................................MANUFACTURERED WOOD CASEWORK
12 36 00...........................................................COUNTERTOPS
13 05 41 .........SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS
07 92 00........................................................JOINT SEALANTS
08 11 13.........................................HOLLOW METAL DOORS AND FRAMES
08 14 00...................................................INTERIOR WOOD DOORS
08 17 10............................................INTEGRATED DOOR ASSEMBLIES
08 31 13...............................................ACCESS DOORS AND FRAMES
08 41 13.............................ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13.11.......................................SIDE-HINGED ALUMINUM WINDOWS
08 71 00.........................................................DOOR HARDWARE
08 71 13..............................................AUTOMATIC DOOR OPERATORS
08 80 00...............................................................GLAZING
08 90 00.....................................................LOUVERS AND VENTS
09 05 16.............................SUBSURFACE PREPARATION FOR FLOOR FINISHES
09 06 00.................................................SCHEDULE FOR FINISHES
09 22 16..........................................NON-STRUCTURAL METAL FRAMING
09 29 00..........................................................GYPSUM BOARD
09 30 13............................................CERAMIC / PORCELAIN TILING
09 51 00...................................................ACOUSTICAL CEILINGS
09 65 13........................................RESILIENT BASE AND ACCESSORIES
09 65 19...............................................RESILIENT TILE FLOORING
09 67 23.60.......RESINOUS URETHANE AND EPOXY MORTAR FLOORING (RES 6A, RES 6B)
09 68 00.............................................................CARPETING
09 91 00..............................................................PAINTING
09 96 59........RESINOUS SPECIALTY GLAZED COATING SYSTEMS FOR WALLS, CEILINGS,
WALLBOARD, AND BLOCK CMU (RES W1, RES W2
10 14 00...............................................................SIGNAGE
10 21 13...................................................TOILET COMPARTMENTS
10 21 23................................................CUBICLE CURTAIN TRACKS
10 26 00..............................................WALL AND DOOR PROTECTION
10 28 00.................................TOILET, BATH, AND LAUNDRY ACCESSORIES
10 44 13............................................FIRE EXTINGUISHER CABINETS
11 73 00..................................CEILING MOUNTED PATIENT LIFT SYSTEMS
07 60 00..............................................FLASHING AND SHEET METAL
07 72 00......................................................ROOF ACCESSORIES
07 84 00..........................................................FIRESTOPPING
3 | P a g e
13 49 00..................................................RADIATION PROTECTION
21 05 11..............................COMMON WORK RESULTS FOR FIRE SUPPRESSION
21 08 00.............................COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 13 13.............................................WET-PIPE SPRINKLER SYSTEM
VOLUME II
22 05 11......................................COMMON WORK RESULTS FOR PLUMBING
22 05 23...............................GENERAL DUTY VALVES FOR PLUBMING PIPING
22 07 11.................................................PLUBMING INSTALLATION
22 08 00................................................PLUMBING COMMISSIONING
22 11 00...........................................FACILITY WATER DISTRIBUTION
22 13 00.........................................FACILITY SANITARY VENT PIPING
22 14 00...............................................FACILITY STORM DRAINAGE
22 33 00.....................................ELECTRONIC DOMESTIC WATER HEATERS
22 40 00......................................................PLUMBING FIXTURE
22 61 13.74.......................................DENTAL COMPRESSED-AIR PIPING
22 61 19.74....................................DENTAL COMPRESSED-AIR EQUIPMENT
22 62 19.74............................DENTAL VACUUM AND EVACTUATION EQUIPMENT
22 63 00 .................GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES
23 05 11 .........................................COMMON WORK RESULTS FOR HVAC
23 05 12 ..................................GENERAL MOTOR REQUIREMENTS FOR HVAC
23 05 41 ..............NOISE & VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT
23 05 93............................TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 11 ......................................................HVAC INSULATION
23 08 00 ..........................................COMISSIOING OF HVAC SYSTEMS
23 09 23...............................DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 23 00 ...................................................REFRIGERANT PIPING
23 31 00 ..............................................HVAC DUCTWORK & CASINGS
23 34 00 ............................................................HVAC FANS
23 36 00 ...................................................AIR TERMINAL UNITS
13 49 00..................................................RADIATION PROTECTION
21 05 11..............................COMMON WORK RESULTS FOR FIRE SUPPRESSION
21 08 00.............................COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 13 13.............................................WET-PIPE SPRINKLER SYSTEM
VOLUME II
22 05 11......................................COMMON WORK RESULTS FOR PLUMBING
22 05 23...............................GENERAL DUTY VALVES FOR PLUBMING PIPING
22 07 11.................................................PLUBMING INSTALLATION
22 08 00................................................PLUMBING COMMISSIONING
22 11 00...........................................FACILITY WATER DISTRIBUTION
22 13 00.........................................FACILITY SANITARY VENT PIPING
22 14 00...............................................FACILITY STORM DRAINAGE
22 33 00.....................................ELECTRONIC DOMESTIC WATER HEATERS
22 40 00......................................................PLUMBING FIXTURE
22 61 13.74.......................................DENTAL COMPRESSED-AIR PIPING
22 61 19.74....................................DENTAL COMPRESSED-AIR EQUIPMENT
22 62 19.74............................DENTAL VACUUM AND EVACTUATION EQUIPMENT
22 63 00 .................GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES
23 05 11 .........................................COMMON WORK RESULTS FOR HVAC
23 05 12 ..................................GENERAL MOTOR REQUIREMENTS FOR HVAC
23 05 41 ..............NOISE & VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT
23 05 93............................TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 11 ......................................................HVAC INSULATION
23 08 00 ..........................................COMISSIOING OF HVAC SYSTEMS
23 09 23...............................DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 23 00 ...................................................REFRIGERANT PIPING
12 32 00..........................................MANUFACTURERED WOOD CASEWORK
12 36 00...........................................................COUNTERTOPS
13 05 41 .........SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS
4 | P a g e
23 37 00 .................................................AIR OUTLETS & INLETS
23 40 00.............................................HVAC AIR CLEANING DEVICES
23 81 00..................................DECENTRALIZED UNITARY HVAC EQUIPMENT
26 05 11.............................REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
26 05 19....................LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26..........................GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 33 .............................RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 41...................................UNDERGROUND ELECTRICAL CONSTRUCTION
26 05 73......................OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
26 08 00....................................COMMISSIONING OF ELECTRICAL SYSTEM
26 09 23.....................................................LIGHTING CONTROLS
26 22 00..............................................LOW-VOLTAGE TRANSFORMERS
26 24 13.............................................DISTRIBUTION SWITCHBOARDS
26 24 16...........................................................PANELBOARDS
26 27 26........................................................WIRING DEVICES
26 29 21................................ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 43 13..............................................SURGE PROTECTIVE DEVICES
26 51 00.....................................................INTERIOR LIGHTING
26 56 00.....................................................EXTERIOR LIGHTING
27 05 11.........................REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
27 05 26......................GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 33.........................RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS
27 08 00...............................COMMISSIONING OF COMMUNICATIONS SYSTEMS
27 10 00..............................CONTROL, COMMUNICATION AND SIGNAL WIRING
27 11 00......................................TELECOMMUNICATIONS ROOM FITTINGS
27 15 00.....................................COMMUNICATIONS STRUCTURED CABLING
28 05 00................COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
28 05 13..............CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
28 05 26..............GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 05 28.33..........CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY
28 08 00......................COMMISSIONING OF ELECTRONIC AND SECURITY SYSTEMS
28 13 00.................................................ACCESS CONTROL SYSTEM
28 23 00....................................................VIDEO SURVEILLANCE
28 31 00.....................................................FIRE ALARM SYSTEM
23 37 00 .................................................AIR OUTLETS & INLETS
23 40 00.............................................HVAC AIR CLEANING DEVICES
23 81 00..................................DECENTRALIZED UNITARY HVAC EQUIPMENT
26 05 11.............................REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
26 05 19....................LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26..........................GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 33 .............................RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 41...................................UNDERGROUND ELECTRICAL CONSTRUCTION
26 05 73......................OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
26 08 00....................................COMMISSIONING OF ELECTRICAL SYSTEM
26 09 23.....................................................LIGHTING CONTROLS
26 22 00..............................................LOW-VOLTAGE TRANSFORMERS
26 24 13.............................................DISTRIBUTION SWITCHBOARDS
26 24 16...........................................................PANELBOARDS
26 27 26........................................................WIRING DEVICES
26 29 21................................ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 43 13..............................................SURGE PROTECTIVE DEVICES
26 51 00.....................................................INTERIOR LIGHTING
26 56 00.....................................................EXTERIOR LIGHTING
27 05 11.........................REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
27 05 26......................GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 33.........................RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS
27 08 00...............................COMMISSIONING OF COMMUNICATIONS SYSTEMS
27 10 00..............................CONTROL, COMMUNICATION AND SIGNAL WIRING
27 11 00......................................TELECOMMUNICATIONS ROOM FITTINGS
27 15 00.....................................COMMUNICATIONS STRUCTURED CABLING
28 05 00................COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
28 05 13..............CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
28 05 26..............GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 05 28.33..........CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY
28 08 00......................COMMISSIONING OF ELECTRONIC AND SECURITY SYSTEMS
23 31 00 ..............................................HVAC DUCTWORK & CASINGS
23 34 00 ............................................................HVAC FANS
23 36 00 ...................................................AIR TERMINAL UNITS
5 | P a g e
31 20 11................................................EARTHWORK (SHORT FORM)
32 05 23.........................CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
32 12 16........................................................ASPHALT PAVING
32 17 23.....................................................PAVEMENT MARKINGS
32 31 13...........................................CHAIN LINK FENCES AND GATES
33 10 00.......................................................WATER UTILITIES
33 30 00..............................................SANITARY SEWER UTILITIES
33 40 00 ................................................STORM SEWER UTILITIES
APPENDIX ..............GEOTECHNICAL ENGINEERING REPORT, DATED NOVEMBER 5, 2018
--END OF TABLE OF CONTENTS--
32 12 16........................................................ASPHALT PAVING
32 17 23.....................................................PAVEMENT MARKINGS
32 31 13...........................................CHAIN LINK FENCES AND GATES
33 10 00.......................................................WATER UTILITIES
32 12 16........................................................ASPHALT PAVING
32 17 23.....................................................PAVEMENT MARKINGS
32 31 13...........................................CHAIN LINK FENCES AND GATES
33 10 00.......................................................WATER UTILITIES
32 12 16........................................................ASPHALT PAVING
32 17 23.....................................................PAVEMENT MARKINGS
32 31 13...........................................CHAIN LINK FENCES AND GATES
33 10 00.......................................................WATER UTILITIES
--END OF TABLE OF CONTENTS-- APPENDIX ..............GEOTECHNICAL ENGINEERING REPORT, DATED NOVEMBER 5, 2018
A DEDUCTIONS
B DBIDS
...........................................CHAIN LINK FE.....................................................PA
...........................................CHAIN LINK FE.....................................................PA..................................................................................................CHAIN LINK FE.....................................................PA
...........................................CHAIN LINK FE.....................................................PA
28 13 00.................................................ACCESS CONTROL SYSTEM
28 23 00....................................................VIDEO SURVEILLANCE
28 31 00.....................................................FIRE ALARM SYSTEM
ADDITIONAL CONTRACTOR REQUIREMENTSAPPENDIX C
.............GEOTECHNICAL ENGINEER--END OF TABLE OF C.............GEOTECHNICAL ENGINEER
VANCHCS MASTER SPECIFICATION
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 GENERAL INTENTION
1.2 STATEMENT OF BID ITEM(S)
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.4 CONSTRUCTION PROJECT SCHEDULE
1.5 CONSTRUCTION SAFETY REQUIREMENTS
1.6 CONSTRUCTION SECURITY REQUIREMENTS
1.7 CONSTRUCTION QUALITY CONTROL PLAN
1.8 CONSTRUCTION SCHEDULE OF VALUES
1.9 NAME BRAND ITEMS
1.10 OPERATIONS AND STORAGE AREAS
1.11 ALTERATIONS
1.12 DISPOSAL AND RETENTION
1.13 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, AND UTILITIES
1.14 RESTORATION
1.15 PHYSICAL DATA
1.16 PROFESSIONAL SURVEYING SERVICES
1.17 LAYOUT OF WORK
1.18 AS-BUILT DRAWINGS
1.19 USE OF ROADWAYS
1.20 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.21 TEMPORARY USE OF EXISTING ELEVATORS
1.22 TEMPORARY USE OF NEW ELEVATORS
1.23 TEMPORARY TOILETS
1.24 AVAILABILITY AND USE OF UTILITY SERVICES
1.25 NEW TELEPHONE EQUIPMENT
1.26 TESTS
1.27 INSTRUCTIONS
1.28 GOVERNMENT-FURNISHED PROPERTY
1.29 RELOCATED EQUIPMENT AND/OR ITEMS
1.30 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
1.31 CONSTRUCTION SIGN
1.32 SAFETY SIGN
1.33 REQUIRED USE OF SUBMITTAL EXCHANGE
1.34 PHOTOGRAPHIC DOCUMENTATION
1.35 FINAL ELEVATION DIGITAL IMAGES
1.36 HISTORIC PRESERVATION
1.37 GUARANTEE PERIOD OF SERVICES
1.38 LOCKOUT/TAGOUT (LOTO) EQUIPMENT REQUIREMENTS
1.39 LOCKOUT/TAGOUT (LOTO) EQUIPMENT INVENTORY
01 00 00 - 2
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 GENERAL INTENTION
A. Contractor shall furnish all labor, materials, equipment, supervision, and necessary engineering to perform the work as required by the project specifications and drawings. This shall include, but not limited to, completely preparing site for building operations, all demolition activities and/or removal of existing structures required to perform the work, foundations, superstructure, mechanical, electrical, plumbing, special systems, landscaping, and other site improvements.
B. Visits to the site by Bidders may be made only by appointment with the
Contracting Officer.
C. Offices of ‘K.F. DAVIS ENGINEERS’, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by the Contractor, the Contractor shall notify the COR in sufficient time to allow COR witnessing of testing laboratory personnel proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.
E. All employees of general Contractor and Subcontractors shall comply with
VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. For card reader installation and programming:
1. All services covered by this contract will be performed by fully qualified/ certified and trained personnel. Individuals completing the work shall possess the necessary skills and experience with the devices/ hardware/ controls to perform the work.
2. Contractor shall include the latest card readers as specified on drawing
SEE CIVIL, ARCHITECTURAL, ELECTRICAL DRAWINGS:
a. Contractor to install and program card readers.
b. Contractor shall provide card reader, door lock, and any additional card reader accessories.
c. Contractor to provide HID card reader.
01 00 00 - 3
G. Contractor to provide Controller system kit that includes controller box, power source box, and a breaker. Contractor to properly label control system kits to be able to identify breaker in the electrical room feeding to the power source box and card readers tying into the controller box and at the physical card reader location. SEE APPENDIX A.
H. Card readers shall be able to be used with the existing PIV cards to gain access and existing HID card readers under the C-Cure 9000 software system.
I. Contractor shall have the Software House Advance Integration certification.
J. All devices and equipment are to be considered the ‘base standard of product quality’. Substitute item shall be greater or equal product. It shall be the burden of the Contractor to prove to VA that the substituted product(s) meet the quality standards of the products.
K. Installation Requirements: All products shall be installed in accordance with the manufacturer’s recommendations. Additional care and attention shall be given to the items; all card readers shall be commissioned.
1.2 STATEMENT OF BID ITEM(S)
A. Required construction items within bid:
1. Item I, General Construction: Work includes labor, materials, equipment, and supervision to perform the required site preparations
(grading and removal of existing structures), development of roads, sidewalks, utilities, a 12,530 BGSF building, and other general construction items. SEE CIVIL, LANDSCAPING, ARCHITECTURAL, STRUCTURAL
DRAWINGS.
2. Item II, Electrical Work: Work includes labor, materials, equipment, and supervision to perform the required installation of an electrical system (normal power, power for life safety and equipment) fed from existing electrical vaults on the East and West side of the proposed building, power distribution, interior and exterior lighting, light control panel, fire alarm system, and other electrical construction items. SEE ELECTRICAL DRAWINGS.
3. Item III, Mechanical, Plumbing Work:
a. Work includes all labor, materials, equipment, and supervision to perform the required chilled water supply and return piping, hot water piping, fire sprinkler system, plumbing and process gases, HVAC distribution, and other mechanical construction items. SEE
MECHANICAL, PLUMBING DRAWINGS.
01 00 00 - 4
b. Work includes all labor, materials, equipment, and supervision to perform the required to:
i. Remove DV from wall cleanout to dental chair utility floor box in all operatory, recovery, and oral surgery rooms. SEE PLUMBING
DRAWINGS AND APPENDIX B.
ii. Include DV from wall cleanout to dental 12 o’clock rear cabinet in all operatory, recovery, and oral surgery rooms. SEE PLUMBING
DRAWINGS AND APPENDIX B.
iii. Install DA per plans in all operatory, recover, and oral surgery rooms. SEE PLUMBING DRAWINGS.
iv. Include DA from wall to dental 12 o’clock rear cabinet in all operatory, recovery, and oral surgery rooms. SEE PLUMBING
DRAWINGS AND APPENDIX B.
B. Deduction will be made in ascending order as listed, as needed:
1. Deduction Alternate 1: Remove all work and materials for exterior sunshades and associated supports. SEE STRUCTURAL, ARCHITECTURAL
DRAWINGS, AND APPENDIX C.
2. Deduction Alternate 2:
a. Remove mechanical screen and EIFS. SEE ARCHITECTURAL DRAWINGS AND
APPENDIX C.
b. Remove portico. SEE ARCHITECTURAL DRAWINGS AND APPENDIX C.
c. Remove all work and materials for outdoor stairs to roof and replace with simple metal ladder. SEE ARCHITECTURAL DRAWINGS AND APPENDIX C.
d. Remove all sidewalks around building and include a 3-feet-by-3-feet landing pad adjacent to doors 1, 6, 34, 35, and 38, outside of building. SEE CIVIL AND ARCHITECTURAL DRAWINGS AND APPENDIX C.
e. Remove all built-in and pre-fabricated casework, exception of materials for kiosk equipment and outdoor entrance columns at door
1; VA to provide and install modular casework in lieu. SEE
ARCHITECTURAL DRAWINGS AND APPENDIX C.
3. Deduction Alternate 3:
a. Remove all interior finish work including ACT ceiling, lighting fixtures, interior partitions, painting on walls, and floor finishes within rooms 1010, 1012, 1016, 1017, 1019, 1021, 1023, 1025, 1027, 1029, 1030, 1031, 1032, 1033, 1034, 1036, 1038, 1C03, 1C07, and area of room 1C02 adjacent to rooms 1017 and 1019, rooms 1C03, and 1C07
(flush with South wall of rooms 1035 and 1037). SEE ARCHITECTURAL
DRAWINGS AND APPENDIX C.
01 00 00 - 5
b. Include a warm lite shell with all rough-in electrical, mechanical, communication, and plumbing work through said disciplines with associated conduits, where required; remove work for said disciplines in areas described under 1.2.B.3.a. Keep fire sprinkler system, covering at deck level, do not lower to ACT height. SEE
ELECTRICAL, MECHANICAL, PLUMBING DRAWINGS, AND APPENDIX C.
c. Provide Level 2 drywall finish along all exterior perimeters of areas described under 1.2.B.3.a. SEE ARCHITECTURAL DRAWINGS AND
APPENDIX C:
i. Provide Level 2 drywall finish along North side of rooms 1017 and
1019, exterior walls of rooms 1017 and 1019. SEE ARCHITECTURAL
DRAWINGS AND APPENDIX C.
ii. Provide Level 2 drywall finish along East side of room 1019 between Northeast corner of room 1019 and Northwest corner of room 1021, exterior wall of room 1019. SEE ARCHITECTURAL DRAWINGS
AND APPENDIX C.
iii. Provide Level 2 drywall finish along North side of room 1021, exterior wall of room 1021. SEE ARCHITECTURAL DRAWINGS AND
APPENDIX C.
iv. Provide Level 2 drywall finish along East side of rooms 1012, 1021, 1023, 1025, 1027, 1029, 1031, and 1033, exterior walls of rooms 1012, 1021, 1023, 1025, 1027, 1029, 1031, and 1033. SEE
ARCHITECTURAL DRAWINGS AND APPENDIX C.
v. Provide Level 2 drywall finish along East side of room 1038 between West side of wall at door 34 location and Southeast corner of room 1038, exterior wall of room 1038. SEE
ARCHITECTURAL DRAWINGS AND APPENDIX C.
vi. Provide Level 2 drywall finish along South side of rooms 1030, 1032, 1034, 1036, 1038, and 1C07, exterior walls of rooms 1030, 1032, 1034, 1036, 1038, and 1C07. SEE ARCHITEDCTURAL DRAWINGS AND
APPENDIX C.
vii. Provide Level 2 drywall finish along West side of rooms 1030, 1032, exterior walls or rooms 1030, 1032. SEE ARCHITECTURAL
DRAWINGS AND APPENDIX C.
d. Provide Level 4 drywall finish along interior wall perimeters of areas described under 1.2.B.3.a. SEE ARCHITECTURAL DRAWINGS AND
APPENDIX C:
01 00 00 - 6
i. Provide Level 4 drywall finish along West side of room 1017, continue wall due South from Southwest corner of room 1017 through room 1C02 and along West side of room 1010 to North wall of room 1018; paint West side of wall (e.g. interior of room
1015, continue painting along same side of wall through room 1C02 to exterior wall of room 1008, interior of room 1008 and 1004.)
SEE ARCHITECTURAL DRAWINGS AND APPENDIX C.
ii. Provide Level 4 drywall finish along South side of room 1010, interior walls of rooms 1018 and 1014; paint South side of wall, interior walls of rooms 1018 and 1014. SEE ARCHITECTURAL DRAWINGS
AND APPENDIX C.
iii. Provide Level 4 drywall finish along East side of room 1014, interior wall of room 1014; extend wall due South from Southeast corner of room 1014 to North wall of room 1016. Paint West side of wall, interior wall of room 1014 and 1C04. SEE ARCHITECTURAL
DRAWINGS AND APPENDIX C.
iv. Provide Level 4 drywall finish along North side of room 1016 between wall described under 1.2.B.3.f. and Northeast corner of room 1016, interior wall of room 1016; paint South side of wall, interior wall of room 1016. SEE ARCHITECTURAL DRAWINGS AND
APPENDIX C.
v. Provide Level 4 drywall finish along East side of room 1016 between Northeast corner of room 1016 and Southwest corner of room 1012, interior wall of room 1016; paint West side of wall, interior wall of room 1016. SEE ARCHITECTURAL DRAWINGS AND
APPENDIX C.
vi. Provide Level 4 drywall finish along North side of rooms 1040A and 1040B, interior walls of rooms 1040A and 1040B; paint South side of wall, interior walls of rooms 1040A and 1040B. SEE
ARCHITECTURAL DRAWINGS AND APPENDIX C.
vii. Provide Level 4 drywall finish along East side of room 1038 between Northeast corner of room 1038 and West side of wall at door 34 location, interior of room 1040; paint East side of wall, interior of room 1040. SEE ARCHITECTURAL DRAWINGS AND APPENDIX C.
viii. Provide Level 4 drywall finish along North side of rooms 1038 and 1C07, extend wall due West to East wall of room 1028, interior wall of rooms 1040, 1037, 1035, and 1C05; paint North
01 00 00 - 7 side of wall, interior of rooms 1040, 1037, 1035, and 1C05. SEE
ARCHITECTURAL DRAWINGS AND APPENDIX C.
ix. Provide Level 4 drywall finish along East side of room 1028 between Southeast corner of room 1028 and wall mentioned in
1.2.B.3.k., interior wall of room 1028; paint West side of wall, interior wall of room 1028. SEE ARCHITECTURAL DRAWINGS AND
APPENDIX C.
x. Provide Level 4 drywall finish along South side of room 1028, interior of room 1028; paint North side of wall, interior wall of room 1028. SEE ARCHITECTURAL DRAWINGS AND APPENDIX C.
xi. Provide Level 4 drywall finish along East side of room 1030 between Northeast corner of room 1030 and Southwest corner of room 1028, interior of room 1028; paint East side of wall, interior wall of room 1028. SEE ARCHITECTURAL DRAWINGS AND
APPENDIX C.
xii. Provide Level 4 drywall finish along North side of room 1030, interior of rooms 1000B, 1C06, and 1C00; paint North side of wall, interior wall of rooms 1000B, 1C06, and 1C00. SEE
ARCHITECTURAL DRAWINGS AND APPENDIX C.
xiii. Provide Level 4 drywall finish along East side of room 1041, interior wall of room 1041; paint West side of wall, interior wall of room 1041. SEE ARCHITECTURAL DRAWINGS AND APPENDIX C.
e. Include door along East side of room 1C04 along wall described under
1.2.B.3.f. for access to and storage within area described under
1.2.B.3.a. SEE ARCHITECTURAL DRAWINGS AND APPENDIX C.
f. Remove door 27, include a minimum 3-foot wide opening along West wall of room 1035 so rooms 1035A and 1037A are accessible. SEE
ARCHITECTURAL DRAWINGS AND APPENDIX C.
g. Door 30 to remain for access to and storage within area described under 1.2.B.3.a. SEE ARCHITECTURAL DRAWINGS AND APPENDIX C.
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractors expense.
1.4 CONSTRUCTION PROJECT SCHEDULE
A. Contractor shall submit a prepared work schedule for approval and arrange with the COTR the sequence of work. Phasing of work may be required for completion of this project and shall be planned thoroughly by the
Contractor. Project will require night and weekend work to accomplish
01 00 00 - 8 specific tasks (i.e. any work that will be disruptive to current daily operations will need to be scheduled during nights and weekends). Work areas shall remain protected, per the project Specifications, from employee and patient access throughout the contract period. 100% of ALL project submittals shall be approved prior to the construction start date.
Work hours will consist of an 8.5-hour period established by the
Contracting Officer between 7:00AM – 4:30PM (local time), Monday through
Friday excluding Government holidays.
Work outside regular working hours shall be submitted to Contracting
Officer and Contracting Officer’s Representative (COR) for approval and at no additional cost to the Government. Approvals are subject to the availability of on-site staff. Make application for work outside regular working hour requests 72 hours prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contact person, contact person’s contact information, contract number, and project title. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and
Government holidays unless directed otherwise.
B. General Contractor schedule shall account for time required to obtain approval on all submittals prior to ‘breaking ground’ for construction work. Submitted project schedule shall show expected submittal period.
General Contractor shall note that it will generally take 14 days for AE review, followed by an additional 5 to 14 days for Department of Veterans
Affairs to review and approve submittals, depending on the content.
C. Refer to section 01 32 16, PROJECT SCHEDULES, for project scheduling requirements.
1.5 CONSTRUCTION SAFETY REQUIREMENTS
A. The General Contractor shall develop a plan for both the area of work and the interaction of the work with the facility per OSHA, AIA, and VA guidelines. The Infection Prevention Measures, as set forth in the VA
Infection Control Risk Assessment, shall be included in the Safety Plan.
The Interim Life Safety Measures (ILSM), as set forth in the project ILSM, shall also be implemented in the Safety Plan. The General Contractor shall submit a copy of their Daily Safety Inspection form. The Safety Plan shall be a submittal and approved by the designated VA COR prior to the start of construction. Contractor shall note that the required training of all
01 00 00 - 9 personnel shall be specific for ‘Construction Safety’, (29 CFR 1926), NOT
‘General Industry’ safety training, (29 CFR 1910). Contractor shall reference project Specifications for in depth safety and documentation requirements such as hazard analyses and respective hazard mitigation techniques to be required for specific work activities. Some general safety precautions are listed below:
1. Work shall be conducted in a manner to afford maximum protection to
Contractors, VA employees, patients, public guests, existing building infrastructure, and to prevent unreasonable delay or interference with normal hospital operations.
2. Provide fire extinguishers that are readily available at all times.
Provide additional fire detection equipment as required to meet VA guidelines and the project ILSM.
3. It will be the obligation of the Contractor to maintain clean work site. Material and tools shall be kept within designated areas and trash will be removed daily.
4. It will be the responsibility of the Contractor to seek and obtain any required permits for construction, which includes but not limited to
NESHAPS Permit, Dust Permit, etc. Reference project Specifications for details.
B. Refer to section 01 35 26, SAFETY REQUIREMENTS, for safety and infection control requirements.
1.6 CONSTRUCTION SECURITY REQUIREMENTS
A. Contractor selected must have experience working on an active military installation or base.
B. Contractor must comply with employment restrictions such that Contractor must not employ any person for any work required by this contract who:
1. Is a non-immigrant as described in section 101(a)(15)(H)(ii) of the
Immigration and Nationality Act 8 USC 1101(a)(15)(H)(ii)
2. Is an alien having a residence in a foreign country which employed person has no intention of abandoning and whom is coming to the United
States to perform temporary services or labor.
C. Submit for approval at least 15 days prior to the desired date of entry an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:
1. Name
2. Date and place of birth
3. Citizenship
01 00 00 - 10
4. Home address
5. Social security number
6. Current pass expiration date
7. Naturalization or Alien Registration number
8. Passport number, place of issue, and expiration date
The request for personnel passes must be accompanied with the following certification:
“I hereby certify that all personnel on this list are either born U.S.
citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated.”
Signature/Firm Name
D. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-
Contractors working on the project and their employees also comply with these regulations.
E. Security Procedures:
1. General Contractors employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractors employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
5. For installation access, obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS).
Requirements for Contractor employee registration and transition for employees currently under Navy Commercial Access Control System (NCACS) are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.
01 00 00 - 11
6. For One-Day Passes, personnel applying for One-Day passes at the Base
Visitor Control Office are subject to daily mandatory vehicle inspection and will have limited access to the installation. The
Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS. Participation in the DBIDS is not mandatory.
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html. DBIDS is not needed if the
Contractor has a contract with Travis Air Force Base (Travis AFB) and has their own sponsor.
a. Present a letter or official award document (i.e. DD FORM 1155 or SF
1442) from the Contracting Officer that provides the purpose for access to the base Visitor Control Center representative.
b. Present a valid identification (e.g. passport or Real ID Act-compliant state driver’s license).
c. Provide completed SECNAV FORM 5512/1 to the Base Visitor Control
Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.
d. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential and will be allowed to proceed to worksite.
Or
a. Submit DBIDS to COR minimum 7 days before the visit. Name on the form needs to match exactly as name on IDs.
b. Once form is completed, take a screenshot of the confirmation page with the QR code and QR barcode. Send the screenshot to COR via email including company, first name, last name, visit date, duration
(days), applicable QR code and QR barcode. SEE APPENDIX D.
7. For Long Term Pass Requests:
DBIDS is not needed if the Contractor has a contract with Travis AFB and has their own sponsor.
a. Initiate long term pass requests with the Government Engineering
Technician at least 14 working days in advance of long-term access to worksite.
b. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes
Contractor employee photo, fingerprints, base restrictions, and several other assessments.
01 00 00 - 12
c. Upon successful completion of DBIDS enrollment process, the
Contractor employee will be issued a DBIDS credential and will be allowed to proceed to worksite.
d. DBIDS eligibility requirements throughout the length of the contract the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges.
DBIDS access privileges will be immediately suspended or revised if at any time a Contractor’s employee becomes ineligible. An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.
e. DBIDS notification requirements:
i. Immediately report instances of lost or stolen badges to the
Contracting Officer.
ii. Immediately collect DBIDS credentials and notify the Contracting
Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly turned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.
F. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.
G. Document Control:
1. Before starting any work, the General Contractor/ Subcontractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
01 00 00 - 13
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the
Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
H. Records Management Requirements: The following standard items relate to records generated in executing the contract and should be included in…