This document provides details for a federal solicitation to conduct infrastructure upgrades at the Tomah VA Medical Center in Wisconsin. The solicitation seeks contractors to perform upgrades to electrical, HVAC, communication, physical security and fiber infrastructure systems across multiple buildings on the campus. Additional requirements include modifying impacted roads, walks and drainage, hazardous material abatement, and data center and WAN updates. The work involves reconfiguring and renovating existing spaces impacted by the infrastructure improvements. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATION
GENERAL ABBREVIATIONS
DESCRIPTION ABBREVIATION DESCRIPTION
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
AD ACCESS DOOR/PANEL
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
DIA DIAMETER
DN DOWN
E EXISTING
EC ELECTRICAL CONTRACTOR
EFF EFFICIENCY
GC GENERAL CONTRACTOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
L LENGTH
LF LINEAR FEET
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PC PLUMBING CONTRACTOR
PSIG POUNDS PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
SHT SHEET
TOB TOP OF BEAM
GPM GALLONS PER MINUTE
TOS TOP OF STEEL
BOB BOTTOM OF BEAM
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
UNION
Y STRAINER WITH BLOWDOWN
ELBOW UP
ELBOW DOWN
TEE UP
PIPING
- SOLID LINE INDICATES SYSTEM SUPPLY
-- DASHED LINE INDICATES SYSTEM RETURN
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
GENERAL MECHANICAL SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
# SHEET NOTE
DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS
AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.
DIAMETER
DENOTES CONNECTION OF NEW WORK TO
EXISTING SYSTEM
PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.
ARROW INDICATES DOWNWARD PIPE SLOPE
#/# INDICATES SLOPE IN INCHES PER FOOT
WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR REQUIREMENTS
ARROW INDICATES DIRECTION OF FLOW IN PIPING
ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CHECK VALVE
ARROW INDICATES DIRECTION OF NORMAL FLOW
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CIRCUIT SETTER, AUTOFLOW, ETC.
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PRESSURE GAUGE
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER - HORIZONTAL PIPE
TEE DOWN
TEE HORIZONTAL
PIPE REDUCER
INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.
SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.
REQUIRED SERVICE CLEARANCE FOR EQUIPMENT
CONTINUATION
FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.
SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.
PLUMBING SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
AIR VENT
AUTOMATIC FLOW CONTROL VALVE
# INDICATES FLOW TO BE BALANCED IN GPM
BACKFLOW PREVENTER
CALIBRATED BALANCING VALVE
VALVE - THROTTLING SERVICE
VALVE - SHUTOFF SERVICE
P/T PORT
PIPE CAP
PIPE CONTINUATION
PRESSURE GAUGE STEAM REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
PRESSURE REDUCING VALVE
PUMP
RELIEF VALVE
S SENSOR
SUCTION DIFFUSER
THERMOMETER - VERTICAL PIPE REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
VACUUM BREAKER
Y STRAINER
STEAM TRAP
CC CONTROLS CONTRACTOR
PIPING
- SINGLE DASH INDICATES DOMESTIC COLD WATER
- DOUBLE DASH INDICATES DOMESTIC HOT WATER
- TRIPLE DASH INDICATES HOT WATER
CIRCULATING
- SOLID INDICATES SANITARY ABOVE FLOOR
- CONTINUOUS DASHED INDICATES VENT
- LONG DASHED LINES INDICATE SANITARY BELOW
FLOOR
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
C.O.
C.O.
ROOF DRAIN
TAG INDICATES DRAIN SIZE IN INCHES AND AREA
OF ROOF DRAINED IN SQUARE FEET
REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
#"RD
# SF
WALL DISCHARGE (DOWNSPOUT NOZZLE)
TAG INDICATES DRAIN SIZE IN INCHES AND AREA
OF ROOF DRAINED IN SQUARE FEET
REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
#"DSN
# SF
FD-# FLOOR DRAIN REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
CLEANOUT
CIRCLE INDICATES UP TO FLOOR OR WALL CLEANOUT.
LINE INDICATES END OF PIPE CLEANOUT LOCATED ABOVE A CEILING.
DOUBLE GRADE CLEANOUT REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS.
ABBREVIATION
PLUMBING ABBREVIATIONS
DESCRIPTION
CHEMICAL VENTCV
CHEMICAL WASTECW
BOTTLE/GLASS FILLERBF
ABBREVIATION DESCRIPTION
DOMESTIC HOT WATERDHW
DOMESTIC HOT WATER CIRCULATIONDHWC
LAVATORYL
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BACK FLOW PREVENTERBFP
BATH TUBBT
COMPRESSED AIR (NON-MEDICAL)CA
PROPANELPG
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
CONDENSATE DRAINCD
CLEANOUTCO
CONDENSATE PUMPCP
MOP SINKMS
NORMALLY CLOSEDNC
NORMALLY OPENNO
CLINICAL SINKCS
DOMESTIC COLD WATERDCW
DRINKING FOUNTAINDF
NON-POTABLE WATERNPW
POST INDICATOR VALVEPIV
PRESSURE REDUCING VALVEPRVDOUBLE GRADE CLEANOUTDGCO
DEIONIZED WATERDI
DEIONIZED WATER CIRCULATINGDIC
ROOF DRAINRD
REVERSE OSMOSIS WATERRO
DEIONIZED HOT WATERDIH
RPZ
S
REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)
SINK
DEIONIZED HOT WATER CIRCULATINGDIHC
DISTILLED WATERDIS
DISTILLED WATER CIRCULATINGDISC
SANITARY SEWERSAN
DOMESTIC SOFT COLD WATERSCW
DOMESTIC SOFT HOT WATERSHW
DIALYSIS WATER RETURNDR
DIALYSIS WATER SUPPLYDS
DRAIN TILEDT
DOMESTIC SOFT HOT WATER CIRCULATINGSHWC
SEWAGE EJECTORSE
SHOWERSH
EMERGENCY EYE WASHEEW
EMERGENCY SHOWERES
EMERGENCY SHOWER AND EYE WASH COMBOESEW
STORM OVERFLOWSO
SUMP PUMPSP
SERVICE SINKSS
EXPANSION TANKET
ELECTRIC WATER COOLEREWC
ENTERING WATER TEMPERATUREEWT
STORM SEWERST
TEMPERATURETEMP
URINALUR
FILTERF
FLOOR CLEANOUTFCO
FLOOR DRAINFD
VENTV
VENT THROUGH ROOFVTR
FLOOR SINKFS
WB
WC
WALL BOX
WATER CLOSET
NATURAL GASG
WALL CLEANOUTWCO
GRADE CLEANOUTGCO
HUB DRAINHD
WATER HEATERWH
WATER SOFTENERWS
HORSEPOWERHP
WPD
YCO
WATER PRESSURE DROP
YARD CLEANOUTGREASE VENTGV
HOSE BIBHB
GREASE WASTEGW
DOWN SPOUT NOZZLEDSN
SYMBOL
FIRE PROTECTION SYMBOLS
DESCRIPTION ADDITIONAL REMARKS
FLOW SWITCH COORDINATE INTERFACE WITH FIRE ALARM SYSTEM CONTRACTOR
FIRE DEPARTMENT CONNECTION MOUNT BETWEEN 18" AND 48" ABOVE FINISHED GRADE
REFER TO SPECIFICATIONS FOR TYPES AND FINISHES.
PENDANT REFERS TO FULL, SEMI-RECESSED AND RECESSED TYPES. LOCATIONS
FOR EACH ARE INDICATED IN THE SPECIFICATIONS OR ON THE PLANS.
SIDEWALL SPRINKLER -
EXISTING SIDEWALL SPRINKLER
SPRINKLER
EXISTING SPRINKLER
EXISTING SPRINKLER TO BE REMOVED
FIRE PIPEF
O.S. & Y. VALVE
SHUT-OFF VALVE WITH TAMPER SWITCHTS
F
ABBREVIATION
FIRE PROTECTION ABBREVIATIONS
DESCRIPTION
BACK FLOW PREVENTERBFP
FIRE PROTECTIONF
FIRE DEPARTMENT CONNECTIONFDC
ABBREVIATION DESCRIPTION
FLOW SWITCHFS
POST INDICATOR VALVEPIV
SPRINKLERSPR
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
RECTANGULAR DUCTWORK
W = DIMENSION IN VIEW (INCHES)
H = DIMENSION PERPENDICULAR TO VIEW (INCHES)
ROUND DUCTWORK
D = DUCT DIAMETER
TURNING VANES
FLEXIBLE PIPING
WxH
D"Ø
HVAC SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
W/H
FLAT OVAL DUCTWORK
W = DIMENSION IN VIEW (INCHES)
H = DIMENSION PERPENDICULAR TO VIEW (INCHES)
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
DUCT CROSS SECTION - SUPPLY
DUCT CROSS SECTION - RETURN
DUCT CROSS SECTION - EXHAUST
CROSS SECTION INDICATES DUCT EXTENDING PERPENDICULAR TO THE PAGE. IN
PLAN VIEW THIS INDICATES A DUCT RISE OR DROP TO ANOTHER LEVEL. SOLID
INTERIOR LINE INDICATES EXTENSION UP. DASHED INTERIOR LINE INDICATES
EXTENSION DOWN.
MANUAL BALANCE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE MANUAL BALANCE DAMPERS IN AN
ACCESSIBLE LOCATION AND AS CLOSE TO THE MAIN DUCT AS POSSIBLE.
CONTROL DAMPER
FIRE/SMOKE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
DIFFUSER
REFER TO SPECIFICATIONS FOR TYPE.
FLEXIBLE DUCT
REFER TO SPECIFICATIONS FOR TYPE. REFER TO DETAILS FOR INSTALLATION
REQUIREMENTS. MAXIMUM LENGTH SHALL BE 48 INCHES UNLESS NOTED OTHERWISE
ON THE PLANS OR IN THE SPECIFICATIONS.
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - NO COIL
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - HOT WATER COIL
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - ELECTRIC COIL
VB-#
### CFM
VAV BOX TAG
# = REFERENCE NUMBER IN SCHEDULE
### = AIRFLOW IN CFM
REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW
LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY
TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS
CONTRACTOR.
VB-#
#.# GPM
VAV BOX TAG
# = REFERENCE NUMBER IN SCHEDULE
#.# = WATER FLOW RATE IN GPM
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - DUAL DUCT
D#
DIFFUSER TAG
D = TYPE # = TYPE NUMBER
### = AIRFLOW IN CFM
REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO
AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE
D1 FOR SUPPLY OR G1 FOR RETURN/EXHAUST.
FLOW ARROW ARROW INDICATES DIRECTION OF AIRFLOW FROM DIFFUSERS WITH ADJUSTABLE
THROWS.
DIFFUSER BLANK OFF SHADED AREA INDICATES QUADRANT OF DIFFUSER TO BE PROVIDED WITH BLANK OFF
PANEL.
RETURN GRILLE
EXHAUST GRILLE
WALL REGISTER / GRILLE
DUCT MOUNTED REGISTER / GRILLE
LINEAR SLOT
REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW
LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY
TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS
CONTRACTOR.
SMOKE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
ABBREVIATION
HVAC ABBREVIATIONS
DESCRIPTION
AIR BLENDERAB
AIR CONDITIONING UNIT (SPLIT SYSTEM INDOOR UNIT)AC
AIR HANDLING UNITAHU
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BOILER FEED UNITBFU
BOILERBLR
CONSTANT AIR VOLUME BOXCAV
COOLING COILCC
CONDENSATE DRAINCD
CUBIC FEET PER MINUTECFM
CHILLERCH
CONDENSATE PUMPCP
CONDENSER WATER RETURNCR
CONDENSER WATER SUPPLYCS
COOLING TOWERCT
CONDENSING UNITCU
CABINET UNIT HEATERCUH
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
DIFFUSERD
DUAL DUCTDD
DIRECT EXPANSIONDX
EXHAUST AIREA
ENTERING AIR TEMPERATUREEAT
EXHAUST FANEF
EFFICIENCYEFF
ENERGY RECOVERY COILERC
ENERGY RECOVERY WHEELERW
EXPANSION TANKET
ENTERING WATER TEMPERATUREEWT
FILTER BANK (CONSISTING OF ONE OR MORE FILTERS)FB
FAN COIL UNITFCU
FLOW MEASURING STATIONFMS
FUEL OIL RETURNFOR
FUEL OIL SUPPLYFOS
FUEL OIL VENTFOV
FIRE DAMPERFRD
FIRE SMOKE DAMPERFSD
FINNED TUBE RADIATORFTR
GRILLEG
GLYCOL CHILLED WATER RETURNGCWR
GLYCOL CHILLED WATER SUPPLYGCWS
GRAVITY EXHAUSTGE
GLYCOL HEATING HOT WATER RETURNGHWR
GLYCOL HEATING HOT WATER SUPPLYGHWS
GRAVITY INTAKEGI
HEATING COILHC
PRESSURE/TEMPERATURE TEST PORT
TEMPERATURE CONTROL SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
WALL MOUNTED CONTROL DEVICE
# INDICATES TYPE
REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION.
T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON MONOXIDE, ETC.)
OCCUPANCY SENSOR
REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WHEN SENSOR IS
NOT SHOWN ON ELECTRICAL DRAWINGS IT SHALL BE PROVIDED AND INSTALLED BY
THE TEMPERATURE CONTROLS CONTRACTOR.
DUCT, PIPE, OR CEILING MOUNTED CONTROL
SENSOR
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON DIOXIDE, ETC.)
CONTROL VALVE (3-WAY)
CONTROL VALVE (2-WAY)
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
F/S FLOW MEASURING STATION
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
FIRE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
CD
FD
SD
FS
DAMPER SHALL BE SAME SIZE AS DUCT UNLESS NOTED OTHERWISE. REFER TO
SEQUENCES, SCHEMATICS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
FLOW SWITCHF
ABBREVIATION DESCRIPTION
HORSEPOWERHP
HIGH PRESSURE STEAM CONDENSATEHPC
HIGH PRESSURE STEAM SUPPLY (86 PSIG AND ABOVE)HPS
HEAT RECOVERY CHILLERHRC
HUMIDIFIERHUM
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
LOW PRESSURE STEAM CONDENSATELPC
LOW PRESSURE STEAM SUPPLY (0-12 PSIG)LPS
LOUVERLV
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
MANUAL DAMPERMD
MOTOR OPERATED DAMPERMOD
MEDIUM PRESSURE STEAM CONDENSATEMPC
MEDIUM PRESSURE STEAM SUPPLY (13-85 PSIG)MPS
NORMALLY CLOSED, NOISE CRITERIANC
NORMALLY OPEN, NUMBERNO
OUTDOOR AIROA
PUMPP
PUMPED CONDENSATEPC
PRESSURE REDUCING VALVEPRV
PUMPED STEAM CONDENSATEPSC
REGISTERR
RETURN AIRRA
RELIEF AIRREA
REFRIGERANT DX LIQUIDREFL
REFRIGERANT DX SUCTION GASREFS
RETURN FANRF
RELATIVE HUMIDITYRH
ROOF TOP UNITRTU
SUPPLY AIRSA
SMOKE DAMPERSD
SUPPLY FANSF
STATIC PRESSURESP
STEAMSTM
TEMPERATURETEMP
TRANSFERTR
UNIT HEATERUH
VARIABLE AIR VOLUME BOXVAV
VENT THROUGH ROOFVTR
WET BULB TEMPERATUREWB
WATER COLUMNWC
WATER PRESSURE DROPWPD
WATER SOURCE HEAT PUMP RETURNWSHPR
WATER SOURCE HEAT PUMP SUPPLYWSHPS
CONTROL SENSOR
# INDICATES TYPE
T = TEMPERATURE H = HUMIDITY #
MECHANICAL GENERAL NOTES:
A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, PLUMBING, TEMPERATURE CONTROLS, AND FIRE PROTECTION WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS.
B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY
ENGINEER.
C. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION OF THE ADDITIONS AND REMODELING/ALTERATION OF THE EXISTING BUILDING. SERVICES TO THE EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION EXCEPT DURING SCHEDULED SHUTDOWNS FOR EXTENSION OR MODIFICATION. PLAN TO COMPLETE SHUTDOWNS DURING OFF HOURS TO MINIMIZE IMPACT TO THE OWNER. COORDINATE SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK. PROVIDE TEMPORARY SERVICES WHERE NECESSARY TO ACCOMPLISH ANY SHUTDOWN. THIS INCLUDES BUT IS NOT LIMITED TO STAFFING AND EQUIPMENT FOR FIRE WATCHES, PROVISIONS FOR BOTTLED WATER, AND TEMPORARY HEATING OR COOLING EQUIPMENT.
TEMPORARY MEASURES SHALL NOT BE REMOVED UNTIL THE PERMANENT SYSTEMS ARE OPERATIONAL AND HAVE PASSED ALL REQUIRED
TESTING.
D. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF
THE OWNER.
E. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND
REFINISHING SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE.
F. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS AS "TO BE RETAINED, RELOCATED", ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW CONSTRUCTION AND/OR
WITH PROPOSED USAGE OF SPACE BY OWNER AS FOLLOWS:
a. REMOVE ANY PIPING PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE
MAIN WITH MATERIAL TO MATCH EXISTING.
b. REMOVE ALL FIXTURES, CARRIERS, SUPPLY AND WASTE AND VENT PIPING, STEAM, HEATING HOT WATER, HVAC SUPPLY, RETURN AND EXHAUST AS NOTED. CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE MAIN. SUPPLY AND RETURN MAINS ON PIPING SYSTEMS
CONVEYING WATER OR GASES SHALL BE VALVED AND CAPPED
c. IN REMODELED/ALTERED AREAS, ANY PIPING OR DUCTWORK PASSING THROUGH THE REMODELED AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR SURROUNDING AREAS THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL AND SHALL BE REROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE TO BE ACCOMPLISHED IN THE
REMODELED AREA.
d. REMOVE UNUSED OR ABANDONED HANGERS AND PATCH ABANDONED PENETRATIONS TO MATCH EXISTING.
e. PENETRATIONS THROUGH EXISTING WALLS AND FLOORS FORMERLY OCCUPIED BY REMOVED PIPING OR DUCTWORK SHALL BE PATCHED
TO MATCH EXISTING CONSTRUCTION.
f. RE-SUPPORT ANY PIPING AND DUCTWORK THAT WAS SUPPORTED FROM BUILDING ELEMENTS REMOVED AS PART OF THE WORK.
g. MAINTAIN CONTROL WIRING OR PNEUMATIC TUBING REQUIRED FOR THE CONTINUED PROPER OPERATION OF THE BUILDING
AUTOMATION SYSTEM.
G. ALL EXISTING EQUIPMENT BEING REMOVED WILL BE HANDED OVER TO OWNER FOR FIRST RIGHT OF SALVAGE. IF OWNER REFUSES SALVAGE
ITEMS, REMOVING CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL.
H. CONTRACTOR SHALL REFER TO THE DRAWINGS OF ALL TRADES TO FAMILIARIZE THEMSELVES WITH EXTENT OF WORK INCLUDING BUT NOT
LIMITED TO WHERE NEW PARTITIONING IS BEING INSTALLED, WHERE EXISTING PARTITIONING IS BEING REMOVED, WHERE CEILINGS ARE BEING
REMOVED AND/OR REPLACED, ETC.
I. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE SHOWN. THE CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
J. PERFORM AIR AND FLUID BALANCE PRE-TEST ON ALL DISTRIBUTION EQUIPMENT AND ALL AIR OUTLETS IN THE AREA PRIOR TO COMMENCING
WORK. SUBMIT PRE-TEST INFORMATION TO OWNER/ENGINEER.
K. PROVIDE ACCESS DOORS IN DUCTWORK AND/OR ARCHITECTURAL ELEMENTS WHERE REQUIRED TO ACCESS ALL EQUIPMENT REQUIRING MAINTENANCE AND ADJUSTMENT. THIS EQUIPMENT INCLUDES BUT IS NOT LIMITED TO SENSORS, DAMPERS, ACTUATORS, CONTROL DEVICES, VALVES, ETC. ACCESS DOORS SHALL BE SIZED TO PROVIDE APPROPRIATE ACCESS BASED ON HEIGHT OF ACCESS REQUIRED AND ACTIVITY.
INSTALL SUCH THAT ACCESS DOOR IS FULLY OPERABLE WITHOUT THE REMOVAL OF ARCHITECTURAL ELEMENTS SUCH AS CEILING RUNNERS, SUPPORTS, ETC. INSTALL IN A LOCATION SUCH THAT STEPPING OR LEANING OVER PERMANENT EQUIPMENT OR FURNITURE IS NOT REQUIRED.
WHERE ACCESS DOORS ARE REQUIRED IN ARCHITECTURAL ELEMENTS THAT PROVIDE A FIRE AND/OR SMOKE RATING, ACCESS DOOR SHALL
MAINTAIN THE REQUIRED RATING.
L. SEAL ALL WALL PENETRATIONS (DUCTWORK, PIPING, CONTROLS, CONDUITS, ETC.) WITH NON-COMBUSTIBLE MATERIAL. SEAL PENETRATIONS INTO ROOMS THAT REQUIRE PRESSURE CONTROL OR SOUND ISOLATION. WITH NON-COMBUSTIBLE MATERIAL AND CAULK.
M. PIPING AND DUCTWORK SHALL NOT BE ROUTED OVER ELECTRICAL AND TELECOM ROOMS. WHERE ROUTING OVER SUCH ROOMS IS UNAVOIDABLE, CONTRACTOR SHALL COORDINATE WITH OWNER, DESIGN TEAM, AHJ, AND OTHER TRADES REGARDING LOCATION OF PANELS AND UTILITY ROUTING AND SHALL PROVIDE DRIP PANS UNDER ALL UTILITIES WITH MOISTURE SENSORS OR DRAIN PIPING AS REQUIRED BY THE
SPECIFICATIONS.
N. REMOVAL AND REINSTALLATION OF CEILINGS REQUIRED FOR THE COMPLETION OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.
CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED CEILING COMPONENTS TO MATCH EXISTING. WHERE AN IDENTICAL MATCH IS NO LONGER AVAILABLE, CONTRACTOR SHALL PROVIDE A SIMILAR REPLACEMENT UPON APPROVAL FROM THE OWNER.
O. FLEXIBLE DUCTWORK SHALL HAVE A MAXIMUM LENGTH OF 48" REGARDLESS OF LENGTH SHOWN ON DRAWINGS. FLEX DUCT INSTALLATION SHALL BE AT TERMINAL ENDS ONLY. CONNECTIONS AT VAV BOX INLETS SHALL BE SOLID HARD DUCT. THE DUCTWORK AT ANY FIRE AND/OR FIRE
SMOKE DAMPER SHALL BE HARD DUCT.
P. LOCATE PIPING AND DUCTWORK IN EXTERIOR BUILDING WALLS ON THE WARM SIDE OF THE BUILDING AND VAPOR BARRIER. COORDINATE INSTALLATION OF BUILDING INSULATION TO RUN CONTINUOUS BETWEEN PIPING AND BUILDING WALL.
Q. SUPPORT ALL DUCTWORK, PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. ROUTE DUCT MAINS TIGHT TO STRUCTURE UNLESS NOTED OTHERWISE. HOLD PIPING TIGHT TO BOTTOM OF STRUCTURAL MEMBERS OR RUN THROUGH JOIST WEBS IF POSSIBLE. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. DO NOT SUPPORT FROM WOOD TONGUE AND GROOVE ROOF DECK. SUPPORT FROM BOTTOM CHORD OF BAR JOISTS ONLY AT PANEL POINTS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR REMOVAL FROM THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR
MAINTENANCE.
R. PROVIDE CONSTRUCTION FILTERS ON AIR MOVING EQUIPMENT SERVING THE CONSTRUCTION AREA AS WELL AS ALL RETURN/EXHAUST DUCT PENETRATIONS COMING FROM THE CONSTRUCTION AREA. AT THE COMPLETION OF WORK, REMOVE ALL TEMPORARY AND CONSTRUCTION
FILTERS AND PROVIDE NEW FILTERS FOR ALL AIR MOVING EQUIPMENT.
S. PROTECT ALL DUCTWORK AND PIPING DURING CONSTRUCTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. AT A MINIMUM, DUCTWORK AND PIPING ENDS SHALL BE COVERED AND SEALED TO PREVENT THE COLLECTION OF DUST AND DEBRIS. CLEAN ALL INTERIOR SURFACES PRIOR TO INSTALLATION AND PROTECT ONCE INSTALLED. MEDICAL GAS PIPING SHALL BE PROTECTED IN ACCORDANCE WITH NFPA
99 REQUIREMENTS.
T. AT THE COMPLETION OF WORK, CLEAN ALL STRAINERS PROVIDED AS A PART OF THE WORK AS WELL AS PRIMARY SYSTEM STRAINERS LOCATED AT PUMPS WHERE SYSTEMS WERE EXTENDED. ON EXISTING EQUIPMENT, COORDINATE WORK WITH OWNER.
U. PROVIDE INTERMEDIATE TESTING AND BALANCING AT THE COMPLETION OF EACH PHASE AND AS REQUIRED TO MAINTAIN PROPER OPERATION OF SYSTEMS SERVING AREAS OF THE FACILITY IN USE INCLUDING BUT NOT LIMITED TO OCCUPIED AREAS, STORAGE AREAS, AND OTHER AREAS
DEEMED CRITICAL BY THE OWNER OR AHJ.
V. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED. REFER TO SHEET M201 FOR GENERAL CONSTRUCTION DETAILS.
W. REFER TO SCHEDULES FOR SIZES OF FINAL RUNOUTS TO EQUIPMENT, FIXTURES, DIFFUSERS, GRILLES, AND TERMINAL DEVICES. FINAL RUNOUT SIZES LISTED SHALL BE USED TO WITHIN 10 EQUIVALENT DIAMETERS OF FINAL CONNECTION POINT. FINAL PIPING CONNECTION TO EQUIPMENT SHALL MATCH EQUIPMENT CONNECTION SIZE, PROVIDE TRANSITIONS AS REQUIRED. REFER TO DETAILS, DIAGRAMS AND SCHEMATICS FOR
ADDITIONAL FINAL CONNECTION REQUIREMENTS. REFER TO SHEET M600 FOR SCHEDULES.
X. FOR DUCTWORK PENETRATING A ONE HOUR FIRE RATED WALL WHERE A FIRE DAMPER IS NOT SHOWN, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. THE SYSTEM SHALL BE FIRE TESTED PER ASTM E119 AND COMPLY WITH EXCEPTION 1 OF 2018 IBC PART 717.5.2. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO A ONE HOUR FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS.
REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS. ALL DUCTWORK PENETRATIONS SHALL BE INSPECTED BY AN APPROVED THIRD PARTY INSPECTION AGENCY IN ACCORDANCE WITH ASTM E2174. THE INSPECTION AGENCY SHALL BE PROCURED BY THE CONTRACTOR. DOCUMENTATION OF APPROVED INSPECTION SHALL BE INCLUDED WITH PROJECT CLOSEOUT
DOCUMENTATION.
Y. FIRE ALARM CONTRACTOR SHALL PROVIDE A DUCT SMOKE DETECTOR FOR EACH SMOKE OR FIRE/SMOKE DAMPER AS REQUIRED BY CODE.
MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION OF EACH DUCT SMOKE DETECTOR AND SHALL INSTALL THEM IN THE DUCT.
Z. FOR ALL PIPING, CONDUIT, AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
FIRE PROTECTION GENERAL NOTES:
A. FIRE PROTECTION WORK SHALL INCLUDE, BUT NOT LIMITED TO, THE FOLLOWING: SPRINKLER BRANCH PIPING & SPRINKLER HEADS.
B. ALL AREAS OF THE BUILDING INDICATED SHALL BE SPRINKLERED ACCORDING TO THE CURRENTLY ADOPTED EDITION OF NFPA STANDARD 13
AND OTHER NFPA STANDARDS AS REQUIRED. ENTIRE SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE STATE FIRE MARSHAL OFFICE, OWNER'S INSURANCE COMPANY AND AUTHORITIES HAVING JURISDICTION.
C. FIRE SPRINKLER DESIGN SHALL BE BASED ON HYDRAULIC CALCULATIONS ACCORDING NFPA 13, WITH SHOP DRAWINGS PREPARED ACCORDING TO THE REQUIREMENTS OF THE STATE FIRE MARSHAL AND AUTHORITIES HAVING JURISDICTION.
D. SPRINKLER CONTRACTOR SHALL OBTAIN STATIC AND RESIDUAL WATER PRESSURE AND FLOW PRIOR TO SYSTEM DESIGN AND SHALL SUBMIT
RECENT HYDRANT FLOW TEST DATA WITH SHOP DRAWING SUBMITTALS.
E. DRAWINGS ARE SCHEMATIC IN NATURE, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT OF THE SYSTEM.
SPRINKLER SYSTEM INSTALLING CONTRACTOR SHALL COORDINATE SYSTEM ARRANGEMENT WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL COMPONENTS. SPRINKLER PIPING SHALL NOT BE INSTALLED BELOW MECHANICAL EQUIPMENT OR WITHIN CLEARANCE SPACES FOR MECHANICAL EQUIPMENT. PROVIDE SPRINKLER PROTECTION BELOW ALL DUCTS GREATER THAN 48 INCHES IN WIDTH. INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MODIFICATIONS TO THE SYSTEM REQUIRED TO AVOID CONFLICTS.
F. AREAS IDENTIFIED INDICATE THE RECOMMENDED MINIMUM OCCUPANCY CLASSIFICATION, SPRINKLER TEMPERATURE CHARACTERISTIC OR SPRINKLER TYPES TO BE INSTALLED. SPRINKLER SYSTEM SHALL BE DESIGNED TO MEET OR EXCEED THESE RECOMMENDATIONS AND SHALL
BE SUBJECT TO APPROVAL BY THE AUTHORITY HAVING JURISDICTION.
G. A PRE-DESIGN MEETING SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO SUBMITTAL OF PIPING LAYOUT DRAWINGS. ARCHITECT
SHALL ISSUE COMMENTS CONCERNING SUBMITTAL PACKAGE PRIOR TO COMMENCEMENT OF WORK.
H. REFER TO ARCHITECTURAL PLANS FOR SPECIFIC CEILING TYPES AND HEIGHTS, AND AREAS OF EXPOSED STRUCTURE.
I. COORDINATE PIPING AND SPRINKLERS IN EXPOSED AREAS TO MINIMIZE APPEARANCE. INSTALL SPRINKLERS A MINIMUM OF SIX INCHES FROM
DIFFUSERS, GRILLES AND LIGHT FIXTURES. INSTALL SPRINKLERS IN LAY-IN CEILINGS WITHIN THREE INCHES OF THE CENTER OF CEILING TILE.
J. COORDINATE INSTALLATION OF SPRINKLERS AND PIPING SYSTEMS TO AVOID FREEZING CONDITIONS. NOTIFY ARCHITECT OF AREAS FOR
WHERE SYSTEM MAY BE EXPOSED TO FREEZING. INSTALL DRY SIDEWALL SPRINKLERS IN ROOMS INDICATED WHERE ROOMS MAY BE UNCONDITIONED OR EXPOSED TO FREEZING CONDITIONS. PROVIDE AUXILIARY DRAINS WHERE REQUIRED.
K. EXPOSED SPRINKLER PIPING, EXCEPT IN MECHANICAL AND STORAGE ROOMS, SHALL BE CLEANED, PRIMED AND PREPARED FOR PAINTING.
L. AVOID ROUTING SPRINKLER PIPING ABOVE ELECTRICAL, DATA, IT AND COMMUNICATION PANELS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
B
IM
/2
V A
T o m a h E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-7
.G
R
.r v t
/8
/2
:4
:2
A M
M000
MECHANICAL SYMBOLS AND
ABBREVIATIONS
EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-21-700
2/11/22 CJW LACRevisions: Date:
02-11-2022
C141
C140
C139
C138
C140A
C112
12301
1230512307
12309
12311 12306
12304
12330
12300
12332
12328 12323
12331
12313
12312
12314
12314A
12315
12316
12319 12318 12318A
12322
12325
12326
12327
12333
12339
12341
12343
12349
12347
12348
12346
12344
12324
12334
12336
12338
12340
C142
U P
D N
U P
U P
DN
UPUP
DN
DN
3-6
3-6
3-6
C141
C140
C139
C138
C140A
C112
12301
1230512307
12309
12311 12306
12304
12330
12300
12332
12328 12323
12331
12313
12312
12314
12314A
12315
12316
12319 12318 12318A
12322
12325
12326
12327
12333
12339
12341
12343
12349
12347
12348
12346
12344
12324
12334
12336
12338
12340
C142
U P
D N
U P
U P
DN
UPUP
DN
DN
12335A
12335
3-6
3-6
3-6 C141
C140
C139
C138
C140A
C112
12301
1230512307
12309
12311 12306
12304
12330
12300
12332
12328 12323
12331
12313
12312
12314
12314A
12315
12316
12319 12318 12318A
12322
12325
12326
12327
12333
12339
12341
12343
12349
12347
12348
12346
12344
12324
12334
12336
12338
12340
C142
U P
D N
U P
U P
DN
UPUP
DN
DN
12335A
12335
3-6
3-6
3-6
C141
C140
C139
C138
C140A
C112
12301
1230512307
12309
12311 12306
12304
12330
12300
12332
12328 12323
12331
12313
12312
12314
12314A
12315
12316
12319 12318 12318A
12322
12325
12326
12327
12333
12339
12341
12343
12349
12347
12348
12346
12344
12324
12334
12336
12338
12340
C142
U P
D N
U P
U P
DN
UPUP
DN
DN
3-6
3-6
3-6
B23-M300
B5
12335A
TELECOM
12335
HAC
2" F
B23-M300
B3 2" F B23-M300
B71
B23-M300
D7
SSAC B23-1.1
CU B23-1.1
12335A
TELECOM
12335
HAC 1
14x10
(E)EF 10
ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:0
A M
B23-M101
FIRST LEVEL FLOOR PLAN -
OVERALL - MECHANICAL
EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B23
CJW LAC
1:192
16' 24'
SHEET NOTES:
1. ROUTE REFRIGERANT LINES FROM OUTDOOR UNIT TO INDOOR UNIT PER MANUFACTURER'S
INSTRUCTIONS.
GENERAL NOTES:
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN IN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR CONTRACTOR'S SAFETY PRECAUTIONS OR
FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES
REQUIRED TO PERFORM THIS WORK.
Revisions: Date:
SHEET NOTES:
1. DEMO EXHAUST GRILLE & DUCTWORK BACK TO MAIN & CAP.
1/16" = 1'-0" F2
FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION
1/16" = 1'-0" C2
FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION - DEMOLITION
1/16" = 1'-0"
C6
FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
1/16" = 1'-0" F6
FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
1:192
16' 24'
1:192
16' 24'
1:192
16' 24'
C139
T H
C139
12335A
12335 C139
12335A
12335
SSAC B23-1.1
12335A
TELECOM
12335
HAC
3/ 4"
C D
3/ 8"
R E
F L
3/ 4"
R E
F S
H T
12335A
TELECOM
12335
HAC
1" F
2" F2" F
1"
2" F2" F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:0
A M
B23-M300
FIRST LEVEL FLOOR PLAN -
ENLARGED - MECHANICAL
EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B23
CJW LAC
1/4" = 1'-0" D7
FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
1/4" = 1'-0"
B5
FIRST LEVEL FLOOR PLAN - ENLARGED - FIRE PROTECTION
1:48
4' 6'
1:48
4' 6'
1/4" = 1'-0" B3
FIRST LEVEL FLOOR PLAN - ENLARGED - FIRE PROTECTION - DEMOLITION
1/4" = 1'-0"
B7
FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL - DEMOLITION
1:48
4' 6'
1:48
4' 6'
SHEET NOTES:
1. THERMOSTAT & HUMIDITY SENSOR ON WALL.
2. PROVIDE TEMPERATURE AND HUMIDITY SENSORS AT CABINET PER VA OIT.
3. NEW OPEN SITE DRAIN TO CONNECT INTO MSB SANITARY PER DETAIL ON M600.
4. ROUTE CONDENSATE FROM SPLIT SYSTEM INTO OPEN SITE DRAIN.
SHEET NOTES:
1. DEMO EXHAUST GRILLE & DUCTWORK BACK TO MAIN & CAP.
GENERAL NOTES:
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN IN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR CONTRACTOR'S SAFETY PRECAUTIONS OR
FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES
REQUIRED TO PERFORM THIS WORK.
SHEET NOTES:
1. NEW SPRINKLER PIPING TO CONNECT INTO EXISTING SPRINKLER & MAIN.
SHEET NOTES:
1. DEMO FP PIPING BACK TO MAIN & CAP. KEEP SPRINKLER FOR CONNECTION TO NEW.
Revisions: Date:
REMARKS:
1. PERFORMANCE BASED ON CONDITIONS INDICATED IN THIS SCHEDULE.
2. PROVIDE CONCRETE PAD AND ANCHOR EXTERIOR UNIT TO PAD.
3. PROVIDE THE FOLLOWING ACCESSORIES: SINGLE POINT POWER CONNECTION, DISCONNECT, HAIL GUARDS, LOW AMBIENT KIT, WIND BAFFLES.
4. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT
BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR
PRIOR TO ORDERING EQUIPMENT.
SINK/LAV/MSB
TO SANITARY
MOUNT & SECURE OPEN SITE DRAIN
PIPING & FITTINGS TO WALL.
TO VENT CONDENSATE DRAIN
FROM SPLIT SYSTEM
AIR GAP FITTING TO BE ZURN
Z1025 OR EQUIVALENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:0
A M
B23-M600
MECHANICAL SCHEDULES EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B23
CJW LAC
DUCT FREE SYSTEM / SPLIT SYSTEM / DX FAN COIL UNIT / COMPUTER ROOM AIR CONDITIONER SCHEDULE
MARK SERVES
NOMINAL
CAPACITY
[TONS]
TOTAL
COOLING
CAPACITY
[MBH]
DX CONNECTION
SIZE
CONDENSATE
DRAIN SIZE
INDOOR UNIT OUTDOOR UNIT ELECTRICAL DATA
MANUFACTURER REMARKS
DIMENSIONS [IN] EAT
(DB / WB)
[°F]
AIRFLOW
[CFM] MODEL
DIMENSIONS [IN] SUMMER
AMBIENT AIR
[°F]
WINTER AMBIENT
AIR
[°F]
OPERATING
WEIGHT
[LBS] MODEL FLA VOLTAGE PHASE MCA MOCP DISCONNECT BY
DISCONNECT
TYPE SCCRLENGTH WIDTH HEIGHT LENGTH WIDTH HEIGHT
SSAC B23-1.1 12335A 2 24 5/8" 5/8" 46 1/16" 11 5/8" 14 3/8" 80/67 705 PKA-A24 37 3/8" 13 1/8" 37 1/8" 115 0 200 PUZ-A24 0.4 208 V 1 19 26 MECHANICAL CONTRACTOR NON FUSED 5 MITSUBISHI 1,2,3,4
NO SCALE
CONDENSATE TO SINK/LAV DETAIL
OFFICE
OFFICE OFFICE
CONFERENCE
RECEPTION
AREA
OFFICE
S T
O R
A G
E
T O
IL
E
T
CORRIDOR
U T
IL
IT
Y
T O
IL
E
T
T O
IL
E
T
ROOM
4 10
WAREHOUSE/STORAGE
D
D
D
D
W
W
W
SECOND FLOOR LEVEL
DN
118A
TELECOM
WAREHOUSE
B25-M300
B7
SSAC B25-1.1
CU B25-1.1 1
3/8" REFL
3/4" REFS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:5
A M
B25-M101
FIRST LEVEL FLOOR PLAN -
OVERALL - MECHANICAL
EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B25
CJW CJW
1/8" = 1'-0" F4
FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
1:96
8' 12'
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
SHEET NOTES:
1. ROUTE REFRIGERANT FROM OUTDOOR UNIT TO INDOOR UNIT PER MANUFACTURER'S INSTRUCTIONS.
2. ROUTE CONDENSATE TO GRADE. CONDENSATE SHOULD BE ROUTED AWAY FROM EQUIPMENT, SIDEWALKS
& DRIVEWAYS.
GENERAL NOTES:
H
118A
TELECOM
SSAC B25-1.1
3/4" REFS
3/8" REFL
H T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:5
A M
B25-M300
FIRST LEVEL FLOOR PLAN -
ENLARGED - MECHANICAL
EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B25
CJW CJW
1/4" = 1'-0" B7
FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
1:48
4' 6'
SHEET NOTES:
1. THERMOSTAT & HUMIDITY SENSOR ON WALL.
2. PROVIDE TEMPERATURE AND HUMIDITY SENSOR AT CABINET PER VA OIT.
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
GENERAL NOTES:
2. PROVIDE CONCRETE PAD AND ANCHOR EXTERIOR UNIT TO PAD.
3. PROVIDE THE FOLLOWING ACCESSORIES: SINGLE POINT POWER CONNECTION, DISCONNECT, HAIL GUARDS, LOW AMBIENT KIT, WIND BAFFLES.
4. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT
BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR
PRIOR TO ORDERING EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:5
A M
B25-M600
MECHANICAL SCHEDULES EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B25
CJW CJW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:5
A M
B25-M600
MECHANICAL SCHEDULES EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B25
CJW CJW
DUCT FREE SYSTEM / SPLIT SYSTEM / DX FAN COIL UNIT / COMPUTER ROOM AIR CONDITIONER SCHEDULE
MARK SERVES
NOMINAL
CAPACITY
[TONS]
TOTAL
COOLING
CAPACITY
[MBH]
DX CONNECTION
SIZE
CONDENSATE
DRAIN SIZE
INDOOR UNIT OUTDOOR UNIT ELECTRICAL DATA
MANUFACTURER REMARKS
DIMENSIONS [IN] EAT
(DB / WB)
[°F]
AIRFLOW
[CFM] MODEL
DIMENSIONS [IN] SUMMER
AMBIENT AIR
[°F]
WINTER AMBIENT
AIR
[°F]
OPERATING
WEIGHT
[LBS] MODEL FLA VOLTAGE PHASE MCA MOCP DISCONNECT BY
DISCONNECT
TYPELENGTH WIDTH HEIGHT LENGTH WIDTH HEIGHT
SSAC B25-1.1 12335A 2 24 5/8" 5/8" 46 1/16" 11 5/8" 14 3/8" 80/67 705 PKA-A24 37 3/8" 13 1/8" 37 1/8" 115 0 200 PUZ-HA24 0.4 208 V 1 19 26 MECHANICAL CONTRACTOR NON FUSED MITSUBISHI 1,2,3,4
Revisions: Date:Revisions: Date:
B36-M300
B3
2" F 2" F
4" F
4" F
105B
STORAGE
105A
TELECOM
B36-M300
D3
2" F2" F
105B
STORAGE
105A
TELECOM
B36-M300
B7
105B
STORAGE
105A
TELECOM
B36-M300
D7
CU B36-1.1
SSAC B36-1.1
105B
STORAGE
105A
TELECOM1
3/4" REFS
3/8" REFL
3/4" REFS
3/8" REFL
3/4" CD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:3
A M
B36-M101
FIRST LEVEL FLOOR PLAN -
OVERALL - MECHANICAL
EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B36
CJW LAC
1:10
10' 15'
SHEET NOTES:
1. PROVIDE BOLLARDS AROUND CONDENSING UNIT.
2. ROUTE REFRIGERANT LINES FROM OUTDOOR UNIT TO INDOOR UNIT PER MANUFACTURER'S
INSTRUCTIONS.
3. NEW OPEN SITE DRAIN TO CONNECT IN EXISTING SANITARY ALONG FLOOR PER DETAIL ON M600.
4. ROUTE CONDENSATE FROM INDOOR UNIT TO OPEN SITE DRAIN.
GENERAL NOTES:
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN IN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR CONTRACTOR'S SAFETY PRECAUTIONS OR
FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES
REQUIRED TO PERFORM THIS WORK.
Revisions: Date:
1" = 10'-0" C1
FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION - DEMOLITION
1" = 10'-0" F1
FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION
1" = 10'-0" C5
FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
1" = 10'-0" F5
FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
1:10
10' 15'
1:10
10' 15'
1:10
10' 15'
105B
STORAGE
105A
TELECOM
2" F
1" F
2" F
SSAC B36-1.1
105B
STORAGE
105A
TELECOM
1/ 2"
C A
1/2" CA 1/2" CA
3/4" CD
3/4" REFS
T H
105B
STORAGE
105A
TELECOM
2" 2"
1" 1"
2 2
105B
STORAGE
105A
TELECOM
1/ 2"
C A
1/2" CA 1/2" CA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:3
A M
B36-M300
FIRST LEVEL FLOOR PLAN -
ENLARGED - MECHANICAL
EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B36
CJW LAC
1/4" = 1'-0" D3
FIRST LEVEL FLOOR PLAN - ENLARGED - FIRE PROTECTION
1/4" = 1'-0"
D7
FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL
1:48
4' 6'
1:48
4' 6'
1/4" = 1'-0" B3
FIRST LEVEL FLOOR PLAN - ENLARGED - FIRE PROTECTION - DEMOLITION
1/4" = 1'-0"
B7
FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL - DEMOLITION
1:48
4' 6'
1:48
4' 6'
SHEET NOTES:
1. THERMOSTAT & HUMIDITY SENSOR ON WALL.
2. PROVIDE TEMPERATURE AND HUMIDITY SENSORS AT CABINET PER VA OIT.
GENERAL NOTES:
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN IN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR CONTRACTOR'S SAFETY PRECAUTIONS OR
FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES
REQUIRED TO PERFORM THIS WORK.
SHEET NOTES:
1. NEW SPRINKLER PIPING SIZE TO MATCH EXISTING, TYP.
2. NEW SPRINKLER HEAD.
SHEET NOTES:
1. DEMO SPRINKLER HEAD & PIPING.
2. DEMO PORTION OF PIPING & KEEP FOR CONNECTION TO NEW, TYP.
2. PROVIDE CONCRETE PAD AND ANCHOR EXTERIOR UNIT TO PAD.
3. PROVIDE THE FOLLOWING ACCESSORIES: SINGLE POINT POWER CONNECTION, DISCONNECT, HAIL GUARDS, LOW AMBIENT KIT, WIND BAFFLES.
4. PROVIDE WITH CONDENSATE PUMP COMPLETE WITH RESERVOIR & SENSOR. PUMP TO BE BLUE DIAMOND
X87-721 OR EQUIVALENT.
5. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT
BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR
PRIOR TO ORDERING EQUIPMENT.
TO SANITARY
MOUNT & SECURE OPEN SITE DRAIN
PIPING & FITTINGS TO WALL.
TO VENT
CONDENSATE DRAIN
FROM SPLIT SYSTEM
AIR GAP FITTING TO BE ZURN
Z1025 OR EQUIVALENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:3
A M
B36-M600
MECHANICAL SCHEDULES EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
B36
CJW LAC
DUCT FREE SYSTEM / SPLIT SYSTEM / DX FAN COIL UNIT / COMPUTER ROOM AIR CONDITIONER SCHEDULE
MARK SERVES
NOMINAL
CAPACITY
[TONS]
TOTAL
COOLING
CAPACITY
[MBH]
DX CONNECTION
SIZE
CONDENSATE
DRAIN SIZE
INDOOR UNIT OUTDOOR UNIT ELECTRICAL DATA
MANUFACTURER REMARKS
DIMENSIONS [IN] EAT
(DB / WB)
[°F]
AIRFLOW
[CFM] MODEL
DIMENSIONS [IN] SUMMER
AMBIENT AIR
[°F]
WINTER AMBIENT
AIR
[°F]
OPERATING
WEIGHT
[LBS] MODEL FLA VOLTAGE PHASE MCA MOCP DISCONNECT BY
DISCONNECT
TYPELENGTH WIDTH HEIGHT LENGTH WIDTH HEIGHT
SSAC B36-1.1 105A TELECOM 1.5 18 1/2" 5/8" 35 1/2" 9 3/8" 11 13/16" 80/67 385 PKA-A18 31 13/16" 16 3/16" 27 7/16" 115 0 150 PUZ-A18 0.5 208 V 1 11 28 MECHANICAL CONTRACTOR NON FUSED MITSUBISHI 1,2,3,4,5
NO SCALE
CONDENSATE TO OPEN SITE DETAIL
KITCHEN
MECH.
ROOM
OFFICE
MALE
TOILET
FEMALE
TOILET
WELDING
MACHINE
SHOP
MACHINE
ROOM
ELECTRIC
SHOP
PLUMBING
SHOP
ELECTRIC
SHOP
SUPERVISOR
OFFICE
A/C SHOP
KEYS
PROGRAM CLERK/
SUPPLY CLERK
CARPENTER
SHOP
BOLT
ROOM
TOOL
CRIB
TOOL CRIBPAINT SHOPPAINT
STORAGE
ELECTRIC
SHOP
STORAGEMACHINE SHOP
STORAGE
105C
105A
105B 108B
108C 109A 109
108A
113A
114E
114A
113B 114B
112A
113D
113C
114D
114C
KITCHEN
MECH.
ROOM
OFFICE
MALE
TOILET
FEMALE
TOILET
WELDING
MACHINE
SHOP
MACHINE
ROOM
ELECTRIC
SHOP
PLUMBING
SHOP
ELECTRIC
SHOP
SUPERVISOR
OFFICE
A/C SHOP
KEYS
PROGRAM CLERK/
SUPPLY CLERK
CARPENTER
SHOP
BOLT
ROOM
TOOL
CRIB
TOOL CRIBPAINT SHOPPAINT
STORAGE
ELECTRIC
SHOP
STORAGEMACHINE SHOP
STORAGE
105C
105A
105B 108B
108C 109A 109
108A
113A
114E
114A
113B 114B
112A
113D
113C
114D
114C
KITCHEN
MECH.
ROOM
OFFICE
MALE
TOILET
FEMALE
TOILET
WELDING
MACHINE
SHOP
MACHINE
ROOM
ELECTRIC
SHOP
PLUMBING
SHOP
ELECTRIC
SHOP
SUPERVISOR
OFFICE
A/C SHOP
KEYS
PROGRAM CLERK/
SUPPLY CLERK
CARPENTER
SHOP
BOLT
ROOM
TOOL
CRIB
TOOL CRIBPAINT SHOPPAINT
STORAGE
ELECTRIC
SHOP
STORAGEMACHINE SHOP
STORAGE
105C
105A
105B 108B
108C 109A 109
108A
113A
114E
114A
113B 114B
112A
113D
113C
114D
114C
KITCHEN
MECH.
ROOM
OFFICE
MALE
TOILET
FEMALE
TOILET
WELDING
MACHINE
SHOP
MACHINE
ROOM
ELECTRIC
SHOP
PLUMBING
SHOP
ELECTRIC
SHOP
SUPERVISOR
OFFICE
A/C SHOP
KEYS
PROGRAM CLERK/
SUPPLY CLERK
CARPENTER
SHOP
BOLT
ROOM
TOOL
CRIB
TOOL CRIBPAINT SHOPPAINT
STORAGE
ELECTRIC
SHOP
STORAGEMACHINE SHOP
STORAGE
105C
105A
105B 108B
108C 109A 109
108A
113A
114E
114A
113B 114B
112A
113D
113C
114D
114C
B40-M300
B4
B40-M300
D4
114E
TELECOM
1 1/4" F
4" F
B40-M300
B7
1/4" 1
B40-M300
D7
SSAC B40-1.1
CU B40-1.1
114E
TELECOM
3/8" REFS
3/4" REFS1
1/2" DHW
1/2" DCW
2" SAN
1 1/2" SAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/11/22
B
IM
/2
V
A T o m a h
E H
R M
I n fr a s tr u c tu re U p g ra d e s /6
-7
.B
.M
R
.r v t
/7
/2
:4
:3
A M
B40-M101
FIRST LEVEL FLOOR PLAN -
OVERALL - MECHANICAL
EHRM INFRASTRUCTURE
UPGRADES, TOMAH, WI
TOMAH, WI
676-700
CJW LAC
1:192
16' 24'
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
SHEET NOTES:
1. ROUTE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .