Appendix H - Environmental Permit Guidance.pdf

PDF 120 KB Posted

Attached to
99 CES Fire Suppression Certification
Solicitation number
FA486126Q0025
Issued by

About this file

This document is environmental permits and authority to proceed guidance issued by 99 Civil Engineering Squadron/Civil Engineer Infrastructure Element (99 CES/CEIE) at Nellis Air Force Base, effective April 10, 2023.

The guidance establishes permit and authorization requirements across multiple environmental programs for construction and maintenance activities at Nellis AFB. Under the Air Quality Program, contractors executing work must obtain a Clark County Dust Permit from the Clark County Department of Environment and Sustainability for trenches of 100+ linear feet, disturbances of ¼ acre or greater (10,890 SF), or structural demolition of 1,000+ SF. An Authority to Construct (ATC) from Clark County DES, coordinated through the Nellis Air Quality Program Manager, is required prior to commencing construction involving boilers, cooling towers, baghouses, cyclones, fuel dispensing equipment, fuel storage tanks, asphalt batch plants, concrete batch plants, rock crushers, paint booths, media blasters, water heaters, HVAC heaters, generators, hush houses, degreasers, fuel cell maintenance, and woodworking equipment. Contractors are responsible for initiating the permitting process. The Water Program requires contractor submission of projects impacting drinking water to the Nevada Division of Environmental Protection Bureau of Safe Drinking Water prior to commencement. Construction storm water discharge permits with Storm Water Pollution Prevention Plans (SWPPP) are required for disturbances of one acre or more of land, with submission to the base Water Program Manager for approval and provision of Notice of Intent to NDEP. The Asbestos/Lead/Toxics Program requires contractor-obtained ACM surveys, abatement notifications (10 days prior to demolition), waste manifests, and lead-based paint surveys and abatement documentation. The Natural Resources Program mandates contractor compliance with Section 7 consultation with the U.S. Fish and Wildlife Service for desert tortoise presence, USACE permits for wetlands, and Migratory Bird Treaty Act nesting surveys from March 1 through September 1. The Petroleum, Oil, and Lubricants Program requires permit applications for underground and above-ground storage tank installations, upgrades, or repairs through the Southern Nevada Health District and AST/UST/POL Program Manager. All work clearance requests must be submitted via AF Form 103 to Nellis CE Customer Service, and if dust permits, ATC/OP, SWPPP, or NPDES permits are required, they must be provided with the AF Form 103 submittal. Contractors must include dust permit and SWPPP maps depicting all unpaved areas used for equipment driving or storage, and must incorporate equipment driving routes in project maps to account for protected desert tortoise areas.

View the file

Other files

File Type Posted
Solicitation Questions and Answers.pdf PDF
Appendix N - RKMF173010 BLDG 10707 Fire Sprinkler Shop Drawings.pdf PDF
Appendix K - 2025 Hydrant Inspection and Flow Test Data Bldg 10707.pdf PDF
Attachment 1 - Solicitation - FA486126Q0025.pdf PDF
Appendix E - Nellis and Creech AFB IFS_22 Jan 2019.pdf PDF
Appendix C - RKMF103011 BLDG 10432 Fire Sprinkler Shop Drawings.pdf PDF
Appendix A - RKMF 173010 As Built Drawings Sections Fire Plumbing.pdf PDF
Attachment 4 - Performance_Work_Statement__Fire_Suppression_Certification - CAO 25AUG26.pdf PDF
Attachment 2 - Price List.pdf PDF
Appendix D - RKMF103011 BLDG 10440 Fire Sprinkler Shop Drawings.pdf PDF
Appendix B - RKMF 103011 F-35 Muns As Built Drawings Sections Fire Plumbing.pdf PDF
Attachment 5 - SCA Wage Determination 2015-5593 Revision 32 - CAO 22 AUG 26.pdf PDF
Appendix I - Hydrazine Fuel Storage and Servicing Facility Specification 2144.pdf PDF
Appendix J - Hydrazine Fuel Storage and Servicing Facility Design Analysis.pdf PDF
Appendix G - Nellis AFB Sole Source EMCS Letter.pdf PDF
Appendix K - Hydrant Inspection and Flow Test Data Bldg 10701.pdf PDF
Appendix L - Hydrant Inspection and Flow Test Data Bldg 10432.pdf PDF
Attachment 3 - Past Performance List of References.pdf PDF
Appendix F - Nellis and Creech AFB IFS Mech-Plumb Req_29 Dec 2025.pdf PDF
Appendix M - Hydrant Inspection and Flow Test Data Bldg 10440.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

99 CES/CEIE

ENVIRONMENTAL PERMITS/AUTHORITY TO PROCEED GUIDANCE

For General Information, call (702) 679-0131 10 April 2023

PERMIT/AUTHORITY TO CONSTRUCT RESPONSIBLE PARTY TO

OBTAIN PERMIT PERMITTING/COORDINATING AGENCY

Air Quality Program Clark County Dust Permit:

- Trench >/= 100 LF

- Disturbance >/= ¼ Acre (10,890 SF)

- Structural demo >/= 1000 SF

Party Executing the Work

Clark County Department of Environment and Sustainability

(DES)

(https://www.clarkcountynv.gov/government/departments/e nvironment_and_sustainability/division_of_air_quality/permitt ing/applications_forms/dust_permitting_forms.php) (702) 455-1524

Authority to Construct (ATC) required prior to commencing construction:

- Boilers

- Cooling Towers

- Baghouse/Cyclones

- Fuel Dispensing Equipment

- Fuel Storage Tanks

- Asphalt Batch Plant

- Concrete Batch Plant

- Rock Crusher/Mineral Processing

- Paint Booths

- Media Blasters

- Water Heaters

- HVAC Heaters

- Generators

- Hush House

- Degreasers

- Fuel Cell Maintenance

- Woodworking Equipment

Nellis AQ PM is responsible for the permitting process

(nellis.air.quality@us.af.

mil (702) 652-8897/2882)

The party adding the equipment/operation is responsible for ensuring the permitting process has been initiated. If the

AQ PM has not been contacted concerning the equipment/operation and been provided all requested information then the permitting process has not been initiated.

Clark County DES

- Refrigerants and other Ozone Depleting Chemicals Contractor Party Executing the Work Contact AQ PM (702) 652-8897/2882

Drinking Water - Water Program Projects impacting drinking water must be submitted to the BSDW for review prior to commencing the water project. Contractor

Party Executing the Work

Nevada Division of Environmental Protection (NDEP) Bureau of Safe Drinking Water View requirements here: https://ndep.nv.gov/water/drinking-water/engineering-reviews/when-to-submit-plans

Water Program Manager (702) 652-8897

Storm Water - Water Program Temporary Discharge to Waters Discharges from remediation and disinfection activities, well pump testing, aquifer drawdown testing, dewatering, underground injection of fluids, and other discharges of a temporary nature.

Contractor Party Executing the Work Nevada Division of Environmental Protection (NDEP)

Construction Storm Water Discharge Permit Requires SWPPP– If an acre or more of land is disturbed.

SWPPP Format: https://ndep.nv.gov/water/water-pollution-control/permitting/stormwater-discharge-permits/construction-sites-greater-than-1-acre

Contractor Party Executing the Work

Submit a copy of SWPPP to base Water Program Manager for approval and provide a copy of NoI. Submit NoT at completion of the project. Provide to base contracting for Civil Engineering to incorporate in project folder. SWPPP is approved by WQ PM. NOI with CSW is issued by NDEP after paying the fee. Both NOI and SWPPP will need approval from WQ PM. NDEP SWPPP form link:

https://ndep.nv.gov/uploads/water-wpc-permitting-stormwater-construction-docs/nvr100000-const-swppp-template-2017.pdf (please fill out with as much details as possible) and store the plan with the map at jobsite.

https://www.clarkcountynv.gov/government/departments/environment_and_sustainability/division_of_air_quality/permitting/applications_forms/dust_permitting_forms.php https://www.clarkcountynv.gov/government/departments/environment_and_sustainability/division_of_air_quality/permitting/applications_forms/dust_permitting_forms.php https://www.clarkcountynv.gov/government/departments/environment_and_sustainability/division_of_air_quality/permitting/applications_forms/dust_permitting_forms.php mailto:nellis.air.quality@us.af.mil mailto:nellis.air.quality@us.af.mil http://www.leg.state.nv.us/nac/NAC-445A.html#NAC445ASec66585 https://ndep.nv.gov/water/drinking-water/engineering-reviews/when-to-submit-plans https://ndep.nv.gov/water/drinking-water/engineering-reviews/when-to-submit-plans https://ndep.nv.gov/water/water-pollution-control/permitting/stormwater-discharge-permits/construction-sites-greater-than-1-acre https://ndep.nv.gov/water/water-pollution-control/permitting/stormwater-discharge-permits/construction-sites-greater-than-1-acre https://ndep.nv.gov/water/water-pollution-control/permitting/stormwater-discharge-permits/construction-sites-greater-than-1-acre https://ndep.nv.gov/uploads/water-wpc-permitting-stormwater-construction-docs/nvr100000-const-swppp-template-2017.pdf https://ndep.nv.gov/uploads/water-wpc-permitting-stormwater-construction-docs/nvr100000-const-swppp-template-2017.pdf https://ndep.nv.gov/uploads/water-wpc-permitting-stormwater-construction-docs/nvr100000-const-swppp-template-2017.pdf

Water Program Manager (702) 652-7639 Asbestos/Lead/Toxics Program

Asbestos:

- ACM Survey/Abatement

- Notification/Demolition Permit

- ACM Waste Manifest

- Abatement Plans approval

Lead Based Paint:

- LBP Survey/Abatement

Contractor Party Executing the Work

(Bill of Lading signed by Authorized Pgm Mgr, notify at least 2 days before shipment (702) 679-0131)

Provide to base contracting for Civil Engineering to incorporate in project folder.

Water connections tapping into ACM distro lines will require asbestos abatement plans approved before disturbing (cutting, drilling) the line.

Asbestos Demo Notification (10 days Prior to demo) https://www.clarkcountynv.gov/government/departments/en vironment_and_sustainability/division_of_air_quality/permitti ng/applications_forms/asbestos_forms.php

Lead Based Paint:

- LBP Waste Manifest

Contractor Party Executing the Work

Provide to base contracting for Civil Engineering to incorporate in project folder.

Manifest signed by Authorized Pgm Mgr (HAZWASTE PM,

(702) 652-3159)

- PCB disposal

- Hazardous Materials

- Hazardous Waste Contractor

Nellis Hazardous Waste Pgm Mgr: (702) 652-3159 Obtain HAZMART ((702) 652-9856) approval.

Nellis Hazardous Material Pgm Mgr: (702) 652-3159 Nellis Bioenvironmental Engr: (702) 652-3316 Nellis Haz Waste Pgm Mg: (702) 652-3159/679-0476

Solid Waste Program

- Landfills (None on Nellis)

- Recycled Materials

Contractor Party Executing the Work

Nellis Solid Waste Program Manager: (702) 652-4123 Qualified Recycling Program Technician: (702) 652-5270

Cultural Resources Cultural Resources:

- Historical Sites/Facilities

- Archaeological Sites

- Tribal Consultation

Nellis AFB CRM

Nellis Archaeologists: (702) 652-6097

(702) 652-5813

Natural Resources Program Natural Resources:

- Presence of Desert Tortoise Nellis AFB-Area I, Area II, and NTTR: Sec 7 consultation with USFWS

- Presence or Creation of a Wetland-USACE Permit

- Plants and Landscaping-tree removals-bldg demos:

Migratory Bird Treaty Act nesting surveys from Mar 1 thru Sep 1.

Proponent/ Contractor Party Executing the Work

Nellis Natural Resource Program Managers:

(702) 652-4354/7606

Petroleum, Oil, and Lubricants Program (POL) Above-Ground Storage Tank (AST), Underground Storage Tank (UST) and Generator

- UST Installation/Upgrade/Repair Permit Application

- AST installation, upgrade, or repair

- Generator installation, upgrade, or repair

Contractor Party Executing the Work

USTs— Southern Nevada Health District: (702) 759-0603

ASTs—Storage tanks AST/UST/POL Program Manager (702)652-6121/4123

Fire Dept.—Nellis: (702) 652-9626

FUEL SPILL Contractor

Immediately call this number anytime of the day.

Recommend posting at the job site.

702-277-1977

Work Clearance Requests (AF Form 103) Work Clearance Requests (AF Form 103)

Contractor Party Executing the Work

Nellis CE Customer Service: (702) 652-2301 NOTE: if dust permit, ATC/OP, SWPPP, or NPDES permit required based on the guidance provided in this document, must provide them with AF Form 103 submittal!

If dust permit, ATC/OP, SWPPP, or NPDES permit required based on the guidance provided in this document, must provide them with AF Form 103 (dig permit) submittal!

If driving or storing equipment on unpaved ground, Dust permit and SWPPP Map must include those areas.

Nellis AFB unpaved areas may also be protected desert tortoise areas, therefore it is important to include the equipment driving route in the project map submittal.

https://www.clarkcountynv.gov/government/departments/environment_and_sustainability/division_of_air_quality/permitting/applications_forms/asbestos_forms.php https://www.clarkcountynv.gov/government/departments/environment_and_sustainability/division_of_air_quality/permitting/applications_forms/asbestos_forms.php https://www.clarkcountynv.gov/government/departments/environment_and_sustainability/division_of_air_quality/permitting/applications_forms/asbestos_forms.php

File details come from the government source that posted it. Updated .