This solicitation is for an infrastructure upgrades construction project at the St. Cloud Veterans Affairs Health Care System. The contractor shall furnish all labor, materials, tools and equipment required to complete electrical, data center, fiber optic cabling, hazardous materials abatement, and HVAC work. Infrastructure improvements include upgrading the electrical system and bonding, installing uninterruptible power supplies and building management system interfaces, enhancing access security, expanding and renovating existing space as needed, and physically securing the main server room. The contractor must complete all work in accordance with the specifications and contract drawings. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The solicitation number is 36C77622B0035.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud, newest first.
File Type Posted
Atch 41 - Construction Wage Rates - Stearns 7-29-22.pdf PDF
36C77622B0035 0003.pdf PDF
Atch 3 - Specifications Volume 3 - Asbestos addendum.pdf PDF
Atch 4 - General 1 of 2 addendum.pdf PDF
Atch 6 - BLDG 1 - 1 of 2 addendum.pdf PDF
Atch 8 - BLDG 2 addendum.pdf PDF
Atch 9 - BLDG 3 addendum.pdf PDF
Atch 12 - BLDG 6 addendum.pdf PDF
Atch 13 - BLDG 7 and 13 addendum.pdf PDF
Atch 27 - BLDG 96 addendum.pdf PDF
Atch 30 - BLDG 111 addendum.pdf PDF
Atch 31 - BLDG 112 addendum.pdf PDF
36C77622B0035 0002.pdf PDF
Technical Questions - FINAL - St. Cloud 7-28-22.pdf PDF
Atch 2 - Specifications Volume 2 addendum.pdf PDF
Atch 7 - BLDG 1 - 2 of 2 addendum.pdf PDF
Atch 16 - BLDG 10 addendum.pdf PDF
Atch 19 - BLDG 28 addendum.pdf PDF
Atch 23 - BLDG 50 addendum.pdf PDF
Atch 26 - BLDG 95 and 88 addendum.pdf PDF
Atch 29 - BLDG 109 and 57 addendum.pdf PDF
Atch 34 - BLDG 118 addendum.pdf PDF
Atch 35 - ADHC addendum.pdf PDF
Atch 36 - Parking Structure addendum.pdf PDF
36C77622B0035 - 6-9-22.pdf PDF
Atch 6 - BLDG 1 - 1 of 2.pdf PDF
Atch 16 - BLDG 10.pdf PDF
Atch 19 - BLDG 28.pdf PDF
Atch 22 - BLDG 49.pdf PDF
Atch 35 - ADHC.pdf PDF
Atch 2 - Specifications Volume 2.pdf PDF
Atch 3 - Specifications Volume 3 - Asbestos.pdf PDF
Atch 9 - BLDG 3.pdf PDF
Atch 11 - BLDG 5.pdf PDF
Atch 13 - BLDG 7 and 13.pdf PDF
Atch 14 - BLDG 8.pdf PDF
Atch 17 - BLDG 11.pdf PDF
Atch 29 - BLDG 109 and 57.pdf PDF
Atch 33 - BLDG 116.pdf PDF
Atch 37 - Brand Name Justification - St. Cloud.pdf PDF
Atch 38 - Contractor Core Work Hours.pdf PDF
Atch 39 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Atch 41 - Construction Wage Rates - Stearns 4-1-22.pdf PDF
Atch 42 - Contractor Safety - Environmental Form.docx DOCX document
Atch 4 - General 1 of 2.pdf PDF
Atch 5 - General 2 of 2.pdf PDF
Atch 8 - BLDG 2.pdf PDF
Atch 23 - BLDG 50.pdf PDF
Atch 24 - BLDG 51.pdf PDF
Atch 27 - BLDG 96.pdf PDF
Show all 50

Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING FIBER - INSIDE

VFY EXIST

EXISTING FIBER - OUTSIDE

VFY EXIST

FIBER ROUTE - INSIDE

SEE TELECOM

FIBER ROUTE - OUTSIDE

SEE CIVIL

BUILDING OUTLINE

VFY EXIST

CORRIDOR OUTLINE

VFY EXIST

LEGEND

TO 8TH ST WEST ONLYTO 8TH ST EAST & WEST

44TH AVE.

TRAIL 1

TRAIL 2

TRANSFER

SWITCH

CAPACITOR

BANK (3)

SWITCH

(2)

15KV

MAIN

SW

BATT

35 KV

TO

15 KV

TRANSFORMER

35KV

FUSED

SWITCH

METER 35KV

SWITCH

GRAVEL

GRAVEL

GRAVEL

EXISTING

ROAD

CHAIN LINK FENCE

CHAIN LINK FENCE

16' GATE

GRAVEL

ELECTRICAL

SUBSTATION

G E N E R A T O R

FUEL LINES

CONDU ITS TO TU NNEL

M V

D U

C T

B A

N K

1 1 2 W

PHARMACY ADDITION

11 2 E

G E N E R A T O R

B

CORRIDOR LINK

A

C T

TR

A

IL

ER

174 s .f.

256 s .f.

185 s .f.

149 s ..f.

155 s .f.

104 s .f.

70 s. .f .

72 s .f.

110 s .f.

276 s .f.

112 s .f.

99 s .f.

57 s .f.

146 s .f.

434 s .f.

R A

MP

U P

1:

M A X

R A

MP

U P

1:

M A X

RA

M P

UP

1:2 0 M

AX

TRANSFER

SWITCH

CAPACITOR

BANK (3)

SWITCH

(2) 15KV

MAIN

SW

BATT

35 KV

TO

15 KV

TRANSFORMER

35KV

FUSED

SWITCH

METER 35KV

SWITCH

.3

TRANSFORMER

BUILD ING

#91

5,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

EXISTIN G G AS SU P P LY EQ U IP M EN T TO R EM AIN

O P ER ATIO N AL DU R IN G D EM O LITIO N AN D N EW

C O N STR U C TIO N. P R O TEC T EQU IP M EN T AN D

P IP ELIN ES IN AC C O R D AN C E W ITH G AS SU P P LIER 'S

R EC O M M EN D ATIO N S

N EW G AS SU P P LY M AIN

IN TO B U ILD IN G

SP AR E

P H O N E LIN E

EXTEN D S TO

E XISTIN G

P H O N E IN

B O ILER R O O M

P ER P LAN .

SP AR E

P H O N E

LIN E TO

M ETER

TU N N EL

E XTEN D S

A D D ITIO N AL

2'- 0" U N D ER

B U ILD IN G

FUEL LINE

VENT LINE

1,000 GAL.

UNDERGROUND

DIESEL FUEL

TANK

1,000/5,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

1,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

1,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

S 1

LIG H T

N EW G AS SU P P LY

(C O O R D IN ATE W ITH SU P P LIER )

12"D

10"D

"D

TP TP

EXIST. BUILDING

EXIST.

BUS STOP

CC

L O

O P

16"

20"

12"

3"

8"

DN

0.

0’

BIRDCAGE

B

IR

D C

A G

E

NSP ELECTRICAL

FOR HWY DEPT

T101

I.T.

CHILLER

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

VESTIBULE

DN

DN

DN

FD

DN

F B

F

B

F B

F

B

F B

F

B

SOUTH

VESTIBULE

PASS

THROUGH

LINK TO

BUILDI NG 51

6 3. 32 56

1 13 5. 35 78

PARKING

NO

PARKING

93 49

37 6

109 5

1A

S M

O K

E B

L D

G

SMOKE

BLDG

SMOKE

BLDG

S M

O K

E B

L D

G

SMOKE

BLDG

M.H.

STOR.

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

STOR.

BIO-

HAZ.

SAUK RIVER

GP

HOLDING POND

PROPOSED TR

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

OWNER AND

CONSULTANTS:

CONTACT:

ADDRESS:

MIKE ENGMARK

ST CLOUD VA MEDICAL CENTER

4801 VETERANS DRIVE

ST. CLOUD, MN 56303

NAME:

ADDRESS:

CONTACT:

ADVANCED STRUCTURAL TECHNOLOGIES

7301 OHMS LANE; SUITE 215

EDINA, MN 55439

ZACHARY CRAIG

PHONE:

NAME:

ADDRESS:

CONTACT:

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

KRIS BURNHAM

PHONE: 402-991-5520

NAME:

ADDRESS:

CONTACT:

PHONE:

NAME:

ADDRESS:

CONTACT:

PHONE:

NAME:

ADDRESS:

CONTACT:

PHONE:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

IAN WEBER

763-412-4000

ARCHITECT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

EDWARD MARKFORT

763-412-4000

952-854-9302

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

KRIS BURNHAM

402-991-5520

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

COVER

DATE:

APPROVED: APPROVED: PROJECTS SECTION MANAGER

APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:

APPROVED: SAFETY MANAGER

APPROVED: CHIEF OF POLICE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE: APPROVED: EMS MANAGER

APPROVED: M/O MANAGER

DATE:

DATE:

DATE:DATE:

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: PROJECT COR DATE:

APPROVED: INFECTION CONTROL NURSE DATE:

APPROVED: SERVICE LINE DIRECTOR

APPROVED: GEMS COORDINATOR DATE:

DATE:

APPROVED: NURSE EXECUTIVE

APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS

APPROVED: ASSOCIATE DIRECTOR

DATE:

DATE:

DATE:

DATE:APPROVED: DATE:

APPROVED: DATE:

APPROVED: DATE:

Main Campus, St. Cloud, Minnesota St. Cloud VA Health Care System

N

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

VICINITY MAP:

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHONE: 320-252-1670

CIVIL ENGINEER:

VA COR:

TELECOMMUNICATIONS ENGINEER:

CONTACT:

ADDRESS:

JONATHAN WEST

ST CLOUD VA MEDICAL CENTER

4801 VETERANS DRIVE

ST. CLOUD, MN 56303

PHONE: 504-250-2699

PROGRAM MANAGER:

EMAIL: Jonathan.West@vciint.com

STRUCTURAL ENGINEER:

MECH/ELEC/PLUMB/FIRE ENGINEER:

C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -9

-R

E

M a rk fo rt

.r v t

/2

/2

:1

:2

P

M

95-GI000

BUILDINGS 95 & 88 COVER

SHEET & SHEET INDEX

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM EM

16305

BUILDINGS 95 AND 88 - EHRM INFRASTRUCTURE UPGRADES

95 & 88

03/30/2022

0APPROX 150' 300'75'

SHEET INDEX - BUILDINGS 95 & 88

SHEET NO. SHEET TITLE

95-GI000 BUILDINGS 95 & 88 COVER SHEET & SHEET INDEX

95-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

88-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

95-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

95-AS100 FIRST FLOOR PLANS (BUILDING 95 & 88)

95-TD110 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - DEMOLITION

95-TN110 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOMMUNICATION

95-TN210 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - CABLE DISTANCE

95-TN400 ENLARGED PLANS (BUILDING 95) - TELECOMMUNICATIONS

95-E201 FIRST FLOOR PLAN - ELECTRICAL

95-E600 ELECTRICAL SCHEDULES

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION: 11

1" = 50'-0"

KEY PLAN

ROOM SCHEDULE

VA

Building Number NO. NAME C

A B

LI

N

G

P A

T C

H P

A N

E L

F

IB

E R

P O

W E

R

B O

N D

IN

G

U P

S

D E

D

IC

A T

E D

C O

O

LI

N G

T E

M P

E R

A T

U R

E

H U

M

ID

IT

Y

R A

C K

S E

N S

O R

S P

A C

E

AREA

WIDTH

(FT)

LENGTH

(FT)

HT TO

CLG

STRUCT REMARKS

FIRST FLOOR

88 112 EXIST RM 17 SF 3.7 4.6 DECOMMISSION EXIST IT/DATA ROOM. SEE

TELECOM DRAWINGS. RELOCATE FUNCTION TO

BUILDING 95 ROOM 11

95 11 TELECOM ROOM X X X X X X X X X X 29 SF 5.2 5.2 UPDATE EXIST IT/DATA ROOM TO EHRM TELECOM

ROOM STANDARDS. SEE TELECOM DRAWINGS

OPENING SCHEDULE

VA Building Number

ASSOCIATED ROOMS OPENING PANEL INFORMATION FRAME INFORMATION

H D

W G

R O

U P

F

IR

E L

A B

E L

(M

IN

G A

S K

E T

E

LE

C T

R

IC

A L

S L

A B

E L

COMMENTSFROM ROOM NAME TO ROOM NAME NUMBER WIDTH HEIGHT

PANEL

TYPE

2ND

PANEL

TYPE

PANEL

GLAZING FRAME TYPE

FRAME

GLAZING

HAZARDOUS MATERIAL SCHEDULE

BUILDING

ROOM

NO. ROOM NAME

QUESTIONABLE HAZARDOUS

ELEMENT POSSIBLE ABATEMENT ACTION

FIRST FLOOR

88 112 EXIST RM ACM. SEE 88-HA-1A NONE. ACM TO REMAIN UNDISTURBED

95 11 TELECOM ROOM ASBESTOS CONTAINING DUCT

SEAM SEALANT. SEE 95-HA-1A

NONE. ACM TO REMAIN UNDISTURBED

HAZARDOUS MATERIALS MAY BE ENCOUNTERED THROUGHOUT THE DISTRIBUTION ROUTING THROUGH CEILING PLENUMS AND UTILITY TUNNELS. INSTALLATION OF DISTRIBUTION SHALL NOT

DISTURB QUESTIONABLE HAZARDOUS MATERIAL.

LEAK PREVENTION / DIVERTER SCHEDULE

VA Building

Number

ROOM

NO. ROOM NAME OVERHEAD LEAK DIVERTER AND DRAIN PIPING LEAK PREVENTION BARRIER WATERPROOFING

88 112 EXIST RM

95 11 TELECOM ROOM

SEE GENERAL NOTES SHEET FOR DETAIL. MWP = MEMBRANE WATERPROOFING. MASONRY = FLUID-APPLIED WATERPROOFING. INT = INTERIOR. EXT = EXTERIOR

ICRA PHASE CONSTRUCTION ROOM SCHEDULE

BUILDING NO.

ROOM

NO. ROOM NAME

CAI BLDG NAME /

FUNCTION

CONSTRUCTION

PROJECT ACTIVITY

INFECTION CONTROL

RISK GROUP

CONTROL

PROCEDURE CLASS SECTION

CONSTRUCTION ZONE /

OCCUPIED CONSTR

DAY /

NIGHT

88 112 EXIST RM CHAPEL TYPE B GROUP 1 CLASS II WEST OCCUPIED CONSTRUCTION DAY

95 11 TELECOM ROOM CANTEEN TYPE C GROUP 1 CLASS II WEST OCCUPIED CONSTRUCTION NIGHT

SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE.

FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.

MECHANICAL

DINING

STAFF

DINING

VESTIBULE

SERVERY

RETAIL

STORAGE

DRY

FREEZER

COOLER

KITCHEN

ELECTRICAL

TOILET

ACCOUNTING

STORAGE

RETAIL

OFFICE

HAC

SERVERY

FOOD

CORRIDOR

DISHES

TOILET

OFFICE

MENS

WOMENS

HAC

VESTIBULE

10A

STAIRWELL

DISPLAY

STOR

CHEM

e

UP

SERVING COUNTER

TRSH. TRSH. TRSH. TRSH.CONDIMENTS

T R

S H

T

R S H

T

R S H

SAFE

HALL

INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND

LIMITS OF CONSTRUCTION

1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER

LOCATION, AND DOOR, WHERE SHOWN

TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER

LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE B.

UPGRADE TO 1 HOUR RATED PARTITION WHEN DIRECTED BY THE VA

/2 95-AS100

TELECOM

ROOM

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -9

-R

E

M a rk fo rt

.r v t

/2

/2

:1

:3

P

M

95-GI111

FIRST FLOOR - INFECTION

CONTROL & PHASING PLAN

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM BMW

16305

95 & 88

03/30/2022

ROOM ICRA SCHEDULE

VA Building

Number

ROOM

NO. ROOM NAME CAI BLDG NAME / FUNCTION CONSTRUCTION PROJECT ACTIVITY INFECTION CONTROL RISK GROUP CONTROL PROCEDURE CLASS

88 112 EXIST RM CHAPEL TYPE B GROUP 1 CLASS II

95 11 TELECOM ROOM CANTEEN TYPE C GROUP 1 CLASS II

SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE.

FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.

1/8" = 1'-0"

FIRST FLOOR - INFECTION CONTROL & PHASING PLAN - BUILDING 95

N

0 8' 16'4'

-ASBESTOS-CONTAINING MASTIC UNDER CARPET

-ASBESTOS-CONTAINING MASTIC UNDER 12"X12" FLOOR TILE

-ASBESTOS-CONTAINING WINDOW GLAZING

-ASBESTOS-CONTAINING FIRE DOOR (ASSUMED)

-ASBESTOS-CONTAINING EXPANSION JOINT CAULK

-ASBESTOS-CONTAINING FLOOR TILE AND MASTIC

CASTLE HILL ASSOCIATES, LLC.

N

S

W E

LEGEND

BUILDING #88 - GROUND FLOOR PLAN

-ASBESTOS-CONTAINING DUCT SEAM SEALANT (BROWN)

CASTLE HILL ASSOCIATES, LLC.

N

S

W E

LEGEND

BUILDING #95 - GROUND FLOOR PLAN

B O

O K

S H

E L F

X

D E

S K

/H T

C H

X

DESK/HTCH

24X48

C10

CORRIDOR

OFFICE

MECH.

CHAPEL

ROOM

SERVICE

VESTIBULE

HAC

CLOSET

BATH

BATH

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

M E

D

IT

A T

IO

N

PURPOSE

MULTI

CHAPEL BUILDING 88

I.T.

CONVECTOR

MECHANICAL

DINING

STAFF

DINING

VESTIBULE

SERVERY

RETAIL

STORAGE

DRY

FREEZER

COOLER

KITCHEN

ELECTRICAL

TOILET

ACCOUNTING

STORAGE

RETAIL

OFFICE

HAC

SERVERY

FOOD

CORRIDOR

DISHES

TOILET

OFFICE

MENS

WOMENS

HAC

VESTIBULE

10A

STAIRWELL

DISPLAY

STOR

CHEM

e

UP

SERVING COUNTER

TRSH. TRSH. TRSH. TRSH.CONDIMENTS

T R

S H

T

R S H

T

R S H

SAFE

HALL

/1 95-AS100

3' -7

/4

4'-7 1/4"

/2 95-AS100

TELECOM

ROOM

5' -2

5'-6 1/2"

95-AS100

PROPOSED TR

TELECOM

ROOM

5' -2

IN-03.01

5'-6 3/8"

TELECOM

ROOM

TELECOM

ROOM

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -9

-R

E

M a rk fo rt

.r v t

/2

/2

:1

:3

P

M

95-AS100

FIRST FLOOR PLANS

(BUILDING 95 & 88)

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM EM

16305

95 & 88

03/30/2022

N

0 8' 16'4' 1/8" = 1'-0"

FIRST FLOOR OVERALL PLAN - BUILDING 88

1/8" = 1'-0"

FIRST FLOOR - OVERALL PLAN - BUILDING 95

1" = 50'-0"

KEY PLAN

N

0 8' 16'4'

RC1

_DEMOLITION PLAN KEYED NOTES

DE1 PREPARE WALL FOR PLYWOOD BACKBOARD INSTALLATION AND EHRM

REQUIREMENTS, SEE FLOOR PLAN AND TELECOM DRAWINGS

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

_FLOOR PLAN KEYED NOTES

FL1 ALL FOUR PERIMETER WALL PARTITIONS APPLY 4' BY 8' AC GRADE ¾”

TRADE SIZE FIRE RATED PLYWOOD BACKBOARD FINISHED WITH

HIGH-GLOSS WHITE PAINT OVER TWO COATS OF FIRE RESISTANT PAINT

FOR SERVICE PROVIDER / SECURITY / VIDEO / ET CETERA. DO NOT PAINT

OVER FIRE RATING STAMP.

FL3 UPGRADE PARTITION TO 1 HOUR FIRE AND SMOKE BARRIER. PROVIDE

TESTED HEAD OF PARTITION ASSEMBLY WITH MATERIALS THAT RESIST

THE PASSAGE OF SMOKE. SEAL JOINT AT HEAD AND ALL PENETRATIONS

WITH FIRE CAULK.

FL20 TELECOM EQUIPMENT, SEE TELECOM DRAWINGS.

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

_REFLECTED CEILING PLAN KEYED NOTES

RC1 LED LIGHTING, SEE ELECTRICAL. IN FRONT OF AND BEHIND CABINET

ROWS PROVIDE 500 LUMENS IN HORIZONTAL AND 200 LUMENS IN THE

VERTICAL AT 3 FT AFF. OPERATED BY MOTION SENSOR PER CABINET

ROW OR SECTION.

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

1/4" = 1'-0"

ENLARGED FLOOR PLAN

N

0 4' 8'2'

FL1

FL3

1/4" = 1'-0"

ENLARGED DEMO PLAN

DE1

DE1

DE1

N

0 4' 8'2'

FL20

1/4" = 1'-0"

REFLECTED CEILING PLAN

N

0 4' 8'2'

FL3

FL3

FL3

_SHEET NOTES

1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL

INFORMATION, LIFE SAFETY, ICRA, AND PHASING

2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING

CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO

THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND

ENGINEERS.

3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS

AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH

OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND

ENGINEERS.

4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL

DEMOLITION AND CONSTRUCTION REQUIREMENTS.

5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE) WITH

WALL MOUNT BRACKET AND CODE REQUIRED SIGNAGE SHALL BE

PROVIDED BY THE CONTRACTOR WITHIN TELECOM ROOMS.

DINING

STAFF

DINING

VESTIBULE

SERVERY

RETAIL

STORAGE

DRY

FREEZER

COOLER

KITCHEN

ELECTRICAL

TOILET

ACCOUNTING

STORAGE

RETAIL

OFFICE

HAC

SERVERY

FOOD

CORRIDOR

DISHES

TOILET

OFFICE

MENS

WOMENS

HAC

VESTIBULE

I.T.

10A

STAIRWELL

DISPLAY

STOR

CHEM

e

INFILL EXISTING LOUVER

AROUND NEW LOUVER

-COORDINATE WITH MECH.

FOR SIZE & LOCATION

UP

SERVING COUNTER

TRSH. TRSH. TRSH. TRSH.

SCREEN

CONDIMENTS

BEVERAGE COOLERS

T R

S H

T

R S H

T

R S H

SAFE

ROOF

HATCH

ABOVE

HALL

A301

A401

A401

TS

B O

O K

S H

E L F

X

D E

S K

/H T

C H

X

DESK/HTCH

24X48

C10

CORRIDOR

OFFICE

MECH.

CHAPEL

ROOM

SERVICE

VESTIBULE 109

HAC

CLOSET

BATH

BATH

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

M E

D

ITA

TIO

N

PURPOSE

MULTI

I.T.

ROOM

SERVICE

HAC

95-TD110

8" x2

8" x2

8"x2"

8"x2"

E

E

E

E

E

LIMITS OF DATA CABLING

E

LIMITS OF DEMOLITION

95-TD110

LIMITS OF DEMOLITION

E

E

E

E

8"x2"

8" x2

8" x2

PROPOSED TR

E

DATA RACK

3 4

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:5

:1

P

M

95-TD110

FIRST FLOOR PLAN (BUILDING

88 & 95) - TELECOM -

DEMOLITION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

SHEET NOTES:

1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.

REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING

ROUTES.

2. 2 POST RACK TO REMAIN IN BUILDING 95.

3. BUILDING 88 DATA CONNECTIONS WILL BE DOMOLISHED AND FED FROM BUILDING 95.

4. EXISTING CABLE TRAY, SECURITY CAMERAS, GROUND BUS BARS, AND RACKS FROM DECOMMISSIONED

ROOMS ARE TO BE REUSED, WHEN POSSBILE, IN NEW CONSTRUCTION TRS.

N

0 8' 16'4'

N

0 8' 16'4' 1/8" = 1'-0"

FIRST FLOOR PLAN - TELECOM - DEMOLITION - BUILDING 95

1/8" = 1'-0"

FIRST FLOOR PLAN - TELECOM - DEMOLITION - BUILDING 88

1" = 50'-0"

KEY PLAN

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

1/4" = 1'-0"

ENLARGED PLAN - TELECOM - DEMO - EXIST RM 11 (BUILDING 95)

1/4" = 1'-0"

ENLARGED PLAN - TELECOM - DEMO - EXIST RM 112 (BUILDING 88)

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE. THE CABLE

RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE PRESENT IN THE SPACE AT THE COMPLETION OF THE

PROJECT.

1. ROOM 11 (B95)

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 56

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

2. ROOM 112 (B88)

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 30

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

DINING

STAFF

DINING

VESTIBULE

SERVERY

RETAIL

STORAGE

DRY

FREEZER

COOLER

KITCHEN

ELECTRICAL

TOILET

ACCOUNTING

STORAGE

RETAIL

OFFICE

HAC

SERVERY

FOOD

CORRIDOR

DISHES

TOILET

OFFICE

MENS

WOMENS

HAC

VESTIBULE

I.T.

10A

STAIRWELL

DISPLAY

STOR

CHEM

e

INFILL EXISTING LOUVER

AROUND NEW LOUVER

-COORDINATE WITH MECH.

FOR SIZE & LOCATION

UP

SERVING COUNTER

TRSH. TRSH. TRSH. TRSH.

SCREEN

CONDIMENTS

BEVERAGE COOLERS

T R

S H

T

R S H

T

R S H

SAFE

ROOF

HATCH

ABOVE

HALL

MECHANICAL

DINING

STAFF

DINING

VESTIBULE

SERVERY

RETAIL

STORAGE

DRY

FREEZER

COOLER

KITCHEN

ELECTRICAL

TOILET

ACCOUNTING

STORAGE

RETAIL

OFFICE

HAC

SERVERY

FOOD

CORRIDOR

DISHES

TOILET

OFFICE

MENS

WOMENS

HAC

VESTIBULE

I.T.

10A

STAIRWELL

DISPLAY

STOR

CHEM

e

INFILL EXISTING LOUVER

AROUND NEW LOUVER

-COORDINATE WITH MECH.

FOR SIZE & LOCATION

UP

SERVING COUNTER

TRSH. TRSH. TRSH. TRSH.

SCREEN

CONDIMENTS

BEVERAGE COOLERS

T R

S H

T

R S H

T

R S H

SAFE

ROOF

HATCH

ABOVE

HALL

B O

O K

S H

E L F

X

D E

S K

/H T

C H

X

DESK/HTCH

24X48

C10

CORRIDOR

OFFICE

MECH.

CHAPEL

ROOM

SERVICE

VESTIBULE 109

HAC

CLOSET

BATH

BATH

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

M E

D

ITA

TIO

N

PURPOSE

MULTI

CHAPEL BUILDING 88

I.T.

CONVECTOR

B O

O K

S H

E L F

X

D E

S K

/H T

C H

X

DESK/HTCH

24X48

C10

CORRIDOR

OFFICE

MECH.

CHAPEL

ROOM

SERVICE

VESTIBULE 109

HAC

CLOSET

BATH

BATH

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

M E

D

ITA

TIO

N

PURPOSE

MULTI

CHAPEL BUILDING 88

I.T.

CONVECTOR

TELECOM

ROOM

95-TN400

8" x2

8"x2"

8"x2"

8" x2

E

E

E

E

E

C2 126"

4"4"4"4"

4"4"4"4"

4"4"4"4"

LIMITS OF DATA CABLING

REPLACEMENT FROM ROOM 11

(BUILDING 95)

8" x2

8"x2"

8" x2

E

E

E

PROPOSED TR

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:5

:2

P

M

95-TN110

FIRST FLOOR PLAN (BUILDING

88 & 95) -

TELECOMMUNICATION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

N

0 8' 16'4'

N

0 8' 16'4' 1/8" = 1'-0"

FIRST FLOOR PLAN - TELECOMMUNICATIONS - BUILDING 95

1/8" = 1'-0"

FIRST FLOOR PLAN - TELECOMMUNICATIONS - BUILDING 88

1" = 50'-0"

KEY PLAN

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

B O

O K

S H

E L

F

X

D E

S K

/H T

C H

X

DESK/HTCH

24X48

C10

CORRIDOR

OFFICE

MECH.

CHAPEL

ROOM

SERVICE

VESTIBULE

HAC

CLOSET

BATH

BATH

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

M E

D

IT

A

TIO

N

PURPOSE

MULTI

CHAPEL BUILDING 88

I.T.

CONVECTOR

MECHANICAL

DINING

STAFF

DINING

VESTIBULE

SERVERY

RETAIL

STORAGE

DRY

FREEZER

COOLER

KITCHEN

ELECTRICAL

TOILET

ACCOUNTING

STORAGE

RETAIL

OFFICE

HAC

SERVERY

FOOD

CORRIDOR

DISHES

TOILET

OFFICE

MENS

WOMENS

HAC

VESTIBULE

I.T.

10A

STAIRWELL

DISPLAY

STOR

CHEM

e

INFILL EXISTING LOUVER

AROUND NEW LOUVER

-COORDINATE WITH MECH.

FOR SIZE & LOCATION

UP

SERVING COUNTER

TRSH. TRSH. TRSH. TRSH.

SCREEN

CONDIMENTS

BEVERAGE COOLERS

T R

S H

T

R S

H

T R

S H

SAFE

ROOF

HATCH

ABOVE

HALL

B O

O K

S H

E L

F

X

D E

S K

/H T

C H

X

DESK/HTCH

24X48

C10

CORRIDOR

OFFICE

MECH.

CHAPEL

ROOM

SERVICE

VESTIBULE

HAC

CLOSET

BATH

BATH

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

OFFICE

CHAPLAIN

M E

D

IT

A

TIO

N

PURPOSE

MULTI

CHAPEL BUILDING 88

I.T.

CONVECTOR

MECHANICAL

DINING

STAFF

DINING

VESTIBULE

SERVERY

RETAIL

STORAGE

DRY

FREEZER

COOLER

KITCHEN

ELECTRICAL

TOILET

ACCOUNTING

STORAGE

RETAIL

OFFICE

HAC

SERVERY

FOOD

CORRIDOR

DISHES

TOILET

OFFICE

MENS

WOMENS

HAC

VESTIBULE

I.T.

10A

STAIRWELL

DISPLAY

STOR

CHEM

e

INFILL EXISTING LOUVER

AROUND NEW LOUVER

-COORDINATE WITH MECH.

FOR SIZE & LOCATION

UP

SERVING COUNTER

TRSH. TRSH. TRSH. TRSH.

SCREEN

CONDIMENTS

BEVERAGE COOLERS

T R

S H

T

R S

H

T R

S H

SAFE

ROOF

HATCH

ABOVE

HALL

PROPOSED TR

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:5

:2

P

M

95-TN210

FIRST FLOOR PLAN (BUILDING

88 & 95) - TELECOM - CABLE

DISTANCE

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

N

0 30' 60'15' 1" = 30'-0"

FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

1" = 50'-0"

KEY PLAN

I.T.

I.T.

C R

A C

C

95-TN400

1 - a b

1 - c d

C2 126"

DATA

RACK

TELECOM

ROOM

W

KEYPAD

8"x2"E

E

CBALE TRAY

4"

4"

4"

4"

E

4"

4"

4"

4"

AC

8"x4"

8"x4"

8" x4

8" x4

8" x4

DATA RACK

1U 144 STRAND OM4 AND OS2 DISTRIBUTION PANEL

1U 48 PORT CAT5E BACKBONE/ANALOG PATCH PANEL

1U CABLE MANAGEMENT

2U CABLE MANAGEMENT

1U 48 PORT CAT6A DATA PATCH PANEL

1U RACK BONDING BUSBAR

2U RACK MOUNT UPS

2U CABLE MANAGEMENT

9U SPACE FOR OIT PROVIDED

EQUIPMENT. PROVIDE BLANKING

PANELS FOR UNUSED SPACES

NOTES:

1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.

2. COORDINATE EXACT RACK COUNT AND LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.

3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.

4. RACK ELEVATION SHOWS A FULLY CONFIGURED SAMPLE RACK. CONTRACTOR TO PROVIDE REQUIRED EQUIPMENT TO

SUPPORT THE FINAL DATA COUNT FROM THE ENLARGED NEW SHEET. (NOT TO EXCEED 288 PORTS PER RACK).

5. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.

6. CONTRACTOR IS RESPONSIBLE FOR FINAL CABLE COUNT, QUANTITY OF PATCH PANELS, SWITCHES, FIBER

ENCLOSURES, BLANKING PANELS, CABLE MANAGEMENT, AND MOUNTING HARDWARE NOT MARKED AS “OIT PROVIDED”.

7. PUNCHDOWN COPPER BACKBONES ON RACK MOUNT PATCH PANELS. TERMINATE ONE (1) PAIR PER PATCH PANEL PORT.

D

PROVIDE DATA CABLE TO RACK

MOUNTED UPS FOR CONNECTION

TO MONITORING SYSTEM

1U 48 PORT VA PROVIDED SWITCH

2U CABLE MANAGEMENT

1U 48 PORT VA PROVIDED SWITCH

1U 48 PORT CAT6A DATA PATCH PANEL

1U CABLE MANAGEMENT

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:5

:2

P

M

95-TN400

ENLARGED PLANS (BUILDING

95) - TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

N

0 2' 4'1'

0 4' 8'2' 0 4' 8'2' 0 4' 8'2' 0 4' 8'2'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

1. ROOM 11

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 56

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 30 FROM ROOM 112 (BUILDING 88)

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6A): 86

DATA (CAT6): 0

1/2" = 1'-0"

ENLARGED PLAN - TR 11 (BUILDING 95) - TELECOM - CABLE TRAY AND DATA

1/4" = 1'-0"2 1 - a

1/4" = 1'-0"3 1 - b

1/4" = 1'-0"4 1 - c

1/4" = 1'-0"5 1 - d

NOT TO SCALE6

COMMUNICATIONS - TYPICAL WALL CABINET (TE) ELEVATION - TR 11 (BUILDING 95)

SHEET NOTES:

1. IF NO ACCESS CONTROL PANEL IS PRESENT IN B95 ROOM 011, PROVIDE A NEW ACCESS CONTROL PANEL TO BE INSTALLED IN THE TELECOM ROOM. THE CARD READER AND KEYPAD FOR THIS ROOM TO BE WIRED TO THE NEW ACCESS CONTROL PANEL. EXISTING CARD READERS AND KEYPADS WILL BE MOVED TO THE NEW

CONTROL PANEL UNDER A DIFFERENT PROJECT.

e

INFILL EXISTING LOUVER

AROUND NEW LOUVER

-COORDINATE WITH MECH.

FOR SIZE & LOCATION

I.T.

MECHANICAL

STAFF

DINING

DINING

VESTIBULE

SERVERY

RETAIL

DRY

STORAGE

FREEZER

19COOLER

KITCHEN

ELECTRICAL

TOILET

ACCOUNTING

25RETAIL

STORAGE

OFFICE

HAC

FOOD

SERVERY

CORRIDOR

DISHES

TOILET

OFFICE

MENS

WOMENS

HAC

VESTIBULE

STAIRS

10A

DISPLAY

CHEM

STOR

UP

SERVING COUNTER

TRSH. TRSH. TRSH. TRSH.

SCREEN

CONDIMENTS

BEVERAGE COOLERS

T R

S H

T

R S H

T

R S H

SAFE

ROOF

HATCH

ABOVE

HALL

I.T.

TOILET

TOILET

95-E201

/2 95-AS100

/1 95-AS100

TELECOM

ROOM

SWITCHBOARD 95-MSB-1

EQ1-1/42

L1-2/29

/1 95-AS100

TELECOM

ROOM

PROPOSED TR

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.E

R

.r v t

/1

/2

:4

:0

P

M

95-E201

FIRST FLOOR PLAN -

ELECTRICAL

EHRM INFRASTRUCTURE

UPGRADES

656-21-235

TBD GJL

16305

SCALE: 1/8" = 1'-0"95-E201

1 FIRST FLOOR PLAN - ELECTRICAL

SCALE: 1/4" = 1'-0"95-E201

2 ENLARGED FLOOR PLAN - TR11 - POWER & SYSTEM

0 4' 8'2'

0 8' 16'4'

N

N

SCALE: 1" = 50'-0"

KEY PLAN

N

KEYNOTES:

1. COORDINATE FINAL LOCATION OF

RECEPTACLE L21-20R WITH TELECOM

CONTRACTOR. PROVIDE 3/4"C-4#12, 1#12 GND

TO PANEL FOR EACH RECEPTACLE.

2. PROVIDE EATON BLADEUPS, 5KW, 120/208V, 3-

PHASE, 4-WIRE RACK MOUNTED UPS FOR

EACH RACK TOWER.

3. PROVIDE APC#AP8861 RPDU RACK PDU 2G

WITH L21-20P CORD. (120/208V, 3-PHASE, 20A,

ZERO U, 5.7 KW, 208V, (36) C13 (6) C19 (2) 5-20R

OUTLETS. PROVIDE TWO PER RACK, MOUNTED

PER MANUFACTURER'S REQUIREMENTS.

4. REARRANGE BREAKERS IN THE PANEL FOR 3

CONSECUTIVE SPACES FOR 20AMP 3POLE

BREAKER.

100% CD 03/30

by certify that this plan, specification was prepared by me or under my d vision and that I am a duly Licensed eer under the laws of the State of M e:

03/30/202205-06-2022 by certify that this plan, specification was prepared by me or under my d vision and that I am a duly Licensed eer under the laws of the State of M e:

03/30/202205-06-2022

FIRST FLOOR

B95IT-1

100Y

SWBD95-MSB-1

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.E

R

.r v t

/2

/2

:0

:5

P

M

95-E600

ELECTRICAL SCHEDULES

EHRM INFRASTRUCTURE

UPGRADES

656-21-235

TBD GJL

16305

NO SCALE

PARTIAL POWER RISER

KEYNOTES:

1. PROVIDE NEW 100A/3P CIRCUIT BREAKER TO

MATCH EXISTING TYPE AND AIC RATING.

CIRCUIT KEY NOTES:

*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS. THIS CALC IS DONE AT EACH PANEL.

TOTAL ESTIMATED DEMAND AMPS: 30.8 A

TOTAL CONNECTED AMPS: 30.76 A

Receptacles 1.08 kVA 100.00% 1.08 kVA TOTAL ESTIMATED DEMAND LOAD: 11.08 kVA

Power 10 kVA 100.00% 10 kVA TOTAL CONNECTED LOAD: 11.08 kVA

Lighting 0 kVA 0.00% 0 kVA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND

TOTALS*

LOAD SUMMARY

Total Amps: 36.78 27.78 27.78

Total Load: 4.41 kVA 3.33 kVA 3.33 kVA

-- 29 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 30 --

-- 27 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 28 --

-- 25 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 26 --

-- 23 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 24 --

-- 21 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 22 --

-- 19 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 20 --

-- 17 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 18 --

-- 15 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 16 --

-- 13 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 14 --

-- 11 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 12 --

-- 9 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 10 --

-- 7 -- -- -- -- -- -- 1.67 0 1 20 A LIGHTING 8

-- 5 -- -- -- -- -- -- 1.67 1.67 -- -- -- -- -- -- 6 --

3 L21-20R 20 A 3 1.67 1.67 -- -- -- -- -- -- 4 --

1 TELECOM ROOM RECEPTACLE 20 A 1 1.08 1.67 3 20 A L21-20R 2

K E Y

CKT

NO. LOAD DESCRIPTION

OCPD

AMPS P

WIRE

SIZE

H N G

A B C

WIRE

SIZE

G N H

OCPD

P AMPS LOAD DESCRIPTION

CKT

NO.

K E Y

NOTES:

ISC UNKNOWN 0.00 kA

SCCR: 65 kA

LOCATION: WIRE: 4

FED FROM: 0 A/0P @ GROUND BUS PHASE: 3

ENCLOSURE: NEMA PB 1 SOLID NEUTRAL VOLTS: 120/208 Wye

MOUNTING: SURFACE MAIN: 100 A MCB

PANEL B95IT-1

100% CD 03/30

53095

95-GI000 - BUILDINGS 95 & 88 COVER SHEET & SHEET INDEX
95-GI111 - FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
88-HA-1A - REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
95-HA-1A - REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
95-AS100 - FIRST FLOOR PLANS (BUILDING 95 & 88)
95-TD110 - FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - DEMOLITION
95-TN110 - FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOMMUNICATION
95-TN210 - FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - CABLE DISTANCE
95-TN400 - ENLARGED PLANS (BUILDING 95) - TELECOMMUNICATIONS
95-E201 - FIRST FLOOR PLAN - ELECTRICAL
95-E600 - ELECTRICAL SCHEDULES