This is an architectural floor plan with design specifications for a facility renovation project. The document depicts a two-story building layout with detailed annotations identifying 16 key modifications (A1-A16) required for the space.
The primary alterations include: expanding office space by pushing out walls to columns and reducing the foyer (A1); creating two unisex restrooms with one ADA-compliant option (A2); removing doors and expanding archways (A3); installing double glass exterior doors (A4); creating two concrete patios (A5); removing walls and converting one permanent wall to a folding wall recessed into the locker room (A6-A7); redesignating Room 101 as an office and converting the work room/admin storage to breakroom continuation (A8-A9); upgrading storage closets with double doors (A10); relocating the doorway to storage in the hallway rather than the classroom (A11); converting the conference room to an instructor lounge (A12); and applying epoxy flooring throughout except for VCT in the foyer (A13). Additionally, the specifications require multiple recessed floor electrical outlets in team rooms, classrooms, instructor lounge, and breakrooms (A14); kitchenette casework in the breakroom and instructor lounge (A15); and custom casework benches and lockers in gear locker rooms with a minimum of 30 lockers per room (A16).
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOBBY
COUSELING
OFFICE
UNISEX
RESTROOM
WORK
ROOM /
ADMIN
STOR
GEAR
LOCKER
ROOM
TEAM
ROOM
TEAM
ROOM
CORRIDOR
BREAKROOM
MEN
WOMEN
JANITOR
STORAGE
GEAR
LOCKER
ROOM
TEL/COM
CONFERENCE
CLASSROOM
CLASSROOM
CONTROL/
STORAGE
120MECHANICAL
CORRIDOR
MECHANICAL
271 SF
MECH / ELECT
218 SF
A1. Push out wall to column to expand offices and reduce the foyer A2. Create two unisex restrooms, one is ADA compliant A3. Remove door and expand archway A4. Install double glass doors leading outside A5. Create two concrete patios A6. Remove wall A7. Remove permanent wall and make folding wall (recessed into locker room) A8. Room 101 is an office A9. Work Room/Admin Storage is now a continuation of the breakroom A10. Storage closets should have double doors A11. Doorway to storage is in the hallway and not the classroom A12. Conference room is now an instructor lounge A13. All flooring is epoxy except for foyer/ Foyer is VCT A14. All team rooms, classrooms, instructor lounge, and breakrooms will have multiple recessed floor electrical outlets.
A15. Breakroom and instructor lounge will have casework for kitchenette A16. Gear locker rooms will have custom casework benches and lockers and must maximize the number of lockers, with no less than 30 lockers per room (see appendix F)
A1 A2
A3
A4
A5 A5
A6
A7
A8 A9
A10 A10
A11 A12
A13
A14
A14
A14 A14 A14 A15
A14 A15
A16
A16 A13
File details come from the government source that posted it. Updated .