Appendix M - Hydrant Inspection and Flow Test Data Bldg 10440.pdf

PDF 198 KB Posted

Attached to
99 CES Fire Suppression Certification
Solicitation number
FA486126Q0025
Issued by

About this file

This is an Inspection and Flow Test report for fire hydrants at Nellis Air Force Base, specifically documenting the annual inspection and testing of Fire Hydrant #BLDG 10440 located in Area II Building 10440. The inspection was conducted by MR. Max McIntyre on 4 MAR 2025 and follows guidelines established under Unified Facilities Criteria (UFC) 3-600-02 and National Fire Protection Association 25 standards.

The dry hydrant inspection verified accessibility, leaks, worn threads, proper functioning, drainage of barrel, and lubrication. The yard monitor nozzles and hose houses were inspected for condition, accessibility, and operational status. The flow test results indicate a static pressure of 30 psig at the primary location and 30 psig at the secondary location. The hydrant manufacturer is Mueller with outlet size coefficient 375. Flow testing recorded 229 GPM at 20 PSI residual pressure and 414 GPM at 0 PSI residual pressure. The pitot pressure reading was 375, and the total flow during test was 375 GPM. All inspection checklist items (A-1.0 through D-1.9) were marked as completed with "X" marks, including verification that the hydrant was left in service. The report includes a pressure versus flow graph displaying the hydrant's performance curve based on the recorded measurements.

View the file

Other files

File Type Posted
Appendix N - RKMF173010 BLDG 10707 Fire Sprinkler Shop Drawings.pdf PDF
Appendix K - 2025 Hydrant Inspection and Flow Test Data Bldg 10707.pdf PDF
Solicitation Questions and Answers.pdf PDF
Appendix F - Nellis and Creech AFB IFS Mech-Plumb Req_29 Dec 2025.pdf PDF
Appendix D - RKMF103011 BLDG 10440 Fire Sprinkler Shop Drawings.pdf PDF
Appendix B - RKMF 103011 F-35 Muns As Built Drawings Sections Fire Plumbing.pdf PDF
Appendix H - Environmental Permit Guidance.pdf PDF
Attachment 5 - SCA Wage Determination 2015-5593 Revision 32 - CAO 22 AUG 26.pdf PDF
Attachment 1 - Solicitation - FA486126Q0025.pdf PDF
Appendix E - Nellis and Creech AFB IFS_22 Jan 2019.pdf PDF
Appendix C - RKMF103011 BLDG 10432 Fire Sprinkler Shop Drawings.pdf PDF
Appendix A - RKMF 173010 As Built Drawings Sections Fire Plumbing.pdf PDF
Attachment 4 - Performance_Work_Statement__Fire_Suppression_Certification - CAO 25AUG26.pdf PDF
Attachment 2 - Price List.pdf PDF
Appendix I - Hydrazine Fuel Storage and Servicing Facility Specification 2144.pdf PDF
Appendix J - Hydrazine Fuel Storage and Servicing Facility Design Analysis.pdf PDF
Appendix G - Nellis AFB Sole Source EMCS Letter.pdf PDF
Appendix K - Hydrant Inspection and Flow Test Data Bldg 10701.pdf PDF
Appendix L - Hydrant Inspection and Flow Test Data Bldg 10432.pdf PDF
Attachment 3 - Past Performance List of References.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Y N/A N Y N/A N

A-1.0 D-1.0

A-1.1 X D-1.1 X

A-1.2 X

A-1.3

D-1.3 X A-1.4 X

B-1.0

B-1.1 X

B-1.2

B-1.3 X

C-1.0

C-1.1 X

C-1.2 X

D-1.9 Hydrant left in Service X

10440

2.5

GPM

Inspector's Initial __________

INSPECTION AND FLOW TEST

Fire Hydrants

The Following inspection and flow testing tasks are to be performed on an ANNUAL basis. These tasks are guidelined under the Unified Facilities Criteria (UFC) 3- 600-02 and National Fire Protection Assocation 25

ALL QUESTIONS ARE TO BE FULLY ANSWERED AND ALL BLANKS TO BE FILLED

LOCATION/BUILDING NUMBER:

Inspector Name: MR. Max McIntyre

Fire Hydrant # BLDG 10440

Inspection of Dry Hydrant: Flow Testing Hydrant:

Inspected for accessibility, leaks, and worn threads Attached pressure gauge to outlet STATIC

Operated to ensure proper functioning D-1.2 Attached pressure gauge to adjacent hydrant and take reading (should be the same) X

Verified drainage of barrel (after all operations and before cold weather) X

Attached diffuser to hydrant being tested Lubricated Hydrant to ensure ease of operation D-1.4

Completely opened hydrant, took and recorded a pitot reading X

Inspection of Yard Monitor Nozzles: D-1.5 Took and recorded the residual pressure on the hydrant cap gauge X

Inspected for condition

Conducted flow test to verify proper function and range of motion X

D-1.6 Took and recorded the residual pressure at the secondary location X

Lubricated to ensure proper operating conditions D-1.7 Closed the hydrant slowly being careful not to cause a "water hammer" and spike the pressure above the normal static pressure on the gauge at the secondary location X

Inspection of Hose Houses:

Inspected for accessibility and condition D-1.8 Verified that all valves closed properly, are not seeping or leaking X

Verified inventory and its condition

AREA II BLDG. 10440

0.9

YEAR 5

WATER FLOW TEST RECORD

WFSM Shop 652-4815

Nellis AFB 99th CES

STATIC PRESSURE

HYDRANT NUMBER PITOT PRESSURE

MANUFACTURER

TOTAL FLOW DURING TEST

Date: ____________________

WATER FLOW GPM

AT 0 PSIAT 20 PSI RESIDUAL

GPM414229

(All "NO" answers to be fully explained.)

MUELER

Date Scheduled: Date Completed: 4 MAR 2025

RWP Number:

OUTLET

SIZE COEFFICIENT SIZE

NO. 375

RESIDUAL PRESSURE PRIMARY RESIDUAL PRESSURE SECONDARY

0 500

Pr es su re

, p si g

Flow, gpm

Data