Atch 20 - Mechanical 1 of 4.pdf

PDF 16 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Tomah Federal contract opportunity
Solicitation number
36C77622B0031
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal solicitation to conduct infrastructure upgrades at the Tomah VA Medical Center in Wisconsin. The solicitation seeks contractors to perform upgrades to electrical, HVAC, communication, physical security and fiber infrastructure systems across multiple buildings on the campus. Additional requirements include modifying impacted roads, walks and drainage, hazardous material abatement, and data center and WAN updates. The work involves reconfiguring and renovating existing spaces impacted by the infrastructure improvements. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Tomah, newest first.
File Type Posted
36C77622B0031 0005.pdf PDF
Follow-up Questions and Responses 7-26-22.pdf PDF
36C77622B0031 0004.pdf PDF
36C77622B0031 0003.pdf PDF
Atch 28 - Construction Wage Rates - Monroe - 7-15-22.pdf PDF
Technical Questions - LATE - Tomah 7-20-22.pdf PDF
OIT-StdTelecomSpacesPgs64-67.pdf PDF
Atch 28 - Construction Wage Rates - Monroe - 6-17-22.pdf PDF
36C77622B0031 0002.pdf PDF
Technical Questions - FINAL - Tomah 7-6-22.pdf PDF
Site Visit Sign-in Sheet - Tomah 6-14-22.pdf PDF
36C77622B0031 0001.pdf PDF
Atch 1 - Specs Division 00-10.pdf PDF
Atch 8 - Civil 2 of 2.pdf PDF
Atch 10 - Architectural 2 of 2.pdf PDF
Atch 12 - Telecommunications 1 of 4.pdf PDF
Atch 14 - Telecommunications 3 of 4.pdf PDF
Atch 17 - Electrical 2 of 4.pdf PDF
Atch 22 - Mechanical 3 of 4.pdf PDF
Atch 23 - Mechanical 4 of 4.pdf PDF
Atch 25 - Appendix C-D Specs on TOC.pdf PDF
Atch 27 - Limitations on Subcontracting - Construction.docx DOCX document
Atch 28 - Construction Wage Rates - Monroe - 4-29-22.pdf PDF
Atch 29 - Contractor Safety - Environmental Form.docx DOCX document
Atch 6 - General.pdf PDF
Atch 13 - Telecommunications 2 of 4.pdf PDF
Atch 16 - Electrical 1 of 4.pdf PDF
Atch 21 - Mechanical 2 of 4.pdf PDF
36C77622B0031 - 5-25-22.pdf PDF
Atch 2 - Specs Division 21-23.pdf PDF
Atch 15 - Telecommunications 4 of 4.pdf PDF
Atch 18 - Electrical 3 of 4.pdf PDF
Atch 19 - Electrical 4 of 4.pdf PDF
Atch 24 - Appendix A-B Specs on TOC.pdf PDF
Atch 3 - Specs Division 26-28.pdf PDF
Atch 4 - Specs Division 31-33.pdf PDF
Atch 5 - Sheet Index - EHRM Upgrades.pdf PDF
Atch 7 - Civil 1 of 2.pdf PDF
Atch 9 - Architectural 1 of 2.pdf PDF
Atch 26 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Atch 30 - Site Visit - Map.pdf PDF
Atch 11 - Hazmat.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATION

GENERAL ABBREVIATIONS

DESCRIPTION ABBREVIATION DESCRIPTION

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

AD ACCESS DOOR/PANEL

AFF ABOVE FINISHED FLOOR

AMB AMBIENT

DIA DIAMETER

DN DOWN

E EXISTING

EC ELECTRICAL CONTRACTOR

EFF EFFICIENCY

GC GENERAL CONTRACTOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

L LENGTH

LF LINEAR FEET

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MFR MANUFACTURER

MIN MINIMUM

NIC NOT IN CONTRACT

NTS NOT TO SCALE

PC PLUMBING CONTRACTOR

PSIG POUNDS PER SQUARE INCH GAUGE

RPM REVOLUTIONS PER MINUTE

SHT SHEET

TOB TOP OF BEAM

GPM GALLONS PER MINUTE

TOS TOP OF STEEL

BOB BOTTOM OF BEAM

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

UNION

Y STRAINER WITH BLOWDOWN

ELBOW UP

ELBOW DOWN

TEE UP

PIPING

- SOLID LINE INDICATES SYSTEM SUPPLY

-- DASHED LINE INDICATES SYSTEM RETURN

NUMBER INDICATES NOMINAL DIAMETER IN INCHES,

LETTER(S) INDICATES SYSTEM.

REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

GENERAL MECHANICAL SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

# SHEET NOTE

DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS

AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.

DIAMETER

DENOTES CONNECTION OF NEW WORK TO

EXISTING SYSTEM

PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.

ARROW INDICATES DOWNWARD PIPE SLOPE

#/# INDICATES SLOPE IN INCHES PER FOOT

WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR REQUIREMENTS

ARROW INDICATES DIRECTION OF FLOW IN PIPING

ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

CHECK VALVE

ARROW INDICATES DIRECTION OF NORMAL FLOW

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

CIRCUIT SETTER, AUTOFLOW, ETC.

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

PRESSURE GAUGE

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER - HORIZONTAL PIPE

TEE DOWN

TEE HORIZONTAL

PIPE REDUCER

INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.

SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.

REQUIRED SERVICE CLEARANCE FOR EQUIPMENT

CONTINUATION

FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.

SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.

PLUMBING SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

AIR VENT

AUTOMATIC FLOW CONTROL VALVE

# INDICATES FLOW TO BE BALANCED IN GPM

BACKFLOW PREVENTER

CALIBRATED BALANCING VALVE

VALVE - THROTTLING SERVICE

VALVE - SHUTOFF SERVICE

P/T PORT

PIPE CAP

PIPE CONTINUATION

PRESSURE GAUGE STEAM REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

PRESSURE REDUCING VALVE

PUMP

RELIEF VALVE

S SENSOR

SUCTION DIFFUSER

THERMOMETER - VERTICAL PIPE REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

VACUUM BREAKER

Y STRAINER

STEAM TRAP

CC CONTROLS CONTRACTOR

PIPING

- SINGLE DASH INDICATES DOMESTIC COLD WATER

- DOUBLE DASH INDICATES DOMESTIC HOT WATER

- TRIPLE DASH INDICATES HOT WATER

CIRCULATING

- SOLID INDICATES SANITARY ABOVE FLOOR

- CONTINUOUS DASHED INDICATES VENT

- LONG DASHED LINES INDICATE SANITARY BELOW

FLOOR

NUMBER INDICATES NOMINAL DIAMETER IN INCHES,

LETTER(S) INDICATES SYSTEM.

REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

C.O.

C.O.

ROOF DRAIN

TAG INDICATES DRAIN SIZE IN INCHES AND AREA

OF ROOF DRAINED IN SQUARE FEET

REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

#"RD

# SF

WALL DISCHARGE (DOWNSPOUT NOZZLE)

TAG INDICATES DRAIN SIZE IN INCHES AND AREA

OF ROOF DRAINED IN SQUARE FEET

REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

#"DSN

# SF

FD-# FLOOR DRAIN REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

CLEANOUT

CIRCLE INDICATES UP TO FLOOR OR WALL CLEANOUT.

LINE INDICATES END OF PIPE CLEANOUT LOCATED ABOVE A CEILING.

DOUBLE GRADE CLEANOUT REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS.

ABBREVIATION

PLUMBING ABBREVIATIONS

DESCRIPTION

CHEMICAL VENTCV

CHEMICAL WASTECW

BOTTLE/GLASS FILLERBF

ABBREVIATION DESCRIPTION

DOMESTIC HOT WATERDHW

DOMESTIC HOT WATER CIRCULATIONDHWC

LAVATORYL

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

BACK FLOW PREVENTERBFP

BATH TUBBT

COMPRESSED AIR (NON-MEDICAL)CA

PROPANELPG

LEAVING WATER TEMPERATURELWT

BTU (1000'S)MBH

CONDENSATE DRAINCD

CLEANOUTCO

CONDENSATE PUMPCP

MOP SINKMS

NORMALLY CLOSEDNC

NORMALLY OPENNO

CLINICAL SINKCS

DOMESTIC COLD WATERDCW

DRINKING FOUNTAINDF

NON-POTABLE WATERNPW

POST INDICATOR VALVEPIV

PRESSURE REDUCING VALVEPRVDOUBLE GRADE CLEANOUTDGCO

DEIONIZED WATERDI

DEIONIZED WATER CIRCULATINGDIC

ROOF DRAINRD

REVERSE OSMOSIS WATERRO

DEIONIZED HOT WATERDIH

RPZ

S

REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)

SINK

DEIONIZED HOT WATER CIRCULATINGDIHC

DISTILLED WATERDIS

DISTILLED WATER CIRCULATINGDISC

SANITARY SEWERSAN

DOMESTIC SOFT COLD WATERSCW

DOMESTIC SOFT HOT WATERSHW

DIALYSIS WATER RETURNDR

DIALYSIS WATER SUPPLYDS

DRAIN TILEDT

DOMESTIC SOFT HOT WATER CIRCULATINGSHWC

SEWAGE EJECTORSE

SHOWERSH

EMERGENCY EYE WASHEEW

EMERGENCY SHOWERES

EMERGENCY SHOWER AND EYE WASH COMBOESEW

STORM OVERFLOWSO

SUMP PUMPSP

SERVICE SINKSS

EXPANSION TANKET

ELECTRIC WATER COOLEREWC

ENTERING WATER TEMPERATUREEWT

STORM SEWERST

TEMPERATURETEMP

URINALUR

FILTERF

FLOOR CLEANOUTFCO

FLOOR DRAINFD

VENTV

VENT THROUGH ROOFVTR

FLOOR SINKFS

WB

WC

WALL BOX

WATER CLOSET

NATURAL GASG

WALL CLEANOUTWCO

GRADE CLEANOUTGCO

HUB DRAINHD

WATER HEATERWH

WATER SOFTENERWS

HORSEPOWERHP

WPD

YCO

WATER PRESSURE DROP

YARD CLEANOUTGREASE VENTGV

HOSE BIBHB

GREASE WASTEGW

DOWN SPOUT NOZZLEDSN

SYMBOL

FIRE PROTECTION SYMBOLS

DESCRIPTION ADDITIONAL REMARKS

FLOW SWITCH COORDINATE INTERFACE WITH FIRE ALARM SYSTEM CONTRACTOR

FIRE DEPARTMENT CONNECTION MOUNT BETWEEN 18" AND 48" ABOVE FINISHED GRADE

REFER TO SPECIFICATIONS FOR TYPES AND FINISHES.

PENDANT REFERS TO FULL, SEMI-RECESSED AND RECESSED TYPES. LOCATIONS

FOR EACH ARE INDICATED IN THE SPECIFICATIONS OR ON THE PLANS.

SIDEWALL SPRINKLER -

EXISTING SIDEWALL SPRINKLER

SPRINKLER

EXISTING SPRINKLER

EXISTING SPRINKLER TO BE REMOVED

FIRE PIPEF

O.S. & Y. VALVE

SHUT-OFF VALVE WITH TAMPER SWITCHTS

F

ABBREVIATION

FIRE PROTECTION ABBREVIATIONS

DESCRIPTION

BACK FLOW PREVENTERBFP

FIRE PROTECTIONF

FIRE DEPARTMENT CONNECTIONFDC

ABBREVIATION DESCRIPTION

FLOW SWITCHFS

POST INDICATOR VALVEPIV

SPRINKLERSPR

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

RECTANGULAR DUCTWORK

W = DIMENSION IN VIEW (INCHES)

H = DIMENSION PERPENDICULAR TO VIEW (INCHES)

ROUND DUCTWORK

D = DUCT DIAMETER

TURNING VANES

FLEXIBLE PIPING

WxH

D"Ø

HVAC SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

W/H

FLAT OVAL DUCTWORK

W = DIMENSION IN VIEW (INCHES)

H = DIMENSION PERPENDICULAR TO VIEW (INCHES)

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

DUCT CROSS SECTION - SUPPLY

DUCT CROSS SECTION - RETURN

DUCT CROSS SECTION - EXHAUST

CROSS SECTION INDICATES DUCT EXTENDING PERPENDICULAR TO THE PAGE. IN

PLAN VIEW THIS INDICATES A DUCT RISE OR DROP TO ANOTHER LEVEL. SOLID

INTERIOR LINE INDICATES EXTENSION UP. DASHED INTERIOR LINE INDICATES

EXTENSION DOWN.

MANUAL BALANCE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE MANUAL BALANCE DAMPERS IN AN

ACCESSIBLE LOCATION AND AS CLOSE TO THE MAIN DUCT AS POSSIBLE.

CONTROL DAMPER

FIRE/SMOKE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

DIFFUSER

REFER TO SPECIFICATIONS FOR TYPE.

FLEXIBLE DUCT

REFER TO SPECIFICATIONS FOR TYPE. REFER TO DETAILS FOR INSTALLATION

REQUIREMENTS. MAXIMUM LENGTH SHALL BE 48 INCHES UNLESS NOTED OTHERWISE

ON THE PLANS OR IN THE SPECIFICATIONS.

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - NO COIL

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - HOT WATER COIL

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - ELECTRIC COIL

VB-#

### CFM

VAV BOX TAG

# = REFERENCE NUMBER IN SCHEDULE

### = AIRFLOW IN CFM

REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW

LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY

TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS

CONTRACTOR.

VB-#

#.# GPM

VAV BOX TAG

# = REFERENCE NUMBER IN SCHEDULE

#.# = WATER FLOW RATE IN GPM

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - DUAL DUCT

D#

DIFFUSER TAG

D = TYPE # = TYPE NUMBER

### = AIRFLOW IN CFM

REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO

AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE

D1 FOR SUPPLY OR G1 FOR RETURN/EXHAUST.

FLOW ARROW ARROW INDICATES DIRECTION OF AIRFLOW FROM DIFFUSERS WITH ADJUSTABLE

THROWS.

DIFFUSER BLANK OFF SHADED AREA INDICATES QUADRANT OF DIFFUSER TO BE PROVIDED WITH BLANK OFF

PANEL.

RETURN GRILLE

EXHAUST GRILLE

WALL REGISTER / GRILLE

DUCT MOUNTED REGISTER / GRILLE

LINEAR SLOT

REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW

LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY

TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS

CONTRACTOR.

SMOKE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

ABBREVIATION

HVAC ABBREVIATIONS

DESCRIPTION

AIR BLENDERAB

AIR CONDITIONING UNIT (SPLIT SYSTEM INDOOR UNIT)AC

AIR HANDLING UNITAHU

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

BOILER FEED UNITBFU

BOILERBLR

CONSTANT AIR VOLUME BOXCAV

COOLING COILCC

CONDENSATE DRAINCD

CUBIC FEET PER MINUTECFM

CHILLERCH

CONDENSATE PUMPCP

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

COOLING TOWERCT

CONDENSING UNITCU

CABINET UNIT HEATERCUH

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

DIFFUSERD

DUAL DUCTDD

DIRECT EXPANSIONDX

EXHAUST AIREA

ENTERING AIR TEMPERATUREEAT

EXHAUST FANEF

EFFICIENCYEFF

ENERGY RECOVERY COILERC

ENERGY RECOVERY WHEELERW

EXPANSION TANKET

ENTERING WATER TEMPERATUREEWT

FILTER BANK (CONSISTING OF ONE OR MORE FILTERS)FB

FAN COIL UNITFCU

FLOW MEASURING STATIONFMS

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

FUEL OIL VENTFOV

FIRE DAMPERFRD

FIRE SMOKE DAMPERFSD

FINNED TUBE RADIATORFTR

GRILLEG

GLYCOL CHILLED WATER RETURNGCWR

GLYCOL CHILLED WATER SUPPLYGCWS

GRAVITY EXHAUSTGE

GLYCOL HEATING HOT WATER RETURNGHWR

GLYCOL HEATING HOT WATER SUPPLYGHWS

GRAVITY INTAKEGI

HEATING COILHC

PRESSURE/TEMPERATURE TEST PORT

TEMPERATURE CONTROL SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

WALL MOUNTED CONTROL DEVICE

# INDICATES TYPE

REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION.

T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON MONOXIDE, ETC.)

OCCUPANCY SENSOR

REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WHEN SENSOR IS

NOT SHOWN ON ELECTRICAL DRAWINGS IT SHALL BE PROVIDED AND INSTALLED BY

THE TEMPERATURE CONTROLS CONTRACTOR.

DUCT, PIPE, OR CEILING MOUNTED CONTROL

SENSOR

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON DIOXIDE, ETC.)

CONTROL VALVE (3-WAY)

CONTROL VALVE (2-WAY)

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

F/S FLOW MEASURING STATION

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

FIRE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

CD

FD

SD

FS

DAMPER SHALL BE SAME SIZE AS DUCT UNLESS NOTED OTHERWISE. REFER TO

SEQUENCES, SCHEMATICS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

FLOW SWITCHF

ABBREVIATION DESCRIPTION

HORSEPOWERHP

HIGH PRESSURE STEAM CONDENSATEHPC

HIGH PRESSURE STEAM SUPPLY (86 PSIG AND ABOVE)HPS

HEAT RECOVERY CHILLERHRC

HUMIDIFIERHUM

HEATING HOT WATER RETURNHWR

HEATING HOT WATER SUPPLYHWS

LOW PRESSURE STEAM CONDENSATELPC

LOW PRESSURE STEAM SUPPLY (0-12 PSIG)LPS

LOUVERLV

LEAVING WATER TEMPERATURELWT

BTU (1000'S)MBH

MANUAL DAMPERMD

MOTOR OPERATED DAMPERMOD

MEDIUM PRESSURE STEAM CONDENSATEMPC

MEDIUM PRESSURE STEAM SUPPLY (13-85 PSIG)MPS

NORMALLY CLOSED, NOISE CRITERIANC

NORMALLY OPEN, NUMBERNO

OUTDOOR AIROA

PUMPP

PUMPED CONDENSATEPC

PRESSURE REDUCING VALVEPRV

PUMPED STEAM CONDENSATEPSC

REGISTERR

RETURN AIRRA

RELIEF AIRREA

REFRIGERANT DX LIQUIDREFL

REFRIGERANT DX SUCTION GASREFS

RETURN FANRF

RELATIVE HUMIDITYRH

ROOF TOP UNITRTU

SUPPLY AIRSA

SMOKE DAMPERSD

SUPPLY FANSF

STATIC PRESSURESP

STEAMSTM

TEMPERATURETEMP

TRANSFERTR

UNIT HEATERUH

VARIABLE AIR VOLUME BOXVAV

VENT THROUGH ROOFVTR

WET BULB TEMPERATUREWB

WATER COLUMNWC

WATER PRESSURE DROPWPD

WATER SOURCE HEAT PUMP RETURNWSHPR

WATER SOURCE HEAT PUMP SUPPLYWSHPS

CONTROL SENSOR

# INDICATES TYPE

T = TEMPERATURE H = HUMIDITY #

MECHANICAL GENERAL NOTES:

A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, PLUMBING, TEMPERATURE CONTROLS, AND FIRE PROTECTION WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS.

B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY

ENGINEER.

C. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION OF THE ADDITIONS AND REMODELING/ALTERATION OF THE EXISTING BUILDING. SERVICES TO THE EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION EXCEPT DURING SCHEDULED SHUTDOWNS FOR EXTENSION OR MODIFICATION. PLAN TO COMPLETE SHUTDOWNS DURING OFF HOURS TO MINIMIZE IMPACT TO THE OWNER. COORDINATE SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK. PROVIDE TEMPORARY SERVICES WHERE NECESSARY TO ACCOMPLISH ANY SHUTDOWN. THIS INCLUDES BUT IS NOT LIMITED TO STAFFING AND EQUIPMENT FOR FIRE WATCHES, PROVISIONS FOR BOTTLED WATER, AND TEMPORARY HEATING OR COOLING EQUIPMENT.

TEMPORARY MEASURES SHALL NOT BE REMOVED UNTIL THE PERMANENT SYSTEMS ARE OPERATIONAL AND HAVE PASSED ALL REQUIRED

TESTING.

D. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF

THE OWNER.

E. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND

REFINISHING SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE.

F. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS AS "TO BE RETAINED, RELOCATED", ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW CONSTRUCTION AND/OR

WITH PROPOSED USAGE OF SPACE BY OWNER AS FOLLOWS:

a. REMOVE ANY PIPING PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE

MAIN WITH MATERIAL TO MATCH EXISTING.

b. REMOVE ALL FIXTURES, CARRIERS, SUPPLY AND WASTE AND VENT PIPING, STEAM, HEATING HOT WATER, HVAC SUPPLY, RETURN AND EXHAUST AS NOTED. CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE MAIN. SUPPLY AND RETURN MAINS ON PIPING SYSTEMS

CONVEYING WATER OR GASES SHALL BE VALVED AND CAPPED

c. IN REMODELED/ALTERED AREAS, ANY PIPING OR DUCTWORK PASSING THROUGH THE REMODELED AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR SURROUNDING AREAS THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL AND SHALL BE REROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE TO BE ACCOMPLISHED IN THE

REMODELED AREA.

d. REMOVE UNUSED OR ABANDONED HANGERS AND PATCH ABANDONED PENETRATIONS TO MATCH EXISTING.

e. PENETRATIONS THROUGH EXISTING WALLS AND FLOORS FORMERLY OCCUPIED BY REMOVED PIPING OR DUCTWORK SHALL BE PATCHED

TO MATCH EXISTING CONSTRUCTION.

f. RE-SUPPORT ANY PIPING AND DUCTWORK THAT WAS SUPPORTED FROM BUILDING ELEMENTS REMOVED AS PART OF THE WORK.

g. MAINTAIN CONTROL WIRING OR PNEUMATIC TUBING REQUIRED FOR THE CONTINUED PROPER OPERATION OF THE BUILDING

AUTOMATION SYSTEM.

G. ALL EXISTING EQUIPMENT BEING REMOVED WILL BE HANDED OVER TO OWNER FOR FIRST RIGHT OF SALVAGE. IF OWNER REFUSES SALVAGE

ITEMS, REMOVING CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL.

H. CONTRACTOR SHALL REFER TO THE DRAWINGS OF ALL TRADES TO FAMILIARIZE THEMSELVES WITH EXTENT OF WORK INCLUDING BUT NOT

LIMITED TO WHERE NEW PARTITIONING IS BEING INSTALLED, WHERE EXISTING PARTITIONING IS BEING REMOVED, WHERE CEILINGS ARE BEING

REMOVED AND/OR REPLACED, ETC.

I. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE SHOWN. THE CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

J. PERFORM AIR AND FLUID BALANCE PRE-TEST ON ALL DISTRIBUTION EQUIPMENT AND ALL AIR OUTLETS IN THE AREA PRIOR TO COMMENCING

WORK. SUBMIT PRE-TEST INFORMATION TO OWNER/ENGINEER.

K. PROVIDE ACCESS DOORS IN DUCTWORK AND/OR ARCHITECTURAL ELEMENTS WHERE REQUIRED TO ACCESS ALL EQUIPMENT REQUIRING MAINTENANCE AND ADJUSTMENT. THIS EQUIPMENT INCLUDES BUT IS NOT LIMITED TO SENSORS, DAMPERS, ACTUATORS, CONTROL DEVICES, VALVES, ETC. ACCESS DOORS SHALL BE SIZED TO PROVIDE APPROPRIATE ACCESS BASED ON HEIGHT OF ACCESS REQUIRED AND ACTIVITY.

INSTALL SUCH THAT ACCESS DOOR IS FULLY OPERABLE WITHOUT THE REMOVAL OF ARCHITECTURAL ELEMENTS SUCH AS CEILING RUNNERS, SUPPORTS, ETC. INSTALL IN A LOCATION SUCH THAT STEPPING OR LEANING OVER PERMANENT EQUIPMENT OR FURNITURE IS NOT REQUIRED.

WHERE ACCESS DOORS ARE REQUIRED IN ARCHITECTURAL ELEMENTS THAT PROVIDE A FIRE AND/OR SMOKE RATING, ACCESS DOOR SHALL

MAINTAIN THE REQUIRED RATING.

L. SEAL ALL WALL PENETRATIONS (DUCTWORK, PIPING, CONTROLS, CONDUITS, ETC.) WITH NON-COMBUSTIBLE MATERIAL. SEAL PENETRATIONS INTO ROOMS THAT REQUIRE PRESSURE CONTROL OR SOUND ISOLATION. WITH NON-COMBUSTIBLE MATERIAL AND CAULK.

M. PIPING AND DUCTWORK SHALL NOT BE ROUTED OVER ELECTRICAL AND TELECOM ROOMS. WHERE ROUTING OVER SUCH ROOMS IS UNAVOIDABLE, CONTRACTOR SHALL COORDINATE WITH OWNER, DESIGN TEAM, AHJ, AND OTHER TRADES REGARDING LOCATION OF PANELS AND UTILITY ROUTING AND SHALL PROVIDE DRIP PANS UNDER ALL UTILITIES WITH MOISTURE SENSORS OR DRAIN PIPING AS REQUIRED BY THE

SPECIFICATIONS.

N. REMOVAL AND REINSTALLATION OF CEILINGS REQUIRED FOR THE COMPLETION OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.

CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED CEILING COMPONENTS TO MATCH EXISTING. WHERE AN IDENTICAL MATCH IS NO LONGER AVAILABLE, CONTRACTOR SHALL PROVIDE A SIMILAR REPLACEMENT UPON APPROVAL FROM THE OWNER.

O. FLEXIBLE DUCTWORK SHALL HAVE A MAXIMUM LENGTH OF 48" REGARDLESS OF LENGTH SHOWN ON DRAWINGS. FLEX DUCT INSTALLATION SHALL BE AT TERMINAL ENDS ONLY. CONNECTIONS AT VAV BOX INLETS SHALL BE SOLID HARD DUCT. THE DUCTWORK AT ANY FIRE AND/OR FIRE

SMOKE DAMPER SHALL BE HARD DUCT.

P. LOCATE PIPING AND DUCTWORK IN EXTERIOR BUILDING WALLS ON THE WARM SIDE OF THE BUILDING AND VAPOR BARRIER. COORDINATE INSTALLATION OF BUILDING INSULATION TO RUN CONTINUOUS BETWEEN PIPING AND BUILDING WALL.

Q. SUPPORT ALL DUCTWORK, PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. ROUTE DUCT MAINS TIGHT TO STRUCTURE UNLESS NOTED OTHERWISE. HOLD PIPING TIGHT TO BOTTOM OF STRUCTURAL MEMBERS OR RUN THROUGH JOIST WEBS IF POSSIBLE. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. DO NOT SUPPORT FROM WOOD TONGUE AND GROOVE ROOF DECK. SUPPORT FROM BOTTOM CHORD OF BAR JOISTS ONLY AT PANEL POINTS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR REMOVAL FROM THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR

MAINTENANCE.

R. PROVIDE CONSTRUCTION FILTERS ON AIR MOVING EQUIPMENT SERVING THE CONSTRUCTION AREA AS WELL AS ALL RETURN/EXHAUST DUCT PENETRATIONS COMING FROM THE CONSTRUCTION AREA. AT THE COMPLETION OF WORK, REMOVE ALL TEMPORARY AND CONSTRUCTION

FILTERS AND PROVIDE NEW FILTERS FOR ALL AIR MOVING EQUIPMENT.

S. PROTECT ALL DUCTWORK AND PIPING DURING CONSTRUCTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. AT A MINIMUM, DUCTWORK AND PIPING ENDS SHALL BE COVERED AND SEALED TO PREVENT THE COLLECTION OF DUST AND DEBRIS. CLEAN ALL INTERIOR SURFACES PRIOR TO INSTALLATION AND PROTECT ONCE INSTALLED. MEDICAL GAS PIPING SHALL BE PROTECTED IN ACCORDANCE WITH NFPA

99 REQUIREMENTS.

T. AT THE COMPLETION OF WORK, CLEAN ALL STRAINERS PROVIDED AS A PART OF THE WORK AS WELL AS PRIMARY SYSTEM STRAINERS LOCATED AT PUMPS WHERE SYSTEMS WERE EXTENDED. ON EXISTING EQUIPMENT, COORDINATE WORK WITH OWNER.

U. PROVIDE INTERMEDIATE TESTING AND BALANCING AT THE COMPLETION OF EACH PHASE AND AS REQUIRED TO MAINTAIN PROPER OPERATION OF SYSTEMS SERVING AREAS OF THE FACILITY IN USE INCLUDING BUT NOT LIMITED TO OCCUPIED AREAS, STORAGE AREAS, AND OTHER AREAS

DEEMED CRITICAL BY THE OWNER OR AHJ.

V. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED. REFER TO SHEET M201 FOR GENERAL CONSTRUCTION DETAILS.

W. REFER TO SCHEDULES FOR SIZES OF FINAL RUNOUTS TO EQUIPMENT, FIXTURES, DIFFUSERS, GRILLES, AND TERMINAL DEVICES. FINAL RUNOUT SIZES LISTED SHALL BE USED TO WITHIN 10 EQUIVALENT DIAMETERS OF FINAL CONNECTION POINT. FINAL PIPING CONNECTION TO EQUIPMENT SHALL MATCH EQUIPMENT CONNECTION SIZE, PROVIDE TRANSITIONS AS REQUIRED. REFER TO DETAILS, DIAGRAMS AND SCHEMATICS FOR

ADDITIONAL FINAL CONNECTION REQUIREMENTS. REFER TO SHEET M600 FOR SCHEDULES.

X. FOR DUCTWORK PENETRATING A ONE HOUR FIRE RATED WALL WHERE A FIRE DAMPER IS NOT SHOWN, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. THE SYSTEM SHALL BE FIRE TESTED PER ASTM E119 AND COMPLY WITH EXCEPTION 1 OF 2018 IBC PART 717.5.2. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO A ONE HOUR FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS.

REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS. ALL DUCTWORK PENETRATIONS SHALL BE INSPECTED BY AN APPROVED THIRD PARTY INSPECTION AGENCY IN ACCORDANCE WITH ASTM E2174. THE INSPECTION AGENCY SHALL BE PROCURED BY THE CONTRACTOR. DOCUMENTATION OF APPROVED INSPECTION SHALL BE INCLUDED WITH PROJECT CLOSEOUT

DOCUMENTATION.

Y. FIRE ALARM CONTRACTOR SHALL PROVIDE A DUCT SMOKE DETECTOR FOR EACH SMOKE OR FIRE/SMOKE DAMPER AS REQUIRED BY CODE.

MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION OF EACH DUCT SMOKE DETECTOR AND SHALL INSTALL THEM IN THE DUCT.

Z. FOR ALL PIPING, CONDUIT, AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

FIRE PROTECTION GENERAL NOTES:

A. FIRE PROTECTION WORK SHALL INCLUDE, BUT NOT LIMITED TO, THE FOLLOWING: SPRINKLER BRANCH PIPING & SPRINKLER HEADS.

B. ALL AREAS OF THE BUILDING INDICATED SHALL BE SPRINKLERED ACCORDING TO THE CURRENTLY ADOPTED EDITION OF NFPA STANDARD 13

AND OTHER NFPA STANDARDS AS REQUIRED. ENTIRE SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE STATE FIRE MARSHAL OFFICE, OWNER'S INSURANCE COMPANY AND AUTHORITIES HAVING JURISDICTION.

C. FIRE SPRINKLER DESIGN SHALL BE BASED ON HYDRAULIC CALCULATIONS ACCORDING NFPA 13, WITH SHOP DRAWINGS PREPARED ACCORDING TO THE REQUIREMENTS OF THE STATE FIRE MARSHAL AND AUTHORITIES HAVING JURISDICTION.

D. SPRINKLER CONTRACTOR SHALL OBTAIN STATIC AND RESIDUAL WATER PRESSURE AND FLOW PRIOR TO SYSTEM DESIGN AND SHALL SUBMIT

RECENT HYDRANT FLOW TEST DATA WITH SHOP DRAWING SUBMITTALS.

E. DRAWINGS ARE SCHEMATIC IN NATURE, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT OF THE SYSTEM.

SPRINKLER SYSTEM INSTALLING CONTRACTOR SHALL COORDINATE SYSTEM ARRANGEMENT WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL COMPONENTS. SPRINKLER PIPING SHALL NOT BE INSTALLED BELOW MECHANICAL EQUIPMENT OR WITHIN CLEARANCE SPACES FOR MECHANICAL EQUIPMENT. PROVIDE SPRINKLER PROTECTION BELOW ALL DUCTS GREATER THAN 48 INCHES IN WIDTH. INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MODIFICATIONS TO THE SYSTEM REQUIRED TO AVOID CONFLICTS.

F. AREAS IDENTIFIED INDICATE THE RECOMMENDED MINIMUM OCCUPANCY CLASSIFICATION, SPRINKLER TEMPERATURE CHARACTERISTIC OR SPRINKLER TYPES TO BE INSTALLED. SPRINKLER SYSTEM SHALL BE DESIGNED TO MEET OR EXCEED THESE RECOMMENDATIONS AND SHALL

BE SUBJECT TO APPROVAL BY THE AUTHORITY HAVING JURISDICTION.

G. A PRE-DESIGN MEETING SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO SUBMITTAL OF PIPING LAYOUT DRAWINGS. ARCHITECT

SHALL ISSUE COMMENTS CONCERNING SUBMITTAL PACKAGE PRIOR TO COMMENCEMENT OF WORK.

H. REFER TO ARCHITECTURAL PLANS FOR SPECIFIC CEILING TYPES AND HEIGHTS, AND AREAS OF EXPOSED STRUCTURE.

I. COORDINATE PIPING AND SPRINKLERS IN EXPOSED AREAS TO MINIMIZE APPEARANCE. INSTALL SPRINKLERS A MINIMUM OF SIX INCHES FROM

DIFFUSERS, GRILLES AND LIGHT FIXTURES. INSTALL SPRINKLERS IN LAY-IN CEILINGS WITHIN THREE INCHES OF THE CENTER OF CEILING TILE.

J. COORDINATE INSTALLATION OF SPRINKLERS AND PIPING SYSTEMS TO AVOID FREEZING CONDITIONS. NOTIFY ARCHITECT OF AREAS FOR

WHERE SYSTEM MAY BE EXPOSED TO FREEZING. INSTALL DRY SIDEWALL SPRINKLERS IN ROOMS INDICATED WHERE ROOMS MAY BE UNCONDITIONED OR EXPOSED TO FREEZING CONDITIONS. PROVIDE AUXILIARY DRAINS WHERE REQUIRED.

K. EXPOSED SPRINKLER PIPING, EXCEPT IN MECHANICAL AND STORAGE ROOMS, SHALL BE CLEANED, PRIMED AND PREPARED FOR PAINTING.

L. AVOID ROUTING SPRINKLER PIPING ABOVE ELECTRICAL, DATA, IT AND COMMUNICATION PANELS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

B

IM

/2

V A

T o m a h E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-7

.G

R

.r v t

/8

/2

:4

:2

A M

M000

MECHANICAL SYMBOLS AND

ABBREVIATIONS

EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-21-700

2/11/22 CJW LACRevisions: Date:

02-11-2022

C141

C140

C139

C138

C140A

C112

12301

1230512307

12309

12311 12306

12304

12330

12300

12332

12328 12323

12331

12313

12312

12314

12314A

12315

12316

12319 12318 12318A

12322

12325

12326

12327

12333

12339

12341

12343

12349

12347

12348

12346

12344

12324

12334

12336

12338

12340

C142

U P

D N

U P

U P

DN

UPUP

DN

DN

3-6

3-6

3-6

C141

C140

C139

C138

C140A

C112

12301

1230512307

12309

12311 12306

12304

12330

12300

12332

12328 12323

12331

12313

12312

12314

12314A

12315

12316

12319 12318 12318A

12322

12325

12326

12327

12333

12339

12341

12343

12349

12347

12348

12346

12344

12324

12334

12336

12338

12340

C142

U P

D N

U P

U P

DN

UPUP

DN

DN

12335A

12335

3-6

3-6

3-6 C141

C140

C139

C138

C140A

C112

12301

1230512307

12309

12311 12306

12304

12330

12300

12332

12328 12323

12331

12313

12312

12314

12314A

12315

12316

12319 12318 12318A

12322

12325

12326

12327

12333

12339

12341

12343

12349

12347

12348

12346

12344

12324

12334

12336

12338

12340

C142

U P

D N

U P

U P

DN

UPUP

DN

DN

12335A

12335

3-6

3-6

3-6

C141

C140

C139

C138

C140A

C112

12301

1230512307

12309

12311 12306

12304

12330

12300

12332

12328 12323

12331

12313

12312

12314

12314A

12315

12316

12319 12318 12318A

12322

12325

12326

12327

12333

12339

12341

12343

12349

12347

12348

12346

12344

12324

12334

12336

12338

12340

C142

U P

D N

U P

U P

DN

UPUP

DN

DN

3-6

3-6

3-6

B23-M300

B5

12335A

TELECOM

12335

HAC

2" F

B23-M300

B3 2" F B23-M300

B71

B23-M300

D7

SSAC B23-1.1

CU B23-1.1

12335A

TELECOM

12335

HAC 1

14x10

(E)EF 10

ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:0

A M

B23-M101

FIRST LEVEL FLOOR PLAN -

OVERALL - MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B23

CJW LAC

1:192

16' 24'

SHEET NOTES:

1. ROUTE REFRIGERANT LINES FROM OUTDOOR UNIT TO INDOOR UNIT PER MANUFACTURER'S

INSTRUCTIONS.

GENERAL NOTES:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN IN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR CONTRACTOR'S SAFETY PRECAUTIONS OR

FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES

REQUIRED TO PERFORM THIS WORK.

Revisions: Date:

SHEET NOTES:

1. DEMO EXHAUST GRILLE & DUCTWORK BACK TO MAIN & CAP.

1/16" = 1'-0" F2

FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION

1/16" = 1'-0" C2

FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION - DEMOLITION

1/16" = 1'-0"

C6

FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION

1/16" = 1'-0" F6

FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

1:192

16' 24'

1:192

16' 24'

1:192

16' 24'

C139

T H

C139

12335A

12335 C139

12335A

12335

SSAC B23-1.1

12335A

TELECOM

12335

HAC

3/ 4"

C D

3/ 8"

R E

F L

3/ 4"

R E

F S

H T

12335A

TELECOM

12335

HAC

1" F

2" F2" F

1"

2" F2" F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:0

A M

B23-M300

FIRST LEVEL FLOOR PLAN -

ENLARGED - MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B23

CJW LAC

1/4" = 1'-0" D7

FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

1/4" = 1'-0"

B5

FIRST LEVEL FLOOR PLAN - ENLARGED - FIRE PROTECTION

1:48

4' 6'

1:48

4' 6'

1/4" = 1'-0" B3

FIRST LEVEL FLOOR PLAN - ENLARGED - FIRE PROTECTION - DEMOLITION

1/4" = 1'-0"

B7

FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL - DEMOLITION

1:48

4' 6'

1:48

4' 6'

SHEET NOTES:

1. THERMOSTAT & HUMIDITY SENSOR ON WALL.

2. PROVIDE TEMPERATURE AND HUMIDITY SENSORS AT CABINET PER VA OIT.

3. NEW OPEN SITE DRAIN TO CONNECT INTO MSB SANITARY PER DETAIL ON M600.

4. ROUTE CONDENSATE FROM SPLIT SYSTEM INTO OPEN SITE DRAIN.

SHEET NOTES:

1. DEMO EXHAUST GRILLE & DUCTWORK BACK TO MAIN & CAP.

GENERAL NOTES:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN IN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR CONTRACTOR'S SAFETY PRECAUTIONS OR

FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES

REQUIRED TO PERFORM THIS WORK.

SHEET NOTES:

1. NEW SPRINKLER PIPING TO CONNECT INTO EXISTING SPRINKLER & MAIN.

SHEET NOTES:

1. DEMO FP PIPING BACK TO MAIN & CAP. KEEP SPRINKLER FOR CONNECTION TO NEW.

Revisions: Date:

REMARKS:

1. PERFORMANCE BASED ON CONDITIONS INDICATED IN THIS SCHEDULE.

2. PROVIDE CONCRETE PAD AND ANCHOR EXTERIOR UNIT TO PAD.

3. PROVIDE THE FOLLOWING ACCESSORIES: SINGLE POINT POWER CONNECTION, DISCONNECT, HAIL GUARDS, LOW AMBIENT KIT, WIND BAFFLES.

4. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT

BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR

PRIOR TO ORDERING EQUIPMENT.

SINK/LAV/MSB

TO SANITARY

MOUNT & SECURE OPEN SITE DRAIN

PIPING & FITTINGS TO WALL.

TO VENT CONDENSATE DRAIN

FROM SPLIT SYSTEM

AIR GAP FITTING TO BE ZURN

Z1025 OR EQUIVALENT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:0

A M

B23-M600

MECHANICAL SCHEDULES EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B23

CJW LAC

DUCT FREE SYSTEM / SPLIT SYSTEM / DX FAN COIL UNIT / COMPUTER ROOM AIR CONDITIONER SCHEDULE

MARK SERVES

NOMINAL

CAPACITY

[TONS]

TOTAL

COOLING

CAPACITY

[MBH]

DX CONNECTION

SIZE

CONDENSATE

DRAIN SIZE

INDOOR UNIT OUTDOOR UNIT ELECTRICAL DATA

MANUFACTURER REMARKS

DIMENSIONS [IN] EAT

(DB / WB)

[°F]

AIRFLOW

[CFM] MODEL

DIMENSIONS [IN] SUMMER

AMBIENT AIR

[°F]

WINTER AMBIENT

AIR

[°F]

OPERATING

WEIGHT

[LBS] MODEL FLA VOLTAGE PHASE MCA MOCP DISCONNECT BY

DISCONNECT

TYPE SCCRLENGTH WIDTH HEIGHT LENGTH WIDTH HEIGHT

SSAC B23-1.1 12335A 2 24 5/8" 5/8" 46 1/16" 11 5/8" 14 3/8" 80/67 705 PKA-A24 37 3/8" 13 1/8" 37 1/8" 115 0 200 PUZ-A24 0.4 208 V 1 19 26 MECHANICAL CONTRACTOR NON FUSED 5 MITSUBISHI 1,2,3,4

NO SCALE

CONDENSATE TO SINK/LAV DETAIL

OFFICE

OFFICE OFFICE

CONFERENCE

RECEPTION

AREA

OFFICE

S T

O R

A G

E

T O

IL

E

T

CORRIDOR

U T

IL

IT

Y

T O

IL

E

T

T O

IL

E

T

ROOM

4 10

WAREHOUSE/STORAGE

D

D

D

D

W

W

W

SECOND FLOOR LEVEL

DN

118A

TELECOM

WAREHOUSE

B25-M300

B7

SSAC B25-1.1

CU B25-1.1 1

3/8" REFL

3/4" REFS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:5

A M

B25-M101

FIRST LEVEL FLOOR PLAN -

OVERALL - MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B25

CJW CJW

1/8" = 1'-0" F4

FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

1:96

8' 12'

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

SHEET NOTES:

1. ROUTE REFRIGERANT FROM OUTDOOR UNIT TO INDOOR UNIT PER MANUFACTURER'S INSTRUCTIONS.

2. ROUTE CONDENSATE TO GRADE. CONDENSATE SHOULD BE ROUTED AWAY FROM EQUIPMENT, SIDEWALKS

& DRIVEWAYS.

GENERAL NOTES:

H

118A

TELECOM

SSAC B25-1.1

3/4" REFS

3/8" REFL

H T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:5

A M

B25-M300

FIRST LEVEL FLOOR PLAN -

ENLARGED - MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B25

CJW CJW

1/4" = 1'-0" B7

FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

1:48

4' 6'

SHEET NOTES:

1. THERMOSTAT & HUMIDITY SENSOR ON WALL.

2. PROVIDE TEMPERATURE AND HUMIDITY SENSOR AT CABINET PER VA OIT.

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

GENERAL NOTES:

2. PROVIDE CONCRETE PAD AND ANCHOR EXTERIOR UNIT TO PAD.

3. PROVIDE THE FOLLOWING ACCESSORIES: SINGLE POINT POWER CONNECTION, DISCONNECT, HAIL GUARDS, LOW AMBIENT KIT, WIND BAFFLES.

4. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT

BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR

PRIOR TO ORDERING EQUIPMENT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:5

A M

B25-M600

MECHANICAL SCHEDULES EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B25

CJW CJW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:5

A M

B25-M600

MECHANICAL SCHEDULES EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B25

CJW CJW

DUCT FREE SYSTEM / SPLIT SYSTEM / DX FAN COIL UNIT / COMPUTER ROOM AIR CONDITIONER SCHEDULE

MARK SERVES

NOMINAL

CAPACITY

[TONS]

TOTAL

COOLING

CAPACITY

[MBH]

DX CONNECTION

SIZE

CONDENSATE

DRAIN SIZE

INDOOR UNIT OUTDOOR UNIT ELECTRICAL DATA

MANUFACTURER REMARKS

DIMENSIONS [IN] EAT

(DB / WB)

[°F]

AIRFLOW

[CFM] MODEL

DIMENSIONS [IN] SUMMER

AMBIENT AIR

[°F]

WINTER AMBIENT

AIR

[°F]

OPERATING

WEIGHT

[LBS] MODEL FLA VOLTAGE PHASE MCA MOCP DISCONNECT BY

DISCONNECT

TYPELENGTH WIDTH HEIGHT LENGTH WIDTH HEIGHT

SSAC B25-1.1 12335A 2 24 5/8" 5/8" 46 1/16" 11 5/8" 14 3/8" 80/67 705 PKA-A24 37 3/8" 13 1/8" 37 1/8" 115 0 200 PUZ-HA24 0.4 208 V 1 19 26 MECHANICAL CONTRACTOR NON FUSED MITSUBISHI 1,2,3,4

Revisions: Date:Revisions: Date:

B36-M300

B3

2" F 2" F

4" F

4" F

105B

STORAGE

105A

TELECOM

B36-M300

D3

2" F2" F

105B

STORAGE

105A

TELECOM

B36-M300

B7

105B

STORAGE

105A

TELECOM

B36-M300

D7

CU B36-1.1

SSAC B36-1.1

105B

STORAGE

105A

TELECOM1

3/4" REFS

3/8" REFL

3/4" REFS

3/8" REFL

3/4" CD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:3

A M

B36-M101

FIRST LEVEL FLOOR PLAN -

OVERALL - MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B36

CJW LAC

1:10

10' 15'

SHEET NOTES:

1. PROVIDE BOLLARDS AROUND CONDENSING UNIT.

2. ROUTE REFRIGERANT LINES FROM OUTDOOR UNIT TO INDOOR UNIT PER MANUFACTURER'S

INSTRUCTIONS.

3. NEW OPEN SITE DRAIN TO CONNECT IN EXISTING SANITARY ALONG FLOOR PER DETAIL ON M600.

4. ROUTE CONDENSATE FROM INDOOR UNIT TO OPEN SITE DRAIN.

GENERAL NOTES:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN IN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR CONTRACTOR'S SAFETY PRECAUTIONS OR

FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES

REQUIRED TO PERFORM THIS WORK.

Revisions: Date:

1" = 10'-0" C1

FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION - DEMOLITION

1" = 10'-0" F1

FIRST LEVEL FLOOR PLAN - OVERALL - FIRE PROTECTION

1" = 10'-0" C5

FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION

1" = 10'-0" F5

FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

1:10

10' 15'

1:10

10' 15'

1:10

10' 15'

105B

STORAGE

105A

TELECOM

2" F

1" F

2" F

SSAC B36-1.1

105B

STORAGE

105A

TELECOM

1/ 2"

C A

1/2" CA 1/2" CA

3/4" CD

3/4" REFS

T H

105B

STORAGE

105A

TELECOM

2" 2"

1" 1"

2 2

105B

STORAGE

105A

TELECOM

1/ 2"

C A

1/2" CA 1/2" CA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:3

A M

B36-M300

FIRST LEVEL FLOOR PLAN -

ENLARGED - MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B36

CJW LAC

1/4" = 1'-0" D3

FIRST LEVEL FLOOR PLAN - ENLARGED - FIRE PROTECTION

1/4" = 1'-0"

D7

FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL

1:48

4' 6'

1:48

4' 6'

1/4" = 1'-0" B3

FIRST LEVEL FLOOR PLAN - ENLARGED - FIRE PROTECTION - DEMOLITION

1/4" = 1'-0"

B7

FIRST LEVEL FLOOR PLAN - ENLARGED - MECHANICAL - DEMOLITION

1:48

4' 6'

1:48

4' 6'

SHEET NOTES:

1. THERMOSTAT & HUMIDITY SENSOR ON WALL.

2. PROVIDE TEMPERATURE AND HUMIDITY SENSORS AT CABINET PER VA OIT.

GENERAL NOTES:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN IN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR CONTRACTOR'S SAFETY PRECAUTIONS OR

FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES

REQUIRED TO PERFORM THIS WORK.

SHEET NOTES:

1. NEW SPRINKLER PIPING SIZE TO MATCH EXISTING, TYP.

2. NEW SPRINKLER HEAD.

SHEET NOTES:

1. DEMO SPRINKLER HEAD & PIPING.

2. DEMO PORTION OF PIPING & KEEP FOR CONNECTION TO NEW, TYP.

2. PROVIDE CONCRETE PAD AND ANCHOR EXTERIOR UNIT TO PAD.

3. PROVIDE THE FOLLOWING ACCESSORIES: SINGLE POINT POWER CONNECTION, DISCONNECT, HAIL GUARDS, LOW AMBIENT KIT, WIND BAFFLES.

4. PROVIDE WITH CONDENSATE PUMP COMPLETE WITH RESERVOIR & SENSOR. PUMP TO BE BLUE DIAMOND

X87-721 OR EQUIVALENT.

5. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT

BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR

PRIOR TO ORDERING EQUIPMENT.

TO SANITARY

MOUNT & SECURE OPEN SITE DRAIN

PIPING & FITTINGS TO WALL.

TO VENT

CONDENSATE DRAIN

FROM SPLIT SYSTEM

AIR GAP FITTING TO BE ZURN

Z1025 OR EQUIVALENT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:3

A M

B36-M600

MECHANICAL SCHEDULES EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

B36

CJW LAC

DUCT FREE SYSTEM / SPLIT SYSTEM / DX FAN COIL UNIT / COMPUTER ROOM AIR CONDITIONER SCHEDULE

MARK SERVES

NOMINAL

CAPACITY

[TONS]

TOTAL

COOLING

CAPACITY

[MBH]

DX CONNECTION

SIZE

CONDENSATE

DRAIN SIZE

INDOOR UNIT OUTDOOR UNIT ELECTRICAL DATA

MANUFACTURER REMARKS

DIMENSIONS [IN] EAT

(DB / WB)

[°F]

AIRFLOW

[CFM] MODEL

DIMENSIONS [IN] SUMMER

AMBIENT AIR

[°F]

WINTER AMBIENT

AIR

[°F]

OPERATING

WEIGHT

[LBS] MODEL FLA VOLTAGE PHASE MCA MOCP DISCONNECT BY

DISCONNECT

TYPELENGTH WIDTH HEIGHT LENGTH WIDTH HEIGHT

SSAC B36-1.1 105A TELECOM 1.5 18 1/2" 5/8" 35 1/2" 9 3/8" 11 13/16" 80/67 385 PKA-A18 31 13/16" 16 3/16" 27 7/16" 115 0 150 PUZ-A18 0.5 208 V 1 11 28 MECHANICAL CONTRACTOR NON FUSED MITSUBISHI 1,2,3,4,5

NO SCALE

CONDENSATE TO OPEN SITE DETAIL

KITCHEN

MECH.

ROOM

OFFICE

MALE

TOILET

FEMALE

TOILET

WELDING

MACHINE

SHOP

MACHINE

ROOM

ELECTRIC

SHOP

PLUMBING

SHOP

ELECTRIC

SHOP

SUPERVISOR

OFFICE

A/C SHOP

KEYS

PROGRAM CLERK/

SUPPLY CLERK

CARPENTER

SHOP

BOLT

ROOM

TOOL

CRIB

TOOL CRIBPAINT SHOPPAINT

STORAGE

ELECTRIC

SHOP

STORAGEMACHINE SHOP

STORAGE

105C

105A

105B 108B

108C 109A 109

108A

113A

114E

114A

113B 114B

112A

113D

113C

114D

114C

KITCHEN

MECH.

ROOM

OFFICE

MALE

TOILET

FEMALE

TOILET

WELDING

MACHINE

SHOP

MACHINE

ROOM

ELECTRIC

SHOP

PLUMBING

SHOP

ELECTRIC

SHOP

SUPERVISOR

OFFICE

A/C SHOP

KEYS

PROGRAM CLERK/

SUPPLY CLERK

CARPENTER

SHOP

BOLT

ROOM

TOOL

CRIB

TOOL CRIBPAINT SHOPPAINT

STORAGE

ELECTRIC

SHOP

STORAGEMACHINE SHOP

STORAGE

105C

105A

105B 108B

108C 109A 109

108A

113A

114E

114A

113B 114B

112A

113D

113C

114D

114C

KITCHEN

MECH.

ROOM

OFFICE

MALE

TOILET

FEMALE

TOILET

WELDING

MACHINE

SHOP

MACHINE

ROOM

ELECTRIC

SHOP

PLUMBING

SHOP

ELECTRIC

SHOP

SUPERVISOR

OFFICE

A/C SHOP

KEYS

PROGRAM CLERK/

SUPPLY CLERK

CARPENTER

SHOP

BOLT

ROOM

TOOL

CRIB

TOOL CRIBPAINT SHOPPAINT

STORAGE

ELECTRIC

SHOP

STORAGEMACHINE SHOP

STORAGE

105C

105A

105B 108B

108C 109A 109

108A

113A

114E

114A

113B 114B

112A

113D

113C

114D

114C

KITCHEN

MECH.

ROOM

OFFICE

MALE

TOILET

FEMALE

TOILET

WELDING

MACHINE

SHOP

MACHINE

ROOM

ELECTRIC

SHOP

PLUMBING

SHOP

ELECTRIC

SHOP

SUPERVISOR

OFFICE

A/C SHOP

KEYS

PROGRAM CLERK/

SUPPLY CLERK

CARPENTER

SHOP

BOLT

ROOM

TOOL

CRIB

TOOL CRIBPAINT SHOPPAINT

STORAGE

ELECTRIC

SHOP

STORAGEMACHINE SHOP

STORAGE

105C

105A

105B 108B

108C 109A 109

108A

113A

114E

114A

113B 114B

112A

113D

113C

114D

114C

B40-M300

B4

B40-M300

D4

114E

TELECOM

1 1/4" F

4" F

B40-M300

B7

1/4" 1

B40-M300

D7

SSAC B40-1.1

CU B40-1.1

114E

TELECOM

3/8" REFS

3/4" REFS1

1/2" DHW

1/2" DCW

2" SAN

1 1/2" SAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

100% CONSTRUCTION

DOCUMENTS

02/11/22

B

IM

/2

V

A T o m a h

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-7

.B

.M

R

.r v t

/7

/2

:4

:3

A M

B40-M101

FIRST LEVEL FLOOR PLAN -

OVERALL - MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES, TOMAH, WI

TOMAH, WI

676-700

CJW LAC

1:192

16' 24'

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

SHEET NOTES:

1. ROUTE…