This is a Fire Hydrant Inspection and Flow Test Record form used by Nellis Air Force Base's 99th Civil Engineer Squadron to document annual maintenance and testing of fire hydrants in compliance with Unified Facilities Criteria (UFC) 3-600-02 and National Fire Protection Association 25 standards.
The inspection was completed on March 4, 2025, by Inspector MR. Max McIntyre for Fire Hydrant #1126 located at Building 10432, Area II. The hydrant, manufactured by Mueller in 2020, underwent comprehensive testing including accessibility verification, lubrication, drainage confirmation, and operational checks. Flow testing data recorded a static pressure of 65 PSI, with a primary residual pressure of 60 PSI at 20 PSI residual and a secondary residual pressure of 50 PSI at 0 PSI. The hydrant outlet size coefficient was 0.9, and total flow during testing measured 3,687 GPM at 20 PSI residual and 4,497 GPM at 0 PSI residual. All inspection items (A-1.0 through D-1.9) were marked as completed with "X" designations, indicating the hydrant passed its annual inspection. The form includes a flow curve graph plotting pressure against flow volume and is signed by WFSM Shop personnel at contact number 652-4815.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Y N/A N Y N/A N
A-1.0 D-1.0
A-1.1 X D-1.1 X
A-1.2 X
A-1.3
D-1.3 X A-1.4 X
B-1.0
B-1.1 X
B-1.2
B-1.3 X
C-1.0
C-1.1 X
C-1.2 X
D-1.9 Hydrant left in Service X
10432
2.5
GPM
Inspector's Initial __________
Date Scheduled: Date Completed: 4 MAR 2025
RWP Number:
OUTLET
SIZE COEFFICIENT SIZE
NO. 1126
RESIDUAL PRESSURE PRIMARY RESIDUAL PRESSURE SECONDARY
Date: ____________________
WATER FLOW GPM
AT 0 PSIAT 20 PSI RESIDUAL
GPM44973687
(All "NO" answers to be fully explained.)
MUELER
WFSM Shop 652-4815
Nellis AFB 99th CES
STATIC PRESSURE
HYDRANT NUMBER PITOT PRESSURE
MANUFACTURER
TOTAL FLOW DURING TEST
AREA II BLDG. 10432
0.9
YEAR 50
WATER FLOW TEST RECORD
Inspection of Hose Houses:
Inspected for accessibility and condition D-1.8 Verified that all valves closed properly, are not seeping or leaking X
Verified inventory and its condition
X
Lubricated to ensure proper operating conditions D-1.7 Closed the hydrant slowly being careful not to cause a "water hammer" and spike the pressure above the normal static pressure on the gauge at the secondary location X
Conducted flow test to verify proper function and range of motion X
D-1.6 Took and recorded the residual pressure at the secondary location
Inspection of Yard Monitor Nozzles: D-1.5 Took and recorded the residual pressure on the hydrant cap gauge X
Inspected for condition
Lubricated Hydrant to ensure ease of operation D-1.4 Completely opened hydrant, took and recorded a pitot reading X
X Verified drainage of barrel (after all operations and before cold weather) X
Attached diffuser to hydrant being tested
Flow Testing Hydrant:
Inspected for accessibility, leaks, and worn threads Attached pressure gauge to outlet STATIC
Operated to ensure proper functioning D-1.2 Attached pressure gauge to adjacent hydrant and take reading (should be the same)
INSPECTION AND FLOW TEST
Fire Hydrants
The Following inspection and flow testing tasks are to be performed on an ANNUAL basis. These tasks are guidelined under the Unified Facilities Criteria (UFC) 3- 600-02 and National Fire Protection Assocation 25
ALL QUESTIONS ARE TO BE FULLY ANSWERED AND ALL BLANKS TO BE FILLED
LOCATION/BUILDING NUMBER:
Inspector Name: MR. Max McIntyre
Fire Hydrant # BLDG 10432
Inspection of Dry Hydrant:
0 1126
44970
0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000
Pr es su re
, p si g
Flow, gpm
Data