Atch 5 - General 2 of 2.pdf
PDF 20 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud Federal contract opportunity
- Solicitation number
- 36C77622B0035
About this file
This federal contract opportunity solicitation requests contractor services to perform infrastructure upgrades at the St. Cloud Veterans Affairs Health Care System facilities in St. Cloud, Minnesota. The solicitation seeks a contractor to furnish all labor, materials, tools and equipment for electrical, bonding, UPS, building management system interfaces, access security, HVAC assessments and upgrades, data center/main server room physical security upgrades, fiber infrastructure installation and upgrades both within and between buildings, and hazardous materials abatement. The solicitation also requires the contractor to complete all work in accordance with provided specifications and contract drawings. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16305
B116
ADHC
CLC EAST
B51
B50
B49
B48
B29
B88
T101 B37
B
B
B14
B 6 B107
B7
B112 B87
B118
B115
B111B28
B2
B
B106
B1 0 B3
B1
B109 B57
PARKING GARAGE
COVID
LEGEND
N
0 100' 200'
B8
B13
B95 B3
B5
B4
B1
B96
B117
B97
B104
B59
B
GENERAL NOTES
SEE DETAIL 4/CD102
SEE DETAIL 1/CD101
SEE DETAIL 1/CD102
SEE DETAIL 2/CD102
SEE DETAIL 3/CD102
SEE DETAIL 1/CD103
SEE DETAIL 2/CD103
DEMOLITION NOTES
1. SURVEY DATA SHOWN IS A COMBINATION OF TOPOGRAPHIC AND UTILITY SURVEYS PERFORMED BY ANDERSON ENGINEERING DATED NOVEMBER 2018, DECEMBER 2018, JUNE 2020, AND SEPTEMBER 2021; INFORMATION SUPPLIED BY THE VA; ANTICIPATED SITE IMPROVEMENTS (FROM COMPLETED DESIGN DOCUMENTS); AND AS APPROXIMATED FROM AERIAL IMAGERY. EXISTING CONDITIONS MAY HAVE CHANGED FROM THE DATE OF THE SURVEYS. CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS (LOCATION AND ELEVATION) PRIOR TO CONSTRUCTION, AND ALL UTILITY LOCATIONS AND ELEVATIONS PRIOR TO EXCAVATION. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY OF ANY CONDITIONS FOUND TO BE VARYING, AND IMPACTING THE PROPOSED WORK. ALL VARYING CONDITIONS, REGARDLESS OF THE IMPACT TO THE WORK, SHALL BE NOTED ON THE RECORD DRAWINGS MAINTAINED IN THE FIELD (REDLINES) AND INCLUDED WITHIN THE CONTRACTOR'S PREPARED ASBUILTS AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR'S ASBUILTS AND REDLINES SHALL BE SUBMITTED TO THE COR AT THE COMPLETION OF THE PROJECT.
2. THE CONTRACTOR SHALL REGULARLY MAINTAIN RECORDS OF THE WORK PERFORMED, FIELD CHANGES, VARYING CONDITIONS, ECT. AT A MINIMUM, SUCH MARKUPS SHALL BE IN THE FORM OF FIELD NOTES RECORDED ON THE CONTRACT DOCUMENTS AND MAINTAINED WITHIN THE CONSTRUCTION TRAILER. SUCH RECORD DRAWINGS SHALL BE MADE AVAILABLE TO THE COR, OR THE COR'S DESIGNATED REPRESENTATIVE, UPON REQUEST.
3. ALL WORK TO BE CONSTRUCTED IN A LEGAL MANNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. REFER TO ELECTRICAL PLANS FOR INSTALLATION OF ALL CONDUIT WITHIN 5.0 FEET OF BUILDINGS AND OTHER LOCATIONS NOTED ON THE CIVIL
DRAWINGS.
5. UNLESS OTHERWISE NOTED, THE TOPS OF CAST IN PLACE CONCRETE DUCT BANKS SHALL BE NO LESS THAN 24" UNDER LANDSCAPED AREAS OR 30"
UNDER PAVED SURFACES, BUT NO LESS THAN AS SHOWN ON THE CIVIL DRAWINGS.
6. ALL CONCRETE-ENCASED CONDUIT IS EXPECTED TO BE INSTALLED THROUGH TRADITIONAL EXCAVATION. DIRECTIONAL BORE OR JACKING OF SUCH CONDUIT IS NOT ANTICIPATED WITH THE PROJECT, AND SHALL NOT BE UNDERTAKEN WITHOUT PRIOR APPROVAL BY THE COR.
7. BEFORE PERFORMING TRENCHING WORK, THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES WITHIN THE EXCAVATION LIMITS.
8. ALL MULTIPLE CONDUIT RUNS SHALL HAVE CONDUIT SPACERS SECURELY SUPPORTING AND MAINTAINING UNIFORM SPACING OF THE DUCT ASSEMBLY AND SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK DETAILS.
9. DUCT BANKS SHALL NOT SLOPE TOWARDS BUILDINGS.
10. AFTER CONCRETE DUCT BANKS HAVE SUFFICIENTLY CURED, THE CONTRACTOR SHALL BACKFILL THE TRENCH, AND INSTALL DETECTABLE UNDERGROUND WARNING TAPE, IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK DETAILS.
11. MAINTAIN 12" MINIMUM SEPARATION BETWEEN EXTERIOR OF CONCRETE ENCASEMENT AND OTHER UTILITY SYSTEMS INCLUDING BUT NOT LIMITED
SANITARY SEWER, WATER MAIN, STORM SEWER, AND CHILLED WATER SERVICES.
12. THE CONTRACTOR SHALL KEEP DUCTS CLEAN OF EARTH, SAND, OR GRAVEL; AND SEAL WITH TAPERED PLUGS UPON COMPLETION OF EACH PORTION
OF WORK.
13. THE CONTRACTOR SHALL PLAN WORK SO AS TO LIMIT THE EXTENTS OF OPEN TRENCHING.
14. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO CONSTRUCTION ACTIVITIES.
15. VERIFY, PROCURE, INSTALL, AND MAINTAIN ALL REQUIRED EROSION CONTROL MEASURES PRIOR TO THE COMMENCEMENT OF WORK.
16. INSTALL TREE PROTECTION FENCING AROUND THOSE TREES INDICATED ON THE DEMOLITION PLANS (SEE SHEETS CD-100 - CD-103).
17. PROTECT ALL EXISTING SITE ELEMENTS (TREES, UTILITIES, CURB, ETC...) NOT NOTED FOR REMOVAL. REPLACE IN KIND IF DAMAGED.
18. PATCH IN-KIND ALL DISTURBED PAVEMENTS & CURBS.
19. STREET SWEEP TO PREVENT DIRT AND DEBRIS ENTERING INTO ADJACENT WALKS AND ROADWAYS, MINIMUM DAILY, MAINTAIN CONFORMANCE WITH
APPLICABLE STORM WATER POLLUTION PREVENTION PRACTICES.
20. NEW CONSTRUCTION FEATURES SHALL MATCH INTO EXISTING WHERE APPLICABLE (PAVEMENT, CURBS, SIDEWALKS). PROVIDE SMOOTH TRANSITIONS
AT MATCH IN POINTS.
21. THE CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO PROVIDE CONSTRUCTION STAKING. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
ALL HORIZONTAL AND VERTICAL CONTROLS THROUGHOUT CONSTRUCTION.
22. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION.
23. SUBSTITUTIONS FROM INFO SHOWN HEREIN SHALL BE REVIEWED AND APPROVED BY THE COR.
24. COORDINATE ALL UTILITY RELOCATIONS / DISRUPTIONS WITH THE COR AND VAMC STAFF. NOTIFY THE COR OF ANY POTENTIAL DISRUPTIONS AT
LEAST 15 CALENDAR DAYS IN ADVANCE OF THE WORK.
25. ALL LANDSCAPED AREAS DISTURBED FOR THE DUCT BANK INSTALLATION ARE TO BE RESTORED IN KIND. TURF AREAS SHALL BE RESTORED WITH SALT TOLERANT SOD PER MNDOT STANDARD SPECIFICATION 3878.2.C. PER THE SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
WATERING THE SOD THROUGH THE ESTABLISHMENT PERIOD.
26. THE LOCATION OF THE CONDUIT, HAND HOLES, AND MAINTENANCE HOLES SHOWN ARE APPROXIMATE LOCATIONS. FIELD COORDINATE THE FINAL
LOCATION WITH VAHCS STAFF AND THE COR PRIOR TO INSTALLATION.
27. HAND HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF THE FRAME WILL BE FLUSH WITH THE GROUND LINE.
28. WITH THE EXCEPTION OF DRAIN HOLES, HAND HOLES / MANHOLES / PULL BOXES SHALL BE CONSTRUCTED TO CREATE A WATER TIGHT ENCLOSURE.
29. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN THE REQUIRED MINIMUM DEPTH TO AVOID EXISTING
UNDERGROUND UTILITIES.
30. PROVIDE A SLACK LOOP WITHIN EACH HAND HOLE MEETING OR EXCEEDING THE MANUFACTURER'S SPECIFICATIONS, BUT NO LESS THAN 25 FT. THE SLACK LOOPS SHALL BE SECURED SO THAT FIBER IS NOT RESTING ON BOTTOM OF STRUCTURE AFTER FINAL INSTALLATION.
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION CONDITION REPORT OF ALL ACCESS ROUTES AND ROADS AND HAVE
IT APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).
2. PHASE DEMOLITION AS NEEDED TO MAINTAIN DRAINAGE AND UTILITIES FOR MINIMAL DISRUPTION.
3. INSTALL PERIMETER EROSION CONTROL PRIOR TO THE COMMENCEMENT OF WORK.
4. INSTALL CONSTRUCTION FENCE PER SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS.
5. TREE REMOVAL SHALL INCLUDE CUTTING, DISPOSAL AND STUMP/ROOT REMOVAL TO A DEPTH OF 2 FT BELOW FINISHED GRADE.
6. EXCEPT AS NOTED, ALL AREAS WITHIN CONSTRUCTION LIMITS SHALL BE CLEARED AND GRUBBED PER PLANS AND SPECIFICATIONS.
7. TREES TO BE SAVED SHALL BE PROTECTED WITH ORANGE CONSTRUCTION FENCE AS PART OF EROSION CONTROL FENCE CONSTRUCTION LIMITS.
8. CONTRACTOR TO CONTAIN ALL EQUIPMENT/TRUCKS AND VEHICLES TO CONSTRUCTION ZONE.
9. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING IRRIGATION EQUIPMENT. ANY EXISTING IRRIGATION EQUIPMENT INCLUDING, BUT NOT LIMITED TO, HEADS, VALVES, WIRES, PIPES AND FITTINGS THAT ARE DISTURBED DURING CONSTRUCTION WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE WITH MATCHING EQUIPMENT. PRIOR TO CONSTRUCTION, LOCATE THE EXISTING IRRIGATION EQUIPMENT AND PIPE IN THE CONSTRUCTION AREA AND MARK LOCATIONS, USING MARKING SPRAY PAINT FOR PIPE AND WIRE STAKE FLAGS FOR HEADS AND VALVE BOXES.
APPROXIMATE LIMITS OF CONCRETE REMOVAL
APPROXIMATE LIMITS OF ROCK MULCH REMOVAL
APPROXIMATE LIMITS OF ASPHALT REMOVAL
APPROXIMATE BUILDING/PAVEMENT LOCATION
FROM AERIAL IMAGERY.
0 20' 40'
SCALE:1
SITE DEMOLITION DETAIL (BUILDING 1A TO BUILDING 3)
1"=20' [30"X42" SHEET SIZE]
REMOVE EXISTING CONCRETE PAVEMENT. EXTEND REMOVAL LIMITS TO
NEAREST EXISTING JOINT. SAWCUT PAVEMENT AT REMOVAL LIMITS.
REMOVE/SALVAGE EXISTING ROCK MULCH AS REQUIRED FOR
DUCTBANK INSTALLATION.
KEY NOTES
AREA SHOWN IS OUTSIDE OF THE
SURVEY LIMITS. APPROXIMATE
DEMOLITION LIMITS SHOWN FOR
ESTIMATING PURPOSES.
CONTRACTOR SHALL LOCATE ALL
UTILITIES AND COORDINATE FINAL
ROUTING WITH THE COR AND
ENGINEER OF RECORD.
BUILDING 3 BUILDING 1
SEE DETAIL 1/CD100
N
0 20' 40'
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16305
IT ROOM
GENERAL NOTES
LEGEND
REMOVE EXISTING CONCRETE PAVEMENT. EXTEND REMOVAL LIMITS TO
NEAREST EXISTING JOINT. SAWCUT PAVEMENT AT REMOVAL LIMITS.
REMOVE EXISTING ASPHALT PAVEMENT.
REMOVE/SALVAGE EXISTING ROCK MULCH AS REQUIRED FOR
DUCTBANK INSTALLATION.
REMOVE EXISTING CURB AND GUTTER. EXTEND REMOVAL LIMITS TO
NEAREST EXISTING JOINT. SAWCUT CURB AT REMOVAL LIMITS.
PROTECT EXISTING UTILITIES TO REMAIN.
PROTECT EXISTING PAVEMENT TO REMAIN.
PROTECT OR RELOCATE EXISTING ELECTRICAL SERVICE AS NECESSARY
FOR DUCT BANK INSTALLATION. COORDINATE WITH COR AND VAMC
STAFF 15 DAYS PRIOR TO ANY POTENTIAL OUTAGES RESULTING FROM
THE RELOCATION.
PROTECT EXISTING TREE TO REMAIN.
INSTALL INLET PROTECTION ON STORM INLET.
KEY NOTES
APPROXIMATE LIMITS OF CONCRETE REMOVAL
APPROXIMATE LIMITS OF ROCK MULCH REMOVAL
APPROXIMATE LIMITS OF ASPHALT REMOVAL
LIMITS OF TOPOGRAPHIC SURVEY
APPROXIMATE EXCAVATION LIMITS
APPROXIMATE BUILDING/PAVEMENT LOCATION
FROM AERIAL IMAGERY.
BIOROLL LOCATION
SILT FENCE LOCATION
INSTALL TREE PROTECTION FENCING
INSTALL INLET PROTECTION ON STORM INLET
SCALE:1
SITE DEMOLITION PLAN 1
1"=20' [30"X42" SHEET SIZE]
SCALE:2
SITE DEMOLITION DETAIL (BUILDING 4)
1"=5' [30"X42" SHEET SIZE] SCALE:3
SITE DEMOLITION DETAIL (BUILDING 5)
1"=10' [30"X42" SHEET SIZE] SCALE:4
SITE DEMOLITION DETAIL (BUILDING 59)
1"=10' [30"X42" SHEET SIZE]
IT ROOM
SCALE:5
SITE DEMOLITION DETAIL (BUILDING 118)
1"=10' [30"X42" SHEET SIZE]
0 5' 10' 0 10' 20'
0 10' 20' 0 10' 20'
DEMOLITION NOTES
AREA SHOWN IS OUTSIDE OF THE
SURVEY LIMITS. APPROXIMATE
DEMOLITION LIMITS SHOWN FOR
ESTIMATING PURPOSES.
CONTRACTOR SHALL LOCATE ALL
UTILITIES AND COORDINATE FINAL
ROUTING WITH THE COR AND
ENGINEER OF RECORD.
SEE DETAIL 3/CD101
SEE DETAIL 4/CD101
SEE DETAIL 5/CD101
SEE DETAIL 2/CD101
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION CONDITION REPORT
OF ALL ACCESS ROUTES AND ROADS AND HAVE IT APPROVED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
2. PHASE DEMOLITION AS NEEDED TO MAINTAIN DRAINAGE AND UTILITIES FOR MINIMAL DISRUPTION.
3. INSTALL PERIMETER EROSION CONTROL PRIOR TO THE COMMENCEMENT OF WORK.
4. INSTALL CONSTRUCTION FENCE PER SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS.
5. TREE REMOVAL SHALL INCLUDE CUTTING, DISPOSAL AND STUMP/ROOT REMOVAL TO A DEPTH OF 2 FT
BELOW FINISHED GRADE.
6. EXCEPT AS NOTED, ALL AREAS WITHIN CONSTRUCTION LIMITS SHALL BE CLEARED AND GRUBBED PER
PLANS AND SPECIFICATIONS.
7. TREES TO BE SAVED SHALL BE PROTECTED WITH ORANGE CONSTRUCTION FENCE AS PART OF
EROSION CONTROL FENCE CONSTRUCTION LIMITS.
8. CONTRACTOR TO CONTAIN ALL EQUIPMENT/TRUCKS AND VEHICLES TO CONSTRUCTION ZONE.
9. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING IRRIGATION EQUIPMENT. ANY EXISTING IRRIGATION EQUIPMENT INCLUDING, BUT NOT LIMITED TO, HEADS, VALVES, WIRES, PIPES AND FITTINGS THAT ARE DISTURBED DURING CONSTRUCTION WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE WITH MATCHING EQUIPMENT. PRIOR TO CONSTRUCTION, LOCATE THE EXISTING IRRIGATION EQUIPMENT AND PIPE IN THE CONSTRUCTION AREA AND MARK LOCATIONS, USING MARKING SPRAY
PAINT FOR PIPE AND WIRE STAKE FLAGS FOR HEADS AND VALVE BOXES.
1. SURVEY DATA SHOWN IS A COMBINATION OF TOPOGRAPHIC AND UTILITY SURVEYS PERFORMED BY ANDERSON ENGINEERING DATED NOVEMBER 2018, DECEMBER 2018, JUNE 2020, AND SEPTEMBER 2021; INFORMATION SUPPLIED BY THE VA; ANTICIPATED SITE IMPROVEMENTS (FROM COMPLETED DESIGN DOCUMENTS); AND AS APPROXIMATED FROM AERIAL IMAGERY. EXISTING CONDITIONS MAY HAVE CHANGED FROM THE DATE OF THE SURVEYS. CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS (LOCATION AND ELEVATION) PRIOR TO CONSTRUCTION, AND ALL UTILITY LOCATIONS AND ELEVATIONS PRIOR TO EXCAVATION. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY OF ANY CONDITIONS FOUND TO BE VARYING, AND IMPACTING THE PROPOSED WORK. ALL VARYING CONDITIONS, REGARDLESS OF THE IMPACT TO THE WORK, SHALL BE NOTED ON THE RECORD DRAWINGS MAINTAINED IN THE FIELD (REDLINES) AND INCLUDED WITHIN THE CONTRACTOR'S PREPARED ASBUILTS AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR'S ASBUILTS AND REDLINES SHALL BE SUBMITTED TO THE COR AT THE COMPLETION OF THE PROJECT.
2. THE CONTRACTOR SHALL REGULARLY MAINTAIN RECORDS OF THE WORK PERFORMED, FIELD CHANGES, VARYING CONDITIONS, ECT. AT A MINIMUM, SUCH MARKUPS SHALL BE IN THE FORM OF FIELD NOTES RECORDED ON THE CONTRACT DOCUMENTS AND MAINTAINED WITHIN THE CONSTRUCTION TRAILER. SUCH RECORD DRAWINGS SHALL BE MADE AVAILABLE TO THE COR, OR THE COR'S DESIGNATED REPRESENTATIVE, UPON REQUEST.
3. ALL WORK TO BE CONSTRUCTED IN A LEGAL MANNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. REFER TO ELECTRICAL PLANS FOR INSTALLATION OF ALL CONDUIT WITHIN 5.0 FEET OF BUILDINGS AND OTHER LOCATIONS NOTED ON THE CIVIL
DRAWINGS.
5. UNLESS OTHERWISE NOTED, THE TOPS OF CAST IN PLACE CONCRETE DUCT BANKS SHALL BE NO LESS THAN 24" UNDER LANDSCAPED AREAS OR 30"
UNDER PAVED SURFACES, BUT NO LESS THAN AS SHOWN ON THE CIVIL DRAWINGS.
6. ALL CONCRETE-ENCASED CONDUIT IS EXPECTED TO BE INSTALLED THROUGH TRADITIONAL EXCAVATION. DIRECTIONAL BORE OR JACKING OF SUCH CONDUIT IS NOT ANTICIPATED WITH THE PROJECT, AND SHALL NOT BE UNDERTAKEN WITHOUT PRIOR APPROVAL BY THE COR.
7. BEFORE PERFORMING TRENCHING WORK, THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES WITHIN THE EXCAVATION LIMITS.
8. ALL MULTIPLE CONDUIT RUNS SHALL HAVE CONDUIT SPACERS SECURELY SUPPORTING AND MAINTAINING UNIFORM SPACING OF THE DUCT ASSEMBLY AND SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK DETAILS.
9. DUCT BANKS SHALL NOT SLOPE TOWARDS BUILDINGS.
10. AFTER CONCRETE DUCT BANKS HAVE SUFFICIENTLY CURED, THE CONTRACTOR SHALL BACKFILL THE TRENCH, AND INSTALL DETECTABLE UNDERGROUND WARNING TAPE, IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK DETAILS.
11. MAINTAIN 12" MINIMUM SEPARATION BETWEEN EXTERIOR OF CONCRETE ENCASEMENT AND OTHER UTILITY SYSTEMS INCLUDING BUT NOT LIMITED
SANITARY SEWER, WATER MAIN, STORM SEWER, AND CHILLED WATER SERVICES.
12. THE CONTRACTOR SHALL KEEP DUCTS CLEAN OF EARTH, SAND, OR GRAVEL; AND SEAL WITH TAPERED PLUGS UPON COMPLETION OF EACH PORTION
OF WORK.
13. THE CONTRACTOR SHALL PLAN WORK SO AS TO LIMIT THE EXTENTS OF OPEN TRENCHING.
14. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO CONSTRUCTION ACTIVITIES.
15. VERIFY, PROCURE, INSTALL, AND MAINTAIN ALL REQUIRED EROSION CONTROL MEASURES PRIOR TO THE COMMENCEMENT OF WORK.
16. INSTALL TREE PROTECTION FENCING AROUND THOSE TREES INDICATED ON THE DEMOLITION PLANS (SEE SHEETS CD-100 - CD-103).
17. PROTECT ALL EXISTING SITE ELEMENTS (TREES, UTILITIES, CURB, ETC...) NOT NOTED FOR REMOVAL. REPLACE IN KIND IF DAMAGED.
18. PATCH IN-KIND ALL DISTURBED PAVEMENTS & CURBS.
19. STREET SWEEP TO PREVENT DIRT AND DEBRIS ENTERING INTO ADJACENT WALKS AND ROADWAYS, MINIMUM DAILY, MAINTAIN CONFORMANCE WITH
APPLICABLE STORM WATER POLLUTION PREVENTION PRACTICES.
20. NEW CONSTRUCTION FEATURES SHALL MATCH INTO EXISTING WHERE APPLICABLE (PAVEMENT, CURBS, SIDEWALKS). PROVIDE SMOOTH TRANSITIONS
AT MATCH IN POINTS.
21. THE CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO PROVIDE CONSTRUCTION STAKING. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
ALL HORIZONTAL AND VERTICAL CONTROLS THROUGHOUT CONSTRUCTION.
22. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION.
23. SUBSTITUTIONS FROM INFO SHOWN HEREIN SHALL BE REVIEWED AND APPROVED BY THE COR.
24. COORDINATE ALL UTILITY RELOCATIONS / DISRUPTIONS WITH THE COR AND VAMC STAFF. NOTIFY THE COR OF ANY POTENTIAL DISRUPTIONS AT
LEAST 15 CALENDAR DAYS IN ADVANCE OF THE WORK.
25. ALL LANDSCAPED AREAS DISTURBED FOR THE DUCT BANK INSTALLATION ARE TO BE RESTORED IN KIND. TURF AREAS SHALL BE RESTORED WITH SALT TOLERANT SOD PER MNDOT STANDARD SPECIFICATION 3878.2.C. PER THE SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE SOD THROUGH THE ESTABLISHMENT PERIOD.
26. THE LOCATION OF THE CONDUIT, HAND HOLES, AND MAINTENANCE HOLES SHOWN ARE APPROXIMATE LOCATIONS. FIELD COORDINATE THE FINAL
LOCATION WITH VAHCS STAFF AND THE COR PRIOR TO INSTALLATION.
27. HAND HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF THE FRAME WILL BE FLUSH WITH THE GROUND LINE.
28. WITH THE EXCEPTION OF DRAIN HOLES, HAND HOLES / MANHOLES / PULL BOXES SHALL BE CONSTRUCTED TO CREATE A WATER TIGHT ENCLOSURE.
29. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN THE REQUIRED MINIMUM DEPTH TO AVOID EXISTING
UNDERGROUND UTILITIES.
30. PROVIDE A SLACK LOOP WITHIN EACH HAND HOLE MEETING OR EXCEEDING THE MANUFACTURER'S SPECIFICATIONS, BUT NO LESS THAN 25 FT. THE SLACK LOOPS SHALL BE SECURED SO THAT FIBER IS NOT RESTING ON BOTTOM OF STRUCTURE AFTER FINAL INSTALLATION.
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16305
GENERAL NOTES
SCALE:1
SITE DEMOLITION PLAN 2
1"=20' [30"X42" SHEET SIZE]
SCALE:2
SITE DEMOLITION PLAN 3
1"=20' [30"X42" SHEET SIZE] SCALE:3
SITE DEMOLITION PLAN 4
1"=20' [30"X42" SHEET SIZE] SCALE:4
SITE DEMOLITION PLAN 5
1"=20' [30"X42" SHEET SIZE]
MATCHLINE 4/CD-102
M A
TC
H
LI
N
E
/C D
-1
M A
TC
H
LI
N
E
/C D
-1
MATCHLINE 2/CD-102
MATCHLINE 1/CD-102MATCHLINE 3/CD-102 MATCHLINE 1/CD-103
AREA SHOWN IS OUTSIDE OF
THE SURVEY LIMITS.
APPROXIMATE DEMOLITION
LIMITS SHOWN FOR ESTIMATING
PURPOSES. CONTRACTOR
SHALL LOCATE ALL UTILITIES
AND COORDINATE FINAL
ROUTING WITH THE COR AND
ENGINEER OF RECORD.
LEGEND
REMOVE EXISTING CONCRETE PAVEMENT. EXTEND REMOVAL LIMITS TO NEAREST EXISTING JOINT. SAWCUT
PAVEMENT AT REMOVAL LIMITS.
REMOVE EXISTING ASPHALT PAVEMENT.
REMOVE/SALVAGE EXISTING ROCK MULCH AS REQUIRED FOR DUCTBANK INSTALLATION.
REMOVE EXISTING CURB AND GUTTER. EXTEND REMOVAL LIMITS TO NEAREST EXISTING JOINT. SAWCUT CURB
AT REMOVAL LIMITS.
PROTECT EXISTING UTILITIES TO REMAIN.
PROTECT EXISTING PAVEMENT TO REMAIN.
PROTECT OR RELOCATE EXISTING ELECTRICAL SERVICE AS NECESSARY FOR DUCT BANK INSTALLATION.
COORDINATE WITH COR AND VAMC STAFF 15 DAYS PRIOR TO ANY POTENTIAL OUTAGES RESULTING FROM THE
RELOCATION.
PROTECT EXISTING TREE TO REMAIN.
INSTALL INLET PROTECTION ON STORM INLET
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION CONDITION REPORT OF ALL ACCESS ROUTES AND ROADS AND
HAVE IT APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).
2. PHASE DEMOLITION AS NEEDED TO MAINTAIN DRAINAGE AND UTILITIES FOR MINIMAL DISRUPTION.
3. INSTALL PERIMETER EROSION CONTROL PRIOR TO THE COMMENCEMENT OF WORK.
4. INSTALL CONSTRUCTION FENCE PER SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS.
5. TREE REMOVAL SHALL INCLUDE CUTTING, DISPOSAL AND STUMP/ROOT REMOVAL TO A DEPTH OF 2 FT BELOW FINISHED GRADE.
6. EXCEPT AS NOTED, ALL AREAS WITHIN CONSTRUCTION LIMITS SHALL BE CLEARED AND GRUBBED PER PLANS AND SPECIFICATIONS.
7. TREES TO BE SAVED SHALL BE PROTECTED WITH ORANGE CONSTRUCTION FENCE AS PART OF EROSION CONTROL FENCE CONSTRUCTION LIMITS.
8. CONTRACTOR TO CONTAIN ALL EQUIPMENT/TRUCKS AND VEHICLES TO CONSTRUCTION ZONE.
9. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING IRRIGATION EQUIPMENT. ANY EXISTING IRRIGATION EQUIPMENT INCLUDING, BUT NOT LIMITED TO, HEADS, VALVES, WIRES, PIPES AND FITTINGS THAT ARE DISTURBED DURING CONSTRUCTION WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE WITH MATCHING EQUIPMENT. PRIOR TO CONSTRUCTION, LOCATE THE EXISTING IRRIGATION EQUIPMENT AND PIPE IN THE CONSTRUCTION AREA AND MARK LOCATIONS, USING MARKING SPRAY PAINT FOR PIPE AND WIRE STAKE FLAGS FOR HEADS AND VALVE BOXES.
DEMOLITION NOTES
KEY NOTES
AREA SHOWN IS OUTSIDE OF THE SURVEY LIMITS.
APPROXIMATE DEMOLITION LIMITS SHOWN FOR
ESTIMATING PURPOSES. CONTRACTOR SHALL LOCATE
ALL UTILITIES AND COORDINATE FINAL ROUTING WITH
THE COR AND ENGINEER OF RECORD.
APPROXIMATE LIMITS OF CONCRETE REMOVAL
APPROXIMATE LIMITS OF ROCK MULCH REMOVAL
APPROXIMATE LIMITS OF ASPHALT REMOVAL
LIMITS OF TOPOGRAPHIC SURVEY
APPROXIMATE EXCAVATION LIMITS
APPROXIMATE BUILDING/PAVEMENT LOCATION
FROM AERIAL IMAGERY.
BIOROLL LOCATION
SILT FENCE LOCATION
APPROXIMATE GEOTHERMAL UTILITY LOCATION.
CONTRACTOR TO CONFIRM LOCATION AND
PROTECT IN PLACE TO AVOID DAMAGE TO
EXISTING SYSTEM.
INSTALL TREE PROTECTION FENCING
INSTALL INLET PROTECTION ON STORM INLET
1. SURVEY DATA SHOWN IS A COMBINATION OF TOPOGRAPHIC AND UTILITY SURVEYS PERFORMED BY ANDERSON ENGINEERING DATED NOVEMBER 2018, DECEMBER 2018, JUNE 2020, AND SEPTEMBER 2021; INFORMATION SUPPLIED BY THE VA; ANTICIPATED SITE IMPROVEMENTS (FROM COMPLETED DESIGN DOCUMENTS); AND AS APPROXIMATED FROM AERIAL IMAGERY. EXISTING CONDITIONS MAY HAVE CHANGED FROM THE DATE OF THE SURVEYS.
CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS (LOCATION AND ELEVATION) PRIOR TO CONSTRUCTION, AND ALL UTILITY LOCATIONS AND ELEVATIONS PRIOR TO EXCAVATION. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY OF ANY CONDITIONS FOUND TO BE VARYING, AND IMPACTING THE PROPOSED WORK. ALL VARYING CONDITIONS, REGARDLESS OF THE IMPACT TO THE WORK, SHALL BE NOTED ON THE RECORD DRAWINGS MAINTAINED IN THE FIELD (REDLINES) AND INCLUDED WITHIN THE CONTRACTOR'S PREPARED ASBUILTS AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR'S ASBUILTS AND REDLINES SHALL BE SUBMITTED TO THE COR AT THE COMPLETION OF THE PROJECT.
2. THE CONTRACTOR SHALL REGULARLY MAINTAIN RECORDS OF THE WORK PERFORMED, FIELD CHANGES, VARYING CONDITIONS, ECT. AT A MINIMUM, SUCH MARKUPS SHALL BE IN THE FORM OF FIELD NOTES RECORDED ON THE CONTRACT DOCUMENTS AND MAINTAINED WITHIN THE CONSTRUCTION TRAILER. SUCH RECORD DRAWINGS SHALL BE MADE AVAILABLE TO THE COR, OR THE COR'S DESIGNATED REPRESENTATIVE, UPON REQUEST.
3. ALL WORK TO BE CONSTRUCTED IN A LEGAL MANNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. REFER TO ELECTRICAL PLANS FOR INSTALLATION OF ALL CONDUIT WITHIN 5.0 FEET OF BUILDINGS AND OTHER LOCATIONS NOTED ON THE CIVIL
DRAWINGS.
5. UNLESS OTHERWISE NOTED, THE TOPS OF CAST IN PLACE CONCRETE DUCT BANKS SHALL BE NO LESS THAN 24" UNDER LANDSCAPED AREAS OR 30"
UNDER PAVED SURFACES, BUT NO LESS THAN AS SHOWN ON THE CIVIL DRAWINGS.
6. ALL CONCRETE-ENCASED CONDUIT IS EXPECTED TO BE INSTALLED THROUGH TRADITIONAL EXCAVATION. DIRECTIONAL BORE OR JACKING OF SUCH CONDUIT IS NOT ANTICIPATED WITH THE PROJECT, AND SHALL NOT BE UNDERTAKEN WITHOUT PRIOR APPROVAL BY THE COR.
7. BEFORE PERFORMING TRENCHING WORK, THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES WITHIN THE EXCAVATION LIMITS.
8. ALL MULTIPLE CONDUIT RUNS SHALL HAVE CONDUIT SPACERS SECURELY SUPPORTING AND MAINTAINING UNIFORM SPACING OF THE DUCT ASSEMBLY AND SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK DETAILS.
9. DUCT BANKS SHALL NOT SLOPE TOWARDS BUILDINGS.
10. AFTER CONCRETE DUCT BANKS HAVE SUFFICIENTLY CURED, THE CONTRACTOR SHALL BACKFILL THE TRENCH, AND INSTALL DETECTABLE UNDERGROUND WARNING TAPE, IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK DETAILS.
11. MAINTAIN 12" MINIMUM SEPARATION BETWEEN EXTERIOR OF CONCRETE ENCASEMENT AND OTHER UTILITY SYSTEMS INCLUDING BUT NOT LIMITED
SANITARY SEWER, WATER MAIN, STORM SEWER, AND CHILLED WATER SERVICES.
12. THE CONTRACTOR SHALL KEEP DUCTS CLEAN OF EARTH, SAND, OR GRAVEL; AND SEAL WITH TAPERED PLUGS UPON COMPLETION OF EACH PORTION OF
WORK.
13. THE CONTRACTOR SHALL PLAN WORK SO AS TO LIMIT THE EXTENTS OF OPEN TRENCHING.
14. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO CONSTRUCTION ACTIVITIES.
15. VERIFY, PROCURE, INSTALL, AND MAINTAIN ALL REQUIRED EROSION CONTROL MEASURES PRIOR TO THE COMMENCEMENT OF WORK.
16. INSTALL TREE PROTECTION FENCING AROUND THOSE TREES INDICATED ON THE DEMOLITION PLANS (SEE SHEETS CD-100 - CD-103).
17. PROTECT ALL EXISTING SITE ELEMENTS (TREES, UTILITIES, CURB, ETC...) NOT NOTED FOR REMOVAL. REPLACE IN KIND IF DAMAGED.
18. PATCH IN-KIND ALL DISTURBED PAVEMENTS & CURBS.
19. STREET SWEEP TO PREVENT DIRT AND DEBRIS ENTERING INTO ADJACENT WALKS AND ROADWAYS, MINIMUM DAILY, MAINTAIN CONFORMANCE WITH
APPLICABLE STORM WATER POLLUTION PREVENTION PRACTICES.
20. NEW CONSTRUCTION FEATURES SHALL MATCH INTO EXISTING WHERE APPLICABLE (PAVEMENT, CURBS, SIDEWALKS). PROVIDE SMOOTH TRANSITIONS
AT MATCH IN POINTS.
21. THE CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO PROVIDE CONSTRUCTION STAKING. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
ALL HORIZONTAL AND VERTICAL CONTROLS THROUGHOUT CONSTRUCTION.
22. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION.
23. SUBSTITUTIONS FROM INFO SHOWN HEREIN SHALL BE REVIEWED AND APPROVED BY THE COR.
24. COORDINATE ALL UTILITY RELOCATIONS / DISRUPTIONS WITH THE COR AND VAMC STAFF. NOTIFY THE COR OF ANY POTENTIAL DISRUPTIONS AT LEAST
15 CALENDAR DAYS IN ADVANCE OF THE WORK.
25. ALL LANDSCAPED AREAS DISTURBED FOR THE DUCT BANK INSTALLATION ARE TO BE RESTORED IN KIND. TURF AREAS SHALL BE RESTORED WITH SALT TOLERANT SOD PER MNDOT STANDARD SPECIFICATION 3878.2.C. PER THE SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE SOD THROUGH THE ESTABLISHMENT PERIOD.
26. THE LOCATION OF THE CONDUIT, HAND HOLES, AND MAINTENANCE HOLES SHOWN ARE APPROXIMATE LOCATIONS. FIELD COORDINATE THE FINAL
LOCATION WITH VAHCS STAFF AND THE COR PRIOR TO INSTALLATION.
27. HAND HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF THE FRAME WILL BE FLUSH WITH THE GROUND LINE.
28. WITH THE EXCEPTION OF DRAIN HOLES, HAND HOLES / MANHOLES / PULL BOXES SHALL BE CONSTRUCTED TO CREATE A WATER TIGHT ENCLOSURE.
29. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN THE REQUIRED MINIMUM DEPTH TO AVOID EXISTING UNDERGROUND
UTILITIES.
30. PROVIDE A SLACK LOOP WITHIN EACH HAND HOLE MEETING OR EXCEEDING THE MANUFACTURER'S SPECIFICATIONS, BUT NO LESS THAN 25 FT. THE SLACK LOOPS SHALL BE SECURED SO THAT FIBER IS NOT RESTING ON BOTTOM OF STRUCTURE AFTER FINAL INSTALLATION.
PRIOR TO DEMOLITION, CONTRACTOR TO NOTE
EXISTING PAVEMENT MARKING COLOR, DIMENSIONS,
AND LAYOUT FOR USE IN THE ESTABLISHMENT OF
NEW MARKINGS. PRIOR TO INSTALLING NEW
PAVEMENT MARKINGS, THE CONTRACTOR SHALL
SUBMIT A PAVEMENT MARKING PLAN FOR THE COR'S
REVIEW AND APPROVAL.
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16305
GENERAL NOTES
AREA SHOWN IS OUTSIDE OF THE SURVEY LIMITS.
APPROXIMATE DEMOLITION LIMITS SHOWN FOR
ESTIMATING PURPOSES. CONTRACTOR SHALL LOCATE ALL
UTILITIES AND COORDINATE FINAL ROUTING WITH THE COR
AND ENGINEER OF RECORD.
LEGEND
REMOVE EXISTING CONCRETE PAVEMENT. EXTEND REMOVAL LIMITS TO
NEAREST EXISTING JOINT. SAWCUT PAVEMENT AT REMOVAL LIMITS.
REMOVE EXISTING ASPHALT PAVEMENT.
REMOVE/SALVAGE EXISTING ROCK MULCH AS REQUIRED FOR DUCTBANK
INSTALLATION.
REMOVE EXISTING CURB AND GUTTER. EXTEND REMOVAL LIMITS TO NEAREST
EXISTING JOINT. SAWCUT CURB AT REMOVAL LIMITS.
PROTECT EXISTING UTILITIES TO REMAIN.
PROTECT EXISTING PAVEMENT TO REMAIN.
PROTECT OR RELOCATE EXISTING ELECTRICAL SERVICE AS NECESSARY FOR
DUCT BANK INSTALLATION. COORDINATE WITH COR AND VAMC STAFF 15 DAYS
PRIOR TO ANY POTENTIAL OUTAGES RESULTING FROM THE RELOCATION.
PROTECT EXISTING TREE TO REMAIN.
INSTALL INLET PROTECTION ON STORM INLET
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION CONDITION REPORT OF ALL ACCESS ROUTES AND ROADS AND HAVE IT APPROVED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
2. PHASE DEMOLITION AS NEEDED TO MAINTAIN DRAINAGE AND UTILITIES FOR MINIMAL DISRUPTION.
3. INSTALL PERIMETER EROSION CONTROL PRIOR TO THE COMMENCEMENT OF WORK.
4. INSTALL CONSTRUCTION FENCE PER SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS.
5. TREE REMOVAL SHALL INCLUDE CUTTING, DISPOSAL AND STUMP/ROOT REMOVAL TO A DEPTH OF 2 FT BELOW FINISHED GRADE.
6. EXCEPT AS NOTED, ALL AREAS WITHIN CONSTRUCTION LIMITS SHALL BE CLEARED AND GRUBBED PER PLANS AND SPECIFICATIONS.
7. TREES TO BE SAVED SHALL BE PROTECTED WITH ORANGE CONSTRUCTION FENCE AS PART OF EROSION CONTROL FENCE CONSTRUCTION LIMITS.
8. CONTRACTOR TO CONTAIN ALL EQUIPMENT/TRUCKS AND VEHICLES TO CONSTRUCTION ZONE.
9. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING IRRIGATION EQUIPMENT. ANY EXISTING IRRIGATION EQUIPMENT INCLUDING, BUT NOT LIMITED TO, HEADS, VALVES, WIRES, PIPES AND FITTINGS THAT ARE DISTURBED DURING CONSTRUCTION WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE WITH MATCHING EQUIPMENT. PRIOR TO CONSTRUCTION, LOCATE THE EXISTING IRRIGATION EQUIPMENT AND PIPE IN THE CONSTRUCTION AREA AND MARK LOCATIONS, USING MARKING SPRAY PAINT FOR PIPE AND WIRE STAKE FLAGS FOR HEADS AND VALVE BOXES.
DEMOLITION NOTES
KEY NOTES
MATCHLINE 1/CD-102
SCALE:1
SITE DEMOLITION PLAN 6
1"=20' [30"X42" SHEET SIZE]
SCALE:2
SITE DEMOLITION PLAN 7
1"=20' [30"X42" SHEET SIZE]
AREA SHOWN IS OUTSIDE OF THE SURVEY LIMITS.
APPROXIMATE DEMOLITION LIMITS SHOWN FOR
ESTIMATING PURPOSES. CONTRACTOR SHALL LOCATE ALL
UTILITIES AND COORDINATE FINAL ROUTING WITH THE COR
AND ENGINEER OF RECORD.
APPROXIMATE LIMITS OF CONCRETE REMOVAL
APPROXIMATE LIMITS OF ROCK MULCH REMOVAL
APPROXIMATE LIMITS OF ASPHALT REMOVAL
LIMITS OF TOPOGRAPHIC SURVEY
APPROXIMATE EXCAVATION LIMITS
APPROXIMATE BUILDING/PAVEMENT LOCATION
FROM AERIAL IMAGERY.
BIOROLL LOCATION
SILT FENCE LOCATION
APPROXIMATE GEOTHERMAL UTILITY LOCATION.
CONTRACTOR TO CONFIRM LOCATION AND
PROTECT IN PLACE TO AVOID DAMAGE TO
EXISTING SYSTEM.
INSTALL TREE PROTECTION FENCING
INSTALL INLET PROTECTION ON STORM INLET
1. SURVEY DATA SHOWN IS A COMBINATION OF TOPOGRAPHIC AND UTILITY SURVEYS PERFORMED BY ANDERSON ENGINEERING DATED NOVEMBER 2018, DECEMBER 2018, JUNE 2020, AND SEPTEMBER 2021; INFORMATION SUPPLIED BY THE VA; ANTICIPATED SITE IMPROVEMENTS (FROM COMPLETED DESIGN DOCUMENTS); AND AS APPROXIMATED FROM AERIAL IMAGERY. EXISTING CONDITIONS MAY HAVE CHANGED FROM THE DATE OF THE SURVEYS.
CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS (LOCATION AND ELEVATION) PRIOR TO CONSTRUCTION, AND ALL UTILITY LOCATIONS AND ELEVATIONS PRIOR TO EXCAVATION. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY OF ANY CONDITIONS FOUND TO BE VARYING, AND IMPACTING THE PROPOSED WORK. ALL VARYING CONDITIONS, REGARDLESS OF THE IMPACT TO THE WORK, SHALL BE NOTED ON THE RECORD DRAWINGS MAINTAINED IN THE FIELD (REDLINES) AND INCLUDED WITHIN THE CONTRACTOR'S PREPARED ASBUILTS AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR'S ASBUILTS AND REDLINES SHALL BE SUBMITTED TO THE COR
AT THE COMPLETION OF THE PROJECT.
2. THE CONTRACTOR SHALL REGULARLY MAINTAIN RECORDS OF THE WORK PERFORMED, FIELD CHANGES, VARYING CONDITIONS, ECT. AT A MINIMUM, SUCH MARKUPS SHALL BE IN THE FORM OF FIELD NOTES RECORDED ON THE CONTRACT DOCUMENTS AND MAINTAINED WITHIN THE CONSTRUCTION TRAILER. SUCH RECORD DRAWINGS SHALL BE MADE AVAILABLE TO THE COR, OR THE COR'S DESIGNATED REPRESENTATIVE, UPON REQUEST.
3. ALL WORK TO BE CONSTRUCTED IN A LEGAL MANNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. REFER TO ELECTRICAL PLANS FOR INSTALLATION OF ALL CONDUIT WITHIN 5.0 FEET OF BUILDINGS AND OTHER
LOCATIONS NOTED ON THE CIVIL DRAWINGS.
5. UNLESS OTHERWISE NOTED, THE TOPS OF CAST IN PLACE CONCRETE DUCT BANKS SHALL BE NO LESS THAN 24" UNDER LANDSCAPED AREAS OR 30" UNDER PAVED SURFACES, BUT NO LESS THAN AS SHOWN ON THE CIVIL
DRAWINGS.
6. ALL CONCRETE-ENCASED CONDUIT IS EXPECTED TO BE INSTALLED THROUGH TRADITIONAL EXCAVATION.
DIRECTIONAL BORE OR JACKING OF SUCH CONDUIT IS NOT ANTICIPATED WITH THE PROJECT, AND SHALL NOT BE
UNDERTAKEN WITHOUT PRIOR APPROVAL BY THE COR.
7. BEFORE PERFORMING TRENCHING WORK, THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES WITHIN THE
EXCAVATION LIMITS.
8. ALL MULTIPLE CONDUIT RUNS SHALL HAVE CONDUIT SPACERS SECURELY SUPPORTING AND MAINTAINING UNIFORM SPACING OF THE DUCT ASSEMBLY AND SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND
DUCT BANK DETAILS.
9. DUCT BANKS SHALL NOT SLOPE TOWARDS BUILDINGS.
10. AFTER CONCRETE DUCT BANKS HAVE SUFFICIENTLY CURED, THE CONTRACTOR SHALL BACKFILL THE TRENCH, AND INSTALL DETECTABLE UNDERGROUND WARNING TAPE, IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT
BANK DETAILS.
11. MAINTAIN 12" MINIMUM SEPARATION BETWEEN EXTERIOR OF CONCRETE ENCASEMENT AND OTHER UTILITY SYSTEMS INCLUDING BUT NOT LIMITED SANITARY SEWER, WATER MAIN, STORM SEWER, AND CHILLED WATER
SERVICES.
12. THE CONTRACTOR SHALL KEEP DUCTS CLEAN OF EARTH, SAND, OR GRAVEL; AND SEAL WITH TAPERED PLUGS
UPON COMPLETION OF EACH PORTION OF WORK.
13. THE CONTRACTOR SHALL PLAN WORK SO AS TO LIMIT THE EXTENTS OF OPEN TRENCHING.
14. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO CONSTRUCTION ACTIVITIES.
15. VERIFY, PROCURE, INSTALL, AND MAINTAIN ALL REQUIRED EROSION CONTROL MEASURES PRIOR TO THE
COMMENCEMENT OF WORK.
16. INSTALL TREE PROTECTION FENCING AROUND THOSE TREES INDICATED ON THE DEMOLITION PLANS (SEE SHEETS
CD-100 - CD-103).
17. PROTECT ALL EXISTING SITE ELEMENTS (TREES, UTILITIES, CURB, ETC...) NOT NOTED FOR REMOVAL. REPLACE IN
KIND IF DAMAGED.
18. PATCH IN-KIND ALL DISTURBED PAVEMENTS & CURBS.
19. STREET SWEEP TO PREVENT DIRT AND DEBRIS ENTERING INTO ADJACENT WALKS AND ROADWAYS, MINIMUM DAILY, MAINTAIN CONFORMANCE WITH APPLICABLE STORM WATER POLLUTION PREVENTION PRACTICES.
20. NEW CONSTRUCTION FEATURES SHALL MATCH INTO EXISTING WHERE APPLICABLE (PAVEMENT, CURBS, SIDEWALKS). PROVIDE SMOOTH TRANSITIONS AT MATCH IN POINTS.
21. THE CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO PROVIDE CONSTRUCTION STAKING. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL HORIZONTAL AND VERTICAL CONTROLS THROUGHOUT CONSTRUCTION.
22. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION.
23. SUBSTITUTIONS FROM INFO SHOWN HEREIN SHALL BE REVIEWED AND APPROVED BY THE COR.
24. COORDINATE ALL UTILITY RELOCATIONS / DISRUPTIONS WITH THE COR AND VAMC STAFF. NOTIFY THE COR OF ANY
POTENTIAL DISRUPTIONS AT LEAST 15 CALENDAR DAYS IN ADVANCE OF THE WORK.
25. ALL LANDSCAPED AREAS DISTURBED FOR THE DUCT BANK INSTALLATION ARE TO BE RESTORED IN KIND. TURF AREAS SHALL BE RESTORED WITH SALT TOLERANT SOD PER MNDOT STANDARD SPECIFICATION 3878.2.C. PER THE SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE SOD THROUGH THE
ESTABLISHMENT PERIOD.
26. THE LOCATION OF THE CONDUIT, HAND HOLES, AND MAINTENANCE HOLES SHOWN ARE APPROXIMATE LOCATIONS.
FIELD COORDINATE THE FINAL LOCATION WITH VAHCS STAFF AND THE COR PRIOR TO INSTALLATION.
27. HAND HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF THE FRAME WILL BE FLUSH WITH THE GROUND LINE.
28. WITH THE EXCEPTION OF DRAIN HOLES, HAND HOLES / MANHOLES / PULL BOXES SHALL BE CONSTRUCTED TO
CREATE A WATER TIGHT ENCLOSURE.
29. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN THE REQUIRED MINIMUM DEPTH
TO AVOID EXISTING UNDERGROUND UTILITIES.
30. PROVIDE A SLACK LOOP WITHIN EACH HAND HOLE MEETING OR EXCEEDING THE MANUFACTURER'S SPECIFICATIONS, BUT NO LESS THAN 25 FT. THE SLACK LOOPS SHALL BE SECURED SO THAT FIBER IS NOT RESTING
ON BOTTOM OF STRUCTURE AFTER FINAL INSTALLATION.
PB39 PB40
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16305
B116
ADHC
CLC EAST
B51
B50
B49
B48
B29
B88
T101 B37
B
B
B14
B 6 B107
B7
B112 B87
B118
B115
B111B28
B2
B
B106
B1 0 B3
B1
B109 B57
PARKING GARAGE
COVID
LEGEND
EXISTING PAVEMENT EDGE
EXISTING CONCRETE CURB
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING HYDRANT AND GATE VALVE
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLETS
EXISTING UNDERGROUND ELECTRIC
EXISTING OVERHEAD ELECTRIC
EXISTING GEOTHERMAL
EXISTING FIBER OPTIC
EXISTING STEAM / CHILLED WATER
EXISTING GAS MAIN
EXISTING UNIDENTIFIED UNDERGROUND UTILITY
PROPOSED EXTERIOR FIBER OPTIC DUCT LINE
PROPOSED EXTERIOR PULL BOX
APPROXIMATE BUILDING/PAVEMENT LOCATION FROM AERIAL
IMAGERY.
BUILDING NOT TO RECEIVE B-SIDE FIBER
BUILDING TO RECEIVE B-SIDE FIBER THROUGH INTERNAL
ROUTING SEE ELECTRICAL / COMMUNICATION PLANS.
UE
N
0 100' 200'
B8
B13
B95 B3
B5
B4
B1
B96
B117
B97
B104
B59
B
SEE DETAIL 4/CU102
SEE DETAIL 1/CU101
SEE DETAIL 1/CU102
SEE DETAIL 2/CU102
SEE DETAIL 3/CU102
SEE DETAIL 1/CU103
SEE DETAIL 2/CU103
GENERAL NOTES
1. SURVEY DATA SHOWN IS A COMBINATION OF TOPOGRAPHIC AND UTILITY SURVEYS PERFORMED BY ANDERSON
ENGINEERING DATED NOVEMBER 2018, DECEMBER 2018, JUNE 2020, AND SEPTEMBER 2021; INFORMATION SUPPLIED BY THE VA; ANTICIPATED SITE IMPROVEMENTS (FROM COMPLETED DESIGN DOCUMENTS); AND AS APPROXIMATED FROM AERIAL IMAGERY. EXISTING CONDITIONS MAY HAVE CHANGED FROM THE DATE OF THE SURVEYS. CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS (LOCATION AND ELEVATION) PRIOR TO CONSTRUCTION, AND ALL UTILITY LOCATIONS AND ELEVATIONS PRIOR TO EXCAVATION. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY OF ANY CONDITIONS FOUND TO BE VARYING, AND IMPACTING THE PROPOSED WORK. ALL VARYING CONDITIONS, REGARDLESS OF THE IMPACT TO THE WORK, SHALL BE NOTED ON THE RECORD DRAWINGS MAINTAINED IN THE FIELD (REDLINES) AND INCLUDED WITHIN THE CONTRACTOR'S PREPARED ASBUILTS AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR'S ASBUILTS AND REDLINES
SHALL BE SUBMITTED TO THE COR AT THE COMPLETION OF THE PROJECT.
2. THE CONTRACTOR SHALL REGULARLY MAINTAIN RECORDS OF THE WORK PERFORMED, FIELD CHANGES, VARYING CONDITIONS, ECT. AT A MINIMUM, SUCH MARKUPS SHALL BE IN THE FORM OF FIELD NOTES RECORDED ON THE CONTRACT DOCUMENTS AND MAINTAINED WITHIN THE CONSTRUCTION TRAILER. SUCH RECORD DRAWINGS SHALL BE MADE AVAILABLE
TO THE COR, OR THE COR'S DESIGNATED REPRESENTATIVE, UPON REQUEST.
3. ALL WORK TO BE CONSTRUCTED IN A LEGAL MANNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. REFER TO ELECTRICAL PLANS FOR INSTALLATION OF ALL CONDUIT WITHIN 5.0 FEET OF BUILDINGS AND OTHER LOCATIONS
NOTED ON THE CIVIL DRAWINGS.
5. UNLESS OTHERWISE NOTED, THE TOPS OF CAST IN PLACE CONCRETE DUCT BANKS SHALL BE NO LESS THAN 24" UNDER LANDSCAPED AREAS OR 30" UNDER PAVED SURFACES, BUT NO LESS THAN AS SHOWN ON THE CIVIL DRAWINGS.
6. ALL CONCRETE-ENCASED CONDUIT IS EXPECTED TO BE INSTALLED THROUGH TRADITIONAL EXCAVATION. DIRECTIONAL BORE OR JACKING OF SUCH CONDUIT IS NOT ANTICIPATED WITH THE PROJECT, AND SHALL NOT BE UNDERTAKEN WITHOUT
PRIOR APPROVAL BY THE COR.
7. BEFORE PERFORMING TRENCHING WORK, THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES WITHIN THE EXCAVATION
LIMITS.
8. ALL MULTIPLE CONDUIT RUNS SHALL HAVE CONDUIT SPACERS SECURELY SUPPORTING AND MAINTAINING UNIFORM SPACING OF THE DUCT ASSEMBLY AND SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK
DETAILS.
9. DUCT BANKS SHALL NOT SLOPE TOWARDS BUILDINGS.
10. AFTER CONCRETE DUCT BANKS HAVE SUFFICIENTLY CURED, THE CONTRACTOR SHALL BACKFILL THE TRENCH, AND INSTALL DETECTABLE UNDERGROUND WARNING TAPE, IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK DETAILS.
11. MAINTAIN 12" MINIMUM SEPARATION BETWEEN EXTERIOR OF CONCRETE ENCASEMENT AND OTHER UTILITY SYSTEMS INCLUDING BUT NOT LIMITED SANITARY SEWER, WATER MAIN, STORM SEWER, AND CHILLED WATER SERVICES.
12. THE CONTRACTOR SHALL KEEP DUCTS CLEAN OF EARTH, SAND, OR GRAVEL; AND SEAL WITH TAPERED PLUGS UPON
COMPLETION OF EACH PORTION OF WORK.
13. THE CONTRACTOR SHALL PLAN WORK SO AS TO LIMIT THE EXTENTS OF OPEN TRENCHING.
14. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO CONSTRUCTION ACTIVITIES.
15. VERIFY, PROCURE, INSTALL, AND MAINTAIN ALL REQUIRED EROSION CONTROL MEASURES PRIOR TO THE COMMENCEMENT
OF WORK.
16. INSTALL TREE PROTECTION FENCING AROUND THOSE TREES INDICATED ON THE DEMOLITION PLANS (SEE SHEETS CD-100 -
CD-103).
17. PROTECT ALL EXISTING SITE ELEMENTS (TREES, UTILITIES, CURB, ETC...) NOT NOTED FOR REMOVAL. REPLACE IN KIND IF
DAMAGED.
18. PATCH IN-KIND ALL DISTURBED PAVEMENTS & CURBS.
19. STREET SWEEP TO PREVENT DIRT AND DEBRIS ENTERING INTO ADJACENT WALKS AND ROADWAYS, MINIMUM DAILY, MAINTAIN CONFORMANCE WITH APPLICABLE STORM WATER POLLUTION PREVENTION PRACTICES.
20. NEW CONSTRUCTION FEATURES SHALL MATCH INTO EXISTING WHERE APPLICABLE (PAVEMENT, CURBS, SIDEWALKS).
PROVIDE SMOOTH TRANSITIONS AT MATCH IN POINTS.
21. THE CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO PROVIDE CONSTRUCTION STAKING. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL HORIZONTAL AND VERTICAL CONTROLS THROUGHOUT CONSTRUCTION.
22. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION.
23. SUBSTITUTIONS FROM INFO SHOWN HEREIN SHALL BE REVIEWED AND APPROVED BY THE COR.
24. COORDINATE ALL UTILITY RELOCATIONS / DISRUPTIONS WITH THE COR AND VAMC STAFF. NOTIFY THE COR OF ANY
POTENTIAL DISRUPTIONS AT LEAST 15 CALENDAR DAYS IN ADVANCE OF THE WORK.
25. ALL LANDSCAPED AREAS DISTURBED FOR THE DUCT BANK INSTALLATION ARE TO BE RESTORED IN KIND. TURF AREAS SHALL BE RESTORED WITH SALT TOLERANT SOD PER MNDOT STANDARD SPECIFICATION 3878.2.C. PER THE SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING THE SOD THROUGH THE ESTABLISHMENT PERIOD.
26. THE LOCATION OF THE CONDUIT, HAND HOLES, AND MAINTENANCE HOLES SHOWN ARE APPROXIMATE LOCATIONS. FIELD COORDINATE THE FINAL LOCATION WITH VAHCS STAFF AND THE COR PRIOR TO INSTALLATION.
27. HAND HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF THE FRAME WILL BE FLUSH WITH THE GROUND LINE.
28. WITH THE EXCEPTION OF DRAIN HOLES, HAND HOLES / MANHOLES / PULL BOXES SHALL BE CONSTRUCTED TO CREATE A
WATER TIGHT ENCLOSURE.
29. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN THE REQUIRED MINIMUM DEPTH TO
AVOID EXISTING UNDERGROUND UTILITIES.
30. PROVIDE A SLACK LOOP WITHIN EACH HAND HOLE MEETING OR EXCEEDING THE MANUFACTURER'S SPECIFICATIONS, BUT NO LESS THAN 25 FT. THE SLACK LOOPS SHALL BE SECURED SO THAT FIBER IS NOT RESTING ON BOTTOM OF STRUCTURE
AFTER FINAL INSTALLATION.
SCALE:1
FIBER UTILITY PLAN (BUILDING 1A TO BUILDING 3)
1"=20' [30"X42" SHEET SIZE]
BUILDING 3 BUILDING 1
COORDINATE FIBER OPTIC CONNECTION TO BUILDING WITH
ELECTRICAL PLANS.
INSTALL NEW PULLBOX PER 3/CJ-501
INSTALL NEW CAST IN PLACE CONCRETE DUCTBANK PER 1/CJ-501
KEY NOTES
AREA SHOWN IS OUTSIDE OF THE SURVEY LIMITS.
APPROXIMATE CONDUIT ROUTING SHOWN FOR
ESTIMATING PURPOSES. CONTRACTOR SHALL LOCATE
ALL EXISTING UTILITIES, AND COORDINATE FINAL
ROUTING WITH THE COR AND ENGINEER OF RECORD
SEE DETAIL 1/CU100
1100+00
1100+26
0+
1+00
2+00
3+
4+00
4+59
106+37
100+00
101+00102+00 103+00
104+00105+00
106+00
200+36
0+
B4 CONNECTION A
PB1
PB2
PB3
PB4
PB5
TURNING POINT 1
TURNING POINT 2
TURNING POINT 3
TURNING POINT 4
TURNING POINT 16
PB7
PB8
PB9
PB10
PB10A
PB10B
PB11PB12
PB13
PB14
PB15
TURNING POINT 17
BUILDING 7 CONNECTION
TURNING POINT 18
PB6
PB9A
N
0 20' 40'
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16305
IT ROOM
GENERAL NOTES
LEGEND
146.8°
122.9°
168.7°
168.9°
178.3°
.3
112.7°
COORDINATE FIBER OPTIC CONNECTION TO BUILDING WITH
ELECTRICAL PLANS.
INSTALL NEW PULLBOX PER 3/CJ-501
INSTALL NEW PRECAST CONCRETE TRENCH PER 7/CJ-502 AND
10/CJ-502
INSTALL NEW CAST IN PLACE CONCRETE DUCTBANK PER 1/CJ-501
TRANSITION TO/FROM PRECAST TO CAST IN PLACE DUCT BANK.
SEE DUCT BANK PROFILES FOR ADDITIONAL INFORMATION.
KEY NOTES
115.3°
154.5°
90.0°
89.6°
.1°
EXISTING PAVEMENT EDGE
EXISTING CONCRETE CURB
EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING HYDRANT AND GATE VALVE
EXISTING SANITARY MANHOLE
EXISTING STORM SEWER INLETS
EXISTING UNDERGROUND ELECTRIC
EXISTING OVERHEAD ELECTRIC
EXISTING GEOTHERMAL
EXISTING FIBER OPTIC
EXISTING STEAM / CHILLED WATER
EXISTING GAS MAIN
EXISTING UNIDENTIFIED UNDERGROUND UTILITY
PROPOSED EXTERIOR FIBER OPTIC DUCT LINE
PROPOSED EXTERIOR PULL BOX
EXISTING UTILITY CROSSING
APPROXIMATE BUILDING/PAVEMENT LOCATION FROM AERIAL
IMAGERY.
BUILDING NOT TO RECEIVE B-SIDE FIBER
BUILDING TO RECEIVE B-SIDE FIBER THROUGH INTERNAL
ROUTING SEE ELECTRICAL / COMMUNICATION PLANS.
NEW CONCRETE PAVEMENT
NEW ASPHALT PAVEMENT
UE
XX
SCALE:1
FIBER UTILITY PLAN (STA 0+00 - 4+59)
1"=20' [30"X42" SHEET SIZE]
AREA SHOWN IS OUTSIDE OF THE SURVEY LIMITS.
APPROXIMATE CONDUIT ROUTING SHOWN FOR
ESTIMATING PURPOSES. CONTRACTOR SHALL LOCATE
ALL EXISTING UTILITIES, AND COORDINATE FINAL
ROUTING WITH THE COR AND ENGINEER OF RECORD
1. SURVEY DATA SHOWN IS A COMBINATION OF TOPOGRAPHIC AND UTILITY SURVEYS PERFORMED BY ANDERSON ENGINEERING DATED NOVEMBER 2018, DECEMBER 2018, JUNE 2020, AND SEPTEMBER 2021; INFORMATION SUPPLIED BY THE VA; ANTICIPATED SITE IMPROVEMENTS (FROM COMPLETED DESIGN DOCUMENTS); AND AS APPROXIMATED FROM AERIAL IMAGERY. EXISTING CONDITIONS MAY HAVE CHANGED FROM THE DATE OF THE SURVEYS. CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS (LOCATION AND ELEVATION) PRIOR TO CONSTRUCTION, AND ALL UTILITY LOCATIONS AND ELEVATIONS PRIOR TO EXCAVATION. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY OF ANY CONDITIONS FOUND TO BE VARYING, AND IMPACTING THE PROPOSED WORK. ALL VARYING CONDITIONS, REGARDLESS OF THE IMPACT TO THE WORK, SHALL BE NOTED ON THE RECORD DRAWINGS MAINTAINED IN THE FIELD (REDLINES) AND INCLUDED WITHIN THE CONTRACTOR'S PREPARED ASBUILTS AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR'S ASBUILTS AND REDLINES
SHALL BE SUBMITTED TO THE COR AT THE COMPLETION OF THE PROJECT.
2. THE CONTRACTOR SHALL REGULARLY MAINTAIN RECORDS OF THE WORK PERFORMED, FIELD CHANGES, VARYING CONDITIONS, ECT. AT A MINIMUM, SUCH MARKUPS SHALL BE IN THE FORM OF FIELD NOTES RECORDED ON THE CONTRACT DOCUMENTS AND MAINTAINED WITHIN THE CONSTRUCTION TRAILER. SUCH RECORD DRAWINGS SHALL BE MADE AVAILABLE
TO THE COR, OR THE COR'S DESIGNATED REPRESENTATIVE, UPON REQUEST.
3. ALL WORK TO BE CONSTRUCTED IN A LEGAL MANNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. REFER TO ELECTRICAL PLANS FOR INSTALLATION OF ALL CONDUIT WITHIN 5.0 FEET OF BUILDINGS AND OTHER LOCATIONS
NOTED ON THE CIVIL DRAWINGS.
5. UNLESS OTHERWISE NOTED, THE TOPS OF CAST IN PLACE CONCRETE DUCT BANKS SHALL BE NO LESS THAN 24" UNDER LANDSCAPED AREAS OR 30" UNDER PAVED SURFACES, BUT NO LESS THAN AS SHOWN ON THE CIVIL DRAWINGS.
6. ALL CONCRETE-ENCASED CONDUIT IS EXPECTED TO BE INSTALLED THROUGH TRADITIONAL EXCAVATION. DIRECTIONAL BORE OR JACKING OF SUCH CONDUIT IS NOT ANTICIPATED WITH THE PROJECT, AND SHALL NOT BE UNDERTAKEN WITHOUT
PRIOR APPROVAL BY THE COR.
7. BEFORE PERFORMING TRENCHING WORK, THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES WITHIN THE EXCAVATION
LIMITS.
8. ALL MULTIPLE CONDUIT RUNS SHALL HAVE CONDUIT SPACERS SECURELY SUPPORTING AND MAINTAINING UNIFORM SPACING OF THE DUCT ASSEMBLY AND SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK
DETAILS.
9. DUCT BANKS SHALL NOT SLOPE TOWARDS BUILDINGS.
10. AFTER CONCRETE DUCT BANKS HAVE SUFFICIENTLY CURED, THE CONTRACTOR SHALL BACKFILL THE TRENCH, AND INSTALL DETECTABLE UNDERGROUND WARNING TAPE, IN ACCORDANCE WITH THE SPECIFICATIONS AND DUCT BANK DETAILS.
11. MAINTAIN 12" MINIMUM SEPARATION BETWEEN EXTERIOR OF CONCRETE ENCASEMENT AND OTHER UTILITY SYSTEMS INCLUDING BUT NOT LIMITED SANITARY SEWER, WATER MAIN, STORM SEWER, AND CHILLED WATER SERVICES.
12. THE CONTRACTOR SHALL KEEP DUCTS CLEAN OF EARTH, SAND, OR GRAVEL; AND SEAL WITH TAPERED PLUGS UPON
COMPLETION OF EACH PORTION OF WORK.
13. THE CONTRACTOR SHALL PLAN WORK SO AS TO LIMIT THE EXTENTS OF OPEN TRENCHING.
14. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO CONSTRUCTION ACTIVITIES.
15. VERIFY, PROCURE, INSTALL, AND MAINTAIN ALL REQUIRED EROSION CONTROL MEASURES PRIOR TO THE COMMENCEMENT
OF WORK.
16. INSTALL TREE PROTECTION FENCING AROUND THOSE TREES INDICATED ON THE DEMOLITION PLANS (SEE SHEETS CD-100 -
CD-103).
17. PROTECT ALL EXISTING SITE ELEMENTS (TREES, UTILITIES, CURB, ETC...) NOT NOTED FOR REMOVAL. REPLACE IN KIND IF
DAMAGED.
18. PATCH IN-KIND ALL DISTURBED PAVEMENTS & CURBS.
19. STREET SWEEP TO PREVENT DIRT AND DEBRIS ENTERING INTO ADJACENT WALKS AND ROADWAYS, MINIMUM DAILY, MAINTAIN CONFORMANCE WITH APPLICABLE STORM WATER POLLUTION PREVENTION PRACTICES.
20. NEW CONSTRUCTION FEATURES SHALL MATCH INTO EXISTING WHERE APPLICABLE (PAVEMENT, CURBS, SIDEWALKS).
PROVIDE SMOOTH TRANSITIONS AT MATCH IN POINTS.
21. THE CONTRACTOR SHALL HIRE A LICENSED SURVEYOR TO PROVIDE CONSTRUCTION STAKING. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL HORIZONTAL AND VERTICAL CONTROLS THROUGHOUT CONSTRUCTION.
22. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION.
23. SUBSTITUTIONS FROM INFO SHOWN HEREIN SHALL BE REVIEWED AND APPROVED BY THE COR.
24. COORDINATE ALL UTILITY RELOCATIONS / DISRUPTIONS WITH THE COR AND VAMC STAFF. NOTIFY THE COR OF ANY
POTENTIAL DISRUPTIONS AT LEAST 15 CALENDAR DAYS IN ADVANCE OF THE WORK.
25. ALL LANDSCAPED AREAS DISTURBED FOR THE DUCT BANK INSTALLATION ARE TO BE RESTORED IN KIND. TURF AREAS SHALL BE RESTORED WITH SALT TOLERANT SOD PER MNDOT STANDARD SPECIFICATION 3878.2.C. PER THE SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING THE SOD THROUGH THE ESTABLISHMENT PERIOD.
26. THE LOCATION OF THE CONDUIT, HAND HOLES, AND MAINTENANCE HOLES SHOWN ARE APPROXIMATE LOCATIONS. FIELD COORDINATE THE FINAL LOCATION WITH VAHCS STAFF AND THE COR PRIOR TO INSTALLATION.
27. HAND HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF THE FRAME WILL BE FLUSH WITH THE GROUND LINE.
28. WITH THE EXCEPTION OF DRAIN HOLES, HAND HOLES / MANHOLES / PULL BOXES SHALL BE CONSTRUCTED TO CREATE A
WATER TIGHT ENCLOSURE.
29. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN THE REQUIRED MINIMUM DEPTH TO
AVOID EXISTING UNDERGROUND UTILITIES.
30. PROVIDE A SLACK LOOP WITHIN EACH HAND HOLE MEETING OR EXCEEDING THE MANUFACTURER'S SPECIFICATIONS, BUT NO LESS THAN 25 FT. THE SLACK LOOPS SHALL BE SECURED SO THAT FIBER IS NOT RESTING ON BOTTOM OF STRUCTURE
AFTER FINAL INSTALLATION.
89.9°
90.9°
300+00 301+00
2+
303+00 304+00 305+00 306+00
0+
1+
0+
0+
+0
1401+00
+0
PB16 PB17
PB18
PB19
TURNING POINT 5
TURNING POINT 6
TURNING POINT 7
PB25
PB28
BLDG 49 CONNECTION
7+
400+00
401+00
401+22
TURNING POINT 8
PB20
PB21
PB22
TURNING POINT 9
BLDG 95 CONNECTION
8+
9+
0+
700+00 700+12
1000+001000+48
TURNING POINT 10
PB23
PB24PB29
ADHC CONNECTION
2+
2+
TURNING POINT 11
PB26
PB27
N
0 20' 40' A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16305
GENERAL NOTES
LEGEND
KEY NOTES
SCALE:1
FIBER UTILITY PLAN (STA 300+00 - 306+16)
1"=20' [30"X42" SHEET SIZE]
SCALE:2
FIBER UTILITY PLAN (STA 400+00 - 401+22)
1"=20' [30"X42" SHEET SIZE]
.0°
0.
1°
130.0°
89.8°
SCALE:3
FIBER UTILITY PLAN (STA 307+70 - 310+44)
1"=20' [30"X42" SHEET SIZE] SCALE:4
F…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .