Atch 9 - Architectural 1 of 2.pdf

PDF 18 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Tomah Federal contract opportunity
Solicitation number
36C77622B0031
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document outlines requirements for a federal construction contract solicitation. The solicitation number 36C77622B0031 is for infrastructure upgrades and renovations to existing spaces at the Tomah VA Medical Center campus in Wisconsin. Work includes electrical, HVAC, communication, physical security, and fiber infrastructure upgrades both within and between buildings, as well as modifications to impacted roads, walks, grading, drainage, and other utilities. Data center WAN updates and hazardous material abatement are also required. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Tomah, newest first.
File Type Posted
36C77622B0031 0005.pdf PDF
Follow-up Questions and Responses 7-26-22.pdf PDF
36C77622B0031 0004.pdf PDF
36C77622B0031 0003.pdf PDF
Atch 28 - Construction Wage Rates - Monroe - 7-15-22.pdf PDF
Technical Questions - LATE - Tomah 7-20-22.pdf PDF
OIT-StdTelecomSpacesPgs64-67.pdf PDF
Atch 28 - Construction Wage Rates - Monroe - 6-17-22.pdf PDF
36C77622B0031 0002.pdf PDF
Technical Questions - FINAL - Tomah 7-6-22.pdf PDF
Site Visit Sign-in Sheet - Tomah 6-14-22.pdf PDF
36C77622B0031 0001.pdf PDF
Atch 6 - General.pdf PDF
Atch 13 - Telecommunications 2 of 4.pdf PDF
Atch 16 - Electrical 1 of 4.pdf PDF
Atch 21 - Mechanical 2 of 4.pdf PDF
36C77622B0031 - 5-25-22.pdf PDF
Atch 2 - Specs Division 21-23.pdf PDF
Atch 15 - Telecommunications 4 of 4.pdf PDF
Atch 18 - Electrical 3 of 4.pdf PDF
Atch 19 - Electrical 4 of 4.pdf PDF
Atch 24 - Appendix A-B Specs on TOC.pdf PDF
Atch 1 - Specs Division 00-10.pdf PDF
Atch 8 - Civil 2 of 2.pdf PDF
Atch 10 - Architectural 2 of 2.pdf PDF
Atch 12 - Telecommunications 1 of 4.pdf PDF
Atch 14 - Telecommunications 3 of 4.pdf PDF
Atch 17 - Electrical 2 of 4.pdf PDF
Atch 20 - Mechanical 1 of 4.pdf PDF
Atch 22 - Mechanical 3 of 4.pdf PDF
Atch 23 - Mechanical 4 of 4.pdf PDF
Atch 25 - Appendix C-D Specs on TOC.pdf PDF
Atch 27 - Limitations on Subcontracting - Construction.docx DOCX document
Atch 28 - Construction Wage Rates - Monroe - 4-29-22.pdf PDF
Atch 29 - Contractor Safety - Environmental Form.docx DOCX document
Atch 3 - Specs Division 26-28.pdf PDF
Atch 4 - Specs Division 31-33.pdf PDF
Atch 5 - Sheet Index - EHRM Upgrades.pdf PDF
Atch 7 - Civil 1 of 2.pdf PDF
Atch 26 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Atch 30 - Site Visit - Map.pdf PDF
Atch 11 - Hazmat.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C141

C140

C139

C138

C140A

C112

12301

1230512307

12309

12311 12306

12304

12330

12300

12332

12328 12323

12331

12313

12312

12314

12314A

12315

12316

12319 12318 12318A

12322

12325

12326

12327

12333

12339

12341

12343

12349

12347

12348

12346

12344

12324

12334

12336

12338

12340

C142

U P

D N

U P

U P

DN

UPUP

DN

DN

3-6

3-6

3-6

12335A

TELECOM

12335

HAC

CONSTRUCTION PROJECT ACTIVITY TYPE - D

INFECTION CONTROL RISK GROUP - GROUP 1 : LOW RISK

CONTROL PROCEDURE CLASS - III

INFECTION CONTROL RISK ASSESSMENT (ICRA) BY

PROJECT AREA USE AND PHASE

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

TYPE A

TYPE B

TYPE C

TYPE D

INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT

LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL

DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE

AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF

WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).

ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,

SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF

FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL

CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE

CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH

CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR

COVERING REMOVAL (WITH SANDING OR GRINDING).

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS

NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK

SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.

GROUP 1

LOW RISK

• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT

CARE, INCLUDING INTERSTITIAL SPACES.

• ENGINEERING OR EMS OFFICE/WORK AREAS

• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE

AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR

EXAMINATIONS.

• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO

PATIENT UNITS OR TREATMENT LOCATIONS.

GROUP 2

MEDIUM

RISK

• OUTPATIENT AREAS:

1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS

2. BEHAVIORAL/MENTAL HEALTH AREAS

3. EXTENDED CARE / REHAB CLINIC AREAS

4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)

GROUP 3

HIGH RISK

• IN-PATIENT UNITS:

1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING

UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;

CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /

ONCOLOGY; DIALYSIS

GROUP 4

HIGHEST

RISK

• ICU/SICU

• OR/PACU/ENDOSCOPY

• GI

• STERILE PROCESSING SERVICES (SPS)

• PHARMACY

• CATH LAB

CLASS

I

KEEP AREAS FREE OF DEBRIS, TRASH

EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)

IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION

(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)

CLASS

II

SAME AS CLASS I PLUS:

1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY

2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.

3. BLOCK OFF AND SEAL AIR VENTS

4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.

5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.

9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA

CLASS

III

SAME AS CLASS I AND II PLUS:

1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION

2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE

CORRECTIVE ACTION AS NEEDED

3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.

5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY

6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE

SPREADING DUST. DEBRIS.

7. VACUUM WORK WITH HEPA FILTERED VACUUM.

8. WET MOP AREA WITH CLEANER/DISINFECTANT.

9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.

10. DISPLAY ICRA AT SITE

11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.

CLASS

IV

SAME AS CLASS I, II AND III PLUS:

1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED

2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION

3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE

INFECTION CONTROL &

CONSTRUCTION BARRIER

GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND

PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA

PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS

SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.

ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN

ICRA CLASS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS

AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN

CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,

PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE

VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE

OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR

EACH PERMIT.

5. CONSTRUCT ICRA (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM

FLOOR TO DECK/FLOOR ABOVE.

6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM

AND AFTER 8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE

NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,

(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR

AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO

COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL

TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF

UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE

REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE

ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE

NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.

PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR

EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,

CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER

PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE

BARRIER.

CONSTRUCTION PHASING

GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE

CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00

1.6.G PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING

WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE

A DETAILED WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND

SEQUENCE PLANS, VALIDATING AND ELABORATING ON THIS PHASING

DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO

WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR

DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE

PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE

SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND

APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL

FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE

SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION

PHASING DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH

THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND

THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON

COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT

PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS

FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL

CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS OR IRA - CONSTRUCTION BARRIERS CONSTRUCTED BY

THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE

UNTIL THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE

REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED

AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED

USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND

ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL

DRAWING(S) AND DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS

FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS

OF EGRESS THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN

PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND

VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN

POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.A

R

.r v t

/7

/2

:2

:3

A

M

B23-GC111

FIRST LEVEL INFECTION

CONTROL & PHASING PLAN

EHRM INFRASTRUCTURE

UPGRADES

TOMAH, WI

676-21-700

B23

2/11/22 GJB GJB

16477

1/8" = 1'-0"

FIRST LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN

NOTE:

• PROVIDE 1 HOUR FIRE RATED, STARC SYSTEMS FIREBLOCK WALL

PANELS OR APPROVED EQUAL FOR ALL ICRA/CONSTRUCTION

BARRIERS AND MODIFY SPRINKLER HEADS TO BE UPTURNED AND

EXTENDED TO 18" OF STRUCTURE.

• MOBILE ICRA CONTAINMENT SYSTEMS WILL NEED TO BE USED IN

AREAS OF WORK THAT ARE OUTSIDE OF THE INDICATED ICRA /

CONSTRUCION BARRIER LOCAIONS. SEE MEPT DRAWINGS FOR

ADDITIONAL AREAS OF WORK.

ICRA / CONSTRUCTION BARRIER

LOCATION

Revisions: Date:

C141

C140

C139

C138

C140A

C112

12301

1230512307

12309

12311 12306

12304

12330

12300

12332

12328 12323

12331

12313

12312

12314

12314A

12315

12316

12319 12318 12318A

12322

12325

12326

12327

12333

12339

12341

12343

12349

12347

12348

12346

12344

12324

12334

12336

12338

12340

C142

U P

D N

U P

U P

DN

UPUP

DN

DN

12335A

12335

3-6

3-6

3-6

C139

B23-AE111-01

B23-AE111-01

B23-AE111-01

SEE SHEET GI003 FOR GENERAL NOTES AND SYMBOLS

PANEL PREFIXES

AL- ALUMINUM

CG- COILING GRILLE

CS- COILING SLATS

HM- HOLLOW METAL

OS- OVERHEAD SECTIONAL

RD3- REVOLVING DOOR 3 PANEL

RD4- REVOLVING DOOR 4 PANEL

VL- VERTICAL LIFT

WD- WOOD

AG ALL GLASS

BF BIFOLD

BFGBIFOLD GLASS

D DUTCH

DG DUTCH GLASS

DSDUTCH W/SHELF

FFLUSH

G2GLASS 2 LIGHT

G3GLASS 3 LIGHT

GFGLASS FULL

GH GLASS HALF

LF LOUVER FULL

LGHLOUVER GLASS HALF

LH LOUVER HALF

HM-GF

FRAME PREFIXES

0 FRAMED-CASED OPENING

1 DOOR ONLY

2 SIDELIGHT(S) 1 SIDE

3 SIDELIGHT(S) 1 SIDE W/HORIZONTAL

4 SIDELIGHT(S) BOTH SIDES

5 SIDELIGHT(S) BOTH SIDES W/HORIZONTAL

6 DOOR W/TRANSOM

7 DOOR W/TRANSOM W/SIDELIGHT(S) 1 SIDE

8 TRANSOM W/SIDELIGHT(S) 1 SIDE W/HORIZONTAL

9 TRANSOM W/SIDELIGHT(S) BOTH SIDES

10 TRANSOM W/SIDELIGHT(S) BOTH SIDES W/HORIZONTAL

11 FULL WIDTH TRANSOM W/SIDELIGHT(S) 1 SIDE

1X1 1 LIGHT WIDE AND 1 LIGHT HIGH

2X2 2 LIGHTS WIDE AND 2 LIGHTS HIGH

3X3 3 LIGHTS WIDE AND 3 LIGHTS HIGH

(NOTE: OTHER COMBINATIONS POSSIBLE)

OX FIXED PANEL, ACTIVE PANEL

OXO FIXED PANEL, ACTIVE PANEL, FIXED PANEL

OXX FIXED, ACTIVE, ACTIVE

OXXO FIXED, ACTIVE, ACTIVE, FIXED

OXXXXO FIXED, ACTIVE, ACTIVE, ACTIVE, ACTIVE, FIXED

HMS-2

LNV LOUVER NARROW VISION

NVNARROW VISION

NV2 NARROW VISION 2 LIGHT

NV3 NARROW VISION 3 LIGHT

NVCNARROW VISION CENTERED

RP2 RAISED PANEL 2 PANEL

RP4 RAISED PANEL 4 PANEL

RP6 RAISED PANEL 6 PANEL

RP8 RAISED PANEL 8 PANEL

VVISION

W WINDOWS (1 ROW)

WT WINDOWS THROUGHOUT

DOOR PANEL NAMING

DOOR FRAME NAMING NOTE: ACTUAL FRAMES MAY VARY FROM DESCRIPTIONS

BELOW, REFER TO FRAME TYPE ELEVATIONS

NOTE: ACTUAL PANELS MAY VARY FROM DESCRIPTIONS

BELOW, REFER TO PANEL TYPE ELEVATIONS

PANEL SUFFIXES

AL- ALUMINUM

AL-BL- ALUMINUM BORROWED LIGHT

AL-SL- ALUMINUM SLIDING

ALR- ALUMINUM REVOLVING

CW## CURTAINWALL

HMM- HOLLOW METAL MASONRY

HMM-BL- HMM BORROWED LIGHT

HMM-DE- HMM DOUBLE EGRESS

HMS- HOLLOW METAL STUD

HMS-BL- HMS BORROWED LIGHT

HMS-DE- HMS DOUBLE EGRESS

OC- OVERHEAD COILING

OS- OVERHEAD SECTIONAL

VL- VERTICAL LIFT

WD- WOOD

WD-BL- WOOD BORROWED LIGHT

WDP- WOOD POCKET

FRAME SUFFIXES

FINISHED

FLOOR

HM-F

WD-F

WIDTH

OPENING

O P

E N

IN

G

H E

IG

H

T

FINISHED

FLOOR

HMS-1

O P

E N

IN

G

H E

IG

H

T

WIDTH

OPENING

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

3 HOUR FIRE &

SMOKE BARRIER

FIRE

EXTINGUISHER

FE

FIRE

EXTINGUISHER

CABINET

FEC

LIMITS OF

CONSTRUCTION

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

12335A

TELECOM12335

HAC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.A

R

.r v t

/7

/2

:2

:4

A

M

B23-AE111

FIRST LEVEL FLOOR OVERALL &

ENLARGED LIFE SAFETY PLAN

EHRM INFRASTRUCTURE

UPGRADES

TOMAH, WI

676-21-700

B23

2/11/22 GJB GJB

16477

1/8" = 1'-0"

FIRST LEVEL FLOOR PLAN

0 8' 16'4'

OPENING SCHEDULE

ASSOCIATED ROOMS OPENING PANEL INFORMATION FRAME INFORMATION

H D

W G

R O

U P

F

IR

E L

A B

E L

(M

IN

G A

S K

E T

E

LE

C T

R

IC

A L

S L

A B

E L

COMMENTSFROM ROOM NAME TO ROOM NAME NUMBER WIDTH HEIGHT

PANEL

TYPE

2ND

PANEL

TYPE

PANEL

GLAZING FRAME TYPE

FRAME

GLAZING

HAC 12335 3'-0" 7'-0" WD-F NONE HMS-1 NONE HW-5

TELECOM 12335A 3'-0" 7'-0" WD-F NONE HMS-1 NONE HW-3.

45 Y Y Y

TYPES - PANELS TYPES - FRAMES

1/4" = 1'-0"2

ENLARGED LIFE SAFETY PLAN - PARTIAL FIRST LEVEL

C139 12333

12335A

12335C139 12333

3D 3 D

A

LI

G N

DE1

DE5

DE1 DE2

DE4

REMOVE METAL CAGE

AND ALL ASSOCIATED

HARDWARE

DE10

REMOVE FIRE HOSE CABINET AND

TRIM. SEE MECHANICAL FOR

ADDITIONAL INFORMATION.

DE2

DE5

DE5

DE5

DE3

DE5

DEMOLITION PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1

REMOVE VCT FLOOR FINISH AND VINYL BASE IN ITS ENTIRETY. PATCH &

PREP FLOOR FOR SCHEDULED FINISH. SEE SPECIFICATION SECTION 09 05

16 SUBSURFACE PREPARATION FOR FLOOR FINISHES

DE2

REMOVE ACT CEILING IN ITS ENTIRETY. INCLUDING ALL CEILING MOUNTED

EQUIPMENT & MECHANICAL & ELECTRICAL ITEMS. SEE MECHANICAL /

ELECTRICAL.

DE3

REMOVE GYP BD ON ONE SIDE OF PARTITION AS REQUIRED FOR

MECHANICAL, PLUMBING OR ELECTRICAL WORK. SEE PLANS AND

MECHANICAL / ELECTRICAL PLANS FOR ADDITIONAL INFORMATION

DE4

CUT OPENING IN PARTITION AS REQUIRED FOR INSTALLATION OF DOOR

AND FRAME AS SCHEDULED. SEE PLAN

DE5

REMOVE PORTION OF CEILING AS REQUIRED FOR WORK IN THIS AREA. SEE

PLANS FOR ADDITIONAL INFORMATION.

DE6

REMOVE PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. -SEE MEP

DRAWINGS FOR ADDITIONAL INFORMATION

DE7

REMOVE BASE CABINETS, UPPER CABINETS, TALL CABINETS AND/ OR

COUNTERTOP AND SUPPORT BRACKETS AS REQUIRED

DE8

REMOVE PORTION OF PARTITION AS REQUIRED. SEE FLOOR PLAN AND

MEP FOR ADDITIONAL INFORMATION.

DE9

REMOVE PORTION OF RAILING AND / OR CRASH RAIL AS REQUIRED. SEE

FINISH PLAN FOR ADDITIONAL INFORMATION

DE10

REMOVE EXISTING ROOM IDENTIFICATION SIGN AND SALVAGE FOR

REINSATLLATION.

DE11

REMOVE PREMANUFACTURED WALK IN REFRIGERATOR SYSTEM IN ITS

ENTIRETY. SEE MEP PLANS FOR ADDITIONAL INFORMATION.

DE12

REMOVE CERAMIC TILE FLOORING. PATCH & PREP FLOOR FOR SCHEDULED

FINISH. SEE SPECIFICATION SECTION 09 05 16 SUBSURFACE PREPARATION

FOR FLOOR FINISHES.

DE13

SAW CUT PLASTER AND HOLLOW BUILDING TILE PARTITION FLOOR TO

CEILING AND REMOVE AS REQUIRED. SEE FLOOR PLAN FOR ADDITIONAL

INFORMATION.

DE14

REMOVE CARPET FLOORING AND BASE AND VCT FLOORING (2 LAYERS) IN

ITS ENTIRETY. PATCH & PREP FLOOR FOR SCHEDULED FINISH. SEE

SPECIFICATION SECTION 09 05 16 SUBSURFACE PREPARATION FOR FLOOR

FINISHES

DE15

REMOVE SUSPENDED LATH AND PLASTER CEILING IN ITS ENTIRETY.

INCLUDING ALL CEILING MOUNTED EQUIPMENT & MECHANICAL &

ELECTRICAL ITEMS. SEE MECHANICAL / ELECTRICAL.

DE16 REMOVE INTERIOR WINDOW SYSTEM AND TRIM IN ITS ENTIRETY.

DE17

REMOVE SHEET FLOORING FINISH AND INTEGRAL COVE BASE IN ITS

ENTIRETY. PATCH & PREP FLOOR FOR SCHEDULED FINISH. SEE

SPECIFICATION SECTION 09 05 16 SUBSURFACE PREPARATION FOR FLOOR

FINISHES

DE18

REMOVE WALL COVERING IN ITS ENTIRETY. REMOVE CARPET BASE AND

SALVAGE FOR REINSTALLATION. PATCH AND PREP FOR NEW FINISHES.

DE19

SAWCUT TERRAZZO HORIZONTALLY AND VERTICALLY AT FLOOR TO

PARTITION TRANSITION. PATCH AND PREP FOR NEW FINISHES.

DE20 REMOVE HANDRAIL IN ITS ENTIRETY. PATCH AND PREP FOR NEW FINISHES.

DE21

CUT SHEET FLOORING AT FLOOR TO PARTITION TRANSITION AND REMOVE

INTEGRAL COVE BASE, LEAVING FLOOR IN PLACE. PATCH AND PREP FOR

NEW FINISHES. SEE FINISH PLAN FOR EXTENT OF DEMOLITION.

FLOOR PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FL1

PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING FINISHES

ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE

PARTITION WHERE PATCHING OCCURS.

FL2

PROVIDE PLYWOOD 3 SIDES OF ROOM. SEE TYPICAL ELEVATIONS SHEET

AE211

FL3

PROVIDE METAL STUDS, AS REQUIRED AND GYP BD BOTH SIDES OF

PARTITION, ABOVE REMOVED CEILING TO UNDERSIDE OF DECK ABOVE.

WHERE PATCHING IS VISIBLE IN ROOM, PAINT TO MATCH ADJACENT FINISH,

PAINT ENTIRE PARTITION WHERE PATCHING OCCURS.

FL4

PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES, AS REQUIRED FROM REMOVAL OF MECHANICAL, ELECTRICAL,

PLUMBING AND/ OR FIRE PROTECTION ITEMS. WHERE EXISTING FINISHES

ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE

PARTITION WHERE PATCHING OCCURS. SEE MEP DRAWINGS FOR

ADDITIONAL INFORMATION

FL5

INFILL OPENING. PATCH ADJACENT SURFACES WITH MATERIALS TO MATCH

EXISTING AS REQUIRED FROM DEMOLITION. WHERE EXISTING FINISHES

ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE

PARTITION WHERE PATCHING OCCURS. BOTH SIDES.

FL6

PROVIDE BLAST RESISTANT FILM APPLIED TO THE INSIDE FACE (ROOM

SIDE) OF GLASS. INSTALL PER MANUFACTURES INSTRUCTIONS FOR BLAST

RESISTANCE.

FL7

PATCH / MODIFY ACT CEILING TILE AND GRID AS NECESSARY,

CONTRACTOR TO PROVIDE LABOR AND MATERIALS. REPLACE ANY

BROKEN, DAMAGED OR DIRTY ACT TILES AND CEILING GRID. COORDINATE

WITH OWNER FOR ACT AND CEILING GRID TYPE. WHERE EXISTING

FINISHES ARE DISTURBED ON PAINTED SURFACES. PAINT TO MATCH

ADJACENT FINISH. PAINT ENTIRE PARTITION / SOFFIT OF EXISTING

INTERIOR SPACES WHERE PATCHING OCCURS.

FL8

PROVIDE SEMI-RECESSED RATED FIRE EXTINGUISHER CABINET. SEE

DRAWINGS AND LIFE SAFETY SYMBOLS FOR ADDITIONAL INFORMATION

FL9

PATCH METAL LATH AND PLASTER CEILING AS REQUIRED FROM

DEMOLITION. PAINT TO MATCH EXISTING FINISHES. PAINT ENTIRE CEILING

WHERE PATCHING OCCURS.

FL10

UPGRADE PARTITIONS TO 1 HOUR FIRE AND SMOKE BARRIER WHERE

INDICATED ON PLAN. PROVIDE TESTED HEAD OF PARTITION ASSEMBLY

WITH MATERIALS THAT RESIST THE PASSAGE OF SMOKE. SEAL JOINT AT

HEAD AND ALL PENETRATIONS WITH FIRE CAULK.

FL11

REINSTALL CEILING TILE AND GRID AS REQUIRED FROM DEMOLITION,

MECHANICAL, ELECTRICAL, PLUMBING, TELECOM OR FIRE PROTECTION

WORK. REPLACE ANY BROKEN, DAMAGED OR DIRTY ACT TILES AND

CEILING GRID. COORDINATE WITH OWNER FOR ACT AND CEILING GRID

TYPE. SEE MEPT FOR ADDITIONAL INFORMATION.

FL12

PROVIDE UL RATED 1 HOUR HORIZONTAL SHAFT WALL ASSEMBLY AT

CEILING TIGHT TO UNDERSIDE OF EXISTING STRUCTURE ABOVE. WHERE

EXISTING FINISHES ARE DISTURBED ON PAINTED SURFACES. PAINT TO

MATCH ADJACENT FINISH. PAINT ENTIRE PARTITION ON INTERIOR SPACES

WHERE PATCHING OCCURS. PAINT CEILING TO MATCH ADJACENT FINISH.

FINISH PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FN1

FINISH PARTITION TO MATCH EXISTING THIS AREA, INCLUDING, BUT NOT

LIMITED TO, PAINT, WALLCOVERING, WALL PROTECTION AND WALL BASE.

CONTRACTOR TO PROVIDE LABOR AND MATERIALS

FN2 FINISH PARTITION WITH P-2 & RB-1.

FN3

MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,

RETURNS AND ALL HARDWARE, TO MATCH EXISTING. AS REQUIRED FOR

INSTALLATION.

FN4

TELECOM ROOM TYPICAL FINISHES; SD-1 AT FLOOR, RB-1 AT BASE. ALL

WALL MOUNTED PLYWOOD TO HAVE FP-1, ALL OTHER WALL SURFACES TO

HAVE P-1. SEE 1 & 2/AE211 FOR ADDITONAL INFORMATION.

FN5

WHERE EXISTING FINISHES ARE DISTURBED BY CONSTRUCTION, FINISH TO

MATCH ADJACENT FINISHES, FINISH ENTIRE PORTION OF PARTITION AS

SHOWN WITHIN DIMENSION.

FN6

MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,

RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR

INSTALLATION – HR-2.

FN7

MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,

RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR

INSTALLATION – HR-3.

FN9

MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,

RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR

INSTALLATION OR INSTALL NEW; CONTRACTOR'S CHOICE – HR-4.

FN10 FINISH PARITION WITH P-1 & REINSTALL SALVAGED CARPET BASE.

FN11 INSTALL CG-1, COLOR 0154 CLAM SHELL

FN12 SEE DETAIL _/AF601 FOR WALL FINISHES

FN13 FINISH PARTITION WITH P-6 & RB-3

FN14 FINISH PARTITION WITH P-2 & RB-3

FN15 FINISH PARTITION WITH P-2 & RB-4

FN8 INSTALL NEW HANDRAIL HR-2.

12335A

TELECOM

12335A

12335

B3bs

FL5

FL2

FL1

12335

HAC

FL5

B3bs

FL1FL8 CR

FL10

B6bs

FL11

FL11

FL12

FL4

FL4

FL11

126 SF

12335A

TELECOM

FN1

FN2

12335

HAC

IN.03-0100

FN4

IN-01.31

THIS AREA

FINISH ENTIRE PARTITION

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR

PARTITION TO BE

REMOVED

EXISTING DOOR

AND FRAME TO

REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR

AND FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR

AND FRAME TO

REMAIN

DOOR

INTERIOR

BORROWED LIGHT

101B

101A

8'-0"

DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR

ELEVATION

INDICATOR TAG

2B

AE2O1

EXTERIOR

ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.A

R

.r v t

/7

/2

:2

:5

A

M

B23-AE111-01

FIRST LEVEL ENLARGED FLOOR,

RCP AND FINISH PLANS

EHRM INFRASTRUCTURE

UPGRADES

TOMAH, WI

676-21-700

B23

2/11/22 GJB GJB

16477

1/4" = 1'-0"1

ENLARGED DEMOLITION PLAN - FIRST LEVEL - ROOM 12335A

0 4' 8'2' 0 4' 8'2'0 4' 8'2'

NOTE: COORDINATE GENERAL DEMOLITION

WORK WITH ABATEMENT AND REMEDIATION WORK

1/4" = 1'-0"

ENLARGED PLAN - FIRST LEVEL - TELECOM 12335A

1/4" = 1'-0"

FINISH PLAN - FIRST LEVEL - TELECOM 12335A

OFFICE

OFFICE OFFICE

CONFERENCE

RECEPTION

AREA

OFFICE

S T

O R

A G

E

T O

IL

E

T

CORRIDOR

U T

IL

IT

Y

T O

IL

E

T

T O

IL

E

T

ROOM

4 10

WAREHOUSE/STORAGE

SECOND FLOOR LEVEL

DN

118A

TELECOM

CONSTRUCTION PROJECT ACTIVITY TYPE - D

INFECTION CONTROL RISK GROUP - GROUP 1 : LOW RISK

CONTROL PROCEDURE CLASS - III

INFECTION CONTROL RISK ASSESSMENT (ICRA) BY

PROJECT AREA USE AND PHASE

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

TYPE A

TYPE B

TYPE C

TYPE D

INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT

LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL

DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE

AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF

WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).

ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,

SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF

FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL

CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE

CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH

CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR

COVERING REMOVAL (WITH SANDING OR GRINDING).

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS

NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK

SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.

GROUP 1

LOW RISK

• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT

CARE, INCLUDING INTERSTITIAL SPACES.

• ENGINEERING OR EMS OFFICE/WORK AREAS

• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE

AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR

EXAMINATIONS.

• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO

PATIENT UNITS OR TREATMENT LOCATIONS.

GROUP 2

MEDIUM

RISK

• OUTPATIENT AREAS:

1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS

2. BEHAVIORAL/MENTAL HEALTH AREAS

3. EXTENDED CARE / REHAB CLINIC AREAS

4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)

GROUP 3

HIGH RISK

• IN-PATIENT UNITS:

1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING

UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;

CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /

ONCOLOGY; DIALYSIS

GROUP 4

HIGHEST

RISK

• ICU/SICU

• OR/PACU/ENDOSCOPY

• GI

• STERILE PROCESSING SERVICES (SPS)

• PHARMACY

• CATH LAB

CLASS

I

KEEP AREAS FREE OF DEBRIS, TRASH

EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)

IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION

(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)

CLASS

II

SAME AS CLASS I PLUS:

1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY

2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.

3. BLOCK OFF AND SEAL AIR VENTS

4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.

5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.

9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA

CLASS

III

SAME AS CLASS I AND II PLUS:

1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION

2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE

CORRECTIVE ACTION AS NEEDED

3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.

5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY

6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE

SPREADING DUST. DEBRIS.

7. VACUUM WORK WITH HEPA FILTERED VACUUM.

8. WET MOP AREA WITH CLEANER/DISINFECTANT.

9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.

10. DISPLAY ICRA AT SITE

11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.

CLASS

IV

SAME AS CLASS I, II AND III PLUS:

1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED

2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION

3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE

INFECTION CONTROL &

CONSTRUCTION BARRIER

GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND

PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA

PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS

SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.

ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN

ICRA CLASS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS

AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN

CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,

PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE

VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE

OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR

EACH PERMIT.

5. CONSTRUCT ICRA (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM

FLOOR TO DECK/FLOOR ABOVE.

6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM

AND AFTER 8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE

NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,

(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR

AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO

COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL

TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF

UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE

REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE

ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE

NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.

PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR

EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,

CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER

PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE

BARRIER.

CONSTRUCTION PHASING

GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE

CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00

1.6.G PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING

WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE

A DETAILED WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND

SEQUENCE PLANS, VALIDATING AND ELABORATING ON THIS PHASING

DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO

WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR

DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE

PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE

SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND

APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL

FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE

SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION

PHASING DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH

THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND

THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON

COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT

PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS

FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL

CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS OR ICRA - CONSTRUCTION BARRIERS CONSTRUCTED BY

THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE

UNTIL THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE

REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED

AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED

USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND

ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL

DRAWING(S) AND DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS

FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS

OF EGRESS THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN

PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND

VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN

POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.A

R

.r v t

/7

/2

:3

:5

A

M

B25-GC111

FIRST LEVEL INFECTION

CONTROL & PHASING PLAN

EHRM Infrastructure Upgrades

Tomah, WI

676-21-700

B25

2/11/22 GJB GJB

16477

3/16" = 1'-0"

FIRST LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN

NOTE:

• PROVIDE 1 HOUR FIRE RATED, STARC SYSTEMS FIREBLOCK WALL

PANELS OR APPROVED EQUAL FOR ALL ICRA/CONSTRUCTION

BARRIERS AND MODIFY SPRINKLER HEADS TO BE UPTURNED AND

EXTENDED TO 18" OF STRUCTURE.

• MOBILE ICRA CONTAINMENT SYSTEMS WILL NEED TO BE USED IN

AREAS OF WORK THAT ARE OUTSIDE OF THE INDICATED ICRA /

CONSTRUCION BARRIER LOCAIONS. SEE MEPT DRAWINGS FOR

ADDITIONAL AREAS OF WORK.

ICRA / CONSTRUCTION BARRIER

OFFICE

OFFICE OFFICE

CONFERENCE

RECEPTION

AREA

OFFICE

S T

O R

A G

E

T O

IL

E

T

CORRIDOR

U T

IL

IT

Y

T O

IL

E

T

T O

IL

E

T

ROOM

4 10

WAREHOUSE/STORAGE

D

D

D

D

W

W

W

SECOND FLOOR LEVEL

DN

118A

TELECOM

WAREHOUSE

B25-AE111

B25-AE111

118A

TELECOM

WAREHOUSE

8' -0

10'-0"

LIMITS OF CONSTRUCTION

LI

M

IT

S

O F

C O

N S

T R

U C

T

IO

N

118A

CR

B3bs

FL8

B6bs

FL6

PANEL PREFIXES

AL- ALUMINUM

CG- COILING GRILLE

CS- COILING SLATS

HM- HOLLOW METAL

OS- OVERHEAD SECTIONAL

RD3- REVOLVING DOOR 3 PANEL

RD4- REVOLVING DOOR 4 PANEL

VL- VERTICAL LIFT

WD- WOOD

AG ALL GLASS

BF BIFOLD

BFGBIFOLD GLASS

D DUTCH

DG DUTCH GLASS

DSDUTCH W/SHELF

FFLUSH

G2GLASS 2 LIGHT

G3GLASS 3 LIGHT

GFGLASS FULL

GH GLASS HALF

LF LOUVER FULL

LGHLOUVER GLASS HALF

LH LOUVER HALF

HM-GF

FRAME PREFIXES

0 FRAMED-CASED OPENING

1 DOOR ONLY

2 SIDELIGHT(S) 1 SIDE

3 SIDELIGHT(S) 1 SIDE W/HORIZONTAL

4 SIDELIGHT(S) BOTH SIDES

5 SIDELIGHT(S) BOTH SIDES W/HORIZONTAL

6 DOOR W/TRANSOM

7 DOOR W/TRANSOM W/SIDELIGHT(S) 1 SIDE

8 TRANSOM W/SIDELIGHT(S) 1 SIDE W/HORIZONTAL

9 TRANSOM W/SIDELIGHT(S) BOTH SIDES

10 TRANSOM W/SIDELIGHT(S) BOTH SIDES W/HORIZONTAL

11 FULL WIDTH TRANSOM W/SIDELIGHT(S) 1 SIDE

1X1 1 LIGHT WIDE AND 1 LIGHT HIGH

2X2 2 LIGHTS WIDE AND 2 LIGHTS HIGH

3X3 3 LIGHTS WIDE AND 3 LIGHTS HIGH

(NOTE: OTHER COMBINATIONS POSSIBLE)

OX FIXED PANEL, ACTIVE PANEL

OXO FIXED PANEL, ACTIVE PANEL, FIXED PANEL

OXX FIXED, ACTIVE, ACTIVE

OXXO FIXED, ACTIVE, ACTIVE, FIXED

OXXXXO FIXED, ACTIVE, ACTIVE, ACTIVE, ACTIVE, FIXED

HMS-2

LNV LOUVER NARROW VISION

NVNARROW VISION

NV2 NARROW VISION 2 LIGHT

NV3 NARROW VISION 3 LIGHT

NVCNARROW VISION CENTERED

RP2 RAISED PANEL 2 PANEL

RP4 RAISED PANEL 4 PANEL

RP6 RAISED PANEL 6 PANEL

RP8 RAISED PANEL 8 PANEL

VVISION

W WINDOWS (1 ROW)

WT WINDOWS THROUGHOUT

DOOR PANEL NAMING

DOOR FRAME NAMING NOTE: ACTUAL FRAMES MAY VARY FROM DESCRIPTIONS

BELOW, REFER TO FRAME TYPE ELEVATIONS

NOTE: ACTUAL PANELS MAY VARY FROM DESCRIPTIONS

BELOW, REFER TO PANEL TYPE ELEVATIONS

PANEL SUFFIXES

AL- ALUMINUM

AL-BL- ALUMINUM BORROWED LIGHT

AL-SL- ALUMINUM SLIDING

ALR- ALUMINUM REVOLVING

CW## CURTAINWALL

HMM- HOLLOW METAL MASONRY

HMM-BL- HMM BORROWED LIGHT

HMM-DE- HMM DOUBLE EGRESS

HMS- HOLLOW METAL STUD

HMS-BL- HMS BORROWED LIGHT

HMS-DE- HMS DOUBLE EGRESS

OC- OVERHEAD COILING

OS- OVERHEAD SECTIONAL

VL- VERTICAL LIFT

WD- WOOD

WD-BL- WOOD BORROWED LIGHT

WDP- WOOD POCKET

FRAME SUFFIXES

FINISHED

FLOOR

HM-F

WD-F

WIDTH

OPENING

O P

E N

IN

G

H E

IG

H

T

FINISHED

FLOOR

HMS-1

O P

E N

IN

G

H E

IG

H

T

WIDTH

OPENING

FLOOR PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FL1

PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING FINISHES

ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE

PARTITION WHERE PATCHING OCCURS.

FL2

PROVIDE PLYWOOD 3 SIDES OF ROOM. SEE TYPICAL ELEVATIONS SHEET

AE211

FL3

PROVIDE METAL STUDS, AS REQUIRED AND GYP BD BOTH SIDES OF

PARTITION, ABOVE REMOVED CEILING TO UNDERSIDE OF DECK ABOVE.

WHERE PATCHING IS VISIBLE IN ROOM, PAINT TO MATCH ADJACENT FINISH,

PAINT ENTIRE PARTITION WHERE PATCHING OCCURS.

FL4

PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES, AS REQUIRED FROM REMOVAL OF MECHANICAL, ELECTRICAL,

PLUMBING AND/ OR FIRE PROTECTION ITEMS. WHERE EXISTING FINISHES

ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE

PARTITION WHERE PATCHING OCCURS. SEE MEP DRAWINGS FOR

ADDITIONAL INFORMATION

FL5

INFILL OPENING. PATCH ADJACENT SURFACES WITH MATERIALS TO MATCH

EXISTING AS REQUIRED FROM DEMOLITION. WHERE EXISTING FINISHES

ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE

PARTITION WHERE PATCHING OCCURS. BOTH SIDES.

FL6

PROVIDE BLAST RESISTANT FILM APPLIED TO THE INSIDE FACE (ROOM

SIDE) OF GLASS. INSTALL PER MANUFACTURES INSTRUCTIONS FOR BLAST

RESISTANCE.

FL7

PATCH / MODIFY ACT CEILING TILE AND GRID AS NECESSARY,

CONTRACTOR TO PROVIDE LABOR AND MATERIALS. REPLACE ANY

BROKEN, DAMAGED OR DIRTY ACT TILES AND CEILING GRID. COORDINATE

WITH OWNER FOR ACT AND CEILING GRID TYPE. WHERE EXISTING

FINISHES ARE DISTURBED ON PAINTED SURFACES. PAINT TO MATCH

ADJACENT FINISH. PAINT ENTIRE PARTITION / SOFFIT OF EXISTING

INTERIOR SPACES WHERE PATCHING OCCURS.

FL8

PROVIDE SEMI-RECESSED RATED FIRE EXTINGUISHER CABINET. SEE

DRAWINGS AND LIFE SAFETY SYMBOLS FOR ADDITIONAL INFORMATION

FL9

PATCH METAL LATH AND PLASTER CEILING AS REQUIRED FROM

DEMOLITION. PAINT TO MATCH EXISTING FINISHES. PAINT ENTIRE CEILING

WHERE PATCHING OCCURS.

FL10

UPGRADE PARTITIONS TO 1 HOUR FIRE AND SMOKE BARRIER WHERE

INDICATED ON PLAN. PROVIDE TESTED HEAD OF PARTITION ASSEMBLY

WITH MATERIALS THAT RESIST THE PASSAGE OF SMOKE. SEAL JOINT AT

HEAD AND ALL PENETRATIONS WITH FIRE CAULK.

FL11

REINSTALL CEILING TILE AND GRID AS REQUIRED FROM DEMOLITION,

MECHANICAL, ELECTRICAL, PLUMBING, TELECOM OR FIRE PROTECTION

WORK. REPLACE ANY BROKEN, DAMAGED OR DIRTY ACT TILES AND

CEILING GRID. COORDINATE WITH OWNER FOR ACT AND CEILING GRID

TYPE. SEE MEPT FOR ADDITIONAL INFORMATION.

FL12

PROVIDE UL RATED 1 HOUR HORIZONTAL SHAFT WALL ASSEMBLY AT

CEILING TIGHT TO UNDERSIDE OF EXISTING STRUCTURE ABOVE. WHERE

EXISTING FINISHES ARE DISTURBED ON PAINTED SURFACES. PAINT TO

MATCH ADJACENT FINISH. PAINT ENTIRE PARTITION ON INTERIOR SPACES

WHERE PATCHING OCCURS. PAINT CEILING TO MATCH ADJACENT FINISH.

118A

TELECOM

WAREHOUSE

IN-03.01

FN4

FN2

FINISH PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FN1

FINISH PARTITION TO MATCH EXISTING THIS AREA, INCLUDING, BUT NOT

LIMITED TO, PAINT, WALLCOVERING, WALL PROTECTION AND WALL BASE.

CONTRACTOR TO PROVIDE LABOR AND MATERIALS

FN2 FINISH PARTITION WITH P-2 & RB-1.

FN3

MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,

RETURNS AND ALL HARDWARE, TO MATCH EXISTING. AS REQUIRED FOR

INSTALLATION.

FN4

TELECOM ROOM TYPICAL FINISHES; SD-1 AT FLOOR, RB-1 AT BASE. ALL

WALL MOUNTED PLYWOOD TO HAVE FP-1, ALL OTHER WALL SURFACES TO

HAVE P-1. SEE 1 & 2/AE211 FOR ADDITONAL INFORMATION.

FN5

WHERE EXISTING FINISHES ARE DISTURBED BY CONSTRUCTION, FINISH TO

MATCH ADJACENT FINISHES, FINISH ENTIRE PORTION OF PARTITION AS

SHOWN WITHIN DIMENSION.

FN6

MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,

RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR

INSTALLATION – HR-2.

FN7

MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,

RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR

INSTALLATION – HR-3.

FN8 INSTALL NEW HANDRAIL HR-2.

FN9

MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,

RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR

INSTALLATION OR INSTALL NEW; CONTRACTOR'S CHOICE – HR-4.

FN10 FINISH PARITION WITH P-1 & REINSTALL SALVAGED CARPET BASE.

FN11 INSTALL CG-1, COLOR 0154 CLAM SHELL

FN12 SEE DETAIL _/AF601 FOR WALL FINISHES

FN13 FINISH PARTITION WITH P-6 & RB-3

FN14 FINISH PARTITION WITH P-2 & RB-3

FN15 FINISH PARTITION WITH P-2 & RB-4

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

3 HOUR FIRE &

SMOKE BARRIER

LIMITS OF

CONSTRUCTION

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

118A

TELECOM

WAREHOUSE

CO2 FEC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.A

R

.r v t

/7

/2

:3

:0

A

M

B25-AE111

FIRST LEVEL & ENLARGED PLANS,

OPENING SCHEDULED

EHRM Infrastructure Upgrades

Tomah, WI

676-21-700

B25

2/11/22 GJB GJB

16477

1/8" = 1'-0"

FIRST LEVEL FLOOR PLAN

0 8' 16'4'

1/4" = 1'-0"2

ENLARGED PLAN - FIRST LEVEL - TELECOM 118A

OPENING SCHEDULE

ASSOCIATED ROOMS OPENING PANEL INFORMATION FRAME INFORMATION

H D

W G

R O

U P

F

IR

E L

A B

E L

(M

IN

G A

S K

E T

E

LE

C T

R

IC

A L

S L

A B

E L

COMMENTSFROM ROOM NAME TO ROOM NAME NUMBER WIDTH HEIGHT

PANEL

TYPE

2ND

PANEL

TYPE

PANEL

GLAZING FRAME TYPE

FRAME

GLAZING

WAREHOUSE TELECOM 118A 3'-0" 7'-0" WD-F NONE HMS-1 NONE HW-3.

45 Y Y Y

TYPES - PANELS TYPES - FRAMES

1/4" = 1'-0"3

ENLARGED FINISH PLAN - FIRST LEVEL - TELECOM 118A

NOTE:

- COORDINATE WORK WITH ABATEMENT AND REMEDIATION WORK

- SEE SHEET GI003 FOR GENERAL NOTES AND SYMBOLS

0 4' 8'2'0 4' 8'2'1/4" = 1'-0"4

ENLARGED LIFE SAFETY PLAN - PARTIAL FIRST LEVEL

0 4' 8'2'

1D

2D

D

D

7D 1D 1D 1D

2D

4D

4D

D

4D

105A

TELECOM

105B

STORAGE

CONSTRUCTION PROJECT ACTIVITY TYPE - D

INFECTION CONTROL RISK GROUP - GROUP 1: LOW RISK

CONTROL PROCEDURE CLASS - III

INFECTION CONTROL RISK ASSESSMENT (ICRA) BY

PROJECT AREA USE AND PHASE

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

TYPE A

TYPE B

TYPE C

TYPE D

INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT

LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL

DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE

AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF

WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).

ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,

SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF

FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL

CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE

CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH

CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR

COVERING REMOVAL (WITH SANDING OR GRINDING).

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS

NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK

SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.

GROUP 1

LOW RISK

• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT

CARE, INCLUDING INTERSTITIAL SPACES.

• ENGINEERING OR EMS OFFICE/WORK AREAS

• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE

AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR

EXAMINATIONS.

• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO

PATIENT UNITS OR TREATMENT LOCATIONS.

GROUP 2

MEDIUM

RISK

• OUTPATIENT AREAS:

1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS

2. BEHAVIORAL/MENTAL HEALTH AREAS

3. EXTENDED CARE / REHAB CLINIC AREAS

4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)

GROUP 3

HIGH RISK

• IN-PATIENT UNITS:

1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING

UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;

CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /

ONCOLOGY; DIALYSIS

GROUP 4

HIGHEST

RISK

• ICU/SICU

• OR/PACU/ENDOSCOPY

• GI

• STERILE PROCESSING SERVICES (SPS)

• PHARMACY

• CATH LAB

CLASS

I

KEEP AREAS FREE OF DEBRIS, TRASH

EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)

IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION

(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)

CLASS

II

SAME AS CLASS I PLUS:

1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY

2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.

3. BLOCK OFF AND SEAL AIR VENTS

4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.

5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.

9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA

CLASS

III

SAME AS CLASS I AND II PLUS:

1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION

2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE

CORRECTIVE ACTION AS NEEDED

3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.

5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY

6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE

SPREADING DUST. DEBRIS.

7. VACUUM WORK WITH HEPA FILTERED VACUUM.

8. WET MOP AREA WITH CLEANER/DISINFECTANT.

9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.

10. DISPLAY ICRA AT SITE

11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.

CLASS

IV

SAME AS CLASS I, II AND III PLUS:

1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED

2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION

3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE

INFECTION CONTROL &

CONSTRUCTION BARRIER

GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND

PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA

PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS

SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.

ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN

ICRA CLASS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS

AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN

CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,

PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE

VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE

OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR

EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR

TO DECK/FLOOR ABOVE.

6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM

AND AFTER 8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE

NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,

(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR

AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO

COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL

TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF

UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE

REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE

ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE

NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.

PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR

EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,

CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER

PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE

BARRIER.

CONSTRUCION PHASING

GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE

CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00

1.6.__ PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING

WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE

A DETAILED WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND

SEQUENCE PLANS, VALIDATING AND ELABORATING ON THIS PHASING

DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO

WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR

DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE

PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE

SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND

APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL

FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE

SEQUENCE SHOWN ON THE PHASING PLAN…

This is the start of the file's text. The full file is on GovTribe.