This is an architectural floor plan with design specifications for a facility renovation project. The document depicts a two-story building layout with detailed annotations identifying 16 key modifications (A1-A16) required for the space.

The primary alterations include: expanding office space by pushing out walls to columns and reducing the foyer (A1); creating two unisex restrooms with one ADA-compliant option (A2); removing doors and expanding archways (A3); installing double glass exterior doors (A4); creating two concrete patios (A5); removing walls and converting one permanent wall to a folding wall recessed into the locker room (A6-A7); redesignating Room 101 as an office and converting the work room/admin storage to breakroom continuation (A8-A9); upgrading storage closets with double doors (A10); relocating the doorway to storage in the hallway rather than the classroom (A11); converting the conference room to an instructor lounge (A12); and applying epoxy flooring throughout except for VCT in the foyer (A13). Additionally, the specifications require multiple recessed floor electrical outlets in team rooms, classrooms, instructor lounge, and breakrooms (A14); kitchenette casework in the breakroom and instructor lounge (A15); and custom casework benches and lockers in gear locker rooms with a minimum of 30 lockers per room (A16).

View the file

Other files for this federal contract opportunity

Other files attached to Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s, newest first.
File Type Posted
Attachment N RFP Questions Government Repsonses 8.17.2026.docx DOCX document
REVISED Appendix J Electronic Security System SOW PIDC 3 7 25.pdf PDF
SF 1442_70CMSW26R00000012.pdf PDF
SACC IDIQ Solicitation rev Aug 12 2026.pdf PDF
REVISED Attachment H1 PIDC SHU SOW 8 12 2026.pdf PDF
SF 30_70CMSW26R00000012.pdf PDF
Attachment N RFPQuestions Government Repsonses 8 13 2026.pdf PDF
REVISED Attachment H2 OFTP Classroom 8 12 2026.pdf PDF
APPENDIX F - Ft. Benning Installation Design Guidelines.pdf PDF
APPENDIX L - ICE SITE SPECIFIC CANBLING REQUIREMENTS.pdf PDF
APPENDIX K - ICE ESS SOW.pdf PDF
APPENDIX J - Ft. Benning NEC ISP-OSP TTP v2.1.pdf PDF
APPENDIX A - 35 Concept Drawings.pdf PDF
APPENDIX G - ICE Cabling Standard.pdf PDF
APPENDIX B - Project Manual.pdf PDF
APPENDIX M- ICE VTC SOW.pdf PDF
APPENDIX H - ICE Facility Design Guide (2025).pdf PDF
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf PDF
APPENDIX N - ALEKNO AREA UTILITY MAP.pdf PDF
APPENDIX I - VSS spec for D-B.pdf PDF
APPENDIX E - CUBBY-LOCKER COMBO DETAIL.pdf PDF
APPENDIX D - SITE PLAN DEVIATIONS.pdf PDF
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf PDF
Attachment L_Task Order Pricing Template.xlsx XLSX spreadsheet
Attachment K_IDIQ Pricing Template.xlsx XLSX spreadsheet
Attachment N_RFP Questions Submission Template.docx DOCX document
Attachment E - Scenario 5_Florence SHU SOW.pdf PDF
Attachment F - Scenario 6_Krome SHU SOW.pdf PDF
OFTP Classroom SOW Final 7 6 2026.docx DOCX document
Aquadilla SHU SOW.docx DOCX document
Appendix I - Prison Rape Elimination Act.pdf PDF
Appendix F - ICE Dwg Stnds.pdf PDF
Appendix E - ICE Cabling Standard.pdf PDF
SACC IDIQ Solicitation_15 July 2026.pdf PDF
St. Thomas SHU SOW.docx DOCX document
EL PASO SHU SOW.docx DOCX document
El Centro SHU SOW.docx DOCX document
Batavia SHU SOW.docx DOCX document
Appendix H Performance-Based National Detention Standards.pdf PDF
Appendix G - ICE Facility Design Guide.pdf PDF
PIDC SHU SOW May 2026.docx DOCX document
Appendix J - Electronic Security Systems.pdf PDF
Appendix D - VSS spec for D-B.pdf PDF
Appendix C - SPC Detention Construction Stnds.pdf PDF
Appendix A - PIDC Concept Dwgs.pdf PDF
Final _SACC SOW_7.1.2026 1_KI.docx DOCX document
Appendix B - Geotech Rpt.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOBBY

COUSELING

OFFICE

UNISEX

RESTROOM

WORK

ROOM /

ADMIN

STOR

GEAR

LOCKER

ROOM

TEAM

ROOM

TEAM

ROOM

CORRIDOR

BREAKROOM

MEN

WOMEN

JANITOR

STORAGE

GEAR

LOCKER

ROOM

TEL/COM

CONFERENCE

CLASSROOM

CLASSROOM

CONTROL/

STORAGE

120MECHANICAL

CORRIDOR

MECHANICAL

271 SF

MECH / ELECT

218 SF

A1. Push out wall to column to expand offices and reduce the foyer A2. Create two unisex restrooms, one is ADA compliant A3. Remove door and expand archway A4. Install double glass doors leading outside A5. Create two concrete patios A6. Remove wall A7. Remove permanent wall and make folding wall (recessed into locker room) A8. Room 101 is an office A9. Work Room/Admin Storage is now a continuation of the breakroom A10. Storage closets should have double doors A11. Doorway to storage is in the hallway and not the classroom A12. Conference room is now an instructor lounge A13. All flooring is epoxy except for foyer/ Foyer is VCT A14. All team rooms, classrooms, instructor lounge, and breakrooms will have multiple recessed floor electrical outlets.

A15. Breakroom and instructor lounge will have casework for kitchenette A16. Gear locker rooms will have custom casework benches and lockers and must maximize the number of lockers, with no less than 30 lockers per room (see appendix F)

A1 A2

A3

A4

A5 A5

A6

A7

A8 A9

A10 A10

A11 A12

A13

A14

A14

A14 A14 A14 A15

A14 A15

A16

A16 A13

File details come from the government source that posted it. Updated .