This is a Fire Hydrant Inspection and Flow Test Record documenting the inspection and testing of Fire Hydrant #155 located in Area II near Building 10150 at Nellis Air Force Base (99th CES). The inspection was completed on November 6, 2019, by Inspector LOVE-G and is conducted on a five-year basis in accordance with Unified Facilities Criteria (UFC) 3-600-02 and National Fire Protection Association 25 standards.

The inspection encompasses multiple components including verification of the dry hydrant's accessibility, leaks, and worn threads; operational testing of yard monitor nozzles; examination of hose house conditions and valve functionality; and comprehensive flow testing. The Mueller brand hydrant (Model No. 531, manufactured in 1997) was tested and verified to be operational and in proper working condition. Key flow test results include a static pressure of 110 PSI, residual pressure primary of 20 PSI, residual pressure secondary of 0.9 PSI, pitot pressure of 10 PSI, and a total flow during test of 591 GPM at a 2.5-inch outlet size with 0.9 coefficient. All inspection checklist items were marked complete with "X" marks, including verification that the hydrant was left in service. The water pressure-flow curve graph plots the relationship between flow (in GPM) and pressure (in PSI), showing the hydrant's performance characteristics with measurements at 531 GPM and 591 GPM points.

View the file

Other files

File Type Posted
Solicitation Questions and Answers.pdf PDF
Appendix N - RKMF173010 BLDG 10707 Fire Sprinkler Shop Drawings.pdf PDF
Appendix K - 2025 Hydrant Inspection and Flow Test Data Bldg 10707.pdf PDF
Attachment 1 - Solicitation - FA486126Q0025.pdf PDF
Appendix E - Nellis and Creech AFB IFS_22 Jan 2019.pdf PDF
Appendix C - RKMF103011 BLDG 10432 Fire Sprinkler Shop Drawings.pdf PDF
Appendix A - RKMF 173010 As Built Drawings Sections Fire Plumbing.pdf PDF
Attachment 4 - Performance_Work_Statement__Fire_Suppression_Certification - CAO 25AUG26.pdf PDF
Attachment 2 - Price List.pdf PDF
Appendix D - RKMF103011 BLDG 10440 Fire Sprinkler Shop Drawings.pdf PDF
Appendix B - RKMF 103011 F-35 Muns As Built Drawings Sections Fire Plumbing.pdf PDF
Appendix H - Environmental Permit Guidance.pdf PDF
Attachment 5 - SCA Wage Determination 2015-5593 Revision 32 - CAO 22 AUG 26.pdf PDF
Appendix I - Hydrazine Fuel Storage and Servicing Facility Specification 2144.pdf PDF
Appendix J - Hydrazine Fuel Storage and Servicing Facility Design Analysis.pdf PDF
Appendix G - Nellis AFB Sole Source EMCS Letter.pdf PDF
Appendix L - Hydrant Inspection and Flow Test Data Bldg 10432.pdf PDF
Attachment 3 - Past Performance List of References.pdf PDF
Appendix F - Nellis and Creech AFB IFS Mech-Plumb Req_29 Dec 2025.pdf PDF
Appendix M - Hydrant Inspection and Flow Test Data Bldg 10440.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Y N/A N Y N/A N

A-1.0 D-1.0

A-1.1 X D-1.1 X

A-1.2 X

A-1.3

D-1.3 X A-1.4 X

B-1.0

B-1.1 X

B-1.2

B-1.3 X

C-1.0

C-1.1 X

C-1.2 X

D-1.9 Hydrant left in Service X

2.5

GPM

Inspector's Initial __________

Date Completed: 6 NOV 2019

RWP Number:

OUTLET

SIZE COEFFICIENT SIZE

NO. 531

RESIDUAL PRESSURE PRIMARY RESIDUAL PRESSURE SECONDARY

Date: ____________________

WATER FLOW GPM

AT 0 PSIAT 20 PSI RESIDUAL

GPM591531

(All "NO" answers to be fully explained.)

Mueller

WFSM Shop 652-4815

Nellis AFB 99th CES

STATIC PRESSURE

HYDRANT NUMBER PITOT PRESSURE

MANUFACTURER

TOTAL FLOW DURING TEST

AREA II - NEAR BLDG. 10150

0.9

YEAR

WATER FLOW TEST RECORD

Inspection of Hose Houses:

Inspected for accessibility and condition D-1.8 Verified that all valves closed properly, are not seeping or leaking X

Verified inventory and its condition

CLASS B ORANGE

X

Lubricated to ensure proper operating conditions D-1.7 Closed the hydrant slowly being careful not to cause a "water hammer" and spike the pressure above the normal static pressure on the gauge at the secondary location X

Conducted flow test to verify proper function and range of motion X

D-1.6 Took and recorded the residual pressure at the secondary location

Inspection of Yard Monitor Nozzles: D-1.5 Took and recorded the residual pressure on the hydrant cap gauge X

Inspected for condition

Lubricated Hydrant to ensure ease of operation D-1.4 Completely opened hydrant, took and recorded a pitot reading X

X Verified drainage of barrel (after all operations and before cold weather) X

Attached diffuser to hydrant being tested

Flow Testing Hydrant:

Inspected for accessibility, leaks, and worn threads Attached pressure gauge to outlet STATIC

Operated to ensure proper functioning D-1.2 Attached pressure gauge to adjacent hydrant and take reading (should be the same)

INSPECTION AND FLOW TEST

Fire Hydrants

The Following inspection and flow testing tasks are to be performed on a 5 YEAR basis. These tasks are guidelined under the Unified Facilities Criteria (UFC) 3-600- 02 and National Fire Protection Assocation 25

ALL QUESTIONS ARE TO BE FULLY ANSWERED AND ALL BLANKS TO BE FILLED

LOCATION/BUILDING NUMBER:

Inspector Name: LOVE-G

Comments:

Fire Hydrant # 155

Inspection of Dry Hydrant:

0 500 1000

Pr es su re

, p si g

Flow, gpm

Data