Appendix G - ICE Facility Design Guide.pdf

PDF 34 MB Posted

Attached to
Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s
Solicitation number
70CMSW26R00000012
Issued by

About this file

This is the ICE Facility Design Guide (FDG), revised 2025, which serves as a comprehensive reference document for planning and developing Immigration and Customs Enforcement facilities across the country. The guide provides design standards, security requirements, space planning criteria, and architectural specifications for ICE facility projects, addressing components including Enforcement and Removal Operations (ERO), Homeland Security Investigations (HSI), Management & Administration (M&A), Office of the Principal Legal Advisor (OPLA), and Office of Professional Responsibility (OPR). The FDG includes facility diagrams showing site layouts and adjacencies for each directorate, updated project and architectural requirements, minimum and maximum square footages for spaces, DHS Space Utilization Requirements for workspace areas, and a waiver process for exceptions to standards. The document establishes higher-level directives referencing applicable instructions, statutes, regulations, executive orders, DHS policy directives, ICE guidelines, and industry codes and standards that must be followed during facility design and construction.

The FDG encompasses planning principles for site selection and building layout specific to each ICE component, including considerations for adjacent uses, building class requirements, co-location policies, parking provisions, sallyport specifications, and security fencing. Section 6 addresses project facility requirements covering general guidelines, industry codes and standards, design and construction guidance, security requirements (including Enterprise Physical Access Control Systems, Intrusion Detection Systems, and Video Surveillance Systems), site requirements (parking, sallyports, gates, guard houses, and vehicle barriers), landscaping, telecommunications infrastructure compliant with OCIO standards, and electrical systems including emergency and standby power. The document provides detailed space and room design criteria including office spaces, conference and training rooms, communications facilities, fitness areas, laboratories, secured areas, detention areas, and support spaces, with prototypical floor plans and design specifications. Additional appendices include example signage packages, detention area details, and Faraday room specifications for Homeland Security Investigations facilities. The FDG is designated as Controlled Unclassified Information (CUI) and is intended for use by design teams, architects, project managers, and ICE facility personnel in developing projects that align with ICE's mission while reducing overall square footage footprint and improving design efficiency.

View the file

Other files

File Type Posted
Attachment N RFP Questions Government Repsonses 8.17.2026.docx DOCX document
SF 30_70CMSW26R00000012.pdf PDF
Attachment N RFPQuestions Government Repsonses 8 13 2026.pdf PDF
SF 1442_70CMSW26R00000012.pdf PDF
REVISED Appendix J Electronic Security System SOW PIDC 3 7 25.pdf PDF
REVISED Attachment H2 OFTP Classroom 8 12 2026.pdf PDF
SACC IDIQ Solicitation rev Aug 12 2026.pdf PDF
REVISED Attachment H1 PIDC SHU SOW 8 12 2026.pdf PDF
APPENDIX I - VSS spec for D-B.pdf PDF
APPENDIX D - SITE PLAN DEVIATIONS.pdf PDF
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf PDF
APPENDIX H - ICE Facility Design Guide (2025).pdf PDF
APPENDIX C - ARCHITECTURAL PLAN DEVIATIONS.pdf PDF
APPENDIX E - CUBBY-LOCKER COMBO DETAIL.pdf PDF
APPENDIX L - ICE SITE SPECIFIC CANBLING REQUIREMENTS.pdf PDF
APPENDIX A - 35 Concept Drawings.pdf PDF
APPENDIX M- ICE VTC SOW.pdf PDF
APPENDIX F - Ft. Benning Installation Design Guidelines.pdf PDF
APPENDIX K - ICE ESS SOW.pdf PDF
APPENDIX N - ALEKNO AREA UTILITY MAP.pdf PDF
APPENDIX J - Ft. Benning NEC ISP-OSP TTP v2.1.pdf PDF
APPENDIX B - Project Manual.pdf PDF
APPENDIX G - ICE Cabling Standard.pdf PDF
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf PDF
Attachment K_IDIQ Pricing Template.xlsx XLSX spreadsheet
Attachment L_Task Order Pricing Template.xlsx XLSX spreadsheet
Attachment E - Scenario 5_Florence SHU SOW.pdf PDF
Attachment N_RFP Questions Submission Template.docx DOCX document
Attachment F - Scenario 6_Krome SHU SOW.pdf PDF
Final _SACC SOW_7.1.2026 1_KI.docx DOCX document
EL PASO SHU SOW.docx DOCX document
Appendix H Performance-Based National Detention Standards.pdf PDF
Appendix B - Geotech Rpt.pdf PDF
Appendix I - Prison Rape Elimination Act.pdf PDF
Appendix C - SPC Detention Construction Stnds.pdf PDF
SACC IDIQ Solicitation_15 July 2026.pdf PDF
Appendix E - ICE Cabling Standard.pdf PDF
Aquadilla SHU SOW.docx DOCX document
Appendix J - Electronic Security Systems.pdf PDF
PIDC SHU SOW May 2026.docx DOCX document
Appendix A - PIDC Concept Dwgs.pdf PDF
Appendix F - ICE Dwg Stnds.pdf PDF
OFTP Classroom SOW Final 7 6 2026.docx DOCX document
Appendix D - VSS spec for D-B.pdf PDF
El Centro SHU SOW.docx DOCX document
Batavia SHU SOW.docx DOCX document
St. Thomas SHU SOW.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .