Appendix A - RKMF 173010 As Built Drawings Sections Fire Plumbing.pdf

PDF 3 MB Posted

Attached to
99 CES Fire Suppression Certification
Solicitation number
FA486126Q0025
Issued by

About this file

Document Summary

This document set contains architectural and engineering drawings and specifications for a federal facility's mechanical, plumbing, fire protection, and related building systems. The drawings include detailed floor plans, system schematics, and installation details for domestic water, sanitary sewer/vent, fire protection, hydrazine detection, and breathing air systems, along with comprehensive plumbing fixture schedules and equipment specifications.

The technical documentation specifies multiple building systems and their requirements: a wet-pipe fire sprinkler system designed per NFPA 13 with reduced-pressure backflow prevention and detailed riser specifications; domestic hot and cold water systems with thermal expansion tanks, tempering stations, and electric water heaters; sanitary waste and vent piping with proper trap seals and condensate drain handling; a hydrazine detection system with electrochemical sensors and digital display interfaces; and a breathing air compression system. The drawings detail critical components including water service entrances with freeze-proof hydrants, pipe penetration specifications, lavatory mounting details, floor drain configurations, emergency eyewash stations, and trap primer systems. Equipment schedules specify plumbing fixtures, water heater parameters, breathing air compressor specifications, and tempering station configurations. General notes establish requirements for sprinkler system installation coordination with structural elements, proper drainage slope requirements, waterproof sealant specifications, and contractor responsibility for coordinating with CAD drawings and confirming concrete schedules for exterior door locations.

View the file

Other files

File Type Posted
Appendix N - RKMF173010 BLDG 10707 Fire Sprinkler Shop Drawings.pdf PDF
Appendix K - 2025 Hydrant Inspection and Flow Test Data Bldg 10707.pdf PDF
Solicitation Questions and Answers.pdf PDF
Attachment 1 - Solicitation - FA486126Q0025.pdf PDF
Appendix E - Nellis and Creech AFB IFS_22 Jan 2019.pdf PDF
Appendix C - RKMF103011 BLDG 10432 Fire Sprinkler Shop Drawings.pdf PDF
Attachment 4 - Performance_Work_Statement__Fire_Suppression_Certification - CAO 25AUG26.pdf PDF
Attachment 2 - Price List.pdf PDF
Appendix F - Nellis and Creech AFB IFS Mech-Plumb Req_29 Dec 2025.pdf PDF
Appendix M - Hydrant Inspection and Flow Test Data Bldg 10440.pdf PDF
Appendix D - RKMF103011 BLDG 10440 Fire Sprinkler Shop Drawings.pdf PDF
Appendix B - RKMF 103011 F-35 Muns As Built Drawings Sections Fire Plumbing.pdf PDF
Appendix H - Environmental Permit Guidance.pdf PDF
Attachment 5 - SCA Wage Determination 2015-5593 Revision 32 - CAO 22 AUG 26.pdf PDF
Appendix I - Hydrazine Fuel Storage and Servicing Facility Specification 2144.pdf PDF
Appendix J - Hydrazine Fuel Storage and Servicing Facility Design Analysis.pdf PDF
Appendix G - Nellis AFB Sole Source EMCS Letter.pdf PDF
Appendix K - Hydrant Inspection and Flow Test Data Bldg 10701.pdf PDF
Appendix L - Hydrant Inspection and Flow Test Data Bldg 10432.pdf PDF
Attachment 3 - Past Performance List of References.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .