Technical Questions - FINAL - Tomah 7-6-22.pdf
PDF 157 KB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Tomah Federal contract opportunity
- Solicitation number
- 36C77622B0031
About this file
This document contains a technical questions and answers tracking sheet for a federal infrastructure upgrades project at the Tomah VA Medical Center. Key details include that the project involves upgrades to electrical, HVAC, communication, physical security and fiber infrastructure systems across multiple buildings on the campus. The contractor must provide all required testing and inspection for the upgrades. The commissioning agent will be provided by the VA. The contractor must include an additional 20% capacity for communications cabling and confirm Level 4 finish is required for all public areas. All asbestos containing materials identified in the report must be removed from areas of work. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #36C77622B0031 EHRM Infrastructure Upgrades - Tomah Technical Questions and VA Response Tracking Sheet
ITEM
NO.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
1. 6-27-22 6-27-22 Is this project tax-exempt? If yes, please issue the Tax Exemption number for bidding purposes. If not, what is the percentage of tax?
No, this is not exempt of sales tax. Contractors are required to pay sales and excise tax. Offerors shall include all applicable taxes in accordance with FAR by Reference Clause 52.229-3 “Federal, State and Local Taxes.” Percentage of tax information is the responsibility of the offeror.
2. 6-28-22 6-30-22 Specification Section 01 35 26 states “The Prime Contractor shall designate a minimum of one SSHO at each project site that will be identified as the SSHO to administer the Contractor's safety program and government-accepted Accident Prevention Plan. Each subcontractor shall designate a minimum of one CP in compliance with 29 CFR 1926.20 (b)(2) that will be identified as a CP to administer their individual safety programs.” Would the government accept one SSHO for the project so long as each site running concurrently has the appropriate competent persons at each site?
Specifications require dedicated SSHO for this project. Each work area under this project must have a CP present.
3. 6-28-22 6-30-22 Please confirm the Superintendent shall not have any shared duties as a QCM or SSHO on the project.
Confirmed, superintendent is expected to be on site full time for duration of project.
4. 6-28-22 6-30-22 Please confirm the SSHO shall not have any shared duties as a QCM or Superintendent on the project.
Confirmed, SSHO is expected to be on site full time for duration of project.
5. 6-28-22 6-30-22 Please confirm the QCM shall not have any shared duties as a SSHO or Superintendent.
Confirmed, QCM is expected to be on site full time for duration of project.
6. 6-28-22 6-30-22 Please confirm that the contractor is to supply all testing and inspection for the project.
Provide testing per specifications and as noted on drawings.
7. 6-28-22 6-30-22 Please confirm that commissioning agent is by the contractor to be included in the bid proposal.
Commissioning agent is by the VA. Contractor will need to work with agent throughout construction.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
8. 6-28-22 6-30-22 Please confirm requirement for an additional 20% capacity of communications cabling to be included in the bid amount.
The intent was to allow for 20% additional data drops throughout project to allow for unforeseen conditions.
9. 6-28-22 6-28-22 Equipment and certain materials have extremely long lead times currently, will the VA be willing to issue an Administrative NTP for the project before issuing a NTP for construction to help mitigate these long lead items?
We may issue an administrative NTP as soon as bonds and insurance are provided to us in accordance with terms and conditions of the contract. This type of NTP can be also referred as a Limited Notice to Proceed under the VAAM 836.213-74.
10. 6-28-22 6-30-22 Please confirm the ICRA wall systems must be one hour rated (STARC fireblockwall or equal system). This has a large cost impact compared to the standard ICRA systems on the market.
Confirmed.
11. 6-28-22 6-30-22 Will work in common hallways require use of the control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit)? Or will the VA allow the work to be done with plastic sheating if the dust disturbance is minimal and 4 or less acoustic tiles are removed for that particular work?
HEPA mobile containment cart is required for any work outside of ICRA barriers or containment.
12. 6-28-22 6-30-22 Please confirm Level 4 finish for all finished areas open to public view of gypsum board.
Confirmed.
13. 6-28-22 6-30-22 Please confirm painting unless otherwise noted is to be
(3) coats (prime, body, and finish) and will be from "seam to seam" or to a change of materials where walls have been patched and refinished.
Confirmed.
14. 6-28-22 6-30-22 Please provide project completion date for PROJECT #676-21-701 Data Center Expansion.
Anticipated completion is fall 2023.
15. 6-28-22 6-30-22 What is the scope of work regarding the ACM listed in the Asbestos report? Are we to remove all ACMs from these areas or only if the contractor encounters them during construction?
All ACM’s shall be removed in areas of work identified in contract documents.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
16. 6-28-22 6-30-22 Are there any known ACMs in the existing duct banks? No known ACM’s within existing electrical duct banks. Any areas with suspected ACM’s shall require work stoppage and testing per specifications.