APPENDIX D - SITE PLAN DEVIATIONS.pdf
PDF 1 MB Posted
- Attached to
- Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s Federal contract opportunity
- Solicitation number
- 70CMSW26R00000012
- Issued by
- Immigration and Customs Enforcement
About this file
This document is a site plan for a construction project at Fort Benning, Georgia, prepared for the U.S. Immigration and Customs Enforcement (ICE) agency. The revised site plan, dated January 6, 2023 (35% final submittal), shows the layout of a main classroom building (FFE 276) with associated infrastructure and site work modifications at the facility located at 9495 Delegated Drive, Orlando, Florida.
The plan designates specific construction work areas and deletion areas marked with "X" symbols, indicating where site work should not occur. Key site improvements include new road paving connecting to the existing road between designated lines, a new parking lot with minimum 60 spaces featuring separate entrance and exit access from existing roads, asphalt pavement with curb and gutter, concrete sidewalks, bio-retention/infiltration basins, chainlink fencing with cantilever and swing gates, handicap ramps and parking signage, utility infrastructure including pad-mounted transformers and HVAC units (air-cooled condensing units and heat pumps), and concrete slabs with stairs. The design was prepared by KZF Design (Cincinnati, Ohio) and is referenced under solicitation number 70CMSW22Q00000001 and contract number 70Z05018DKZFNPL08. The document is marked "NOT FOR CONSTRUCTION" and serves as a design submittal document rather than a procurement solicitation.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG. 2294
BLDG. 2296
BLDG. 2291
S
PA
C
ES
S
PA
C
ES
S
PA
C
ES
S
PA
C
ES
FUTURE
ROAD
FUTURE
ROAD
MAIN CLASSROOM BUILDING
FFE 276
(SEE ARCHITECTURAL PLANS)
TRENCH UNDER
EXCAVATION FOR
FUTURE POWER LINE
TRENCH UNDER
EXCAVATION FOR
FUTURE POWER LINE
1-
ST
O R
Y C
O N
C R
ET
E
BL
O
C K
BU
IL
D
IN
G
1-
ST
O R
Y C
O N
C R
ET
E
BL
O
C K
BU
IL
D
IN
G
SIGN
"WOMACK MOTEL"
GAS
CHAMBER
RIP RAP
ED
G
E O
F
PA
VE
M
EN
T
DECK
DECK
D
EC
K
X
X
DECK
DECK
D
EC
K
Control Point 1 N = 853629.44' E = 2043732.52' Elev. = 282.04' Set Concrete Monument w/disk Stamped "1 DRMP Inc. Vertical Control"
Control Point 54 N = 853360.91'
E = 2044281.35' Elev. = 273.76'
Set 5/8" Iron Rod w/Cap Stamped "DRMP
Traverse"
Control Point 56
N = 853608.45'
E = 2043631.50'
Elev. = 279.01'
Set Nail & Disk Stamped
"Drmp Traverse"
Control Point 57 N = 853540.26'
E = 2043864.83' Elev. = 279.72'
Set 5/8" Iron Rod w/Cap Stamped "DRMP
Traverse"
26" Pine 26" Pine
21" Pine 27" Pine
28" Oak
27" Pine
29" Pine 25" Pine
13" Oak 20" Oak
31" Pine
30" Pine
WM
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
IN
D
IA
N
H
EA
D R
O
AD
W(C
W(C
W(C
W(C
6' CHAINLINK FENCE
GRAVEL
RIVER ROCK
RIP RAP
VE
G
ET
AT
IO
N
A R
EA
6' C
H
AI
N
LI
N K
FE
N
C E
CONCRETE
BELFRY STREET
IN
D
IA
N
H
EA
D R
O
AD
IN
D
IA
N
H
EA
D R
O
AD
AS
PH
AL
T
PA
VE
M
EN
T
AS
PH
AL
T
PA
VE
M
EN
T
ED
G
E O
F
PA
VE
M
EN
T
ED
G
E O
F
PA
VE
M
EN
T
ED
G
E O
F
PA
VE
M
EN
T
ED
G
E O
F
PA
VE
M
EN
T
ED
G
E O
F
PA
VE
M
EN
T
ED
G
E O
F
PA
VE
M
EN
T
CONCRETE
CONCRETE
CONCRETE
SLAB
D
IT
C H
STAIRS
D
IT
C H
WOOD SHOT HOUSE
(NO ROOF)
WOOD SHOT HOUSE
(NO ROOF)
WOOD SHOT HOUSE
(NO ROOF)
1-STORY
CONCRETE
BLOCK BUILDING
CONCRETE
SLAB
CONCRETE
SLAB
STAIRS
STAIRS
STAIRS
STAIRS
STAIRS
SPOIL
PILE
CONCRETE BATH HOUSE
CONCRETE
SLAB
CONCRETE
SLAB
S
5 7
3(TYP.)
3(TYP.)
LEGEND:
CONCRETE WALK
ASPHALT PAVEMENT
GRAVEL
FENCE
HANDICAP SIGNSTORM INLET
BIO-RETENTION/INFILTRATION BASIN
BIO-RETENTION/INFILTRATION
00 30' 60'
SCALE: 1" = 30'
SHEET ID
FT
B
EN
N
IN
G
, G
EO
R G
IA
U
S
IM
M
IG
R A
TI
O
N A
N D
C U
ST
O
M S
EN
FO
R C
EM
EN
T
(IC
E)
D
EL
EG
A
TE
D D
R
IV
E O
R
LA
N D
O , F
L
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
JA
N
, 2
- F
IN
AL
S
U
BM
IT
TA
L (3
5%
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
IM
M
IG
R
A
TI
O N
C
U
ST
O M
S
EN
FO
R
C
EM
EN
T
(IC
E)
File Path:
Plot Date:
M A
R K
D
ES
C R
IP
TI
O N
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
TR
EE
T C
IN
C
IN
N
AT
I, O H
C
M
SW
Q
Z0
D
KZ
FN
PL
NOT FOR CONSTRUCTION
MCB
H U
TZ
EL
/2
2/
CS101
SI
TE
P
LA
N
PE
F
PE
F
G B
CODED NOTES:
1. ASPHALT PAVEMENT WITH CURB AND GUTTER
2. CONCRETE SIDEWALK
3. BIO-RETENTION/INFILTRATION BASIN (SEE SHEET CG101)
4. PAD MOUNTED UTILITY TRANSFORMER
5. CHAINLINK FENCE (SEE DETAIL C-501 AND C-502)
6. 24-FT WIDE CANTILEVER GATE (SEE DETAIL SHEET C-504)
7. DOUBLE LEAF SWING GATE (SEE DETAIL SHEET C-503)
8. HANDICAP RAMP
9. CROSSWALK
10. CONCRETE PATIO
11. FACILITY SIGN
12. PARKING SPACE
13. AIR COOLED CONDENSING UNIT (SEE MECHANICAL PLAN
M-101)
14. HEAT PUMP (SEE MECHANICAL PLAN M-101)
15. HANDICAP PARKING SIGN
MATCH LINE (SEE CS102)
NOTE 10
__________________________________________________________________________________________ 2
33" Pine
___________________________________________________________________________________________________ NO SITE WORK ABOVE THIS LINE _
_NOTE 2___
NOTE 2___
NOTE 10
X
X
XX
CONNECT TO EXISTING ROAD ______________________
NEW PARKING LOT, WITH
SEPARATE ENTRANCE
FROM EXISTING ROAD
AND SEPARATE EXIT
FROM NEW PAVEMENT,
WITH A MINIMUM OF 60
SPACES
NOTES 9, 15 APPLY
X
REVISED SITE PLAN
X = DELETE WORK
NEW ROAD PAVING BETWEEN LINES ONLY
LIMIT OF NEW ROAD PAVING
X
File details come from the government source that posted it. Updated .