Atch 6 - General.pdf

PDF 2 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Tomah Federal contract opportunity
Solicitation number
36C77622B0031
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document outlines the scope of work for a federal construction contract opportunity involving infrastructure upgrades at a Department of Veterans Affairs medical center. The project includes upgrading electrical, communication, HVAC, and fiber infrastructure across campus buildings, along with modifying impacted roads, walks, and utilities. Data center and hazardous material abatement work are also within scope. Bids are due on an unspecified date in 2022 for renovations that are expected to reconfigure and update existing spaces based on the infrastructure improvements.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Tomah, newest first.
File Type Posted
36C77622B0031 0005.pdf PDF
Follow-up Questions and Responses 7-26-22.pdf PDF
36C77622B0031 0004.pdf PDF
Technical Questions - LATE - Tomah 7-20-22.pdf PDF
OIT-StdTelecomSpacesPgs64-67.pdf PDF
36C77622B0031 0003.pdf PDF
Atch 28 - Construction Wage Rates - Monroe - 7-15-22.pdf PDF
36C77622B0031 0002.pdf PDF
Technical Questions - FINAL - Tomah 7-6-22.pdf PDF
Atch 28 - Construction Wage Rates - Monroe - 6-17-22.pdf PDF
Site Visit Sign-in Sheet - Tomah 6-14-22.pdf PDF
36C77622B0031 0001.pdf PDF
36C77622B0031 - 5-25-22.pdf PDF
Atch 2 - Specs Division 21-23.pdf PDF
Atch 15 - Telecommunications 4 of 4.pdf PDF
Atch 18 - Electrical 3 of 4.pdf PDF
Atch 19 - Electrical 4 of 4.pdf PDF
Atch 24 - Appendix A-B Specs on TOC.pdf PDF
Atch 3 - Specs Division 26-28.pdf PDF
Atch 4 - Specs Division 31-33.pdf PDF
Atch 5 - Sheet Index - EHRM Upgrades.pdf PDF
Atch 7 - Civil 1 of 2.pdf PDF
Atch 9 - Architectural 1 of 2.pdf PDF
Atch 26 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Atch 30 - Site Visit - Map.pdf PDF
Atch 11 - Hazmat.pdf PDF
Atch 13 - Telecommunications 2 of 4.pdf PDF
Atch 16 - Electrical 1 of 4.pdf PDF
Atch 21 - Mechanical 2 of 4.pdf PDF
Atch 1 - Specs Division 00-10.pdf PDF
Atch 8 - Civil 2 of 2.pdf PDF
Atch 10 - Architectural 2 of 2.pdf PDF
Atch 12 - Telecommunications 1 of 4.pdf PDF
Atch 14 - Telecommunications 3 of 4.pdf PDF
Atch 17 - Electrical 2 of 4.pdf PDF
Atch 20 - Mechanical 1 of 4.pdf PDF
Atch 22 - Mechanical 3 of 4.pdf PDF
Atch 23 - Mechanical 4 of 4.pdf PDF
Atch 25 - Appendix C-D Specs on TOC.pdf PDF
Atch 27 - Limitations on Subcontracting - Construction.docx DOCX document
Atch 28 - Construction Wage Rates - Monroe - 4-29-22.pdf PDF
Atch 29 - Contractor Safety - Environmental Form.docx DOCX document
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

IT

U M

IN

O U S

P A

TH

H

C O N C R E T E

C U R B

C O N C R E T E

C U R B

C O N C R E T E C U R B

CON

CR

ET

E C

UR

B

C O N C R E T E

C U R B

WATER ELEVATION = 945.6

SEPTEMBER 29, 2015

GAZEBO

CONCRETE

B

B

B

B

B

B

B

B

B

B

B

B

B

P O N D

SMOKING

SHELTER

WELL HOUSE

GENERATOR

BUILDING

G E N E R A T O R

B U

IL

D

IN

G

GENERATOR

BUILDING

GENERATOR

BUILDING

WELL HOUSE

WELL

HOUSE

PUMP

TREATMENT

HOUSE

SMOKING SHELTER

SMOKING SHELTER

SMOKING

SHELTER

SMOKING SHELTER

SMOKING SHELTER

GENERATOR

BUILDING

402A

410 409

446 450

6 5

3 12 4

T370

411 412

T240

STEPS

OVERHANG

STEPS

U N D E R G R O U N D

F U E L S T O R A G E

H E L I P A D

R A M P

STEPS

STEPS

STEPS

STEPSSTEPS

STEPS

CONCRETE

SLABS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

S T E P

SSTEPS

STEPS

STEPS STEPS

STEPS

STEPS STEPS

STEPS

STEPS

STEPS

STEPS

STEPSSTEPS

S T E P S

STEPS

STEPS

FUEL

S T

EP

S

CONCRETE

STEPS

STEPS

STEPS

CONCRETE

CONCRETE

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

STEPS

TANKS

STEAM

HANDHOLES

CONCRETE

CURB

CONCRETE

STEPS

MANHOLE (SEDIMENT FILLED)

STEPS STEPS

STEPS

W

IN

D O W

W E

LL

CONCRETE

CONCRETE

CURB

S T E P S

C O N C R E T E

C U R B

STEPS

STEPS

R A M P

STEPS

WINDOW WELLWINDOW WELL

W

IN

D O W

W E

LL

W

IN

D O W

W E

LL

STEAM

MANHOLE

(ABANDONED)

S T E A M

H A N D H O

LE

S

(A B A N D O N E D

A B A N D O N E D

S T E A M

A B A N D O N E D

S T E A M

W A

LL

2"

METAL

PIPES

F

IL

L E D

W

IT

H

S E D

IM

E N T

WALL

FLOOR DRAIN

FLOOR DRAIN

FLOOR DRAIN

STEAM

HANDHOLES

CONCRETE

W

IN

D O W

W E

LL

W

IN

D O W

W E

LL

STEP

STEP

STEPS

S T E A M

H A N D H O

LE

S

(A B A N D O N E D

(S E D

IM

E N T

F

IL

LE

D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROJECT NAME:

SITE ADDRESS:

VA PROJECT NUMBER:

OWNER AND CONSULTANTS:

VICINITY MAP:

ARCHITECT/ENGINEER OF RECORD

NOT FOR CONSTRUCTION

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

B

IM

/2

V A

T o m a h E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-7

.G

R

.r v t

/1

/2

:3

:0

P

M

GI000

COVER SHEET EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-21-700

2/11/22

EHRM INFRASTRUCTURE UPGRADES, TOMAH, WI

TOMAH VA MEDICAL CENTER

500 EAST VETERANS STREET, TOMAH, WI 54660

676-21-700

Project Number

VA COR:

CONTACT:

ADDRESS:

PHONE:

ROBERT PIDGEON

TOMAH VA MEDICAL CENTER

500 EAST VETERANS STREET

TOMAH, WI 54660

XXXX

ARCHITECT:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

GIOVANNI BARBARI

PHONE: 763-412-4000

MECH/PLUMB/FIRE ENGINEER:

NAME:

ADDRESS:

CONTACT:

SPECIALIZED ENGINEERING SOLUTIONS

333 EAST 2ND STREET, SUITE 16

OGALLALA, NE 69153

JOHN MARTIN

PHONE: 402-991-5520

CIVIL ENGINEER:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

LEE KOPPY

PHONE: 763-412-4000

ELECTRICAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG CORP.

15 SUNNEN DRIVE, SUITE 104

ST. LOUIS, MO 63143

GREG LYFORD

PHONE: XXXX

SITE PLAN - OVERALL

Revisions: Date:

02-11-22

Sheet

Number Sheet Name

General

GI000 COVER SHEET

GI001 SHEET INDEX

GI002 ABBREVIATIONS

GI003 GENERAL NOTES AND SYMBOLS

Civil

C-001 OVERALL SITE PLAN

C-002 OVERALL STAGING - PLAN

CD-101 EXISTING CONDITIONS & REMOVALS - PLAN

CD-102 EXISTING CONDITIONS & REMOVALS - PLAN

CD-103 EXISTING CONDITIONS & REMOVALS - PLAN

CD-104 EXISTING CONDITIONS & REMOVALS - PLAN

CD-105 EXISTING CONDITIONS & REMOVALS - PLAN

CD-106 EXISTING CONDITIONS & REMOVALS - PLAN

CD-107 EXISTING CONDITIONS & REMOVALS - PLAN

CD-108 EXISTING CONDITIONS & REMOVALS - PLAN

CU-201 PLANNED CONSTRUCTION - PLAN 1

CU-202 PLANNED CONSTRUCTION - PLAN 2

CU-203 PLANNED CONSTRUCTION - PLAN 3

CU-204 PLANNED CONSTRUCTION - PLAN 4

CU-205 PLANNED CONSTRUCTION - PLAN 5

CU-206 PLANNED CONSTRUCTION - PLAN 6

CU-207 PLANNED CONSTRUCTION - PLAN 7

CU-208 PLANNED CONSTRUCTION - PLAN 8

CU-301 PLANNED CONSTRUCTION - PROFILE 1

CU-302 PLANNED CONSTRUCTION - PROFILE 2

CU-303 PLANNED CONSTRUCTION - PROFILE 3

CU-304 PLANNED CONSTRUCTION - PROFILE 4

CU-305 PLANNED CONSTRUCTION - PROFILE 5

CU-306 PLANNED CONSTRUCTION - PROFILE 6

CL-401 RESTORATION - PLAN

CL-402 RESTORATION - PLAN

CL-403 RESTORATION - PLAN

CL-404 RESTORATION - PLAN

CL-405 RESTORATION - PLAN

CL-406 RESTORATION - PLAN

CL-407 RESTORATION - PLAN

CL-408 RESTORATION - PLAN

C-501 CIVIL DETAILS

C-502 CIVIL DETAILS

C-503 CIVIL DETAILS

C-504 CIVIL DETAILS

C-505 CIVIL DETAILS

C-506 CIVIL DETAILS

Architectural

B23-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B23-AE111 FIRST LEVEL FLOOR PLAN - OVERALL

B23-AE111-01 FIRST LEVEL ENLARGED FLOOR, RCP AND FINISH PLANS

B25-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B25-AE111 FIRST LEVEL & ENLARGED PLANS, OPENING SCHEDULED

B36-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B36-AE111 FIRST LEVEL PLAN - OVERALL AND ENLARGED PLANS

B40-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B40-AE111 FIRST LEVEL & ENLARGED PLANS, OPENING SCHEDULE

B52-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B52-AE111 FIRST LEVEL FLOOR & ENLARGED PLANS

B400-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN

B400-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN

B400-AE121 SECOND LEVEL FLOOR PLAN - OVERALL

B400-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B400-AE131 THIRD LEVEL FLOOR PLAN - OVERALL

B400-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B400-AE602 DOOR SCHEDULE AND ELEVATIONS

B401-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B401-AE111 FIRST LEVEL PLAN - OVERALL

B401-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B403-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B403-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN

B403-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN

B403-AE111 FIRST LEVEL FLOOR PLAN - OVERALL

B403-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B403-AE121 SECOND LEVEL FLOOR PLAN - OVERALL

B403-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B403-AE131 THIRD LEVEL FLOOR PLAN - OVERALL

B403-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B403-AE602 DOOR SCHEDULE AND ELEVATIONS

B404-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B404-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN

B404-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN

B404-AE111 FIRST LEVEL FLOOR PLAN - OVERALL

B404-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B404-AE121 SECOND LEVEL FLOOR PLAN - OVERALL

B404-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B404-AE131 THIRD LEVEL FLOOR PLAN - OVERALL

B404-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B404-AE602 DOOR SCHEDULE AND ELEVATIONS

B406-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B406-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN

B406-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN

B406-AE111 FIRST LEVEL FLOOR PLAN - OVERALL

B406-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B406-AE121 SECOND LEVEL FLOOR PLAN - OVERALL

B406-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B406-AE131 THIRD LEVEL FLOOR PLAN - OVERALL

B406-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B406-AE602 DOOR SCHEDULE AND ELEVATIONS

B407-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B407-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN

B407-AE111 FIRST LEVEL FLOOR PLAN - OVERALL

B407-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B407-AE121 SECOND LEVEL FLOOR PLAN - OVERALL

B407-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B407-AE602 DOOR SCHEDULE AND ELEVATIONS

B408-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B408-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN

B408-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN

B408-AE111 FIRST LEVEL FLOOR PLAN - OVERALL

B408-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B408-AE121 SECOND LEVEL FLOOR PLAN - OVERALL

B408-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B408-AE131 THIRD LEVEL FLOOR PLAN - OVERALL

B408-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS

B408-AE602 DOOR SCHEDULE AND ELEVATIONS

B416-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B416-AE111 FIRST LEVEL FLOOR & ENLARGED PLANS, DOOR SCHEDULE

B423-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B423-AE111 FIRST LEVEL FLOOR & ENLARGED PLANS, DOOR SCHEDULE

B424-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B424-AE111 FIRST LEVEL FLOOR PLAN - OVERALL

B424-AE111-01 FIRST LEVEL ENLARGED DEMO & FLOOR PLANS, DOOR SCHEDULE

B425-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN

B425-AE111 FIRST LEVEL & ENLARGED PLANS, DOOR SCHEDULE

AE211 INTERIOR ELEVATIONS AND DETAILS

AE601 PARTITION TYPES AND DETAILS - TYPICAL

AF601 MATERIAL AND SIGN MESSAGE SCHEDULE

Hazmat

B32-HA-101 FLOOR PLANS - TBUILDING 32 TELECOMMUNICATIONS - ASBESTOS

B406-HA-100 SECOND FLOOR PLAN - BUILDING 406 TELECOMMUNICATIONS - ASBESTOS

B407-HA-101 FIRST FLOOR PLAN - BUILDING 407 TELECOMMUNICATIONS - ASBESTOS

B407-HA-102 SECOND FLOOR PLAN - BUILDING 407 TELECOMMUNICATIONS - ASBESTOS

B407-HA-103 THIRD FLOOR PLAN - BUILDING 407 TELECOMMUNICATIONS - ASBESTOS

Telecom

TN000 TELECOMMUNICATIONS SYMBOLS AND ABBREVIATIONS

TN001 TELECOMMUNICATIONS SHEET INDEX

TN002 SITE PLAN - TELECOMMUNICATIONS (WEST LOOP)

TN003 SITE PLAN - TELECOMMUNICATIONS (CENTER LOOP)

TN004 SITE PLAN - TELECOMMUNICATIONS (EAST LOOP)

B23-TD100 BASEMENT DEMOLITION - TELECOMMUNICATIONS

B23-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B23-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B23-TN100 BASEMENT - TELECOMMUNICATIONS

B23-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B23-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B23-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B23-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B23-TN400 TELECOMMUNICATIONS DETAILS

B25-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B25-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B25-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B25-TN400 TELECOMMUNICATIONS DETAILS

B36-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B36-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B36-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B36-TN400 TELECOMMUNICATIONS DETAILS

B40-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B40-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B40-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B40-TN400 TELECOMMUNICATIONS DETAILS

B52-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B52-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B52-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B52-TN400 TELECOMMUNICATIONS DETAILS

B400-TD111 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B400-TD112 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B400-TD113 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B400-TD114 FOURTH FLOOR DEMOLITION - TELECOMMUNICATIONS

B400-TN110 BASEMENT - TELECOMMUNICATIONS

B400-TN111 FIRST FLOOR - TELECOMMUNICATIONS

B400-TN112 SECOND FLOOR - TELECOMMUNICATIONS

B400-TN113 THIRD FLOOR - TELECOMMUNICATIONS

B400-TN114 FOURTH FLOOR - TELECOMMUNICATIONS

B400-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B400-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B400-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B400-TN400 TELECOMMUNICATIONS DETAILS

B401-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B401-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B401-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B401-TN100 BASEMENT FLOOR - TELECOMMUNICATIONS

B401-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B401-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B401-TN103 THIRD FLOOR - TELECOMMUNICATIONS

B401-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B401-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B401-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B401-TN400 TELECOMMUNICATIONS DETAILS

B402-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B402-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B402-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B402-TN100 BASEMENT FLOOR - TELECOMMUNICATIONS

B402-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B402-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B402-TN103 THIRD FLOOR - TELECOMMUNICATIONS

B402-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B402-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B402-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B402-TN400 TELECOMMUNICATIONS DETAILS

B403-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B403-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B403-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B403-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

B403-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B403-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B403-TN103 THIRD FLOOR - TELECOMMUNICATIONS

B403-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B403-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B403-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B403-TN400 TELECOMMUNICATIONS DETAILS

B404-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B404-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B404-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B404-TN100 BASEMENT FLOOR - TELECOMMUNICATIONS

B404-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B404-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B404-TN103 THIRD FLOOR - TELECOMMUNICATIONS

B404-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B404-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B404-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B404-TN400 TELECOMMUNICATIONS DETAILS

B405-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B405-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B405-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B405-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B405-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B405-TN103 THIRD FLOOR - TELECOMMUNICATIONS

B405-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B405-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B405-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B405-TN400 TELECOMMUNICATIONS DETAILS

B406-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B406-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B406-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B406-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

B406-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B406-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B406-TN103 THIRD FLOOR - TELECOMMUNICATIONS

B406-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B406-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B406-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B406-TN400 TELECOMMUNICATIONS DETAILS

B407-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B407-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B407-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B407-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

B407-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B407-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B407-TN103 THIRD FLOOR - TELECOMMUNICATIONS

B407-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B407-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B407-TN400 TELECOMMUNICATIONS DETAILS

B408-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B408-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS

B408-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS

B408-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

B408-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B408-TN102 SECOND FLOOR - TELECOMMUNICATIONS

B408-TN103 THIRD FLOOR - TELECOMMUNICATIONS

B408-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B408-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B408-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B408-TN303 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B408-TN304 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B408-TN400 TELECOMMUNICATIONS DETAILS

B409-TD100 BASEMENT DEMOLITION - TELECOMMUNICATIONS

B409-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B409-TN100 BASEMENT - TELECOMMUNICATIONS

B409-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B409-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B409-TN400 TELECOMMUNICATIONS DETAILS

B410-TD100 BASEMENT DEMOLITION - TELECOMMUNICATIONS

B410-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B410-TN100 BASEMENT - TELECOMMUNICATIONS

B410-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B410-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B410-TN400 TELECOMMUNICATIONS DETAILS

B411-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B411-TD102 ATTIC FLOOR DEMOLITION - TELECOMMUNICATIONS

B411-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B411-TN102 ATTIC FLOOR - TELECOMMUNICATIONS

B411-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B411-TN400 TELECOMMUNICATIONS DETAILS

B412-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B412-TD102 ATTIC FLOOR DEMOLITION - TELECOMMUNICATIONS

B412-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B412-TN102 ATTIC FLOOR - TELECOMMUNICATIONS

B412-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B412-TN400 TELECOMMUNICATIONS DETAILS

B415-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B415-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B415-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B415-TN400 TELECOMMUNICATIONS DETAILS

B416-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B416-TN100 LOWER LEVEL - TELECOMMUNICATIONS

B416-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B416-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B416-TN400 TELECOMMUNICATIONS DETAILS

B423-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B423-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B423-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B423-TN400 TELECOMMUNICATIONS DETAILS

B424-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B424-TN100 BASEMENT FLOOR - TELECOMMUNICATIONS

B424-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B424-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B424-TN400 TELECOMMUNICATIONS DETAILS

B425-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B425-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B425-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B425-TN400 TELECOMMUNICATIONS DETAILS

B452-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS

B452-TN101 FIRST FLOOR - TELECOMMUNICATIONS

B452-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS

B452-TN400 TELECOMMUNICATIONS DETAILS

B455-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATION

B455-TN101 FIRST FLOOR - TELECOMMUNICATION

B455-TN300 TELECOMMUNICATION ROOM ENLARGEMENTS

B455-TN400 TELECOMMUNICATION DETAILS

TN400 TELECOMMUNICATIONS DETAILS

TN401 TELECOMMUNICATIONS DETAILS

TN402 TELECOMMUNICATIONS DETAILS

TN403 TELECOMMUNICATIONS DETAILS

TN404 TELECOMMUNICATIONS DETAILS

TN405 TELECOMMUNICATIONS DETAILS

TN500 TELECOMMUNICATIONS RISERS

TN501 TELECOMMUNICATIONS RISERS

TN502 TELECOMMUNICATIONS RISERS

TN503 TELECOMMUNICATIONS RISERS

TN600 TELECOMMUNICATIONS SCHEDULES

Electrical

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

E001 ELECTRICAL SHEET INDEX & LUMINAIRE SCHEDULE

E002 ELECTRICAL DETAILS

B23-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B23-EP110 BASEMENT - ELECTRICAL

B23-EP111 FIRST FLOOR - ELECTRICAL

B23-EP112 SECOND FLOOR - ELECTRICAL

B23-EP200 ELECTRICAL ENLARGED PLANS

B23-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B23-EP400 ELECTRICAL SCHEDULES

B25-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B25-EP111 FIRST FLOOR - ELECTRICAL

B25-EP200 ELECTRICAL ENLARGED PLANS

B25-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B25-EP400 ELECTRICAL SCHEDULES

B36-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B36-EP111 FIRST FLOOR - ELECTRICAL

B36-E200 ELECTRICAL ENLARGED PLANS

B36-E300 ELECTRICAL ONE-LINE DIAGRAMS

B36-E400 ELECTRICAL SCHEDULES

B40-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B40-EP111 FIRST FLOOR - ELECTRICAL

B40-EP200 ELECTRICAL ENLARGED PLANS

B40-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B40-EP400 ELECTRICAL SCHEDULES

B52-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B52-EP111 FIRST FLOOR - ELECTRICAL

B52-EP200 ELECTRICAL ENLARGED PLANS

B52-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B52-EP400 ELECTRICAL SCHEDULES

B400-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B400-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL

B400-ED114 FOURTH FLOOR DEMOLITION - ELECTRICAL

B400-EP111 FIRST FLOOR - ELECTRICAL

B400-EP112 SECOND FLOOR - ELECTRICAL

B400-EP113 THIRD FLOOR - ELECTRICAL

B400-EP114 FOURTH FLOOR - ELECTRICAL

B400-EP200 ELECTRICAL ENLARGED PLANS

B400-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B400-EP301 ELECTRICAL ONE-LINE DIAGRAMS

B400-EP400 ELECTRICAL SCHEDULES

B401-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B401-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B401-ED113 THIRD FLOOR DEMOLITION - ELECTRICAL

B401-EP111 FIRST FLOOR - ELECTRICAL

B401-EP112 SECOND FLOOR - ELECTRICAL

B401-EP113 THIRD FLOOR - ELECTRICAL

B401-EP200 ELECTRICAL ENLARGED PLANS

B401-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B401-EP301 ELECTRICAL ONE-LINE DIAGRAMS

B401-EP400 ELECTRICAL SCHEDULES

B402-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B402-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B402-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL

B402-EP111 FIRST FLOOR - ELECTRICAL

B402-EP112 SECOND FLOOR - ELECTRICAL

B402-EP113 THIRD FLOOR - ELECTRICAL

B402-EP200 ELECTRICAL ENLARGED PLANS

B402-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B402-EP301 ELECTRICAL ONE-LINE DIAGRAMS

B402-EP400 ELECTRICAL SCHEDULES

B403-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B403-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B403-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL

B403-EP111 FIRST FLOOR - ELECTRICAL

B403-EP112 SECOND FLOOR - ELECTRICAL

B403-EP113 THIRD FLOOR - ELECTRICAL

B403-EP200 ELECTRICAL ENLARGED PLANS

B403-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B403-EP301 ELECTRICAL ONE-LINE DIAGRAMS

B403-EP400 ELECTRICAL SCHEDULES

B404-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B404-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B404-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL

B404-EP111 FIRST FLOOR - ELECTRICAL

B404-EP112 SECOND FLOOR - ELECTRICAL

B404-EP113 THIRD FLOOR - ELECTRICAL

B404-E200 ELECTRICAL ENLARGED PLANS

B404-E300 ELECTRICAL ONE-LINE DIAGRAMS

B404-E301 ELECTRICAL ONE-LINE DIAGRAMS

B404-E400 ELECTRICAL SCHEDULES

B405-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B405-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B405-ED113 THIRD FLOOR DEMOLITION - ELECTRICAL

B405-EP111 FIRST FLOOR - ELECTRICAL

B405-EP112 SECOND FLOOR - ELECTRICAL

B405-EP113 THIRD FLOOR - ELECTRICAL

B405-EP200 ELECTRICAL ENLARGED PLANS

B405-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B405-EP400 ELECTRICAL SCHEDULES

B405-EP401 ELECTRICAL SCHEDULES

B406-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B406-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B406-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL

B406-EP111 FIRST FLOOR - ELECTRICAL

B406-EP112 SECOND FLOOR - ELECTRICAL

B406-EP113 THIRD FLOOR - ELECTRICAL

B406-EP200 ELECTRICAL ENLARGED PLANS

B406-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B406-EP301 ELECTRICAL ONE-LINE DIAGRAMS

B406-EP400 ELECTRICAL SCHEDULES

B407-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B407-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B407-EP111 FIRST FLOOR - ELECTRICAL

B407-EP112 SECOND FLOOR - ELECTRICAL

B407-E200 ELECTRICAL ENLARGED PLANS

B407-E300 ELECTRICAL ONE-LINE DIAGRAMS

B407-E301 ELECTRICAL ONE-LINE DIAGRAMS

B407-E400 ELECTRICAL SCHEDULES

B408-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B408-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL

B408-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL

B408-EP111 FIRST FLOOR - ELECTRICAL

B408-EP112 SECOND FLOOR - ELECTRICAL

B408-EP113 THIRD FLOOR - ELECTRICAL

B408-EP200 ELECTRICAL ENLARGED PLANS

B408-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B408-EP301 ELECTRICAL ONE-LINE DIAGRAMS

B408-EP400 ELECTRICAL SCHEDULES

B409-ED110 BASEMENT DEMOLITION - ELECTRICAL

B409-EP110 BASEMENT - ELECTRICAL

B409-EP111 FIRST FLOOR - ELECTRICAL

B409-EP200 ELECTRICAL ENLARGED PLANS

B409-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B409-EP400 ELECTRICAL SCHEDULES

B410-ED110 BASEMENT DEMOLITION - ELECTRICAL

B410-EP110 BASEMENT - ELECTRICAL

B410-EP111 FIRST FLOOR - ELECTRICAL

B410-EP200 ELECTRICAL ENLARGED PLANS

B410-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B410-EP400 ELECTRICAL SCHEDULES

B411-EP111 FIRST FLOOR - ELECTRICAL

B411-EP200 ELECTRICAL ENLARGED PLANS

B411-EP400 ELECTRICAL SCHEDULES

B412-EP111 FIRST FLOOR - ELECTRICAL

B412-EP200 ELECTRICAL ENLARGED PLANS

B412-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B412-EP400 ELECTRICAL SCHEDULES

B415-EP111 FIRST FLOOR - ELECTRICAL

B415-EP200 ELECTRICAL ENLARGED PLANS

B415-EP400 ELECTRICAL SCHEDULES

B416-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B416-EP111 FIRST FLOOR - ELECTRICAL

B416-EP200 ELECTRICAL ENLARGED PLANS

B416-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B416-EP400 ELECTRICAL SCHEDULES

B423-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B423-EP111 FIRST FLOOR - ELECTRICAL

B423-EP200 ELECTRICAL ENLARGED PLANS

B423-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B423-EP400 ELECTRICAL SCHEDULES

B424-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B424-EP111 FIRST FLOOR - ELECTRICAL

B424-EP200 ELECTRICAL ENLARGED PLANS

B424-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B424-EP400 ELECTRICAL SCHEDULES

B425-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B425-EP111 FIRST FLOOR - ELECTRICAL

B425-EP200 ELECTRICAL ENLARGED PLANS

B425-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B425-EP400 ELECTRICAL SCHEDULES

B452-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL

B452-EP111 FIRST FLOOR - ELECTRICAL

B452-EP200 ELECTRICAL ENLARGED PLANS

B452-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B452-EP400 ELECTRICAL SCHEDULES

B455-EP111 FIRST FLOOR - ELECTRICAL

B455-EP200 ELECTRICAL ENLARGED PLANS

B455-EP300 ELECTRICAL ONE-LINE DIAGRAMS

B455-EP400 ELECTRICAL SCHEDULES

Mechanical

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

B23-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B23-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B23-M600 MECHANICAL SCHEDULES

B25-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B25-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B25-M600 MECHANICAL SCHEDULES

B36-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B36-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B36-M600 MECHANICAL SCHEDULES

B40-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B40-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B40-M600 MECHANICAL SCHEDULES

B52-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B52-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B52-M600 MECHANICAL SCHEDULES

B400-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B400-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B400-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B400-M104 FOURTH LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B400-M302 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B400-M303 THIRD LEVEL FLOOR PLAN - ENLARGED MECHANICAL

B400-M304 FOURTH LEVEL FLOOR PLAN - ENLARGED MECHANICAL

B400-M600 MECHANICAL SCHEDULES

B401-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B401-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B401-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B401-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B401-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B401-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B401-M600 MECHANICAL SCHEDULES

B402-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B402-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B402-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B402-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B402-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B402-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B402-M600 MECHANICAL SCHEDULES

B403-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B403-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B403-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B403-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B403-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B403-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B403-M600 MECHANICAL SCHEDULES

B404-FD101 FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROT - DEMO

B404-FD102 SECOND LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION - DEMO

B404-FD103 THIRD LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION - DEMO

B404-F101 FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION

B404-F102 SECOND LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION

B404-F103 THIRD LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION

B404-MD101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMO

B404-MD102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMO

B404-MD103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMO

B404-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B404-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B404-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B404-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B404-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B404-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B404-M600 MECHANICAL SCHEDULES

B405-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B405-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B405-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B405-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B405-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B405-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B405-M600 MECHANICAL SCHEDULES

B406-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B406-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B406-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B406-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B406-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B406-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B406-M600 MECHANICAL SCHEDULES

B407-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B407-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B407-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B407-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B407-M600 MECHANICAL SCHEDULES

B408-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B408-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B408-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B408-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B408-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B408-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B408-M600 MECHANICAL SCHEDULES

B409-M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL

B409-M101 FIRST FLOOR PLAN - MECHANICAL

B409-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B409-M600 MECHANICAL SCHEDULES

B410-M100 BASEMENT LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B410-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B410-M300 ENLARGED PLANS

B410-M600 MECHANICAL SCHEDULES

B411-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B411-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B411-M600 MECHANICAL SCHEDULES

B412-M100 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B412-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B412-M600 MECHANICAL SCHEDULES

B416-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B416-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B416-M600 MECHANICAL SCHEDULES

B423-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B423-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B423-M600 MECHANICAL SCHEDULES

B424-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B424-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B424-M600 MECHANICAL SCHEDULES

B425-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B425-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B425-M600 MECHANICAL SCHEDULES

B455-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

B455-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

B455-M600 MECHANICAL SCHEDULES

M201 MECHANICAL DETAILS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

B

IM

/2

V A

T o m a h E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-7

.G

R

.r v t

/1

/2

:3

:0

P

M

GI001

SHEET INDEX EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-21-700

2/11/22Revisions: Date:

ARCHITECTURAL ABBREVIATIONS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACC

ACI

ACT

ACS DR

ACS FLR

ACS PNL

ACST

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

ACCESSIBLE

AMERICAN CONCRETE INSTITUTE

ACOUSTICAL CEILING TILE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EFF

EFS

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUE

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CARD READER

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

EFFICIENCY

EXTERIOR FINISH SYSTEM

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LS

LT

LT GA

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT SWITCH

LIGHT

LIGHT GAGE

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUTLET

OUNCE

PAINT

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PRIVACY CURTAIN TRACK

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERIMETER

PERPENDICULAR

PHARMACY

PHOTOGRAPH

PACKAGE

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE, PURCHASE ORDER

POLYETHYLENE (PLASTIC)

PUSH PLATE

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PORCELAIN TILE OR PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

PNEUMATIC TUBE STATION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARTER

QUANTITY

QUADRANT

QUALITY

RADIUS OR RISER

RETURN AIR

RADIATOR

REINFORCED BRICK MASONRY

RUBBER

RC

RCP

RCVR

RD

REC

RECD

RECPT

RECT

REF

REFR

REG

REINF

REP

REPL

REQ

REQD

RET

REV

RFG

RFI

RFP

RFS

RL

RLG

RM

RM LT

RND

RO

ROW

RS

RSV

RT

RV

RVS

RWL

S

SA

SALV

SAMP

SAN

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRD

SHT

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLDG

SLNT

SM

SMK

SND INS

SPEC

SPKLR

SPKR

SPLY

SPR

SQ

SQ IN

SQ YD

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

STRUCT STL

SUB

SURF

SUSP

SUSP CLG

SW

SWDR

SYM

SYNTH

SYS

REMOTE CONTROL

REFLECTED CEILING PLAN

RECEIVER

ROAD OR ROOF DRAIN

RECESSED

RECEIVED

RECEPTACLE

RECTANGLE

REFERENCE OR REFRIGERATOR

REFRACTORY, REFRIGERATION

REGISTER

REINFORCE

REPAIR

REPLACE

REQUIRE

REQUIRED

RETURN

REVISION

ROOFING

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

ROOF LEADER

RAILING

ROOM

NURSE CALL LIGHT/ROOM LIGHT

ROUND

ROUGH OPENING

RIGHT OF WAY

ROUGH SAWN

RESILIENT SHEET VINYL

RIGHT

ROOF VENT

REVERSE

RAIN WATER LEADER

SOLID SURFACE

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHARPS CONTAINER

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

SHOWER CURTAIN TRACK

SOLID CORE WOOD DOOR

SMOKE DETECTOR/SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

SLIDING

SEALANT

SHEET METAL

SMOKE

SOUND INSULATION

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SINGLE PLY ROOF SYSTEM

SQUARE

SQUARE INCH

SQUARE YARD

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

STRUCTURAL STEEL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&M

TB

TBD

TECH

TEL

TEMP

THERM

THK

THRES

THRU

THRUOUT

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TRANS

TRTD

TS

TSTAT

TV

TYP

U

UC

UGND

UL

ULT

UNFIN

UNO

UPS

UR

UTIL

UV

VAC

VAR

VEH

VENT

VERT

VEST

VFD

VIC

VID

VIF

VNR

VOC

VOL

VR

VTR

W/ W/O

WBL

WC

WD

WDW

WF

WFR

WFS

WH

WHSE

WP

WPM

WR

WS

WSCT

WT

X BRACE

XPS

YD

TREAD OR THERMOSTAT

TIME AND MATERIALS

TOWEL BAR

TACK BOARD

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF ___

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MASONRY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TRANSOM

TREATED

TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

HEAT TRANSFER COEFFICIENT

UNDERCUT

UNDERGROUND

UNDERWRITERS LABORATORIES

ULTIMATE

UNFINISH

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

URINAL

UTILITY

ULTRAVIOLET

VACUUM

VARIES

VEHICLE

VENTILATION

VERTICAL

VESTIBULE

VARIABLE FREQUENCY DRIVE

VICINITY

VIDEO

VERIFY IN FIELD

VENEER

VOLATILE ORGANIC COMPOUND

VOLUME

VAPOR RETARDER

VENT THROUGH ROOF

WITH

WITHOUT

WOOD BLOCKING

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WATERPROOFING

WATERPROOF MEMBRANE

WEATHER RESISTANT

WEATHERSTRIP OR WALL SCONCE

WAINSCOT

WEIGHT OR WINDOW TREATMENT

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

YARD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

B

IM

/2

V A

T o m a h E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-7

.G

R

.r v t

/1

/2

:3

:0

P

M

GI002

ABBREVIATIONS EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-21-700

2/11/22Revisions: Date:

FLOOR PLAN GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PARTIAL AREAS AND LIMITS OF

CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.

INCIDENTAL WORK IS NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL

DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING

ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS

CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK

REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT

NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH

THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT

AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR

TO DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY

DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY

DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE

THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH

AND REPAIR ANY OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES

AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE

FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL

CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE

WITH MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR

EQUIPMENT SHALL BE VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING

CONDITIONS SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR

SURFACE AND PREPARE FOR SCHEDULED FINISH APPLICATION. COORDINATE WORK

WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE

TYPES WITH TRADES WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS

REQUIRED BY MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY

DIFFER FROM ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR

DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT

PLYWOOD BACKING BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT,

UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY

SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE

AS REQUIRED. ALL FIRE RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF

MATERIALS / ASSEMBLIES MEETING THE RATING INDICATED, TERMINATE AT THE

DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS

SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE

AT THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL

PENETRATIONS SHALL BE SEALED WITH FIRE CAULK.

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING

AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING

PURPOSES ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO

FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED

FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH

SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.

5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION

SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,

UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE

REMODELED.

6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND

PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR

FINISHES.

7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY

DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH

AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS

COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE

PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL

MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL

ENGINEER.

11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED

DEMOLITION AND PREP WORK.

12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,

OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING

FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS

LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL

SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,

SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,

MECHANICAL AND ELECTRICAL.

RCP GENERAL NOTES

1. GENERAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .