Atch 6 - General.pdf
PDF 2 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Tomah Federal contract opportunity
- Solicitation number
- 36C77622B0031
About this file
This document outlines the scope of work for a federal construction contract opportunity involving infrastructure upgrades at a Department of Veterans Affairs medical center. The project includes upgrading electrical, communication, HVAC, and fiber infrastructure across campus buildings, along with modifying impacted roads, walks, and utilities. Data center and hazardous material abatement work are also within scope. Bids are due on an unspecified date in 2022 for renovations that are expected to reconfigure and update existing spaces based on the infrastructure improvements.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
IT
U M
IN
O U S
P A
TH
H
C O N C R E T E
C U R B
C O N C R E T E
C U R B
C O N C R E T E C U R B
CON
CR
ET
E C
UR
B
C O N C R E T E
C U R B
WATER ELEVATION = 945.6
SEPTEMBER 29, 2015
GAZEBO
CONCRETE
B
B
B
B
B
B
B
B
B
B
B
B
B
P O N D
SMOKING
SHELTER
WELL HOUSE
GENERATOR
BUILDING
G E N E R A T O R
B U
IL
D
IN
G
GENERATOR
BUILDING
GENERATOR
BUILDING
WELL HOUSE
WELL
HOUSE
PUMP
TREATMENT
HOUSE
SMOKING SHELTER
SMOKING SHELTER
SMOKING
SHELTER
SMOKING SHELTER
SMOKING SHELTER
GENERATOR
BUILDING
402A
410 409
446 450
6 5
3 12 4
T370
411 412
T240
STEPS
OVERHANG
STEPS
U N D E R G R O U N D
F U E L S T O R A G E
H E L I P A D
R A M P
STEPS
STEPS
STEPS
STEPSSTEPS
STEPS
CONCRETE
SLABS
STEPS
STEPS
STEPS
STEPS
STEPS
STEPS
STEPS
STEPS
STEPS
S T E P
SSTEPS
STEPS
STEPS STEPS
STEPS
STEPS STEPS
STEPS
STEPS
STEPS
STEPS
STEPSSTEPS
S T E P S
STEPS
STEPS
FUEL
S T
EP
S
CONCRETE
STEPS
STEPS
STEPS
CONCRETE
CONCRETE
STEPS
STEPS
STEPS
STEPS
STEPS
STEPS
STEPS
STEPS
TANKS
STEAM
HANDHOLES
CONCRETE
CURB
CONCRETE
STEPS
MANHOLE (SEDIMENT FILLED)
STEPS STEPS
STEPS
W
IN
D O W
W E
LL
CONCRETE
CONCRETE
CURB
S T E P S
C O N C R E T E
C U R B
STEPS
STEPS
R A M P
STEPS
WINDOW WELLWINDOW WELL
W
IN
D O W
W E
LL
W
IN
D O W
W E
LL
STEAM
MANHOLE
(ABANDONED)
S T E A M
H A N D H O
LE
S
(A B A N D O N E D
A B A N D O N E D
S T E A M
A B A N D O N E D
S T E A M
W A
LL
2"
METAL
PIPES
F
IL
L E D
W
IT
H
S E D
IM
E N T
WALL
FLOOR DRAIN
FLOOR DRAIN
FLOOR DRAIN
STEAM
HANDHOLES
CONCRETE
W
IN
D O W
W E
LL
W
IN
D O W
W E
LL
STEP
STEP
STEPS
S T E A M
H A N D H O
LE
S
(A B A N D O N E D
(S E D
IM
E N T
F
IL
LE
D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
VICINITY MAP:
ARCHITECT/ENGINEER OF RECORD
NOT FOR CONSTRUCTION
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
B
IM
/2
V A
T o m a h E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-7
.G
R
.r v t
/1
/2
:3
:0
P
M
GI000
COVER SHEET EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-21-700
2/11/22
EHRM INFRASTRUCTURE UPGRADES, TOMAH, WI
TOMAH VA MEDICAL CENTER
500 EAST VETERANS STREET, TOMAH, WI 54660
676-21-700
Project Number
VA COR:
CONTACT:
ADDRESS:
PHONE:
ROBERT PIDGEON
TOMAH VA MEDICAL CENTER
500 EAST VETERANS STREET
TOMAH, WI 54660
XXXX
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
GIOVANNI BARBARI
PHONE: 763-412-4000
MECH/PLUMB/FIRE ENGINEER:
NAME:
ADDRESS:
CONTACT:
SPECIALIZED ENGINEERING SOLUTIONS
333 EAST 2ND STREET, SUITE 16
OGALLALA, NE 69153
JOHN MARTIN
PHONE: 402-991-5520
CIVIL ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
LEE KOPPY
PHONE: 763-412-4000
ELECTRICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
IMEG CORP.
15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
GREG LYFORD
PHONE: XXXX
SITE PLAN - OVERALL
Revisions: Date:
02-11-22
Sheet
Number Sheet Name
General
GI000 COVER SHEET
GI001 SHEET INDEX
GI002 ABBREVIATIONS
GI003 GENERAL NOTES AND SYMBOLS
Civil
C-001 OVERALL SITE PLAN
C-002 OVERALL STAGING - PLAN
CD-101 EXISTING CONDITIONS & REMOVALS - PLAN
CD-102 EXISTING CONDITIONS & REMOVALS - PLAN
CD-103 EXISTING CONDITIONS & REMOVALS - PLAN
CD-104 EXISTING CONDITIONS & REMOVALS - PLAN
CD-105 EXISTING CONDITIONS & REMOVALS - PLAN
CD-106 EXISTING CONDITIONS & REMOVALS - PLAN
CD-107 EXISTING CONDITIONS & REMOVALS - PLAN
CD-108 EXISTING CONDITIONS & REMOVALS - PLAN
CU-201 PLANNED CONSTRUCTION - PLAN 1
CU-202 PLANNED CONSTRUCTION - PLAN 2
CU-203 PLANNED CONSTRUCTION - PLAN 3
CU-204 PLANNED CONSTRUCTION - PLAN 4
CU-205 PLANNED CONSTRUCTION - PLAN 5
CU-206 PLANNED CONSTRUCTION - PLAN 6
CU-207 PLANNED CONSTRUCTION - PLAN 7
CU-208 PLANNED CONSTRUCTION - PLAN 8
CU-301 PLANNED CONSTRUCTION - PROFILE 1
CU-302 PLANNED CONSTRUCTION - PROFILE 2
CU-303 PLANNED CONSTRUCTION - PROFILE 3
CU-304 PLANNED CONSTRUCTION - PROFILE 4
CU-305 PLANNED CONSTRUCTION - PROFILE 5
CU-306 PLANNED CONSTRUCTION - PROFILE 6
CL-401 RESTORATION - PLAN
CL-402 RESTORATION - PLAN
CL-403 RESTORATION - PLAN
CL-404 RESTORATION - PLAN
CL-405 RESTORATION - PLAN
CL-406 RESTORATION - PLAN
CL-407 RESTORATION - PLAN
CL-408 RESTORATION - PLAN
C-501 CIVIL DETAILS
C-502 CIVIL DETAILS
C-503 CIVIL DETAILS
C-504 CIVIL DETAILS
C-505 CIVIL DETAILS
C-506 CIVIL DETAILS
Architectural
B23-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B23-AE111 FIRST LEVEL FLOOR PLAN - OVERALL
B23-AE111-01 FIRST LEVEL ENLARGED FLOOR, RCP AND FINISH PLANS
B25-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B25-AE111 FIRST LEVEL & ENLARGED PLANS, OPENING SCHEDULED
B36-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B36-AE111 FIRST LEVEL PLAN - OVERALL AND ENLARGED PLANS
B40-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B40-AE111 FIRST LEVEL & ENLARGED PLANS, OPENING SCHEDULE
B52-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B52-AE111 FIRST LEVEL FLOOR & ENLARGED PLANS
B400-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN
B400-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN
B400-AE121 SECOND LEVEL FLOOR PLAN - OVERALL
B400-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B400-AE131 THIRD LEVEL FLOOR PLAN - OVERALL
B400-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B400-AE602 DOOR SCHEDULE AND ELEVATIONS
B401-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B401-AE111 FIRST LEVEL PLAN - OVERALL
B401-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B403-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B403-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN
B403-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN
B403-AE111 FIRST LEVEL FLOOR PLAN - OVERALL
B403-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B403-AE121 SECOND LEVEL FLOOR PLAN - OVERALL
B403-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B403-AE131 THIRD LEVEL FLOOR PLAN - OVERALL
B403-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B403-AE602 DOOR SCHEDULE AND ELEVATIONS
B404-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B404-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN
B404-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN
B404-AE111 FIRST LEVEL FLOOR PLAN - OVERALL
B404-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B404-AE121 SECOND LEVEL FLOOR PLAN - OVERALL
B404-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B404-AE131 THIRD LEVEL FLOOR PLAN - OVERALL
B404-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B404-AE602 DOOR SCHEDULE AND ELEVATIONS
B406-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B406-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN
B406-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN
B406-AE111 FIRST LEVEL FLOOR PLAN - OVERALL
B406-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B406-AE121 SECOND LEVEL FLOOR PLAN - OVERALL
B406-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B406-AE131 THIRD LEVEL FLOOR PLAN - OVERALL
B406-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B406-AE602 DOOR SCHEDULE AND ELEVATIONS
B407-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B407-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN
B407-AE111 FIRST LEVEL FLOOR PLAN - OVERALL
B407-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B407-AE121 SECOND LEVEL FLOOR PLAN - OVERALL
B407-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B407-AE602 DOOR SCHEDULE AND ELEVATIONS
B408-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B408-GC121 SECOND LEVEL INFECTION CONTROL & PHASING PLAN
B408-GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLAN
B408-AE111 FIRST LEVEL FLOOR PLAN - OVERALL
B408-AE111-01FIRST LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B408-AE121 SECOND LEVEL FLOOR PLAN - OVERALL
B408-AE121-01SECOND LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B408-AE131 THIRD LEVEL FLOOR PLAN - OVERALL
B408-AE131-01THIRD LEVEL ENLARGED DEMO, FLOOR & FINISH PLANS
B408-AE602 DOOR SCHEDULE AND ELEVATIONS
B416-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B416-AE111 FIRST LEVEL FLOOR & ENLARGED PLANS, DOOR SCHEDULE
B423-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B423-AE111 FIRST LEVEL FLOOR & ENLARGED PLANS, DOOR SCHEDULE
B424-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B424-AE111 FIRST LEVEL FLOOR PLAN - OVERALL
B424-AE111-01 FIRST LEVEL ENLARGED DEMO & FLOOR PLANS, DOOR SCHEDULE
B425-GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
B425-AE111 FIRST LEVEL & ENLARGED PLANS, DOOR SCHEDULE
AE211 INTERIOR ELEVATIONS AND DETAILS
AE601 PARTITION TYPES AND DETAILS - TYPICAL
AF601 MATERIAL AND SIGN MESSAGE SCHEDULE
Hazmat
B32-HA-101 FLOOR PLANS - TBUILDING 32 TELECOMMUNICATIONS - ASBESTOS
B406-HA-100 SECOND FLOOR PLAN - BUILDING 406 TELECOMMUNICATIONS - ASBESTOS
B407-HA-101 FIRST FLOOR PLAN - BUILDING 407 TELECOMMUNICATIONS - ASBESTOS
B407-HA-102 SECOND FLOOR PLAN - BUILDING 407 TELECOMMUNICATIONS - ASBESTOS
B407-HA-103 THIRD FLOOR PLAN - BUILDING 407 TELECOMMUNICATIONS - ASBESTOS
Telecom
TN000 TELECOMMUNICATIONS SYMBOLS AND ABBREVIATIONS
TN001 TELECOMMUNICATIONS SHEET INDEX
TN002 SITE PLAN - TELECOMMUNICATIONS (WEST LOOP)
TN003 SITE PLAN - TELECOMMUNICATIONS (CENTER LOOP)
TN004 SITE PLAN - TELECOMMUNICATIONS (EAST LOOP)
B23-TD100 BASEMENT DEMOLITION - TELECOMMUNICATIONS
B23-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B23-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B23-TN100 BASEMENT - TELECOMMUNICATIONS
B23-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B23-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B23-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B23-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B23-TN400 TELECOMMUNICATIONS DETAILS
B25-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B25-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B25-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B25-TN400 TELECOMMUNICATIONS DETAILS
B36-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B36-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B36-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B36-TN400 TELECOMMUNICATIONS DETAILS
B40-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B40-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B40-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B40-TN400 TELECOMMUNICATIONS DETAILS
B52-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B52-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B52-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B52-TN400 TELECOMMUNICATIONS DETAILS
B400-TD111 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B400-TD112 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B400-TD113 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B400-TD114 FOURTH FLOOR DEMOLITION - TELECOMMUNICATIONS
B400-TN110 BASEMENT - TELECOMMUNICATIONS
B400-TN111 FIRST FLOOR - TELECOMMUNICATIONS
B400-TN112 SECOND FLOOR - TELECOMMUNICATIONS
B400-TN113 THIRD FLOOR - TELECOMMUNICATIONS
B400-TN114 FOURTH FLOOR - TELECOMMUNICATIONS
B400-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B400-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B400-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B400-TN400 TELECOMMUNICATIONS DETAILS
B401-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B401-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B401-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B401-TN100 BASEMENT FLOOR - TELECOMMUNICATIONS
B401-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B401-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B401-TN103 THIRD FLOOR - TELECOMMUNICATIONS
B401-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B401-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B401-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B401-TN400 TELECOMMUNICATIONS DETAILS
B402-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B402-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B402-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B402-TN100 BASEMENT FLOOR - TELECOMMUNICATIONS
B402-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B402-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B402-TN103 THIRD FLOOR - TELECOMMUNICATIONS
B402-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B402-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B402-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B402-TN400 TELECOMMUNICATIONS DETAILS
B403-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B403-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B403-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B403-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
B403-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B403-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B403-TN103 THIRD FLOOR - TELECOMMUNICATIONS
B403-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B403-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B403-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B403-TN400 TELECOMMUNICATIONS DETAILS
B404-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B404-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B404-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B404-TN100 BASEMENT FLOOR - TELECOMMUNICATIONS
B404-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B404-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B404-TN103 THIRD FLOOR - TELECOMMUNICATIONS
B404-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B404-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B404-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B404-TN400 TELECOMMUNICATIONS DETAILS
B405-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B405-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B405-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B405-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B405-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B405-TN103 THIRD FLOOR - TELECOMMUNICATIONS
B405-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B405-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B405-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B405-TN400 TELECOMMUNICATIONS DETAILS
B406-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B406-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B406-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B406-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
B406-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B406-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B406-TN103 THIRD FLOOR - TELECOMMUNICATIONS
B406-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B406-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B406-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B406-TN400 TELECOMMUNICATIONS DETAILS
B407-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B407-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B407-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B407-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
B407-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B407-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B407-TN103 THIRD FLOOR - TELECOMMUNICATIONS
B407-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B407-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B407-TN400 TELECOMMUNICATIONS DETAILS
B408-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B408-TD102 SECOND FLOOR DEMOLITION - TELECOMMUNICATIONS
B408-TD103 THIRD FLOOR DEMOLITION - TELECOMMUNICATIONS
B408-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
B408-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B408-TN102 SECOND FLOOR - TELECOMMUNICATIONS
B408-TN103 THIRD FLOOR - TELECOMMUNICATIONS
B408-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B408-TN301 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B408-TN302 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B408-TN303 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B408-TN304 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B408-TN400 TELECOMMUNICATIONS DETAILS
B409-TD100 BASEMENT DEMOLITION - TELECOMMUNICATIONS
B409-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B409-TN100 BASEMENT - TELECOMMUNICATIONS
B409-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B409-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B409-TN400 TELECOMMUNICATIONS DETAILS
B410-TD100 BASEMENT DEMOLITION - TELECOMMUNICATIONS
B410-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B410-TN100 BASEMENT - TELECOMMUNICATIONS
B410-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B410-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B410-TN400 TELECOMMUNICATIONS DETAILS
B411-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B411-TD102 ATTIC FLOOR DEMOLITION - TELECOMMUNICATIONS
B411-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B411-TN102 ATTIC FLOOR - TELECOMMUNICATIONS
B411-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B411-TN400 TELECOMMUNICATIONS DETAILS
B412-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B412-TD102 ATTIC FLOOR DEMOLITION - TELECOMMUNICATIONS
B412-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B412-TN102 ATTIC FLOOR - TELECOMMUNICATIONS
B412-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B412-TN400 TELECOMMUNICATIONS DETAILS
B415-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B415-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B415-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B415-TN400 TELECOMMUNICATIONS DETAILS
B416-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B416-TN100 LOWER LEVEL - TELECOMMUNICATIONS
B416-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B416-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B416-TN400 TELECOMMUNICATIONS DETAILS
B423-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B423-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B423-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B423-TN400 TELECOMMUNICATIONS DETAILS
B424-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B424-TN100 BASEMENT FLOOR - TELECOMMUNICATIONS
B424-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B424-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B424-TN400 TELECOMMUNICATIONS DETAILS
B425-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B425-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B425-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B425-TN400 TELECOMMUNICATIONS DETAILS
B452-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATIONS
B452-TN101 FIRST FLOOR - TELECOMMUNICATIONS
B452-TN300 TELECOMMUNICATIONS ROOM ENLARGEMENTS
B452-TN400 TELECOMMUNICATIONS DETAILS
B455-TD101 FIRST FLOOR DEMOLITION - TELECOMMUNICATION
B455-TN101 FIRST FLOOR - TELECOMMUNICATION
B455-TN300 TELECOMMUNICATION ROOM ENLARGEMENTS
B455-TN400 TELECOMMUNICATION DETAILS
TN400 TELECOMMUNICATIONS DETAILS
TN401 TELECOMMUNICATIONS DETAILS
TN402 TELECOMMUNICATIONS DETAILS
TN403 TELECOMMUNICATIONS DETAILS
TN404 TELECOMMUNICATIONS DETAILS
TN405 TELECOMMUNICATIONS DETAILS
TN500 TELECOMMUNICATIONS RISERS
TN501 TELECOMMUNICATIONS RISERS
TN502 TELECOMMUNICATIONS RISERS
TN503 TELECOMMUNICATIONS RISERS
TN600 TELECOMMUNICATIONS SCHEDULES
Electrical
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E001 ELECTRICAL SHEET INDEX & LUMINAIRE SCHEDULE
E002 ELECTRICAL DETAILS
B23-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B23-EP110 BASEMENT - ELECTRICAL
B23-EP111 FIRST FLOOR - ELECTRICAL
B23-EP112 SECOND FLOOR - ELECTRICAL
B23-EP200 ELECTRICAL ENLARGED PLANS
B23-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B23-EP400 ELECTRICAL SCHEDULES
B25-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B25-EP111 FIRST FLOOR - ELECTRICAL
B25-EP200 ELECTRICAL ENLARGED PLANS
B25-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B25-EP400 ELECTRICAL SCHEDULES
B36-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B36-EP111 FIRST FLOOR - ELECTRICAL
B36-E200 ELECTRICAL ENLARGED PLANS
B36-E300 ELECTRICAL ONE-LINE DIAGRAMS
B36-E400 ELECTRICAL SCHEDULES
B40-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B40-EP111 FIRST FLOOR - ELECTRICAL
B40-EP200 ELECTRICAL ENLARGED PLANS
B40-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B40-EP400 ELECTRICAL SCHEDULES
B52-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B52-EP111 FIRST FLOOR - ELECTRICAL
B52-EP200 ELECTRICAL ENLARGED PLANS
B52-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B52-EP400 ELECTRICAL SCHEDULES
B400-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B400-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL
B400-ED114 FOURTH FLOOR DEMOLITION - ELECTRICAL
B400-EP111 FIRST FLOOR - ELECTRICAL
B400-EP112 SECOND FLOOR - ELECTRICAL
B400-EP113 THIRD FLOOR - ELECTRICAL
B400-EP114 FOURTH FLOOR - ELECTRICAL
B400-EP200 ELECTRICAL ENLARGED PLANS
B400-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B400-EP301 ELECTRICAL ONE-LINE DIAGRAMS
B400-EP400 ELECTRICAL SCHEDULES
B401-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B401-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B401-ED113 THIRD FLOOR DEMOLITION - ELECTRICAL
B401-EP111 FIRST FLOOR - ELECTRICAL
B401-EP112 SECOND FLOOR - ELECTRICAL
B401-EP113 THIRD FLOOR - ELECTRICAL
B401-EP200 ELECTRICAL ENLARGED PLANS
B401-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B401-EP301 ELECTRICAL ONE-LINE DIAGRAMS
B401-EP400 ELECTRICAL SCHEDULES
B402-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B402-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B402-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL
B402-EP111 FIRST FLOOR - ELECTRICAL
B402-EP112 SECOND FLOOR - ELECTRICAL
B402-EP113 THIRD FLOOR - ELECTRICAL
B402-EP200 ELECTRICAL ENLARGED PLANS
B402-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B402-EP301 ELECTRICAL ONE-LINE DIAGRAMS
B402-EP400 ELECTRICAL SCHEDULES
B403-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B403-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B403-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL
B403-EP111 FIRST FLOOR - ELECTRICAL
B403-EP112 SECOND FLOOR - ELECTRICAL
B403-EP113 THIRD FLOOR - ELECTRICAL
B403-EP200 ELECTRICAL ENLARGED PLANS
B403-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B403-EP301 ELECTRICAL ONE-LINE DIAGRAMS
B403-EP400 ELECTRICAL SCHEDULES
B404-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B404-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B404-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL
B404-EP111 FIRST FLOOR - ELECTRICAL
B404-EP112 SECOND FLOOR - ELECTRICAL
B404-EP113 THIRD FLOOR - ELECTRICAL
B404-E200 ELECTRICAL ENLARGED PLANS
B404-E300 ELECTRICAL ONE-LINE DIAGRAMS
B404-E301 ELECTRICAL ONE-LINE DIAGRAMS
B404-E400 ELECTRICAL SCHEDULES
B405-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B405-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B405-ED113 THIRD FLOOR DEMOLITION - ELECTRICAL
B405-EP111 FIRST FLOOR - ELECTRICAL
B405-EP112 SECOND FLOOR - ELECTRICAL
B405-EP113 THIRD FLOOR - ELECTRICAL
B405-EP200 ELECTRICAL ENLARGED PLANS
B405-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B405-EP400 ELECTRICAL SCHEDULES
B405-EP401 ELECTRICAL SCHEDULES
B406-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B406-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B406-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL
B406-EP111 FIRST FLOOR - ELECTRICAL
B406-EP112 SECOND FLOOR - ELECTRICAL
B406-EP113 THIRD FLOOR - ELECTRICAL
B406-EP200 ELECTRICAL ENLARGED PLANS
B406-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B406-EP301 ELECTRICAL ONE-LINE DIAGRAMS
B406-EP400 ELECTRICAL SCHEDULES
B407-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B407-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B407-EP111 FIRST FLOOR - ELECTRICAL
B407-EP112 SECOND FLOOR - ELECTRICAL
B407-E200 ELECTRICAL ENLARGED PLANS
B407-E300 ELECTRICAL ONE-LINE DIAGRAMS
B407-E301 ELECTRICAL ONE-LINE DIAGRAMS
B407-E400 ELECTRICAL SCHEDULES
B408-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B408-ED112 SECOND FLOOR DEMOLITION - ELECTRICAL
B408-ED113 THIRD FLOOR DEMOLITON - ELECTRICAL
B408-EP111 FIRST FLOOR - ELECTRICAL
B408-EP112 SECOND FLOOR - ELECTRICAL
B408-EP113 THIRD FLOOR - ELECTRICAL
B408-EP200 ELECTRICAL ENLARGED PLANS
B408-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B408-EP301 ELECTRICAL ONE-LINE DIAGRAMS
B408-EP400 ELECTRICAL SCHEDULES
B409-ED110 BASEMENT DEMOLITION - ELECTRICAL
B409-EP110 BASEMENT - ELECTRICAL
B409-EP111 FIRST FLOOR - ELECTRICAL
B409-EP200 ELECTRICAL ENLARGED PLANS
B409-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B409-EP400 ELECTRICAL SCHEDULES
B410-ED110 BASEMENT DEMOLITION - ELECTRICAL
B410-EP110 BASEMENT - ELECTRICAL
B410-EP111 FIRST FLOOR - ELECTRICAL
B410-EP200 ELECTRICAL ENLARGED PLANS
B410-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B410-EP400 ELECTRICAL SCHEDULES
B411-EP111 FIRST FLOOR - ELECTRICAL
B411-EP200 ELECTRICAL ENLARGED PLANS
B411-EP400 ELECTRICAL SCHEDULES
B412-EP111 FIRST FLOOR - ELECTRICAL
B412-EP200 ELECTRICAL ENLARGED PLANS
B412-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B412-EP400 ELECTRICAL SCHEDULES
B415-EP111 FIRST FLOOR - ELECTRICAL
B415-EP200 ELECTRICAL ENLARGED PLANS
B415-EP400 ELECTRICAL SCHEDULES
B416-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B416-EP111 FIRST FLOOR - ELECTRICAL
B416-EP200 ELECTRICAL ENLARGED PLANS
B416-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B416-EP400 ELECTRICAL SCHEDULES
B423-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B423-EP111 FIRST FLOOR - ELECTRICAL
B423-EP200 ELECTRICAL ENLARGED PLANS
B423-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B423-EP400 ELECTRICAL SCHEDULES
B424-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B424-EP111 FIRST FLOOR - ELECTRICAL
B424-EP200 ELECTRICAL ENLARGED PLANS
B424-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B424-EP400 ELECTRICAL SCHEDULES
B425-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B425-EP111 FIRST FLOOR - ELECTRICAL
B425-EP200 ELECTRICAL ENLARGED PLANS
B425-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B425-EP400 ELECTRICAL SCHEDULES
B452-ED111 FIRST FLOOR DEMOLITION - ELECTRICAL
B452-EP111 FIRST FLOOR - ELECTRICAL
B452-EP200 ELECTRICAL ENLARGED PLANS
B452-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B452-EP400 ELECTRICAL SCHEDULES
B455-EP111 FIRST FLOOR - ELECTRICAL
B455-EP200 ELECTRICAL ENLARGED PLANS
B455-EP300 ELECTRICAL ONE-LINE DIAGRAMS
B455-EP400 ELECTRICAL SCHEDULES
Mechanical
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
B23-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B23-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B23-M600 MECHANICAL SCHEDULES
B25-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B25-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B25-M600 MECHANICAL SCHEDULES
B36-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B36-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B36-M600 MECHANICAL SCHEDULES
B40-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B40-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B40-M600 MECHANICAL SCHEDULES
B52-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B52-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B52-M600 MECHANICAL SCHEDULES
B400-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B400-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B400-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B400-M104 FOURTH LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B400-M302 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B400-M303 THIRD LEVEL FLOOR PLAN - ENLARGED MECHANICAL
B400-M304 FOURTH LEVEL FLOOR PLAN - ENLARGED MECHANICAL
B400-M600 MECHANICAL SCHEDULES
B401-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B401-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B401-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B401-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B401-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B401-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B401-M600 MECHANICAL SCHEDULES
B402-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B402-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B402-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B402-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B402-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B402-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B402-M600 MECHANICAL SCHEDULES
B403-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B403-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B403-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B403-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B403-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B403-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B403-M600 MECHANICAL SCHEDULES
B404-FD101 FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROT - DEMO
B404-FD102 SECOND LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION - DEMO
B404-FD103 THIRD LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION - DEMO
B404-F101 FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION
B404-F102 SECOND LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION
B404-F103 THIRD LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION
B404-MD101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMO
B404-MD102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMO
B404-MD103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMO
B404-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B404-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B404-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B404-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B404-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B404-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B404-M600 MECHANICAL SCHEDULES
B405-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B405-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B405-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B405-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B405-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B405-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B405-M600 MECHANICAL SCHEDULES
B406-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B406-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B406-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B406-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B406-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B406-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B406-M600 MECHANICAL SCHEDULES
B407-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B407-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B407-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B407-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B407-M600 MECHANICAL SCHEDULES
B408-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B408-M102 SECOND LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B408-M103 THIRD LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B408-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B408-M301 SECOND LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B408-M302 THIRD LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B408-M600 MECHANICAL SCHEDULES
B409-M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B409-M101 FIRST FLOOR PLAN - MECHANICAL
B409-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B409-M600 MECHANICAL SCHEDULES
B410-M100 BASEMENT LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B410-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B410-M300 ENLARGED PLANS
B410-M600 MECHANICAL SCHEDULES
B411-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B411-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B411-M600 MECHANICAL SCHEDULES
B412-M100 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B412-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B412-M600 MECHANICAL SCHEDULES
B416-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B416-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B416-M600 MECHANICAL SCHEDULES
B423-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B423-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B423-M600 MECHANICAL SCHEDULES
B424-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B424-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B424-M600 MECHANICAL SCHEDULES
B425-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B425-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B425-M600 MECHANICAL SCHEDULES
B455-M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B455-M300 FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
B455-M600 MECHANICAL SCHEDULES
M201 MECHANICAL DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
B
IM
/2
V A
T o m a h E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-7
.G
R
.r v t
/1
/2
:3
:0
P
M
GI001
SHEET INDEX EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-21-700
2/11/22Revisions: Date:
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
B
IM
/2
V A
T o m a h E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-7
.G
R
.r v t
/1
/2
:3
:0
P
M
GI002
ABBREVIATIONS EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-21-700
2/11/22Revisions: Date:
FLOOR PLAN GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PARTIAL AREAS AND LIMITS OF
CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.
INCIDENTAL WORK IS NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL
DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING
ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS
CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK
REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT
NO ADDITIONAL COST.
2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH
THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT
AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR
TO DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH
AND REPAIR ANY OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES
AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.
6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE
FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL
CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.
7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE
WITH MANUFACTURER.
8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR
EQUIPMENT SHALL BE VERIFIED WITH THE RESPECTIVE TRADE.
9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING
CONDITIONS SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR
SURFACE AND PREPARE FOR SCHEDULED FINISH APPLICATION. COORDINATE WORK
WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.
10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE
TYPES WITH TRADES WHICH REQUIRE THEM.
11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS
REQUIRED BY MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.
12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY
DIFFER FROM ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR
DEFINITIONS.
13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT
PLYWOOD BACKING BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT,
UNLESS NOTED OTHERWISE.
14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY
SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE
AS REQUIRED. ALL FIRE RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF
MATERIALS / ASSEMBLIES MEETING THE RATING INDICATED, TERMINATE AT THE
DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS
SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE
CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE
AT THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL
PENETRATIONS SHALL BE SEALED WITH FIRE CAULK.
DEMOLITION GENERAL NOTES
1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING
AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING
PURPOSES ONLY, UNLESS NOTED OTHERWISE.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL
TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.
3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG
WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,
SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO
STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO
FLOOR SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED
FINISHES WITHIN AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH
SCHEDULE FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.
5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION
SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,
UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE
REMODELED.
6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND
PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR
FINISHES.
7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY
DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.
8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH
AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.
9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR
REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.
10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS
COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE
PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL
MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL
ENGINEER.
11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED
DEMOLITION AND PREP WORK.
12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,
SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE
REMOVED, UNLESS NOTED OTHERWISE.
13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL,
OR CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING
FINISHES DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS
LOCATED WITHIN THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL
SUBSTRATES TO RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION,
SEE KEYNOTED ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL,
MECHANICAL AND ELECTRICAL.
RCP GENERAL NOTES
1. GENERAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .