APPENDIX L - ICE SITE SPECIFIC CANBLING REQUIREMENTS.pdf

PDF 2 MB Posted

Attached to
Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s Federal contract opportunity
Solicitation number
70CMSW26R00000012
Issued by
Immigration and Customs Enforcement

About this file

This document comprises a Site-Specific Cabling Requirements (SSCR) package and the ICE OCIO Structured Cable Plant Standard (January 2025 Edition) for an Information and Communications Technology (ICT) cabling infrastructure project at Fort Moore, Georgia.

The SSCR addresses the OFTP ATOC Classroom project (Request/Project #REQ1120710/PRJ0212403) located at 6760 Upton Ave., Fort Moore, GA 31905. The contractor must provide plenum-rated horizontal cabling between MDF Room 116 and 75 work area outlets (WAOs), consisting of 8 A1 outlets (single blue CAT-6 UTP), 43 A2 outlets (blue and gray CAT-6 UTP), 4 A3 outlets (dual blue and gray CAT-6 UTP), 14 A5 outlets (CATV with RG6 coax and CAT-6 UTP), and 6 A6 outlets (Wireless Access Point connections with CAT-6A UTP in surface-mount boxes with 20-foot service loops). The contractor must also furnish specific patch cord inventories including blue, gray, and yellow CAT-6/6A cables in various lengths, plus multimode and single-mode fiber patch cables for equipment connectivity. Installation must be scheduled consecutively through completion and ready for use. Testing must achieve overall "Pass" results with properly cleaned connector ports using manufacturer-matched equipment; marginal Pass results are not acceptable. Closing documents include test results organized by floor and closet, project record drawings with labeling as installed, and a summary report transferred directly from test instruments to PDF format without data manipulation.

The comprehensive Structured Cable Plant Standard establishes performance specifications for Division 27 Communications low-voltage cabling across all ICE facilities, supporting Commercial Television (CATV/IPTV), VoIP telephony, Ethernet LAN (wired and 802.11 wireless), and service provider utilities. The standard mandates specific infrastructure requirements including EMI clearances (5 inches from fluorescent lighting, 12-48 inches from electrical power depending on kVA rating, 48 inches from motors/transformers), conduit specifications (EMT with compression fittings, minimum two 4-inch sleeves between Demarc and MDF, pull boxes every 100 feet and every 180-degree bend), grounding and bonding requirements (Primary and Secondary Bonding Busbars, Rack Bonding Busbars with minimum #6 AWG stranded copper conductors), and distribution closet specifications (minimum 10.5 feet x 14.5 feet for MDFs serving up to 20,000 square feet and 192 WAOs). Backbone cabling requires twelve strands each of OS2 single-mode and OM3 multi-mode fiber between Demarc and MDF with fusion-spliced LC connectors, fifty-pair CAT-5e copper, and RG11 coax for CATV distribution. Horizontal cabling must utilize CAT-6/6A UTP or STP (terminated ANSI/TIA T568B) and RG6 coax for work areas. All cabling must be plenum-rated inside facilities and indoor/outdoor plenum-rated for outside cable plant. The standard specifies environmental controls (64-81°F, maximum 60% relative humidity, one air change per hour), fire protection (preaction sprinkler or dry suppression systems recommended), power receptacles (general-purpose NEMA 5-20R outlets every 6 feet in closets; dedicated red receptacles on emergency power including NEMA 5-20R quad, L5-30R, and L6-30R configurations for equipment), and occupancy-sensor-controlled lighting (minimum 500 lux horizontal, 200 lux vertical at 3 feet AFF). Documentation requirements include machine-printed labels with specific naming conventions (e.g., 111-A-A01 format), as-built drawings, test results organized by closet with clear identification, and a work results report on contractor letterhead addressing the authorized ICE contract representative with project identification details, installation summary, deviations, certification statement, warranty information, and final inspection acceptance.

View the file

Other files for this federal contract opportunity

Other files attached to Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s, newest first.
File Type Posted
Attachment N RFP Questions Government Repsonses 8.17.2026.docx DOCX document
REVISED Attachment H2 OFTP Classroom 8 12 2026.pdf PDF
SACC IDIQ Solicitation rev Aug 12 2026.pdf PDF
REVISED Attachment H1 PIDC SHU SOW 8 12 2026.pdf PDF
SF 30_70CMSW26R00000012.pdf PDF
REVISED Appendix J Electronic Security System SOW PIDC 3 7 25.pdf PDF
SF 1442_70CMSW26R00000012.pdf PDF
Attachment N RFPQuestions Government Repsonses 8 13 2026.pdf PDF
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf PDF
APPENDIX N - ALEKNO AREA UTILITY MAP.pdf PDF
APPENDIX I - VSS spec for D-B.pdf PDF
APPENDIX E - CUBBY-LOCKER COMBO DETAIL.pdf PDF
APPENDIX D - SITE PLAN DEVIATIONS.pdf PDF
APPENDIX G - ICE Cabling Standard.pdf PDF
APPENDIX B - Project Manual.pdf PDF
APPENDIX F - Ft. Benning Installation Design Guidelines.pdf PDF
APPENDIX C - ARCHITECTURAL PLAN DEVIATIONS.pdf PDF
APPENDIX K - ICE ESS SOW.pdf PDF
APPENDIX J - Ft. Benning NEC ISP-OSP TTP v2.1.pdf PDF
APPENDIX A - 35 Concept Drawings.pdf PDF
APPENDIX M- ICE VTC SOW.pdf PDF
APPENDIX H - ICE Facility Design Guide (2025).pdf PDF
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf PDF
Attachment L_Task Order Pricing Template.xlsx XLSX spreadsheet
Attachment K_IDIQ Pricing Template.xlsx XLSX spreadsheet
Attachment E - Scenario 5_Florence SHU SOW.pdf PDF
Attachment F - Scenario 6_Krome SHU SOW.pdf PDF
Attachment N_RFP Questions Submission Template.docx DOCX document
Final _SACC SOW_7.1.2026 1_KI.docx DOCX document
Appendix B - Geotech Rpt.pdf PDF
St. Thomas SHU SOW.docx DOCX document
EL PASO SHU SOW.docx DOCX document
El Centro SHU SOW.docx DOCX document
Batavia SHU SOW.docx DOCX document
Appendix H Performance-Based National Detention Standards.pdf PDF
Appendix G - ICE Facility Design Guide.pdf PDF
OFTP Classroom SOW Final 7 6 2026.docx DOCX document
Aquadilla SHU SOW.docx DOCX document
Appendix I - Prison Rape Elimination Act.pdf PDF
Appendix F - ICE Dwg Stnds.pdf PDF
Appendix E - ICE Cabling Standard.pdf PDF
SACC IDIQ Solicitation_15 July 2026.pdf PDF
PIDC SHU SOW May 2026.docx DOCX document
Appendix J - Electronic Security Systems.pdf PDF
Appendix D - VSS spec for D-B.pdf PDF
Appendix C - SPC Detention Construction Stnds.pdf PDF
Appendix A - PIDC Concept Dwgs.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE-SPECIFIC CABLING REQUIREMENTS

PROJECT INFORMATION

ADDRESS

6760 UPTON AVE.

FORT MOORE, GA 31905

SITE CODE/SITE NAME

FFR/6760 UPTON AVE., FORT MOORE, GA

PROJECT NAME

OFTP ATOC CLASSROOM

REQUEST/PROJECT #

REQ1120710/PRJ0212403

ICE POINTS OF CONTACT

REGIONAL DEPLOYMENT LEAD (RDL) LOCAL ITFO SITE LEAD

NAME

GORDON LI

PHONE

(202) 578-7133

EMAIL

GORDON.LI@ICE.DHS.GOV

NAME

STEVEN THOMAS

PHONE

(229) 838-1227

EMAIL

STEVAN.J.THOMAS@ASSOCIATES.ICE.DHS.GOV

DOCUMENT VERSION

DATE DESCRIPTION

06/29/2026 CABLING REQUIREMENTS

Site-Specific Cabling Requirements

1. PURPOSE

The Immigration and Customs Enforcement (ICE) - Office of the Chief Information Officer (OCIO) Structured Cable Plant Standard, January 2025 Edition, outlines the performance specifications for Division 27 Communications low voltage cabling in ICE facilities. The Site-Specific Cabling Requirements (SSCR) document consists of a narrative and drawings that aim to define the unique project requirements and shall be used in combination with the ICE Cable Plant Standard to provide a complete and fully functional cabling system.

The cabling infrastructure is intended to support the following Information and Communications Technology (ICT) special systems (powered equipment and end user devices not in scope):

A. Commercial Television: Community Antennae Television (CATV) or Internet Protocol Television (IPTV).

B. Telephony: Voice over Internet Protocol (VoIP).

C. Ethernet Local Area Networks (LAN): Wired and 802.11 wireless applications. Installation of Owner furnished wireless access points (WAPs) and housings not in scope.

D. Service Provider utilities: Facilitate circuit extension within the facility via ICE owned riser backbone cabling.

2. PROJECT CONDITIONS

A. The Contractor shall schedule and execute the Information and Communications Technology (ICT) cabling installation work in consecutive business days through to completion and ready for use, unless agreed otherwise by ICE. Include a detailed installation schedule in proposal for ICE approval.

B. The Demarcation (Demarc) Room is the building entrance facility for public communications utilities and private campus outside cable plant (OSP). Also, the location of utility Service Provider/Local Exchange Carrier (LEC) head end network equipment. Locate new infrastructure adjacent to Service Provider circuit interface connection points.

1. The Demarc is a shared space with the Main Distribution Frame (MDF) Room.

C. The Main Distribution Frame (MDF) Room is the centralized location for head end equipment supporting OCIO network and telephony systems, and the distribution point for associated copper and optical fiber backbone cabling. Also, the MDF is the floor or space serving OCIO telecommunications room for terminating horizontal cabling infrastructure supporting Work Area Outlets (WAO).

1. MDF Room 116

3. BACKBONE CABLING DISTRIBUTION

Section not applicable.

4. HORIZONTAL CABLING DISTRIBUTION

Task Description: Provide plenum rated horizontal cabling between distribution closets and Work Area Outlets (WAO) identified on floor plans. Table provided for special systems engineering coordination.

Quantity Outlet Type Special Notes

A. Distribution Closet: MDF Room 116

8 A1

43 A2

4 A3

14 A5

6 A6

75 Project Total

5. OUTLET CONFIGURATION DETAILS

The table below details typical ICE Work Area Outlet (WAO) configurations. Provide matching cable and jack colors and terminate ANSI/TIA T568B. Coordinate faceplate styles per WAO location and application.

Faceplate finishes to be approved by the Architect or local ICE point of contact.

Outlet Type Description Example

Program: Enterprise “A” Series

A1

WAO: (1) blue CAT-6 UTP.

A2

WAO: (1) blue and (1) gray CAT-6 UTP.

A3

WAO: (2) blue and (2) gray CAT-6 UTP.

A5

CATV outlet: (1) white RG6, 75-ohm, 2000 MHz dual shield coax terminated with “F” type connector and (1) gray CAT-6 UTP.

A6 Wireless Access Point (WAP) outlet: (2) yellow CAT-6A UTP in a plenum rated surface mount box, with a 20’ service loop, structurally supported above false ceilings or open areas.

6. EQUIPMENT PATCH CORDS

Task Description: Furnish Patch Cords to Local ITFO Site Lead for installation by ICE staff. Verify appropriate lengths for rack and/or cabinet cross connecting.

Patch Cord Inventory

Quantity Length Description

48 5 ft. Blue CAT-6 UTP patch cables for “A” series patch panels.

48 10 ft. Blue CAT-6 UTP patch cables for “A” series workstations.

15 3 ft. Gray CAT-6 UTP patch cables for “A” 1series CATV locations.

12 7 ft. Gray CAT-6 UTP patch cables for “A” series patch panels.

12 10 ft. Gray CAT-6 UTP patch cables for “A” series workstations.

12 5 ft. Yellow CAT-6A UTP patch cables for “A” series patch panel supporting Wi-Fi.

12 20 ft. Yellow CAT-6A UTP patch cables for “A” series wireless access points (WAPs).

4 10 meters 50/125 μm OM3 multi-mode duplex, LC to LC fiber patch cables to support equipment connectivity.

4 10 meters Single-mode OS2 duplex, LC to LC fiber patch cables to support equipment connectivity.

7. DISTRIBUTION CLOSET INFRASTRUCTURE

Task Description: Provide the following Distribution Closet build components. Terminate cables in color dedicated, and media independent, fiber housings and 110-Type IDC copper patch panels - partially loaded modular, or frame, type patch panels are not allowed.

8. CLOSING DOCUMENTS

A. Properly clean connector ports prior to testing. Test and certify the horizontal cabling using equipment, patch/launch cords, and adapters matched and qualified by the equipment manufacturer, and to the performance category of the cabling provided. Properly clean connector ports prior to testing. Ensure test equipment is calibrated in compliance with the manufacturer's requirements, referenced, and has up‐to‐date software/firmware. Resolve deficiencies to achieve an overall “Pass” result, marginal Pass* results will not be accepted and must be resolved.

B. Provide test results in a summary report, transferred from the test instrument to a computer without manipulation of the data, and saved as pdf files. Organize results per floor, distribution closet, and specified labeling scheme.

C. Provide project record drawing (as-builts) utilizing the OCIO SSCR floorplan and the identification labeling as installed. This SSCR floorplan will include the locations and WAO types. The labeling shall correspond to the test results.

9. APPENDIX: DRAWINGS

GENERAL NOTES

1. THE IMMIGRATION AND CUSTOMS ENFORCEMENT (ICE) - OFFICE OF THE CHIEF INFORMATION OFFICER (OCIO) STRUCTURED CABLE PLANT STANDARD, JANUARY 2025 EDITION, OUTLINES THE PERFORMANCE

SPECIFICATIONS FOR DIVISION 27 COMMUNICATIONS LOW VOLTAGE CABLING IN ICE FACILITIES. THE SITE-SPECIFIC CABLING REQUIREMENTS (SSCR) DOCUMENT CONSISTS OF A NARRATIVE AND DRAWINGS THAT AIM TO

DEFINE THE UNIQUE PROJECT REQUIREMENTS AND SHALL BE USED IN COMBINATION WITH THE ICE CABLE PLANT STANDARD TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL CABLING SYSTEM.

2. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENTS AND LOCATIONS OF DIVISION 27 COMMUNICATIONS SUBSYSTEMS. COORDINATE WORK AREA

COMMUNICATIONS OUTLET LOCATIONS WITH FINAL FURNITURE PLANS AND OTHER DISCIPLINES TO MEET THE DESIGN INTENT OF BEING PRACTICAL AND READILY ACCESSIBLE.

3. COMMUNICATIONS OUTLETS REQUIRE GENERAL PURPOSE POWER RECEPTACLES WITHIN 2’, UNLESS OTHERWISE NOTED.

ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

AV AUDIO-VISUAL

CAA CONTROLLED ACCESS AREA

CATV COMMUNITY ANTENNAE TELEVISION/COMMERCIAL TELEVISION

EMT ELECTRICAL METALLIC TUBING

HSDN HOMELAND SECURITY DATA NETWORK

ITFO INFORMATION TECHNOLOGY FIELD OFFICE

MDF MAIN DISTRIBUTION FRAME ROOM

OCIO OFFICE OF THE CHIEF INFORMATION OFFICER

OD OUTSIDE DIAMETER

RBB RACK BONDING BUSBAR

RWC REMOTE WIRING CLOSET

SBB SECONDARY BONDING BUSBAR

STP SHIELDED TWISTED PAIR

UTP UNSHIELDED TWISTED PAIR

ELEVATION AND DETAIL CALLOUT SYMBOLS

DETAIL NUMBER

DETAIL SHEET

ELEVATION ORIENTATION

DETAIL NUMBER

DETAIL SHEET

KEYNOTE TAG

A1

A1

A1

A1

ELEVATION AND DETAIL CALLOUT SYMBOLS

DETAIL NUMBER

DETAIL SHEET

ELEVATION ORIENTATION

DETAIL NUMBER

DETAIL SHEET

KEYNOTE TAG

A1

INFORMATION AND COMMUNICATIONS TECHNOLOGY SYSTEMS

T0.00

NOTES AND SYMBOLS

ADDRESS

6760 UPTON AVE,

ATOC MAIN CLASSROOM BLDG

FORT MOORE, GA 31905

SCALE

NOT TO

SCALE

DATE SUBMISSION

06/29/2026 CABLING REQUIREMENTS

REQ/PRJ #

REQ1120710

PRJ0212403

INFORMATION AND COMMUNICATIONS TECHNOLOGY SYSTEMS

T0.00

NOTES AND SYMBOLS

ADDRESS

6760 UPTON AVE,

ATOC MAIN CLASSROOM BLDG

FORT MOORE, GA 31905

SCALE

NOT TO

SCALE

DATE SUBMISSION

06/29/2026 CABLING REQUIREMENTS

REQ/PRJ #

REQ1120710

PRJ0212403

SYMBOL LEGEND

COMMUNICATIONS WALL WAO MOUNTED AT TYPICAL GENERAL PURPOSE ELECTRICAL OUTLET HEIGHT, APPROXIMATELY 18-INCHES TO CENTER AFF. MOUNT WAO’S AT

COUNTER TYPE WORKSPACES TO BE PRACTICAL AND READILY ACCESSIBLE ABOVE THE COUNTER SPACE, APPROXIMATELY 42-INCHES TO CENTER AFF.

COMMUNICATIONS MODULAR FURNITURE WAO. ROUTE WAO CABLES THROUGH FURNITURE RACEWAYS DIRECTLY TO EACH WORKSTATION AND TERMINATE IN A COMPATIBLE

SNAP IN FACEPLATE TO FURNITURE BASE.

COMMUNICATIONS WALL PHONE WAO MOUNTED AT 48” TO CENTER AFF. DOES NOT REQUIRE GENERAL PURPOSE ELECTRICAL OUTLET.

COMMUNICATIONS COUNTERTOP WAO MOUNTED AT 48” TO CENTER AFF.

COMMUNICATIONS FLOOR OUTLET. COORDINATE WAO’S AT CONFERENCE TABLE LOCATIONS TO BE WITHIN THE FURNITURE WITH COMPATIBLE COMPONENTS.

COMMERCIAL TELEVISION WAO MOUNTED ABOVE IN-WALL BACKBOARD, APPROXIMATELY 72-INCHES TO CENTER AFF. PROVIDE MINIMUM 16-INCHES X 16-INCHES IN-WALL

BACKBOARD 60-INCHES TO CENTER AFF.

COMMUNICATIONS WI-FI ABOVE-CEILING WAO WITH A 20’ SERVICE LOOP. COORDINATE MOUNTING REQUIREMENTS WITH LOCAL ITFO SITE LEAD. DOES NOT REQUIRE

GENERAL PURPOSE ELECTRICAL OUTLET.

EVIDENCE CAMERA ABOVE-CEILING WAO WITH A 20’ SERVICE LOOP. COORDINATE MOUNTING REQUIREMENTS WITH LOCAL ITFO SITE LEAD. DOES NOT REQUIRE GENERAL

PURPOSE ELECTRICAL OUTLET.

COMMUNICATIONS SECURITY CEILING WAO WITH A 20’ SERVICE LOOP. COORDINATE MOUNTING REQUIREMENTS WITH SECURITY VENDOR. DOES NOT REQUIRE GENERAL

PURPOSE ELECTRICAL OUTLET.

COMMUNICATIONS TELEVISION CEILING WAO WITH A 20’ SERVICE LOOP. COORDINATE MOUNTING REQUIREMENTS WITH VTC/AV VENDOR.

TELECOMMUNICATIONS SECONDARY BONDING BUSBAR. BOND TO ELECTRICAL GROUNDING SYSTEM, INCLUDING BUILDING STEEL, AND BOND EQUIPMENT FRAMES, RACKS, CABINETS, ENCLOSURES AND CABLE TRAYS TO THE SBB USING A MINIMUM #6 AWG BONDING CONDUCTOR.

TELECOMMUNICATIONS 110 STYLE TERMINATION BLOCK WITH VERTICAL AND HORIZONTAL CROSS CONNECT MANAGEMENT.

GENERAL PURPOSE 120 VOLT/20 AMP NEMA 5-20R DUPLEX RECEPTACLE OUTLET

RED DEDICATED 120 VOLT/20 AMP NEMA 5-20R QUAD ELECTRICAL OUTLET

RED DEDICATED 120 VOLT/30 AMP NEMA L5-30R OR 240 VOLT/30 AMP NEMA L6-30R TWIST LOCK ELECTRICAL OUTLET

NOTE: XX = OUTLET CONFIGURATION TAG

XXXX

XXXX

w

XX

w

XXXX

XXXX

F

XX

F

XXXX

w

XX

w

XXXX

S

XX

S

XXXX

T

XX

T

XXXXXX

XXXX

E

XX

E

XX

CATV

XX

CATV

XXXX

C

XX

C

SYMBOL LEGEND

COMMUNICATIONS WALL WAO MOUNTED AT TYPICAL GENERAL PURPOSE ELECTRICAL OUTLET HEIGHT, APPROXIMATELY 18-INCHES TO CENTER AFF. MOUNT WAO’S AT

COUNTER TYPE WORKSPACES TO BE PRACTICAL AND READILY ACCESSIBLE ABOVE THE COUNTER SPACE, APPROXIMATELY 42-INCHES TO CENTER AFF.

COMMUNICATIONS MODULAR FURNITURE WAO. ROUTE WAO CABLES THROUGH FURNITURE RACEWAYS DIRECTLY TO EACH WORKSTATION AND TERMINATE IN A COMPATIBLE

SNAP IN FACEPLATE TO FURNITURE BASE.

COMMUNICATIONS WALL PHONE WAO MOUNTED AT 48” TO CENTER AFF. DOES NOT REQUIRE GENERAL PURPOSE ELECTRICAL OUTLET.

COMMUNICATIONS COUNTERTOP WAO MOUNTED AT 48” TO CENTER AFF.

COMMUNICATIONS FLOOR OUTLET. COORDINATE WAO’S AT CONFERENCE TABLE LOCATIONS TO BE WITHIN THE FURNITURE WITH COMPATIBLE COMPONENTS.

COMMERCIAL TELEVISION WAO MOUNTED ABOVE IN-WALL BACKBOARD, APPROXIMATELY 72-INCHES TO CENTER AFF. PROVIDE MINIMUM 16-INCHES X 16-INCHES IN-WALL

BACKBOARD 60-INCHES TO CENTER AFF.

COMMUNICATIONS WI-FI ABOVE-CEILING WAO WITH A 20’ SERVICE LOOP. COORDINATE MOUNTING REQUIREMENTS WITH LOCAL ITFO SITE LEAD. DOES NOT REQUIRE

GENERAL PURPOSE ELECTRICAL OUTLET.

EVIDENCE CAMERA ABOVE-CEILING WAO WITH A 20’ SERVICE LOOP. COORDINATE MOUNTING REQUIREMENTS WITH LOCAL ITFO SITE LEAD. DOES NOT REQUIRE GENERAL

PURPOSE ELECTRICAL OUTLET.

COMMUNICATIONS SECURITY CEILING WAO WITH A 20’ SERVICE LOOP. COORDINATE MOUNTING REQUIREMENTS WITH SECURITY VENDOR. DOES NOT REQUIRE GENERAL

PURPOSE ELECTRICAL OUTLET.

COMMUNICATIONS TELEVISION CEILING WAO WITH A 20’ SERVICE LOOP. COORDINATE MOUNTING REQUIREMENTS WITH VTC/AV VENDOR.

TELECOMMUNICATIONS SECONDARY BONDING BUSBAR. BOND TO ELECTRICAL GROUNDING SYSTEM, INCLUDING BUILDING STEEL, AND BOND EQUIPMENT FRAMES, RACKS, CABINETS, ENCLOSURES AND CABLE TRAYS TO THE SBB USING A MINIMUM #6 AWG BONDING CONDUCTOR.

TELECOMMUNICATIONS 110 STYLE TERMINATION BLOCK WITH VERTICAL AND HORIZONTAL CROSS CONNECT MANAGEMENT.

GENERAL PURPOSE 120 VOLT/20 AMP NEMA 5-20R DUPLEX RECEPTACLE OUTLET

RED DEDICATED 120 VOLT/20 AMP NEMA 5-20R QUAD ELECTRICAL OUTLET

RED DEDICATED 120 VOLT/30 AMP NEMA L5-30R OR 240 VOLT/30 AMP NEMA L6-30R TWIST LOCK ELECTRICAL OUTLET

NOTE: XX = OUTLET CONFIGURATION TAG

XX

XX

w

XX

XX

F

XX

w

XX

S

XX

T

XX

XX

E

XX

CATV

XX

C

SHEET NOTES

1. TERMINATE HORIZONTAL “A” SERIES CABLING HEADEND IN THE OCIO MDF ROOM 116.

INFORMATION AND COMMUNICATIONS TECHNOLOGY SYSTEMS

T1.00

FLOOR PLANS

ADDRESS

6760 UPTON AVE.

ATOC MAIN CLASSROOM BLDG

FORT MOORE, GA 31905

SCALE

NOT TO

SCALE

DATE SUBMISSION

06/29/2026 CABLING REQUIREMENTS

REQ/PRJ #

REQ1120710

PRJ0212403

INFORMATION AND COMMUNICATIONS TECHNOLOGY SYSTEMS

T1.00

FLOOR PLANS

ADDRESS

6760 UPTON AVE.

ATOC MAIN CLASSROOM BLDG

FORT MOORE, GA 31905

SCALE

NOT TO

SCALE

DATE SUBMISSION

06/29/2026 CABLING REQUIREMENTS

REQ/PRJ #

REQ1120710

PRJ0212403

MDF

T2.00

A

A

A

T2 .0

T2 .0

T2 .0

T2 .0

T2 .0

T2 .0

A2A2A2

A2A2A2

A

A

A

T2 .0

T2 .0

T2 .0

T2 .0

T2.0

T2.0

A2A2A2

A2A2A2

A2A2A2

T2.00

T2.00

T2.00

T2.00

T2.00

T2.00

A

A

A

A2A2A2

T2.00

T2.00

T2.00

T2.00

T2.00

T2.00

A

A

A

A2A2 A2A2

A2A2 A2A2

A2 A2

A2 A2

A2A2 A2A2

A2A2 A2A2

A2 A2

A2 A2

T2.00

T2.00

T2 .0

T2 .0

A2A2A2

A

A

A

A

A

A

A2A2A2

A2A2A2 A2A2A2

A6A6 w

A6 w

A6A6 w

A6 w

A6A6 w

A6 w

A6A6 w

A6 w

A6A6 w

A6 w

A6A6 w

A6 w

A

A

A

A

A

A 2A

A

A

A

A

A

A

A

A

A

A

A

A 1w A 1w

A

A 1 wA 1 w

A

A 1 wA 1 w

A

A 1w A 1w

A1A1 w A1 w

A1A1 w A1 w

A

A 1 wA 1 w

SHEET NOTES

1. ENCLOSED EQUIPMENT CABINETS (ANTICIPATED TO BE 7’ H x 24”W x 36”D – 42”D) SHOWN FOR

COORDINATION PURPOSES ONLY - NOT IN CONTRACT.

A. ATTACH RECEPTACLES SUPPORTING ENCLOSED EQUIPMENT CABINETS TO CABLE TRAY ABOVE

CABINET LOCATIONS.

2. PROVIDE STANDARD 19” X 7’ TWO-POST RACK WITH 6” FRONT/REAR VERTICAL CABLING MANAGER, UNLESS OTHERWISE NOTED.

A. ATTACH RECEPTACLES, IN CONDUIT, TO THE REAR OF VERTICAL CABLE MANAGER AT 18” AFF.

3. DIMENSIONS TO BE FIELD VERIFIED. PROVIDE A MINIMUM WORKING CLEARANCE OF 36-INCHES OF

UNOBSTRUCTED SPACE IN THE FRONT, REAR, AND ACCESSIBLE SIDES OF EQUIPMENT CABINETS, LOADED RACKS, AND WALL MOUNTED EQUIPMENT.

4. SEPARATE AND ORGANIZE CABLES BY MEDIA, SIGNAL TYPE, AND COLOR PRIOR TO ENTERING WIRING

CLOSETS.

5. LOCATE CABLE TRAY A MINIMUM 2” ABOVE ENCLOSED EQUIPMENT CABINETS, OPEN RACKS, AND

CLOSET DOOR TRIMS. ATTACH OPEN RACKS TO THE TRAY SYSTEM WITH MANUFACTURER

RECOMMENDED HARDWARE.

6. WORK AREA OUTLETS AT SECURITY WALL FIELDS TO BE EXTENDED TO FINAL LOCATION BY ELECTRONIC

SECURITY SYSTEMS VENDOR AND ACTIVATION COORDINATED WITH LOCAL ITFO SITE LEAD.

7. CONFERENCE ROOM WALL FIELD ELEVATIONS ARE DIAGRAMMATIC FOR COORDINATION PURPOSES

ONLY - AV DESIGN NOT IN SCOPE. CONFIRM LOCATION OF DISPLAYS, AUDIO-VISUAL HEAD END

EQUIPMENT AND POTENTIAL PODIUMS WITHIN EACH SPACE SERVED.

KEY NOTES

1. 4’ X’ 8’ X ¾” FIRE RATED PLYWOOD MOUNTED VERTICALLY 12”-18” AFF.

INFORMATION AND COMMUNICATIONS TECHNOLOGY SYSTEMS

T2.00

ENLARGED PLANS

ADDRESS

6760 UPTON AVE.

ATOC MAIN CLASSROOM BLDG

FORT MOORE, GA 31905

SCALE

NOT TO

SCALE

DATE SUBMISSION

06/29/2026 CABLING REQUIREMENTS

REQ/PRJ #

REQ1120710

PRJ0212403

INFORMATION AND COMMUNICATIONS TECHNOLOGY SYSTEMS

T2.00

ENLARGED PLANS

ADDRESS

6760 UPTON AVE.

ATOC MAIN CLASSROOM BLDG

FORT MOORE, GA 31905

SCALE

NOT TO

SCALE

DATE SUBMISSION

06/29/2026 CABLING REQUIREMENTS

REQ/PRJ #

REQ1120710

PRJ0212403

CABLING RACK “A”

Reserved for OCIO Equipment (Not in

Contract)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

“A” SERIES – BLUE

NEMA L5-30R

MDF ROOM 116 RACK ELEVATION

MDF ROOM 116 RACK ELEVATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

“A” SERIES – YELLOW

“A” SERIES – GRAY

NEMA L5-30R

Reserved for OCIO Equipment (Not in

Contract)

NEMA 5-20R

CABLING RACK “B”

RBB RBB

CABLING RACK “A”

Reserved for OCIO Equipment (Not in

Contract)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

“A” SERIES – BLUE

NEMA L5-30R

MDF ROOM 116 RACK ELEVATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

“A” SERIES – YELLOW

“A” SERIES – GRAY

NEMA L5-30R

Reserved for OCIO Equipment (Not in

Contract)

NEMA 5-20R

CABLING RACK “B”

RBB RBB

MDF ROOM 116 ENLARGED PLAN

MDF ROOM 116 ENLARGED PLAN

11' 6"

' 4

4' 6"

S e c u rity

S e rv e r

C a b in e t

S e c u rity

S e rv e r

C a b in e t

R a c k

“A

L5-20RL5-20R

R a

L5-20R

L5-30RL5-30RL5-30R

L5-20RL5-20R

R a

“B

L5-20R

R a

C A

T V

W a ll F ie ld

S e c u rity

W a ll F ie ld

A

A

2 SA

2 S

S e c u rity

W a ll F ie ld

A 2 S

S e c u rity

W a ll F ie ld

A

A

2 SA

2 S

S e c u rity

W a ll F ie ld

A 2 S

MDF ROOM 116 ENLARGED PLAN

11' 6"

' 4

4' 6"

S e c u rity

S e rv e r

C a b in e t

R a

L5-20R

L5-30R

L5-20R

R a

C A ll F ie ld

S e c u rity

W a ll F ie ld

A 2 S

S e c u rity

W a ll F ie ld

A 2 S

T2 .00

T2 .00

MDF ROOM 116 ENLARGED PLAN

11' 6"

' 4

4' 6"

S e c u rity

S e rv e r

C a b in e t

R a

L5-20R

L5-30R

L5-20R

R a

C A ll F ie ld

S e c u rity

W a ll F ie ld

A 2 S

S e c u rity

W a ll F ie ld

A 2 S

T2 .00

A1A1 w A1 w

MDF ROOM 116 ENLARGED PLAN

11' 6"

' 4

4' 6"

S e c u rity

S e rv e r

C a b in e t

R a

L5-20R

L5-30R

L5-20R

R a

C A ll F ie ld

S e c u rity

W a ll F ie ld

A 2 S

S e c u rity

W a ll F ie ld

A 2 S

T2 .00

A1 w

1 ¼” EMT TO NEAREST

FLOOR BOX

A

FF

GENERAL POWER

TYPICAL

A

FF

1 ¼” EMT TO ACCESSIBLE

CEILING - TYPICAL

IN-WALL BACKBOARD

BASED ON SIZE OF

MONITOR INSTALLED

A

FF

A5A5

CONFERENCE ROOM AV/DATA WALL FIELD CONFERENCE ROOM AV/DATA WALL FIELD

A2

2-GANG OUTLET WITH BRUSH

PASSTHROUGH COVER

AV

AV

DISPLAY

LOCATION

DISPLAY

LOCATION

AV EQUIPMENT

LOCATION

AV EQUIPMENT

LOCATION

1 ¼” EMT TO NEAREST

FLOOR BOX

A

FF

GENERAL POWER

TYPICAL

A

FF

1 ¼” EMT TO ACCESSIBLE

CEILING - TYPICAL

IN-WALL BACKBOARD

BASED ON SIZE OF

MONITOR INSTALLED

A

FF

A5

CONFERENCE ROOM AV/DATA WALL FIELD

A2

2-GANG OUTLET WITH BRUSH

PASSTHROUGH COVER

AV

AV

DISPLAY

LOCATION

AV EQUIPMENT

LOCATION

1 ¼” EMT TO NEAREST

FLOOR BOX

A

FF

A

FF

A

FF

A2

2-GANG OUTLET WITH BRUSH

PASSTHROUGH COVER

LARGE CONFERENCE/TRAINING ROOM AV/DATA WALL FIELD LARGE CONFERENCE/TRAINING ROOM AV/DATA WALL FIELD 3

GENERAL POWER

TYPICAL

A3

1 ¼” EMT TO ACCESSIBLE

CEILING - TYPICAL

A5A5

AV

Blue

Gray

PODIUM

LOCATION

PODIUM

LOCATION

DISPLAY

LOCATION

DISPLAY

LOCATION

AV EQUIPMENT

LOCATION

AV EQUIPMENT

LOCATION

AV

1 ¼” EMT TO NEAREST

FLOOR BOX

A

FF

A

FF

A

FF

A2

2-GANG OUTLET WITH BRUSH

PASSTHROUGH COVER

LARGE CONFERENCE/TRAINING ROOM AV/DATA WALL FIELD 3

GENERAL POWER

TYPICAL

A3

1 ¼” EMT TO ACCESSIBLE

CEILING - TYPICAL

A5

AV

Blue

Gray

PODIUM

LOCATION

DISPLAY

LOCATION

AV EQUIPMENT

LOCATION

AV

IN-WALL BACKBOARD

BASED ON SIZE OF

MONITOR INSTALLED

AVAV

1 ¼” EMT TO NEAREST

FLOOR BOX

A

FF

A

FF

A

FF

A2

2-GANG OUTLET WITH BRUSH

PASSTHROUGH COVER

LARGE CONFERENCE/TRAINING ROOM AV/DATA WALL FIELD 3

GENERAL POWER

TYPICAL

A3

1 ¼” EMT TO ACCESSIBLE

CEILING - TYPICAL

A5

AV

Blue

Gray

PODIUM

LOCATION

DISPLAY

LOCATION

AV EQUIPMENT

LOCATION

AV

IN-WALL BACKBOARD

BASED ON SIZE OF

MONITOR INSTALLED

AV

For Official Use Only

INFORMATION and COMMUNICATIONS TECHNOLOGY SYSTEMS

STRUCTURED CABLE PLANT

STANDARD

January 2025 Edition

Office of the Chief Information Officer (OCIO) Information Technology Operations (IT OPS) Division

ICE OCIO Structured Cable Plant Standard

January 2025 Edition 2

Table of Contents

1 INTRODUCTION

1.1 Summary of Changes

1.2 Background

1.3 Purpose

1.4 Definitions

2 QUALITY ASSURANCE

2.1 Architectural Designs

2.2 Proposals

2.3 References

2.4 Manufactured Products

2.5 Testing

2.6 Inspections & Reports

3 PATHWAYS

3.1 General

3.2 Conduit, Boxes & Fittings

3.3 Cable Trays & Runways

4 MECHANICAL & ELECTRICAL

4.1 Grounding & Bonding

4.2 Power & Lighting

4.3 Environmental Conditioning

5 DISTRIBUTION CLOSETS

5.1 Equipment Racks & Cabinets

5.2 Patch Panels & Cable Management

5.3 Labeling Conventions

5.4 Space Planning

6 BACKBONE CABLING

6.1 General

6.2 Copper Cabling

6.3 Optical Fiber Cabling

6.4 Space Planning

7 HORIZONTAL CABLING

7.1 General

7.2 Copper Cabling

7.3 Optical Fiber Cabling

7.4 Faceplates & Patch Cords

7.5 Space Planning

January 2025 Edition 3

8 CLOSING DOCUMENTS

8.1 Work Results Report

9 RISK MANAGEMENT

Table of Figures

Figure 1 MDF Room Dimensions Figure 2 RWC Room Dimensions

List of Tables

Table 1 Summary of Changes Table 2 Conduit Fill Table Table 3 Outlet Locations Table 4 WAO Configuration Details

January 2025 Edition 4

1 INTRODUCTION

1.1 SUMMARY OF CHANGES

This document, hereafter referred to as the Immigration and Customs Enforcement (ICE) Cabling Standard, replaces and supersedes previous releases of the ICE Structured Cable Plant Standard.

The objective is to continuously improve upon the breadth, depth, and clarity of information.

Also, to promote efficient use and comprehension. Approved changes integrated into this edition are reflected in Table 1. Suggestions for future editions may be submitted to:

Robert Neill Section Chief, Deployment Robert.Neill@ice.dhs.gov

Table 1 Summary of Changes

Revision No.

Reference Section

Description

1 General

• Minor edits of section information to aid in clear interpretation with no significant changes unless otherwise noted.

Section 1:

Definitions

• Section 1.4.B: Added copper cabling.

Section 2:

Quality Assurance

• Section 2.3: Update references.

• Section 2.5: Added requirement for cable testing pass results to exceed margin of error.

Section 3:

Pathways

• Section 3.2 (A.3): Modified pull box requirements to indicate a pull box for every accumulated 180 degrees of conduit bend.

• Section 3.2 (B.1): Added code and standards compliance.

• Section 3.2 (B.3): Added textile innerduct requirement.

• Section 3.2 (B.3.a): Changed steel to metallic.

• Section 3.2 (B.4.g): Added requirement to offset back boxes.

• Section 3.2 (C): Added textile innerduct requirement.

Section 4:

Mechanical and Electrical

• Section 4.1: Section rewritten to reflect updates to codes and standards.

• Section 4.1 (D.2): Changed RBB width.

Section 5:

Distribution Closets

• Section 5.1 (C): Removed galvanized steel and uni-body construction requirement.

• Section 5.2 (B.2): Added the use of frame-type patch panels are not allowed.

• Section 5.3 (F-G): Changed 3-digit labeling requirement to 2-digit.

• Section 5.4 (C): Added Fire protection to comply with ANSI/TIA 569- E.

• Section 5.4 (F): Added requirement for door to swing out of the telecom space.

7 Section 6: • Section 6.1 (D): Changed service loop location to field.

January 2025 Edition 5

Backbone Cabling

• Eliminated Category 3 as an acceptable backbone cable.

• Section 6.3 (A): Added requirement for fusion splicing.

• Section 6.3 (B): Changed all single-mode fiber to OS2.

• Section 6.3 (B): Changed steel to metallic.

• Section 6.4 (A-E): Added requirements for plenum-rating, armoring, and fusion splicing.

• Section 6.4 (B.1): Deleted requirement for copper backbone cabling to the Title III Wire Room.

Section 7:

Horizontal

Cabling

• Section 7.3: Changed acceptable insertion loss from 0.75 dB to 0.3 dB per BICSI TDMM recommendation.

• Section 7.4 (B.2): Added patch cord delivery requirement.

1.2 BACKGROUND

ICE is a component of the U.S. Department of Homeland Security (DHS); bringing a unified and coordinated focus to the enforcement of federal immigration, customs, and air security laws. ICE’s primary mission is to detect vulnerabilities and protect national security. The Office of the Chief Information Officer (OCIO), Information Technology Operations (IT OPS) Division supports the ICE mission by providing deployment, project management, and design services for diverse and complex Information and Communications Technology (ICT) systems to over 600 facilities worldwide.

ICE projects involve various Programs with unique ICT systems requirements. The ICT low voltage cabling infrastructure is intended to support the following special systems (powered equipment and end user devices not in scope):

A. Commercial Television: Community Antennae Television (CATV) or satellite applications.

B. Telephony: Voice over Internet Protocol (VoIP) or Public Branch Exchange (PBX), and plain old telephone (POTS)/analog applications.

C. Ethernet Local Area Networks (LAN): Wired and 802.11 wireless applications.

D. Service Provider utilities: Facilitate circuit extension within the facility via ICE owned riser backbone cabling.

1.3 PURPOSE

The purpose of the ICE Cabling Standard is to serve as a performance specification and basis of design for Architects, Engineers, Consultants, Contractors, and ICE staff involved in the planning, design, and construction of ICE facilities, and supplements the latest edition of the ICE Facility Design Guide. In addition, OCIO will provide a Site-Specific Cabling Requirements (SSCR) Document, hereafter referred to as the OCIO Cabling Package, which shall be used in combination with the ICE Cabling Standard to provide a complete and fully functional ICT cabling infrastructure. The OCIO Cabling Package includes:

A. Site requirements narrative.

B. Floor plans with power and communications outlet locations, and configuration details.

C. Enlarged Distribution Closet layouts and rack elevations.

January 2025 Edition 6

1.4 DEFINITIONS

A. Contractor: The prime contractor responsible for performing the work as defined by the ICE Cabling Standard and OCIO Cabling Package. It is the responsibility of the Contractor to coordinate the cabling design and installation with other trades and utilities, ensuring other building systems and design elements are compatible, complementary, and achieve symmetry with the overall project requirements.

1. Furnish: Term used to describe Contractor or Owner purchased products supplied for installation by others.

2. Provide: Term used to describe Contractor purchased products installed, tested, labeled, and ready for use.

B. Backbone Cabling: Optical fiber, copper, and coaxial cables, and connecting hardware between Distribution Closets.

C. Distribution Closets:

1. Demarcation Room (Demarc): The building’s entrance facility for public communications utilities and private campus Outside Cable Plant (OSP). Also, the location of utility Service Provider/Local Exchange Carrier (LEC) head end network equipment.

2. Main Distribution Frame Room (MDF): The centralized location for head end equipment supporting OCIO network and telephony systems, and the distribution point for associated copper and optical fiber backbone cabling. Also, the MDF is the floor or space serving OCIO telecommunications room for terminating backbone and horizontal cabling infrastructure supporting Work Area Outlets.

3. Remote Wiring Closet (RWC): The floor or space serving OCIO telecommunications room for terminating backbone and horizontal cabling infrastructure supporting Work Area Outlets.

4. Riser Closets: Closets in multi-story facilities for the routing of cabling between floors.

5. Special Program Spaces: Special purpose work areas containing dedicated network equipment and associated cabling, with unique security and construction requirements.

Typical spaces include: Controlled Access Area (CAA), Computer Forensics, Homeland Security Data Networks (HSDN) Room, and Title III Wire Room.

D. Horizontal Cabling: Optical fiber, copper, and coaxial cables and connecting hardware between the floor or space serving MDF/RWC and Work Area Outlets.

E. Pathways: Infrastructure that conceals, protects, and supports backbone and horizontal cabling between Distribution Closets, Work Area Outlets, and building risers.

F. Work Area Outlet (WAO): Horizontal distribution cabling interface connection points supporting peripheral communications end user devices. Examples include laptops, telephones, printers, etc.

* END OF SECTION 1 *

January 2025 Edition 7

2 QUALITY ASSURANCE

2.1 ARCHITECTURAL DESIGNS

The Architect is completely responsible for construction drawings and specifications that accurately meet OCIO requirements.

• Projects are open bid and performance based.

• Do not specify product manufacturers or part numbers.

• Submit Architectural and Engineering designs to OCIO at each design phase for technical compliance review and approval.

• Submit issues, requests for information (RFIs), and change requests in writing for OCIO response and/or approval.

2.2 PROPOSALS

Submit Contractor proposals to OCIO for technical compliance review and approval prior to award and execution of work. Submit requests for information (RFIs) and changes in writing for OCIO response and/or approval. When necessary, perform a site survey to determine conditions and submit a report of findings with contacts, references to specific requirements and issues, markups, and recommendations. Submit proposal documentation as one comprehensive file in pdf format and include the following information:

A. Identify team members with roles and qualifications. The installation team shall be certified by the proposed solutions manufacturer and under the direct supervision of a skilled Technician experienced in all aspects of the work.

B. Reference the ICE Cabling Standard version, OCIO Cabling Package version, and other documents provided by ICE used for pricing.

C. Detailed Statement of Work (SOW) with assumptions, exclusions, and a detailed installation schedule. Schedule work in consecutive business days, through to completion and ready for use, unless agreed otherwise by ICE.

D. Quantity and configuration of WAOs per wiring closet, wiring closets build details, backbone cabling details, understanding of Classified cabling requirements, and test equipment details.

E. Detailed Bill of Materials (BOM) including manufacturers, part numbers, and quantities.

Include product technical data sheets, shop drawings, and other documentation as required by the Accrediting Officer (AO) of Controlled Access Areas.

F. Product and installation warranty scope and correction period for deficiencies.

2.3 REFERENCES

The ICE Cabling Standard defers to the following sources when data is extensive. The entirety of the ICT system cabling design and installation shall meet the latest edition of the following codes and standards:

A. National and local regulations enforced by the authority having jurisdiction (AHJ).

B. BICSI, Telecommunications Distribution Methods Manual (TDDM), 15th Edition.

C. ANSI/BICSI 007-2024, Information Communication Technology Design and Implementation Practices for Intelligent Buildings and Premises.

January 2025 Edition 8

D. ANSI/BICSI 008-2024, Wireless Local Area Network (WLAN) Systems Design and Implementation Best Practices.

E. ANSI/BICSI N1-2019, Installation Practices for Telecommunications and ICT Cabling and Related Cabling Infrastructure.

F. ANSI/BICSI N2-17, Practices for the Installation of Telecommunications and ICT Cabling to Support Remote Power Applications.

G. ANSI/BICSI N3-20, Planning and Installation Methods for the Bonding and Grounding of Telecommunication and ICT Systems and Infrastructure.

H. BICSI G1-17, ICT Outside Plant Construction and Installation: General Practices.

I. TIA, Building Telecommunications Wiring Standards.

J. NECA 1, National Electrical Contractors Association Standards for Good Workmanship.

K. CNSSAM TEMPEST/1-13 17 January 2014 Red/ Black Installation Guide.

L. Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, V1.5.1, July 26, 2021, IC Tech Spec for Intelligence Community Directive/Intelligence Community Standards (ICD/ICS) 705, Physical and Technical Standards for Sensitive Compartmented Information Facilities.

M. Underwriters Laboratories, Inc. (UL).

N. American Society for Testing and Materials (ASTM) International.

O. National Electrical Manufacturers Association (NEMA) Standards.

2.4 MANUFACTURED PRODUCTS

A. Products provided or furnished by the Contractor are required to be new using matched and certified manufacturer solutions listed for its intended purpose by a nationally recognized testing laboratory. The Contractor is required to match products in existing facilities being modified if they meet current standards.

B. The Contractor is required provide products manufactured in the USA that have been in satisfactory use in similar service for not less than 3 years, and which replacement parts are readily available. The Contractor is required to protect products during shipment, storage, and installation against damage. Damaged products, as determined by OCIO, shall be replaced with new product.

C. Cabling infrastructure installation shall comply with manufacturer requirements and all applicable codes and standards.

2.5 TESTING

A. Properly clean connector ports prior to testing. Test and certify the backbone and horizontal cabling using equipment, patch/launch cords, and adapters matched and qualified by the equipment manufacturer, and to the performance category of the cabling provided. Ensure test equipment is properly calibrated, referenced, and has up-to-date software/firmware.

Resolve deficiencies to achieve an overall “pass” result. Marginal Pass results (often noted with an asterisk on test results) will not be accepted and must be resolved.

B. Provide test results in a complete report transferred from the test instrument to a computer and saved as pdf files. Organize results per floor, distribution closet, and specified labeling scheme.

January 2025 Edition 9

C. Each fiber optic strand, backbone and horizontal, and copper horizontal cable shall be submitted individually as it is recorded in the testing equipment.

2.6 INSPECTIONS & REPORTS

Contractor shall submit written installation progress reports with digital photos at significant completion of rough-in, distribution closet(s) buildout, and cable termination phases. Include enough detail to confirm compliance with approved project requirements.

* END OF SECTION 2 *

January 2025 Edition 10

3 PATHWAYS

3.1 GENERAL

A. Remove abandoned cables and existing cables that do not meet specifications, in their entirety. Coordinate removal with local ICE point of contact.

B. Communications cable and pathway clearances:

1. Maintain 6-inches minimum clearance from parallel runs of flues and steam or hot-water pipes. Install horizontal pathway runs above water and steam piping.

2. Sources of electromagnetic interference (EMI):

a. Maintain 5-inches minimum clearance from fluorescent lighting.

b. Maintain 12-inches minimum clearance from conduit and cables used for electrical power distribution under 5 kilo Volt Amps (kVA).

c. Maintain 24-inches minimum clearance from conduit and cables used for electrical power distribution over 5 kilo Volt Amps (kVA).

d. Maintain 48-inches minimum clearance from motors or transformers.

3. Cross perpendicularly to electrical power cables and conduits.

4. Controlled Access Area (CAA) and Homeland Security Data Network (HSDN) Rooms:

Maintain a minimum 3-inches separation between classified pathways, cabling and outlets, and all other communications and power pathways, cables, and outlets.

C. Align and route pathways and cables parallel or perpendicular to the building lines and furniture layouts to the extent possible, ensuring accessibility to cable supports and pull boxes.

D. Firestopping and sealing: Seal openings between penetrated floors and walls with a listed manufacturer-made mechanical assembly, approved by the local authority having jurisdiction (AHJ). Maintain the structural, fire, and/or smoke rating integrity, and allow re-entry for future use with minimal impact.

E. Pathway systems to be structurally supported, rigidly secured, and not exceed 40 percent fill factor.

F. Provide separate pathways for conveyance of dissimilar signal types and voltage levels.

Examples are Ethernet, Audio Visual (AV), and overhead paging cabling.

G. Conceal pathways within finished walls, ceilings, and floors. Exposed pathways only permitted as noted for specific applications or approved through submittal review process.

H. Create pathway bends with smooth sweeping turns that safeguard against bend radius violations.

I. CAA: Label Classified and Unclassified cabling pathways entering and within CAA space.

Pathways embedded in concrete or that do not support the CAA space may not pass through CAA space.

3.2 CONDUIT, BOXES & FITTINGS

A. General:

1. Provide a continuous rigid thin wall conduit for cables passing through non-ICE controlled space, non-accessible ceilings, and where vulnerable to damage. Include polypropylene or monofilament plastic line with minimum 200-pound tensile strength.

January 2025 Edition 11

2. Provide a pull box every 100 feet and every accumulated 180 degrees change in direction. Route conduits supporting continuous cable runs with openings facing each other in the box.

3. Conduit cable fill (Table 2): Table includes baseline figures. Validate fill rates per manufacturer specified cable dimensions and listed firestop assembly guidelines.

Table 2 Conduit Fill Table

Cable Outside Diameter Conduit Trade Size

1” 1 ¼” 1 ½” 2” 2 ½” 3” 4”

.25-inch Cables 7 12 16 27 41 60 103

.5-inch Cables 1 3 4 6 10 15 25

1-inch Cables 0 1 1 1 2 3 6

B. Inside Cable Plant:

1. Conduit design and installation shall be code and standards compliant for telecommunication pathways.

2. Provide Electrical Metallic Tubing (EMT) conduit with compression type fittings with insulated throats.

3. Provide a minimum of two 4-inch trade size sleeves or conduits between the Demarc and MDF, between Distribution Closets, and between building riser closets. Install textile fabric 3-pack innerducts with factory pull tape in one 4-inch sleeve and/or conduit for future use.

a. EXCEPTION: Optical fiber cable with specified interlocking metallic armored construction does not require continuous conduit protection when installed independently.

b. EXCEPTION: Provide a minimum 3-inch trade size continuous conduit from the primary floor serving Distribution Closet (MDF or RWC) to Homeland Security Data Network (HSDN) and Controlled Access Area (CAA) workspaces to support Unclassified cabling. Include a dielectric break when penetrating the workspace secure wall partition.

4. WAO wall boxes: Provide a minimum 5-inches square x 2 7/8-inches deep with minimum 1-inch knockouts, and a single or two-gang device ring (per outlet configuration). Provide a minimum 1-inch trade size conduit from WAO stubbed above accessible ceiling.

a. EXCEPTION: Where conduit installation is impractical, "ring and string" installations permitted with ICE approval.

b. EXCEPTION: Provide surface mounted raceway dedicated for Classified WAOs in Homeland Security Data Network (HSDN) and Controlled Access Area (CAA) workspaces.

c. EXCEPTION: Route Wi-Fi horizontal cables directly to designated locations and terminate in a plenum rated surface mount box above false ceilings, unless otherwise dictated by code.

January 2025 Edition 12

d. EXCEPTION: Route horizontal cables serving modular furniture through furniture raceways directly to each WAO and terminate in a compatible snap-in faceplate to furniture base. Surface mount boxes are permitted for WAOs with high cable count with ICE approval.

e. Serial connections (daisy chaining) of conduits supporting WAOs not permitted.

f. Provide separate conduits for WAOs containing optical fiber and copper cables.

g. Mount WAO boxes on opposite sides of walls in separate vertical channels offset from each other.

h. Locate communications and general-purpose electrical outlets to be practical and readily accessible. When necessary, provide a 4-inch access hole with a grommet in the back of stationary office furniture.

5. Floor boxes: Provide capacity to accommodate specified power, Audio Visual (AV), and communications WAOs. Power poles and/or floor surface raceway not permitted without ICE approval. Install floor boxes flush with finished floor.

6. WAO mounting height: Match general purpose electrical outlet heights, approximately 18-inches to center above finished floor.

a. EXCEPTION: Mount WAOs at counter type workspaces above the counter space, approximately 42-inches to center above finished floor.

b. EXCEPTION: Mount Community Antennae Television (CATV) WAO above proposed display mounting brackets, approximately 72-inches to center above finished floor

c. EXCEPTION: Mount wall phone WAO at 48-inches to center above finished floor.

7. Conference/Training rooms:

a. Provide one minimum 1-1/4-inch trade size conduit from a two-gang WAO backbox at typical wall outlet height at the AV headend equipment location, within the conference space, to accessible ceiling. Continue conduit from the WAO to the nearest conference table floor box. Include brush style WAO faceplate.

b. Provide one minimum 1-1/4-inch trade size conduit from a two-gang WAO backbox at display locations to accessible ceiling. Include brush style WAO faceplate.

c. Provide one minimum 1-1/4-inch trade size conduit from a two-gang WAO backbox at typical wall outlet height at podium location to accessible ceiling.

Include brush style WAO faceplate.

d. See OCIO Cabling Package for elevation detail.

C. Outside Cable Plant:

1. Provide high-density polyethylene (HDPE) conduit with weatherproof pull boxes designed for flush burial and having structural load rating consistent with installed location. Secure pull box with tamper-resistant locking devices.

2. Provide a minimum of two 4-inch trade size conduits between buildings in a campus environment. Install outdoor-rated textile fabric 3-pack innerducts with factory pull tape in one 4-inch conduit for future use.

3. Provide a minimum of two 4-inch trade size conduits from communications utilities easements to the building Demarc. Install outdoor-rated textile fabric 3-pack innerducts with factory pull tape in one 4-inch conduit for future use.

January 2025 Edition 13

4. Coordinate requirements for communications and television utility cabling entering the facility directly with local service providers early in space planning phase.

3.3 CABLE TRAYS & RUNWAYS

A. Provide couplings, offsets, adapters, end caps, horizontal and vertical cable bend radius components, and other fittings for a complete cable support system. All metallic components shall be bonded to the telecommunication grounding system.

B. Verify no intruding items such as debris, pipes, hangers, or other equipment are in the pathways prior to cable installation.

C. Additional Clearances: Maintain 8-inches minimum access clearance above, below, and at least one accessible side of cable trays and runways.

D. Dimensions: Internal maximum height of 2-inches and minimum width of 12-inches.

E. Work Areas: Provide continuous wire mesh style cable tray above false and open accessible ceilings from the work areas to the distribution closets to support backbone and horizontal cabling.

1. EXCEPTION: J Hooks may be used in facilities with existing false ceilings and other areas approved by ICE and the local authority having jurisdiction (AHJ). Support open air cables every 36-inches.

F. Distribution Closets: Provide ladder style runway in distribution closets to support backbone and horizontal cabling to wall fields, open equipment racks, and enclosed cabinets. Locate cable tray a minimum 2-inches above racks, cabinets, and closet door trims.

1. Finish: Manufacturer's standard finish in black.

2. Attach open racks to the tray system with manufacturer recommended hardware.

* END OF SECTION 3 *

January 2025 Edition 14

4 MECHANICAL & ELECTRICAL

4.1 GROUNDING & BONDING

A. Telecommunications Bonding Conductor (TBC): Provide a TBC to bond the PBB to the service equipment (power) ground.

1. TBC size: TBC to be determined by the project’s electrical engineer and shall not exceed 30 feet.

2. TBC shall be installed by the Division 26 electrical contractor.

B. Primary Bonding Busbar (PBB): Provide a PBB adjacent to the Electrical Entrance Facility and bond to the Electrical Entrance Facility grounding electrode system, the alternating current (AC) main electrical branch circuit panel, and structural building steel if available.

1. PBB must be listed.

2. PBB size: Predrilled solid copper with minimum dimensions of 0.25-inch-thick, 4-inches wide, and 20-inches long.

C. Secondary Bonding Busbar (SBB): Provide a SBB in every Distribution Closet and Wall Field as shown in the Cabling Package drawings.

1. SBB must be listed.

2. SBB size: Predrilled solid copper 0.25-inch-thick, 2-inches wide, and 12-inches long.

3. All SBBs must be bonded to structural steel as required by code.

4. Bonding conductor size shall be determined by Table 1 in ANSI/TIA-607-E.

5. Bonding conductors shall be insulated and stranded.

D. Rack Bonding Busbar (RBB): Provide a listed RBB in every two-post rack and wall cabinet.

1. Locate RBB at bottom of the racks and cabinets.

2. RBB size: Predrilled solid copper 0.25-inch-thick, 0.75-inch wide, and 19-inches long.

3. Bond the RBB to the SBB with a #6 AWG stranded copper conductor.

E. Telecommunications Bonding Backbone (TBB): Provide a TBB conductor from the PBB to a Secondary Bonding Busbar (SBB) located in each Distribution Closet and bond the SBB to the alternating current (AC) electrical branch circuit panel that supports dedicated receptacles in the closet, and to structural building steel if available.

1. TBB size: TBB to be determined per Table 1 in ANSI/TIA-607-E by the telecommunication infrastructure install contractor’s designer and installed by the telecommunication install contractor.

2. Multi-story facilities require the TBB to be extended to the top of the facility riser and SBBs independently bonded to the TBB. Facilities constructed with two or more TBB risers require a Backbone Bonding Conductor (BBC) between the systems Secondary Bonding Busbars (SBB) at the top floor and then every third floor.

a. Backbone Bonding Conductor (BBC) size: BBC to be determined per Table 1 in ANSI/TIA-607-E by the telecommunication infrastructure install contractor’s designer and installed by the telecommunication install contractor. The BBC shall be labeled at its attachment point with destination identifiers and "Warning!

Telecommunications Bonding Conductor. Do Not Remove or Disconnect!”.

F. Installation:

1. Locate Primary and Secondary busbars in locations shown on Cabling Package drawings.

January 2025 Edition 15

2. Install bonding busbars on 4-inch minimum insulated spacers using stainless steel hardware and label “Telecommunications Primary Bonding Busbar” and “Telecommunications Secondary Bonding Busbar” accordingly.

3. All lugs must be listed and two-hole.

4. Route conductors directly between termination points without splices and a minimum bend radius of 8-inches at the busbar and 10 times the diameter of the conductor along the pathway. No one bend may exceed 90 degrees.

5. Outside Cable Plant: Provide primary lightning and fault protection for communications cables routed underground or exposed to outdoor elements, and bond to nearest Bonding Busbar per manufacturer specifications.

6. Bond equipment frames, racks, cabinets, raised floor systems, cable shields, and cable pathways to the SBB using a minimum #6 AWG stranded copper bonding conductor no longer than 30 feet, and jumpers no longer than 12-inches.

4.2 POWER & LIGHTING

A. General purpose receptacles: Provide outlets 120 Volt/20 Amp NEMA 5-20R duplex non-switched receptacles, not connected to dedicated communications panel boards.

1. Distribution Closets: Install outlets every 6 feet around perimeter walls and identify as convenience outlets.

2. Work Areas: Install one outlet located within 2 feet of each communications WAO.

a. EXCEPTION: Wi-Fi WAOs do not require supplemental power.

B. Dedicated branch circuit receptacles: Provide red non-switched receptacles in Distribution Closets, connected to dedicated communications panel boards and on emergency power if available.

1. Wall outlets: Install a minimum of two 120 Volt/20 Amp NEMA 5-20R quad receptacles on perimeter walls.

a. EXCEPTION: - Install one 120 Volt/20 Amp NEMA 5-20R quad receptacle in Homeland Security Data Network (HSDN) rooms and Title III Wire rooms.

2. Enclosed equipment cabinets: Provide one 120 Volt/20 Amp NEMA 5-20R quad receptacle, one 120 Volt/30 Amp NEMA L5-30R, and one 208 Volt/30 Amp NEMA L6-30R receptacles. Attach outlets to overhead cable runway above each cabinet.

a. EXCEPTION: Replace L5-30R with additional L6-30R receptacle in Forensics Server rooms.

b. EXCEPTION: L6-30R not required for Security cabinets.

3. Two-post open racks: Provide one 120 Volt/20 Amp NEMA 5-20R quad receptacle and one 120 Volt/30 Amp NEMA L5-30R receptacles. Attach to the rear of vertical cable management in each rack.

a. EXCEPTION: Replace L5-30R with L6-30R receptacle in Forensics Server Room.

b. EXCEPTION: L5-30R receptacle not required in Controlled Access Area Server Room.

C. Distribution closet lighting: Provide occupancy sensor-controlled lighting with a minimum 500 lux in the horizontal plane…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .