APPENDIX A - 35 Concept Drawings.pdf

PDF 30 MB Posted

Attached to
Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s Federal contract opportunity
Solicitation number
70CMSW26R00000012
Issued by
Immigration and Customs Enforcement

About this file

This is an appendix containing concept drawings for the ICE Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ) solicitation. The appendix provides visual representations and design concepts related to the Service Processing Center (SPC) facilities that are subject to construction, renovation, and repair work under this solicitation. These concept drawings serve as reference materials for offerors to understand the scope and nature of potential construction projects that may be issued as task orders under the resulting IDIQ contracts. The drawings are intended to illustrate facility configurations, layouts, and design considerations relevant to ICE's mission-critical facility needs at owned Service Processing Centers throughout and outside the continental United States.

View the file

Other files for this federal contract opportunity

Other files attached to Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s, newest first.
File Type Posted
Attachment N RFP Questions Government Repsonses 8.17.2026.docx DOCX document
SACC IDIQ Solicitation rev Aug 12 2026.pdf PDF
REVISED Attachment H1 PIDC SHU SOW 8 12 2026.pdf PDF
SF 30_70CMSW26R00000012.pdf PDF
Attachment N RFPQuestions Government Repsonses 8 13 2026.pdf PDF
REVISED Attachment H2 OFTP Classroom 8 12 2026.pdf PDF
REVISED Appendix J Electronic Security System SOW PIDC 3 7 25.pdf PDF
SF 1442_70CMSW26R00000012.pdf PDF
APPENDIX G - ICE Cabling Standard.pdf PDF
APPENDIX B - Project Manual.pdf PDF
APPENDIX M- ICE VTC SOW.pdf PDF
APPENDIX H - ICE Facility Design Guide (2025).pdf PDF
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf PDF
APPENDIX N - ALEKNO AREA UTILITY MAP.pdf PDF
APPENDIX I - VSS spec for D-B.pdf PDF
APPENDIX E - CUBBY-LOCKER COMBO DETAIL.pdf PDF
APPENDIX D - SITE PLAN DEVIATIONS.pdf PDF
APPENDIX F - Ft. Benning Installation Design Guidelines.pdf PDF
APPENDIX C - ARCHITECTURAL PLAN DEVIATIONS.pdf PDF
APPENDIX L - ICE SITE SPECIFIC CANBLING REQUIREMENTS.pdf PDF
APPENDIX K - ICE ESS SOW.pdf PDF
APPENDIX J - Ft. Benning NEC ISP-OSP TTP v2.1.pdf PDF
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf PDF
Attachment L_Task Order Pricing Template.xlsx XLSX spreadsheet
Attachment K_IDIQ Pricing Template.xlsx XLSX spreadsheet
Attachment N_RFP Questions Submission Template.docx DOCX document
Attachment E - Scenario 5_Florence SHU SOW.pdf PDF
Attachment F - Scenario 6_Krome SHU SOW.pdf PDF
St. Thomas SHU SOW.docx DOCX document
EL PASO SHU SOW.docx DOCX document
El Centro SHU SOW.docx DOCX document
Batavia SHU SOW.docx DOCX document
Appendix H Performance-Based National Detention Standards.pdf PDF
Appendix G - ICE Facility Design Guide.pdf PDF
PIDC SHU SOW May 2026.docx DOCX document
Appendix J - Electronic Security Systems.pdf PDF
Appendix D - VSS spec for D-B.pdf PDF
Appendix C - SPC Detention Construction Stnds.pdf PDF
Appendix A - PIDC Concept Dwgs.pdf PDF
Final _SACC SOW_7.1.2026 1_KI.docx DOCX document
Appendix B - Geotech Rpt.pdf PDF
OFTP Classroom SOW Final 7 6 2026.docx DOCX document
Aquadilla SHU SOW.docx DOCX document
Appendix I - Prison Rape Elimination Act.pdf PDF
Appendix F - ICE Dwg Stnds.pdf PDF
Appendix E - ICE Cabling Standard.pdf PDF
SACC IDIQ Solicitation_15 July 2026.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET ID

U S

I M

M

IG

R A

T

IO

N A

N D

C U

S T

O M

S

E N

F O

R C

E M

E N

T

IC

E

D

E L

E G

A T

E D

D R

IV

E

O R

L A

N D

O F

L

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

SOLICITATION NO.: 70CMSW22Q00000001

ISSUE DATE:

M A

R K

D E

S C

R

IP

T

IO

N

K Z

F D

E S

IG

N

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

C

M S

W Q

Z

D

K Z

F N

P L

CONTRACT NO.: 70Z05018DKZFNPL08

FINAL SUBMITTAL (35%)

NOT FOR CONSTRUCTION

MCB

H U

T Z

E L

G-000

C O

V E

R S

H E

E T

F T

B E

N N

IN

G

G

E O

R G

IA

S

C H

M

IT

Z

S C

H M

IT

Z

S C

H M

IT

Z

-0

-2

J A

N

F

IN

A L

S U

B M

IT

T

A L

IM

M

IG

R

A T

IO

N

C

U S

T O

M S

E N

F O

R C

E M

E N

T

IC

E

01-06-2023

FT BENNING, GEORGIA

IMMIGRATION & CUSTOMS ENFORCEMENT (ICE)

MAIN CLASSROOM BUILDING

U.S. DEPARTMENT OF

HOMELAND SECURITY

ADVANCED TRAINING OPERATIONS CENTER

VICINITY MAP LOCATION MAP

I. APPLICABLE CODES

UFC CODE: UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, WITH CHANGE 6

UFC 1-200-01 DOD BUILDING CODE

UFC 4-021-01 DESIGN AND O&M: MASS NOTOFICATION SYSTEMS, WITH CHANGE 1

BUILDING CODE: INTERNATIONAL BUILDING CODE (IBC 2018)

FIRE CODE: INTERNATIONAL FIRE CODE (IFC 2018)

MECHANICAL CODE: INTERNATIONAL MECHANICAL CODE (IMC 2018)

PLUMBING CODE: INTERNATIONAL PLUMBING CODE (IPC 2018)

NFPA CODES: 13 (2019), 72 (2019), 101 FOR MEANS OF EGRESS REQUIREMENTS (2018)

II. BUILDING CLASSIFICATIONS AND LIMITATIONS

A. PRIMARY USE GROUP: NON-SEPARATED MIXED USE IBC 508.3. SEE CODE ANALYSIS FOR FURTHER DETAIL.

B. CONSTRUCTION TYPE

THE BUILDING WILL BE CONSTRUCTION TYPE IIB.

III. MEANS OF EGRESS

A. OCCUPANCY LOAD FACTORS

B. OCCUPANCY LOAD CALCULATIONS AND EGRESS

REQUIREMENTS EGRESS WIDTH BY CODE

IV CONSTRUCTION

A. SPACES WITH ONE EXIT OR EXIT ACCESS DOORWAY

B MAXIMUM TRAVEL DISTANCES

DISTANCES ARE BASED ON BUILDING BEING PROTECTED BY AN AUTOMATIC SPRINKLER SYSTEM.

C. FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (IBC TABLE 601)

BUILDING CONSTRUCTION

TYPE

USE GROUP SPRINKLER ALLOWABLE HEIGHTS

& STORIES

ACTUAL HEIGHTS &

STORIES

ALLOWABLE

AREA

ACTUAL

AREA

CLASSROOM IIB B, A-3, S-2, YES 75ft., 3 STORIES 30ft - 8in, 3 STORIES 28,500ft²

BUILDING NFPA 101 TABLE 7.3.1.2:: MAXIMUM FLOOR AREA

ALLOWANCES PER OCCUPANT

ACCESSORY STORAGE / MEP SPACES 500 GROSS

15 NET

BUSINESS, CIRCULATION 150 GROSS

ASSEMBLY - UNCONCENTRATED (TABLES & CHAIRS)

CODE LEVEL COMPONENTS CAPACITY FACTOR

NFPA 101 TABLE 7.3.1.1 0.2 INCHES PER PERSON

C = CAPACITY, IN PERSONS, ROUNDED TO THE NEAREST INTEGER.

STORAGE S-2

EXIT ACCESS TRAVEL DISTANCE 400ft

BUSINESS

300ft

ASSEMBLY

250ft

BUILDING ELEMENT FIRE RATING (HOURS)

TYPE IIB

STRUCTURAL FRAME * INCLUDING COLUMNS, GIRDERS, TRUSSES 0

X < 5 = 1 HOUR

5 ≤ X < 10 = 1 HOUR

10 ≥ = 0 HOUR

COLUMNS

EXTERIOR WALLS, BASED ON FIRE SEPARATION DISTANCE (FSD)

BEARING INTERIOR WALLS AND PARTITIONS

FLOOR CONSTRUCTION INCLUDING SUPPORTING BEAMS, JOISTS

ROOF CONSTRUCTION INCLUDING SUPPORTING BEAMS, JOISTS

17634.6ft²

BUSINESS - CONCENTRATED 50 GROSS

LOCKER ROOMS 50 GROSS 1 HOURFLOOR CONSTRUCTION INCLUDING SUPPORTING BEAMS, COLUMNS - ELECTRICAL ROOMS, STAIRWELL, ELEVATOR CONTROL ROOM, ANY OTHER RATED CONTRUCTION

OCCUPANCY MAXIMUM COMMON PATH OF EGRESS TRAVEL DISTANCE

WITH SPRINKLER SYSTEM (FEET)

A 75ft FOR LESS THAN OR EQUAL TO 50 OCCUPANTS, 20ft FOR MORE THAN 50 OCCUPANTS. PER NFPA

SECTION 12.2.5.1.2

100ft

100ft

B

S

SHEET ID

U S

I M

M

IG

R A

T

IO

N A

N D

C U

S T

O

F O

R C

E M

E N

T

IC

E

D

E L

E G

A T

E D

D R

IV

E

O R

L A

N D

O F

L

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

K Z

F D

E S

IG

N

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

C

M S

W Q

Z

D

K Z

F N

P L

NOT FOR CONSTRUCTION

MCB

H U

T Z

E L

G-002

B U

IL

D

IN

G

C O

D E

S U

M M

A R

Y

F T

B E

N N

IN

G

G

E O

R G

IA

K

L a w re n c e

A L o c k w o o d

E B a b c o c k

J A

N

,2

J A

N

F

IN

A L

S U

B M

IT

T

A L

IM

M

IG

R

A T

IO

N

C

U S

T O

M 'S

E N

F O

R C

E M

E N

T

IC

LOBBY

COUSELING

OFFICE

UNISEX

RESTROOM

WORK

ROOM /

ADMIN

STOR

GEAR

LOCKER

ROOM

TEAM

ROOM

TEAM

ROOM

CORRIDOR

BREAKROOM

MEN

WOMEN

JANITOR

STORAGE

GEAR

LOCKER

ROOM

MECH /

ELECT

TEL/COM

CONFERENCE

CLASSROOM

CLASSROOM

CONTROL/

STORAGE

120MECHANICAL

CORRIDOR

848.9 ft²

ASSEMBLY -

UNCONCENTRATED

15 57

935.2 ft²

ASSEMBLY -

UNCONCENTRATED

15 63

466.5 ft²

ASSEMBLY -

UNCONCENTRATED

15 98

655.8 ft²

BUSINESS

100 7

1232.4 ft²

CLASSROOM

20 62

1233.8 ft²

CLASSROOM

20 62

646.2 ft²

BUSINESS

100 4

EXIT

335 140

EXIT

122A

335 108

EXIT

335 2

EXIT

118B

170 62

EXIT

119B

170 62

EXIT

335 2

EXIT

122B

335 139

0 NCNP

122A

0 NCNP

0 NCNP

118B

0 NCP

119B

0 NCP

0 NCNP

122B

0 NCNP

0 NCP

0 NCP

0 NCNP

119A

0 NCP

118A

0 NCP

0 NCNP

CP: 72'-11"

TD: 125'-2"

CP: 66'-7"

TD: 75'-10"

D

K

A

E

F

G

H

J

4 6

5 7 8 109 11

463.3 ft²

ASSEMBLY -

UNCONCENTRATED

15 31

0 NCP

EXIT

170 1

FUNCTION OF SPACEIDENTIFIER

OCCUPANT

LOAD FACTOR

ACCESSORY STORAGE AREAS,

MECHANICAL EQUIPMENT ROOM

300 GROSS

ASSEMBLY -

UNCONCENTRATED 15 NET

BUSINESS AREA 100 GROSS

CLASSROOM AREA 20 NET

LOCKER ROOMS

* OCCUPANCY LOAD FACTORS ARE FROM TABLE 1004.1.2 OF THE IBC.

50 GROSS

SMOKE PARTITION

WALL TYPE LEGEND:

EGRESS CAPACITY TAG LEGEND

EXIT DESIGNATION

ACTUAL USE

EXIT CAPACITY

EGRESS CAPACITY TAG LEGEND

OCCUPANCY USE

GROUP

OCCUPANCY USE GROUP

SPACE AREA

OCCUPANT LOAD

OCCUPANT LOAD FACTOR

TRAVEL DISTANCE LEGEND

DEAD END

COMMON PATH OF TRAVEL

TRAVEL DISTANCE

DE XXXmm

CP XXXmm

TD XXXmm

DOOR HARDWARE / WALL PENETRATION LEGEND

###=FIRE RATING IN MINUTES

##=PANIC HARDWARE: P=YES, NP=NO

##=SELF CLOSING: C=YES, NC=NO

FIRE EXTINGUISHER LEGEND

DRY CHEMICAL - ABC

DRY CHEMICAL - BC

A

W

A=FIRE RATING IN MINUTES

W=TYPE OF PENETRATION

Door#

SHEET ID

U S

I M

M

IG

R A

T

IO

N A

N D

C U

S T

O

F O

R C

E M

E N

T

IC

E

D

E L

E G

A T

E D

D R

IV

E

O R

L A

N D

O F

L

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

K Z

F D

E S

IG

N

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

C

M S

W Q

Z

D

K Z

F N

P L

NOT FOR CONSTRUCTION

MCB

H U

T Z

E L

G-003

L

IF

E S

A F

E T

Y P

L A

N

F T

B E

N N

IN

G

G

E O

R G

IA

K

L a w re n c e

A L o c k w o o d

E B a b c o c k

J A

N

,2

J A

N

F

IN

A L

S U

B M

IT

T

A L

IM

M

IG

R

A T

IO

N

C

U S

T O

M 'S

E N

F O

R C

E M

E N

T

IC

E

1/8" = 1'-0"G-003

01 LIFE SAFETY PLAN

DOOR HARDWARE - LEVEL 1

DOOR NUMBER FIRE RATING

PANIC

HARDWARE SELF CLOSING

100 0 NP NC

122A 0 NP NC

115 0 NP NC

118B 0 P NC

119B 0 P NC

121 0 NP NC

122B 0 NP NC

107 0 P NC

106 0 P NC

109 0 NP NC

119A 0 P NC

118A 0 P NC

117 0 NP NC

116 0 P NC

118B 0 P NC

EXIT TABLE - LEVEL 1

STAIR /

EXIT

DOOR

WIDTH

DOOR WIDTH

FACTOR

DOOR

CAPACITY

EXIT

CAPACITY

ACTUAL

USE

EXIT 100 67 0.2 335 335 140

EXIT 115 67 0.2 335 335 2

EXIT 116 34 0.2 170 170 1

EXIT 118B 34 0.2 170 170 62

EXIT 119B 34 0.2 170 170 62

EXIT 121 67 0.2 335 335 2

EXIT 122A 67 0.2 335 335 108

EXIT 122B 67 0.2 335 335 139

TOTALS 2185 516

OCCUPANT LOAD TABLE - LEVEL 1

OCCUPANCY USE AREA OCCUPANT LOAD FACTOR OCCUPANT LOAD

ASSEMBLY - UNCONCENTRATED 2713.8 ft² 15 249

BUSINESS 1993.3 ft² 100 17

CIRCULATION 2624.9 ft² 150 18

CLASSROOM 2466.2 ft² 20 124

LOCKER ROOM 4771.5 ft² 50 97

STORAGE/ MECHANICAL 2501.5 ft² 500 11

TOTALS 17071.1 ft² 516

4'0 8' 16'

SCALE: 1/8" = 1'-0"

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

M

ET

AL

S

H

IP

PI

N

G C

O N

TA

IN

ER

M

ET

AL

S

H

IP

PI

N

G C

O N

TA

IN

ER

M

ET

AL

S

H

IP

PI

N

G C

O N

TA

IN

ER

M

ET

AL

S

H

IP

PI

N

G C

O N

TA

IN

ER

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

SANITARY MANHOLE

RIM EL. = 278.98'

NE INV. = 276.36' (18" CMP)

SE INV. = 276.28' (12" R

CP)

CATCH BASIN

TOP EL. = 275.67'

NE INV. = 271.77' (18" RCP)

NW INV. = 271.73' (12" CMP)

CATCH BASIN

TOP EL. = 274.40'

SW INV. = 269.86' (18" RCP)

NW INV. = 271.17' (18" CMP)

NE INV. = 271.63' (18" CMP)

SE INV. = 269.71' (24" CMP)

6" VC

INV. = 275.20'

6" VC

INV. = 275.20'

STORM MANHOLE

RIM EL. = 271.63'

INV. = 264.56' (24" CMP)

STRUCTURE HOLDING

WATER AND DEBRIS

AT BOTTOM

CATCH BASIN

18" CMP

INV. = 272.71'

15" CMP

INV. = 274.04'

G R

AV

EL

GR

AV

EL

GRAVEL

SIGN

"WOMACK MOTEL"

GAS

CHAMBER

GRAV

EL

GRAVEL

O

LD

B U

R

IE

D A

SP

H

AL

T

O

LD

B U

R

IE

D A

SP

H

AL

T

OLD BURIED ASPHALT

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

GATE

6' CHAINLINK FENCE

6' CHAINLINK FENCE

DECK

DECK

D

EC

K

6' CHAINLINK FENCE

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(A

XXXXXXXXXXXXXX

X

X

X

X

X

X

X

X X X

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SDx SDx

SDx SDx

SDx SDx

SD

x

SD

x

SDx

SDx

SDx

SDx

SDx

SDx SDx SDx SDx SDx SDx

SDx

SDx

DECK

DECK

D

EC

K

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U(B) U(B) U(B) U(B)

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U(B)U(B)U(B)U(B)U(B)U(B)U(B)

U(B) U(B) U(B) U(B) U(B)

U(B) U(B) U(B) U(B) U(B) U(B)

U(B) U(B)

G (B

G (B

G

(B

G(B) G(B) G(B) G(B) G(B) G(B) G(B) G(B)

G (B

G(B) G(B) G(B) G(B)

G(B)

G(B) G(B) G(B) G(B)

G(B)

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

G

(B

G(B) G(B) G(B) G(B) G(B)

G (B

BE(D)

BE(D)

BE(D)

BE(D)

BE

(D

BE

(D

BE

(D

BE(D)

BE(D)

BE(D)

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B) W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W (B)

W (B)

W (B)

W (B)

W (B)

W (B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT(B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

Control Point 1 N = 853629.44' E = 2043732.52' Elev. = 282.04' Set Concrete Monument w/disk Stamped "1 DRMP Inc. Vertical Control"

Control Point 54 N = 853360.91'

E = 2044281.35' Elev. = 273.76'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

Control Point 56

N = 853608.45'

E = 2043631.50'

Elev. = 279.01'

Set Nail & Disk Stamped

"Drmp Traverse"

Control Point 57 N = 853540.26'

E = 2043864.83' Elev. = 279.72'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

26" Pine 26" Pine

21" Pine 27" Pine

33" Pine

28" Oak

27" Pine

29" Pine 25" Pine

13" Oak 20" Oak

31" Pine

30" Pine

XX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

XXX

OLD BURIED ASPHALT OLD BURIED ASPHALT

IN

D

IA

N

H

EA

D R

O

AD

SW INV. = 276.58' (12" RCP)

NE INV. = 276.44' (18" CMP)

STORM MANHOLE

WITH GRATED LID

RIM EL. = 279.19'

SW INV. = 276.80'

W(C

W(C

W(C

SANITARY MANHOLE

RIM EL. = 277.16'

N INV. = 272.26'

SE INV. = 272.29'

SW INV. = 272.26'

6' CHAINLINK FENCE

SANITARY MANHOLE

RIM EL. = 280.61'

NE INV. = 276.70' (10" VC)

SW INV. = 277.16' (6" VC)

Control Point 55 N = 853376.54'

E = 2043968.41' Elev. = 276.64'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

GRAVEL

GRAVEL

VE

G

ET

AT

IO

N

A R

EA

6' C

H

AI

N

LI

N K

FE

N

C E

G

AT

E

CONCRETE

CONCRETE

ASPHALT PAVEMENT

BELFRY STREET

IN

D

IA

N

H

EA

D R

O

AD

IN

D

IA

N

H

EA

D R

O

AD

GOLTRA AVENUE

AS

PH

AL

T

PA

VE

M

EN

T

AS

PH

AL

T

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

EDGE OF PAVEMENT

EDGE OF PAVEMENT

ED

G

E O

F

PA

VE

M

EN

T

CONCRETE

CONCRETE

CONCRETE

SLAB

D

IT

C H

STAIRS

D

IT

C H

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

1-STORY

CONCRETE

BLOCK BUILDING

CONCRETE

SLAB

CONCRETE

SLAB

STAIRS

STAIRS

STAIRS

STAIRS

STAIRS

SPOIL

PILE

CONCRETE BATH HOUSE

CONCRETE

SLAB

CONCRETE

SLAB

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

SDxSDxSDxSDxSDx 24" CORRUGATED METAL PIPE24" CORRUGATED METAL PIPE

18" CORRUGATED METAL PIPE

" C

O R

R U

G

AT

ED

M

ET

AL

P

IP

E

" C O

R R

U G

AT

ED

M

ET

AL

P

IP

E

18" R

CP

" C

O R

R U

G

AT

ED

M

ET

AL

P

IP

E

12" C

ORRUGATED M

ETAL PIPE

END OF PIPE NOT FOUND

LOCATION SHOWN IS BASED ON

PROVIDED DATA FROM THE BASE

DIRECTION ONLY

6" V

C

" V C

S

LOCATION OF PROPOSED

MAIN CLASSROOM BUILDING

(SEE SHEET CS101)

G

G G G G G G G

GGGGGGGGGGGGGG

G G

G G

G G

G G

G G

G G

G

G G

G G

G G

G

G G G G

G G

G

G G

G G

SD

SD

SD

SD

SD

SD

SD

SD

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

W

W W

W W

W W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W 6"

S

AN

IT

AR

Y (P

ER

G

IS

" A

BANDONED W

ATE

R

(A

SBESTO

S C

EMENT)

P

ER G

IS

6" ABANDONED WATER (PER GIS)

4" G

AS

(P

ER

G

IS

3" GAS (PER GIS)

2" GAS (PER GIS)

1" GAS (PER GIS)

" A

BANDONED W

ATE

R

(A

SBESTO

S C

EMENT)

P

ER G

IS

LEGEND:

DEMO

00 30' 60'

SCALE: 1" = 30'

CODED NOTES:

1. REMOVE GRAVEL

2. RELOCATE (4) METAL CONTAINERS

3. REMOVE CONCRETE CURB

4. REMOVE GATE

5. REMOVE FENCE

6. CUT, PLUG & ABANDON UTILITY PIPE

7. CUT, PLUG & ABANDON 10" ASBESTOS

WATER LINE (ABANDONED PER GIS)

8. REMOVE CURB AND GUTTER

9. REMOVE ASPHALT PAVEMENT

10. REMOVE VEGETATION

11. REMOVE CONCRETE

12. REMOVE OLD BURIED ASPHALT

13. REMOVE STORM STRUCTURE

14. REMOVE STORM SEWER PIPE

15. REMOVE AND RELOCATE UTILITY POLE

SHEET ID

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

CD101

SI

TE

D

EM

O

LI

TI

O

N P

LA

N

PE

F

PE

F

G B

W W

WWWWWW

GGGGGGGGGGGG

G G

G

W W W W W W W W W W W W W W

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

S

S

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

WWWWWWWWWWWWWW

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMM COMM COMM COMM

E E

E

E

E

W

C O

M M

C O

M M

SAN

G

G G G G G G G

GGGGGGGGGGGGGG

G G

G G

G G

G G

G G

G G

G

G G

G G

G G

G

G G G G

G G

G

G G

G G

SD

SD

SD

SD

SD

SD

SD

SD

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

W

W W

W W

W W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

" A

BANDONED W

ATE

R

(A

SBESTO

S C

EMENT)

P

ER G

IS

6" ABANDONED WATER (PER GIS)

4" G

AS

(P

ER

G

IS

3" GAS (PER GIS)

2" GAS (PER GIS)

1" GAS (PER GIS)

" A

BANDONED W

ATE

R

(A

SBESTO

S C

EMENT)

P

ER G

IS

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

CATCH BASIN

TOP EL. = 275.67'

NE INV. = 271.77' (18" RCP)

NW INV. = 271.73' (12" CMP)

CATCH BASIN

TOP EL. = 274.40'

SW INV. = 269.86' (18" RCP)

NW INV. = 271.17' (18" CMP)

NE INV. = 271.63' (18" CMP)

SE INV. = 269.71' (24" CMP)

6" VC

INV. = 275.20'

6" VC

INV. = 275.20'

STORM MANHOLE

RIM EL. = 271.63'

INV. = 264.56' (24" CMP)

STRUCTURE HOLDING

WATER AND DEBRIS

AT BOTTOM

CATCH BASIN

18" CMP

INV. = 272.71'

15" CMP

INV. = 274.04'

SIGN

"WOMACK MOTEL"

GAS

CHAMBER

ED

G

E O

F

PA

VE

M

EN

T

DECK

DECK

D

EC

K

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

X

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SDx

SDx

SDx

SDx

SDx

SDx SDx SDx SDx SDx

SDx

SDx

DECK

DECK

D

EC

K

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U(B) U(B) U(B) U(B)

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U(B)U(B)U(B)U(B)U(B)U(B)U(B)

U(B) U(B) U(B) U(B) U(B)

U(B) U(B) U(B) U(B) U(B) U(B)

U(B) U(B)

G (B

G (B

G

(B

G(B) G(B) G(B) G(B) G(B) G(B) G(B) G(B)

G (B

G(B) G(B) G(B) G(B)

G(B)

G(B) G(B) G(B) G(B)

G(B)

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

G(B) G(B) G(B) G(B) G(B)

G (B

BE(D)

BE(D)

BE(D)

BE(D)

BE

(D

BE

(D

BE(D)

BE(D)

BE(D)

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B) W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W (B)

W (B)

W (B)

W (B)

W (B)

W (B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT(B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

Control Point 1 N = 853629.44' E = 2043732.52' Elev. = 282.04' Set Concrete Monument w/disk Stamped "1 DRMP Inc. Vertical Control"

Control Point 54 N = 853360.91'

E = 2044281.35' Elev. = 273.76'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

Control Point 56

N = 853608.45'

E = 2043631.50'

Elev. = 279.01'

Set Nail & Disk Stamped

"Drmp Traverse"

Control Point 57 N = 853540.26'

E = 2043864.83' Elev. = 279.72'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

26" Pine 26" Pine

21" Pine 27" Pine

33" Pine

28" Oak

27" Pine

29" Pine 25" Pine

13" Oak 20" Oak

31" Pine

30" Pine

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

IN

D

IA

N

H

EA

D R

O

AD

W(C

W(C

W(C

SANITARY MANHOLE

RIM EL. = 277.16'

N INV. = 272.26'

SE INV. = 272.29'

SW INV. = 272.26'

6' CHAINLINK FENCE

SANITARY MANHOLE

RIM EL. = 280.61'

NE INV. = 276.70' (10" VC)

SW INV. = 277.16' (6" VC)

Control Point 55 N = 853376.54'

E = 2043968.41' Elev. = 276.64'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

VE

G

ET

AT

IO

N

A R

EA

6' C

H

AI

N

LI

N K

FE

N

C E

CONCRETE

BELFRY STREET

IN

D

IA

N

H

EA

D R

O

AD

IN

D

IA

N

H

EA

D R

O

AD

AS

PH

AL

T

PA

VE

M

EN

T

AS

PH

AL

T

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

CONCRETE

CONCRETE

CONCRETE

SLAB

D

IT

C H

STAIRS

D

IT

C H

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

1-STORY

CONCRETE

BLOCK BUILDING

CONCRETE

SLAB

CONCRETE

SLAB

STAIRS

STAIRS

STAIRS

STAIRS

STAIRS

SPOIL

PILE

CONCRETE BATH HOUSE

CONCRETE

SLAB

CONCRETE

SLAB

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

SDxSDxSDxSDxSDx 24" CORRUGATED METAL PIPE24" CORRUGATED METAL PIPE

18" R

CP

" C

O R

R U

G

AT

ED

M

ET

AL

P

IP

E

12" C

ORRUGATED M

ETAL PIPE

END OF PIPE NOT FOUND

LOCATION SHOWN IS BASED ON

PROVIDED DATA FROM THE BASE

DIRECTION ONLY

6" V

C

" V C

S

BLDG. 2294

BLDG. 2296

BLDG. 2291

S

PA

C

ES

S

PA

C

ES

S

PA

C

ES

S

PA

C

ES

FUTURE

ROAD

FUTURE

ROAD

MAIN CLASSROOM BUILDING

FFE 276

(SEE ARCHITECTURAL PLANS)

1(TYP.)

3(TYP.)

278 27

3 272

CB

CB

CB

CB

CB CB

CB

CB

CB

CB

CB

CB

SD

SD

SD

SDCB CB

SD

SD

SD

CB

CB

SD

SD

SD

SD

CB

CB

SD

CB

SD

CB

SD

SD

D

CB

CB

CB

SD

SD

SD

SD

SD

CB

CB

SD

CB

CB

CB

SD

CB

SD

CB

CB

CB

CB CB

SD

CB

SD

CB

SD

CB

CB CB

CB

CB

SD

CB

CB

HP 276.3

HP 282

HP

280.5

CB 274

CB

CB

SD

SD

SD

SD

SD

SD

SD

CB

CB

CB

CB

SD

9(TYP.)

2(TYP.)

9 (TYP.)

LEGEND:

CONCRETE WALK

ASPHALT PAVEMENT

GRAVEL

FENCE

HANDICAP SIGNWATER LINE

SANITARY SEWER

GAS LINE

TELECOMMUNICATIONS

UNDERGROUND ELECTRIC

LIGHT FIXTURE

G

COMM

SAN

W

E

A1

CONTOUR

STORM SEWER

STORM INLET

BIO-RETENTION/INFILTRATION BASIN

BIO-RETENTION/INFILTRATION

OVERFLOW WITH CLEANOUT

STORM MANHOLE

SD

CB

CB

D

CODED NOTES:

1. NEW GUTTER INLET (NEENAH R-3165, TYPE A, OR EQUAL)

2. NEW 6" STORM PIPE TO BIO-RETENTION/INFILTRATION BASIN

3. NEW BIO-RETENTION/INFILTRATION BASIN

4. NEW DOWNSPOUT PIPE TO BIO-RETENTION/INFILTRATION

BASIN

5. NEW 18" RCP STORM PIPE

6. NEW 24" RCP STORM PIPE

7. NEW 15" RCP STORM PIPE

8. NEW TRENCH DRAIN

9. NEW BIO-RETENTION/INFILTRATION BASIN OVERFLOW WITH

CLEANOUT

00 30' 60'

SCALE: 1" = 30'

SHEET ID

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

CG101

SI

TE

G R

A D

IN

G

P

LA

N

G B

PE

F

G B

GENERAL NOTES:

1. CONTRACTOR TO PERFORM INFILTRATION TESTS

TO CONFIRM INFILTRATION RATES OF SOILS.

2. CONTRACTOR SHALL SUBMIT A STORMWATER

POLLUTION PREVENTION PLAN THAT MEETS

GEORGIA REQUIREMENTS.

MATCH LINE (SEE CG102)

G G

G G

G G

G G

G G

G G

G G

G

G

G

G

G

G

G

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SS

SS

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

DETENTION POND

RIP RAP

R

IP

R

AP

D

IT

C H

R

IP

R

AP

DETENTION POND

DETENTION POND

X

X

X

U (B

U

(B

U (B

U

(B

U (B

U

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W(B)

W(B)

BT

(B

BT

(B

BT

(B

)BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

VEGETATION AREA

6' CHAINLINK FENCE

VEGETATION AREA

RIVER ROCK

RIP RAP

RIVER ROCK

RIP RAP

VEGETATION AREA

METAL POST

GRAVEL

RIVER ROCK

RIP RAP

RIVER ROCK

RIP RAP

AS

PH

AL

T

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

E x

E x

R

IP

R

AP

TOP OF POND

TOP OF POND

TOP OF POND

TOP OF POND

SD

SD

SD

SD

SD

D

LEGEND:

CONCRETE WALK

ASPHALT PAVEMENT

GRAVEL

FENCE

HANDICAP SIGN

WATER LINE

SANITARY SEWER

GAS LINE

TELECOMMUNICATIONS

UNDERGROUND ELECTRIC

LIGHT FIXTURE

G

COMM

SAN

W

E

A1

CONTOUR

STORM SEWER

STORM INLET

BIO-RETENTION/INFILTRATION BASIN

BIO-RETENTION/INFILTRATION

OVERFLOW WITH CLEANOUT

STORM MANHOLE

SD

CB

CB

D

CODED NOTES:

1. NEW 18" RCP STORM PIPE

2. OUTLET STORM PIPE TO EXISTING DETENTION POND

00 30' 60'

SCALE: 1" = 30'

SHEET ID

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

CG102

SI

TE

G R

A D

IN

G

P

LA

N

G B

PE

F

G B

GENERAL NOTES:

1. CONTRACTOR TO PERFORM INFILTRATION TESTS

TO CONFIRM INFILTRATION RATES OF SOILS.

2. CONTRACTOR SHALL SUBMIT A STORMWATER

POLLUTION PREVENTION PLAN THAT MEETS

GEORGIA REQUIREMENTS.

MATCH LINE (SEE CG101)

BLDG. 2294

BLDG. 2296

BLDG. 2291

S

PA

C

ES

S

PA

C

ES

S

PA

C

ES

S

PA

C

ES

FUTURE

ROAD

FUTURE

ROAD

MAIN CLASSROOM BUILDING

FFE 276

(SEE ARCHITECTURAL PLANS)

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

SIGN

"WOMACK MOTEL"

GAS

CHAMBER

RIP RAP

ED

G

E O

F

PA

VE

M

EN

T

DECK

DECK

D

EC

K

X

X

DECK

DECK

D

EC

K

Control Point 1 N = 853629.44' E = 2043732.52' Elev. = 282.04' Set Concrete Monument w/disk Stamped "1 DRMP Inc. Vertical Control"

Control Point 54 N = 853360.91'

E = 2044281.35' Elev. = 273.76'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

Control Point 56

N = 853608.45'

E = 2043631.50'

Elev. = 279.01'

Set Nail & Disk Stamped

"Drmp Traverse"

Control Point 57 N = 853540.26'

E = 2043864.83' Elev. = 279.72'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

26" Pine 26" Pine

21" Pine 27" Pine

33" Pine

28" Oak

27" Pine

29" Pine 25" Pine

13" Oak 20" Oak

31" Pine

30" Pine

WM

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

IN

D

IA

N

H

EA

D R

O

AD

W(C

W(C

W(C

W(C

6' CHAINLINK FENCE

Control Point 55 N = 853376.54'

E = 2043968.41' Elev. = 276.64'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

GRAVEL

RIVER ROCK

RIP RAP

VE

G

ET

AT

IO

N

A R

EA

6' C

H

AI

N

LI

N K

FE

N

C E

CONCRETE

BELFRY STREET

IN

D

IA

N

H

EA

D R

O

AD

IN

D

IA

N

H

EA

D R

O

AD

AS

PH

AL

T

PA

VE

M

EN

T

AS

PH

AL

T

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

CONCRETE

CONCRETE

CONCRETE

SLAB

D

IT

C H

STAIRS

D

IT

C H

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

1-STORY

CONCRETE

BLOCK BUILDING

CONCRETE

SLAB

CONCRETE

SLAB

STAIRS

STAIRS

STAIRS

STAIRS

STAIRS

SPOIL

PILE

CONCRETE BATH HOUSE

CONCRETE

SLAB

CONCRETE

SLAB

S

5 7

3(TYP.)

3(TYP.)

LEGEND:

CONCRETE WALK

ASPHALT PAVEMENT

GRAVEL

FENCE

HANDICAP SIGNSTORM INLET

BIO-RETENTION/INFILTRATION BASIN

BIO-RETENTION/INFILTRATION

00 30' 60'

SCALE: 1" = 30'

SHEET ID

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

CS101

SI

TE

P

LA

N

PE

F

PE

F

G B

CODED NOTES:

1. ASPHALT PAVEMENT WITH CURB AND GUTTER

2. CONCRETE SIDEWALK

3. BIO-RETENTION/INFILTRATION BASIN (SEE SHEET CG101)

4. PAD MOUNTED UTILITY TRANSFORMER

5. CHAINLINK FENCE (SEE DETAIL C-501 AND C-502)

6. 24-FT WIDE CANTILEVER GATE (SEE DETAIL SHEET C-504)

7. DOUBLE LEAF SWING GATE (SEE DETAIL SHEET C-503)

8. HANDICAP RAMP

9. CROSSWALK

10. CONCRETE PATIO

11. FACILITY SIGN

12. PARKING SPACE

13. AIR COOLED CONDENSING UNIT (SEE MECHANICAL PLAN

M-101)

14. HEAT PUMP (SEE MECHANICAL PLAN M-101)

15. HANDICAP PARKING SIGN

MATCH LINE (SEE CS102)

SEE APPENDIX D FOR REVISIONS

R

AV

EL

O

LD

B U

R

IE

D A

SP

H

AL

T

AL

EK

N O

R O

AD

AS

PH

AL

T

P

AV

EM

EN

T

O

LD

B U

R

IE

D A

SP

H

AL

T

O

LD

B U

R

IE

D A

SP

H

AL

T

O

LD

B U

R

IE

D A

SP

H

AL

T

1-STORY WOOD HOUSE

"MOCK TRAINING" BUILDING

FFE = 278.12'

X

Control Point 2 N = 853950.85' E = 2043902.53' Elev. = 282.01' Set Concrete Monument w/disk Stamped "2 DRMP Inc. Vertical Control"

Control Point 52

N = 853917.68'

E = 2044156.21'

Elev. = 278.76'

Set Nail & Disk Stamped

"Drmp Traverse"

Control Point 53 N = 853631.62' E = 2044414.82' Elev. = 274.86' Set 5/8" Iron Rod w/Cap Stamped "DRMP Traverse"

M

AI

LB

O

X

AC

28" Oak

38" Sugar Berry Tree

33" Sugar Berry Tree

US MAIL

X X

X X

X X

X X

X X

X

XXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X

METAL

6' CHAINLINK FENCE

AS

PH

AL

T

PA

VE

M

EN

T

IN

D

IA

N

H

EA

D R

O

AD

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

6' C

H

AI

N

LI

N K

FE

N

C E

6' C

H

AI

N

LI

N K

FE

N

C E

6' CHAINLINK FENCE

STAIRS

STAIRS

STAIRS

G

AT

E

DECK

DECK

2-STORY WOOD

APARTMENT COMPLEX

FFE = 276.71'

G

AT

E

GATE

GATE

G

AT

E

.94

LLD

W1

SS

S

LEGEND:

CONCRETE WALK

ASPHALT PAVEMENT

GRAVEL

FENCESTORM INLET

BIO-RETENTION/INFILTRATION BASIN

BIO-RETENTION/INFILTRATION

00 30' 60'

SCALE: 1" = 30'

SHEET ID

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

CS102

SI

TE

P

LA

N

PE

F

PE

F

G B

CODED NOTES:

1. DUMPSTER PAD & ENCLOSURE

2. CONCRETE PAVEMENT (8" THICK REINFORCED)

3. GRAVEL PAVEMENT

MATCH LINE (SEE CS101)

PROPOSED ELEVATIONS AND

NEW PAVEMENT PROVIDED IN

FUTURE DESIGN PHASE

BLDG. 2294

BLDG. 2296

BLDG. 2291

S

PA

C

ES

S

PA

C

ES

S

PA

C

ES

S

PA

C

ES

FUTURE FUTURE

MAIN CLASSROOM BUILDING

FFE 276

(SEE ARCHITECTURAL PLANS)

W W

WWWWWW

GGGGGGGGGGGG

G G

G

W W W W W W W W W W W W W W

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

S

S

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

WWWWWWWWWWWWWW

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMM COMM COMM COMM

E E

E

E

E

W

C O

M M

C O

M M

C O

M M

SAN

G

G G G G G G G

GGGGGGGGGGGGGG

G G

G

G G

G G

G G

G G

G

G

G G

G G

G G

G

G G G G

G G

G G

G G

SD

SD

SD

SD

SD

SD

SD

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

W W

W W

W W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W 6"

S

AN

IT

AR

Y (P

ER

G

IS

" A

BANDONED W

ATE

R

(A

SBESTO

S C

EMENT)

P

ER G

IS

6" ABANDONED WATER (PER GIS)

4" G

AS

(P

ER

G

IS

3" GAS (PER GIS)

2" GAS (PER GIS)

1" GAS (PER GIS)

" A

BANDONED W

ATE

R

(A

SBESTO

S C

EMENT)

P

ER G

IS

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

CATCH BASIN

TOP EL. = 275.67'

NE INV. = 271.77' (18" RCP)

NW INV. = 271.73' (12" CMP)

CATCH BASIN

TOP EL. = 274.40'

SW INV. = 269.86' (18" RCP)

NW INV. = 271.17' (18" CMP)

NE INV. = 271.63' (18" CMP)

SE INV. = 269.71' (24" CMP)

6" VC

INV. = 275.20'

6" VC

INV. = 275.20'

STORM MANHOLE

RIM EL. = 271.63'

INV. = 264.56' (24" CMP)

STRUCTURE HOLDING

WATER AND DEBRIS

AT BOTTOM

CATCH BASIN

18" CMP

INV. = 272.71'

15" CMP

INV. = 274.04'

METAL SHED

O

LD

B U

R

IE

D A

SP

H

AL

T

SIGN

"WOMACK MOTEL"

GAS

CHAMBER

O

LD

B U

R

IE

D A

SP

H

AL

T

ED

G

E O

F

PA

VE

M

EN

T

MULTI STORY MOTEL

FFE = 278.36'

DECK

DECK

D

EC

K

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(A

SA

N

(A

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SDx

SDx

SDx

SDx

SDx

SDx SDx SDx SDx SDx

SDx

SDx

DECK

DECK

D

EC

K

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U(B) U(B) U(B) U(B)

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U(B)U(B)U(B)U(B)U(B)U(B)U(B)

U(B) U(B) U(B) U(B) U(B)

U(B) U(B) U(B) U(B) U(B) U(B)

U(B) U(B)

G (B

G (B

G

(B

G(B) G(B) G(B) G(B) G(B) G(B) G(B) G(B)

G (B

G(B) G(B) G(B) G(B)

G(B)

G(B) G(B) G(B) G(B)

G(B)

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

G

(B

G(B) G(B) G(B) G(B) G(B)

G (B

BE(D)

BE(D)

BE(D)

BE(D)

BE

(D

BE

(D

BE

(D

BE(D)

BE(D)

BE(D)

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B) W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W (B)

W (B)

W (B)

W (B)

W (B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT(B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

Control Point 1 N = 853629.44' E = 2043732.52' Elev. = 282.04' Set Concrete Monument w/disk Stamped "1 DRMP Inc. Vertical Control"

Control Point 54 N = 853360.91'

E = 2044281.35' Elev. = 273.76'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

Control Point 56

N = 853608.45'

E = 2043631.50'

Elev. = 279.01'

Set Nail & Disk Stamped

"Drmp Traverse"

Control Point 57 N = 853540.26'

E = 2043864.83' Elev. = 279.72'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

26" Pine 26" Pine

21" Pine 27" Pine

33" Pine

28" Oak

27" Pine

29" Pine 25" Pine

13" Oak 20" Oak

31" Pine

30" Pine

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

W(C

SANITARY MANHOLE

RIM EL. = 277.16'

N INV. = 272.26'

SE INV. = 272.29'

SW INV. = 272.26'

METAL

RAMP

SANITARY MANHOLE

RIM EL. = 280.61'

NE INV. = 276.70' (10" VC)

SW INV. = 277.16' (6" VC)

Control Point 55 N = 853376.54'

E = 2043968.41' Elev. = 276.64'

Set 5/8" Iron Rod w/Cap Stamped "DRMP

Traverse"

VE

G

ET

AT

IO

N

A R

EA

6' C

H

AI

N

LI

N K

FE

N

C E

CONCRETE

BELFRY STREET

IN

D

IA

N

H

EA

D R

O

AD

IN

D

IA

N

H

EA

D R

O

AD

AS

PH

AL

T

PA

VE

M

EN

T

AS

PH

AL

T

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

CONCRETE

CONCRETE

CONCRETE

SLAB

D

IT

C H

STAIRS

D

EC

K

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

1-STORY

CONCRETE

BLOCK BUILDING

CONCRETE

SLAB

CONCRETE

SLAB

STAIRS

STAIRS

STAIRS

STAIRS

STAIRS

SPOIL

PILE

CONCRETE BATH HOUSE

CONCRETE

SLAB

CONCRETE

SLAB

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

SDxSDxSDxSDxSDx 24" CORRUGATED METAL PIPE24" CORRUGATED METAL PIPE

18" R

CP

" C

O R

R U

G

AT

ED

M

ET

AL

P

IP

E

12" C

ORRUGATED M

ETAL PIPE

END OF PIPE NOT FOUND

LOCATION SHOWN IS BASED ON

PROVIDED DATA FROM THE BASE

DIRECTION ONLY

6" V

C

" V C

S14

CB

CB

CB

CB

CB CB

CB

CB

CB

CB

CB

CB

SD

SD

SDCB CB

SD

SD

SD

CB

CB

SD

SD

SD

SD

CB

CB

SD

CB

SD

CB

SD

SD

D

CB

CB

CB

SD

SD

SD

SD

SD

CB

CB

SD

CB

CB

CB

SD

CB

SD

CB

CB

CB

CB CB

SD

CB

SD

CB

SD

CB

CB CB

CB

CB

SD

CB

CB

CB

CB

SD

SD

SD

SD

SD

SD

SD

CB

CB

CB

CB

SD

Xr ef

F :\P ro je ct s\

\0

5_ D el iv er ab le s\

D ra w in gs \A ut oC

AD

\E le ct

\F lo or Pl an -0

0_

SL

_S

IT

EL

IG

H

TI

N G

PL

AN

_D O

C -6

1_ M

C B_

Ar ch ite ct ur al

_C en tra l_

-rv t-1

-0 0_

SL

_S

IT

E

LI

G

H

TI

N G

P

LA

N _D

O C

.d w g

A1 A1

A1

A1

A1A1

A1

A2A2 A2 A2A2

A2A2 A2

A1

A1A1A1

A2A2

A2

A1

A2 A2

A1

A1A1A1

A1

A1 A4

A4 A4

A4 A4

A4A4 A4 A4

A4 A4

A4 A4

A4 A4

A4

17(TYP.)

LEGEND:

CONCRETE WALK

ASPHALT PAVEMENT

GRAVEL

FENCE

WATER LINE

SANITARY SEWER

GAS LINE

TELECOMMUNICATIONS

UNDERGROUND ELECTRIC

LIGHT FIXTURE

G

COMM

SAN

W

E

A1

STORM SEWER

STORM INLET

BIO-RETENTION/INFILTRATION BASIN

BIO-RETENTION/INFILTRATION

OVERFLOW WITH CLEANOUT

SD

CB

CB

CODED NOTES:

1. NEW 6" FIRE SERVICE (SEE SHEET FX101)

2. NEW 2" DOMESTIC WATER SERVICE (SEE SHEET

P-101)

3. NEW POST INDICATOR VALVE

4. NEW FIRE DEPARTMENT CONNECTION (SEE

SHEET FX101)

5. NEW FIRE HYDRANT

6. NEW WATER MAIN

7. NEW 8" SANITARY MAIN

8. NEW 2" SANITARY FORCE MAIN

9. HEAT PUMP (SEE MECHANICAL PLAN M-101)

10. NEW SANITARY MANHOLE

11. NEW GAS LINE (SEE SHEET P-101)

12. NEW UNDERGROUND ELECTRIC (SEE SHEET

ES201)

13. NEW TELECOMMUNICATIONS SERVICE (SEE

SHEET T-101)

14. RELOCATE ELECTRIC POLE

15. COORDINATE WATER METER VAULT, BACKFLOW

PREVENTOR AND SEWER TAP LOCATION WITH

COLUMBUS WATER.

16. NEW SANITARY LIFT STATION (SEE SHEET P-101)

17. NEW LIGHT FIXTURE (SEE SHEET ES101)

18. AIR COOLED CONDENSING UNIT (SEE

MECHANICAL PLAN M-101)

00 30' 60'

SCALE: 1" = 30'

MATCH LINE (SEE CU102)

SHEET ID

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

CU101

SI

TE

U

TI

LI

TY

P

LA

N

PE

F

PE

F

SA

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

S

C O

M M

G G

G G

G

G

G

G

G

G

G

G

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

W W

W W

W W

W W

W W

W W

W

W

6" S

AN

IT

AR

Y

(P

ER

G

IS

SANITARY MANHOLE

RIM EL. = 277.06'

NE INV. = 272.38' (12" VC)

SE INV. = 272.54' (12"PVC)

G R

AV

EL

O

LD

B U

R

IE

D A

SP

H

AL

T

AL

EK

N O

R O

AD

AS

PH

AL

T

P

AV

EM

EN

T

O

LD

B U

R

IE

D A

SP

H

AL

T

O

LD

B U

R

IE

D A

SP

H

AL

T

O

LD

B U

R

IE

D A

SP

H

AL

T

1-STORY WOOD HOUSE

"MOCK TRAINING" BUILDING

FFE = 278.12'

SAN(A)

SAN(A)

SAN(A)

SAN(A)

SAN(A)

SAN(A)

SAN(A)

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SA

N

(A

SAN(A)

SAN(A)

SAN(A)

SA

N

(A

SA

N

(A

X

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

U (B

U

(B

U (B

U

(B

U (B

U

(B

U (B

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

BE

(D

BE

(D

E x

E x

E x

Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W(B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

)BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

Control Point 2 N = 853950.85' E = 2043902.53' Elev. = 282.01' Set Concrete Monument w/disk Stamped "2 DRMP Inc. Vertical Control"

Control Point 52

N = 853917.68'

E = 2044156.21'

Elev. = 278.76'

Set Nail & Disk Stamped

"Drmp Traverse"

Control Point 53 N = 853631.62' E = 2044414.82' Elev. = 274.86' Set 5/8" Iron Rod w/Cap Stamped "DRMP Traverse"

M

AI

LB

O

X

28" Oak

38" Sugar Berry Tree

33" Sugar Berry Tree

US MAIL

X X

X X

X X

X X

X X

X

XXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X

SANITARY MANHOLE

RIM EL. = 274.90'

NW INV. = 267.78' (12" VC)

SE INV.= 267.68' (12" VC)

S INV. = 268.45' (6" VC)

SANITARY MANHOLE

RIM EL. = 274.71'

NW INV. = 267.25' (12" VC)

SE INV.= 267.24' (12" VC)

METAL

6' CHAINLINK FENCE

AS

PH

AL

T

PA

VE

M

EN

T

IN

D

IA

N

H

EA

D R

O

AD

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

6' C

H

AI

N

LI

N K

FE

N

C E

6' C

H

AI

N

LI

N K

FE

N

C E

6' CHAINLINK FENCE

STAIRS

STAIRS

STAIRS

G

AT

E

DECK

DECK

2-STORY WOOD

APARTMENT COMPLEX

FFE = 276.71'

G

AT

E

GATE

GATE

G

AT

E

E x

E x

E x

E x

E x

E x

SANITARY LINE EXPOSED

ABOVE GROUND

12" DUCTILE IRON PIPE

TOP OF PIPE EL. = 267.93'

SS

S

LEGEND:

CONCRETE WALK

ASPHALT PAVEMENT

GRAVEL

FENCE

HANDICAP SIGN

WATER LINE

SANITARY SEWER

GAS LINE

TELECOMMUNICATIONS

UNDERGROUND ELECTRIC

LIGHT FIXTURE

G

COMM

SAN

W

E

A1

CODED NOTES:

1. NEW 8" SANITARY MAIN

2. NEW SANITARY MANHOLE

3. CONNECT TO EXISTING SANITARY MANHOLE

4. NEW TELECOMMUNICATIONS SERVICE

00 30' 60'

SCALE: 1" = 30'

MATCH LINE (SEE CU101)

SHEET ID

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

CU102

SI

TE

U

TI

LI

TY

P

LA

N

PE

F

PE

F

G B

PROPOSED ELEVATIONS AND

NEW PAVEMENT PROVIDED IN

FUTURE DESIGN PHASE

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

C-501

D

ET

A

IL

S

PE

F

PE

F

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

C-502

D

ET

A

IL

S

PE

F

PE

F

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

C-503

D

ET

A

IL

S

PE

F

PE

F

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

C-504

D

ET

A

IL

S

PE

F

PE

F

278 27

3 272

CB

CB

CB

CB

CB CB

CB

CB

CB

CB

CB

CB

SD

SD

SD

SDCB CB

SD

SD

SD

CB

CB

SD

SD

SD

SD

CB

CB

SD

CB

SD

CB

SD

SD

D

CB

CB

CB

SD

SD

SD

SD

SD

CB

CB

SD

CB

CB

CB

SD

CB

SD

CB

CB

CB

CB CB

SD

CB

SD

CB

SD

CB

CB CB

CB

CB

SD

CB

CB

HP 276.3

HP 282

HP

280.5

CB 274

CB

CB

SD

SD

SD

SD

SD

SD

SD

CB

CB

CB

CB

SD

W W

WWWWWW

GGGGGGGGGGGG

G G

G

W W W W W W W W W W W W W W

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

S

S

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

WWWWWWWWWWWWWW

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMM COMM COMM COMM

E E

E

E

E

W

C O

M M

C O

M M

SAN

G

G G G G G G G

GGGGGGGGGGGGGG

G G

G G

G G

G G

G G

G G

G

G G

G G

G G

G

G G G G

G G

G

G G

G G

SD

SD

SD

SD

SD

SD

SD

SD

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

W

W W

W W

W W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W 6"

S

AN

IT

AR

Y (P

ER

G

IS

" A

BANDONED W

ATE

R

(A

SBESTO

S C

EMENT)

P

ER G

IS

6" ABANDONED WATER (PER GIS)

4" G

AS

(P

ER

G

IS

3" GAS (PER GIS)

2" GAS (PER GIS)

1" GAS (PER GIS)

" A

BANDONED W

ATE

R

(A

SBESTO

S C

EMENT)

P

ER G

IS

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

TRENCH UNDER

EXCAVATION FOR

FUTURE POWER LINE

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

1-

ST

O R

Y C

O N

C R

ET

E

BL

O

C K

BU

IL

D

IN

G

CATCH BASIN

TOP EL. = 275.67'

NE INV. = 271.77' (18" RCP)

NW INV. = 271.73' (12" CMP)

CATCH BASIN

TOP EL. = 274.40'

SW INV. = 269.86' (18" RCP)

NW INV. = 271.17' (18" CMP)

NE INV. = 271.63' (18" CMP)

SE INV. = 269.71' (24" CMP)

6" VC

INV. = 275.20'

6" VC

INV. = 275.20'

STORM MANHOLE

RIM EL. = 271.63'

INV. = 264.56' (24" CMP)

STRUCTURE HOLDING

WATER AND DEBRIS

AT BOTTOM

CATCH BASIN

18" CMP

INV. = 272.71'

15" CMP

INV. = 274.04'

SIGN

"WOMACK MOTEL"

GAS

CHAMBER

ED

G

E O

F

PA

VE

M

EN

T

DECK

DECK

D

EC

K

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(D

SA

N

(A

X

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SDx

SDx

SDx

SDx

SDx

SDx SDx SDx SDx SDx

SDx

SDx

DECK

DECK

D

EC

K

G (B

G (B

G

(B

G(B) G(B) G(B) G(B) G(B) G(B) G(B) G(B)

G (B

G(B) G(B) G(B) G(B)

G(B)

G(B) G(B) G(B) G(B)

G(B)

G (B

G

(B

G (B

G

(B

G (B

G

(B

G (B

G

(B

G(B) G(B) G(B) G(B) G(B)

G (B

BE(D)

BE(D)

BE(D)

BE(D)

BE

(D

BE

(D

BE

(D

BE(D)

BE(D)

BE(D)

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W (B

W

(B

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B) W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W (B)

W (B)

W (B)

W (B)

W (B)

W (B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT(B)

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT

(B

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

26" Pine 26" Pine

21" Pine 27" Pine

33" Pine

28" Oak

27" Pine

29" Pine 25" Pine

13" Oak 20" Oak

31" Pine

30" Pine

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

IN

D

IA

N

H

EA

D R

O

AD

W(C

W(C

W(C

W(C

W(C

SANITARY MANHOLE

RIM EL. = 277.16'

N INV. = 272.26'

SE INV. = 272.29'

SW INV. = 272.26'

6' CHAINLINK FENCE

SANITARY MANHOLE

RIM EL. = 280.61'

NE INV. = 276.70' (10" VC)

SW INV. = 277.16' (6" VC)

VE

G

ET

AT

IO

N

A R

EA

6' C

H

AI

N

LI

N K

FE

N

C E

CONCRETE

BELFRY STREET

IN

D

IA

N

H

EA

D R

O

AD

IN

D

IA

N

H

EA

D R

O

AD

AS

PH

AL

T

PA

VE

M

EN

T

AS

PH

AL

T

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

ED

G

E O

F

PA

VE

M

EN

T

CONCRETE

CONCRETE

CONCRETE

SLAB

D

IT

C H

STAIRS

D

IT

C H

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

WOOD SHOT HOUSE

(NO ROOF)

1-STORY

CONCRETE

BLOCK BUILDING

CONCRETE

SLAB

CONCRETE

SLAB

STAIRS

STAIRS

STAIRS

STAIRS

STAIRS

SPOIL

PILE

CONCRETE BATH HOUSE

CONCRETE

SLAB

CONCRETE

SLAB

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

E x

SDxSDxSDxSDxSDxSDx 24" CORRUGATED METAL PIPE24" CORRUGATED METAL PIPE

18" R

CP

" C

O R

R U

G

AT

ED

M

ET

AL

P

IP

E

12" C

ORRUGATED M

ETAL PIPE

END OF PIPE NOT FOUND

LOCATION SHOWN IS BASED ON

PROVIDED DATA FROM THE BASE

DIRECTION ONLY

6" V

C

" V C

S

A1 A1

A1

A1

A1A1

A1

A2A2 A2 A2A2

A2A2 A2

A1

A1A1A1

A2A2

A2

A1

A2 A2

A1

A1A1A1

A1

A1 A4

A4 A4

A4 A4

A4A4 A4 A4

A4 A4

A4 A4

A4 A4

A4

BLDG. 2294

BLDG. 2296

BLDG. 2291

S

PA

C

ES

S

PA

C

ES

S

PA

C

ES

S

PA

C

ES

FUTURE

ROAD

FUTURE

ROAD

MAIN CLASSROOM BUILDING

FFE 276

(SEE ARCHITECTURAL PLANS)

LEGEND:

CONCRETE WALK

ASPHALT PAVEMENT

GRAVEL

FENCE

HANDICAP SIGN

WATER LINE

SANITARY SEWER

GAS LINE

TELECOMMUNICATIONS

UNDERGROUND ELECTRIC

LIGHT FIXTURE

G

COMM

SAN

W

E

A1

CODED NOTES:

1. LARGE DECIDUOUS SHADE TREE

2. MEDIUIM ORNAMENTAL DECIDUOUS TREE

3. LARGE EVERGREEN TREE

4. LOW EVERGREEN SHRUB

5. MEDIUM DECIDUOUS ORNAMENTAL SHRUB

6. LOW EVERGREEN GROUNDCOVER

00 30' 60'

SCALE: 1" = 30'

SHEET ID

FT

B

EN

N

IN

G

, G

EO

R G

IA

U

S

IM

M

IG

R A

TI

O

N A

N D

C U

ST

O

M S

EN

FO

R C

EM

EN

T

(IC

E)

D

EL

EG

A

TE

D D

R

IV

E O

R

LA

N D

O , F

L

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

JA

N

, 2

- F

IN

AL

S

U

BM

IT

TA

L (3

5%

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

TE

IM

M

IG

R

A

TI

O N

C

U

ST

O M

S

EN

FO

R

C

EM

EN

T

(IC

E)

File Path:

Plot Date:

M A

R K

D

ES

C R

IP

TI

O N

KZ

F

D

ES

IG

N

BR

O

AD

W

AY

S

TR

EE

T C

IN

C

IN

N

AT

I, O H

C

M

SW

Q

Z0

D

KZ

FN

PL

NOT FOR CONSTRUCTION

MCB

H U

TZ

EL

/2

2/

L-101

LA

N

D

SC

A

PE

P

LA

N

SD

S

SD

S

PE

F

S

I M

M

IG

R A

T

IO

N A

N D

C U

S T

O

F O

R C

E M

E N

T

IC

E

D

E L

E G

A T

E D

D R

IV

E

O R

L A

N D

O F

L

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

K Z

F D

E S

IG

N

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

C

M S

W Q

Z

D

K Z

F N

P L

NOT FOR CONSTRUCTION

MCB

H U

T Z

E L

S-001

G E

N E

R A

L N

O T

E S

F T

B E

N N

IN

G

G

E O

R G

IA

D e s ig n e r

A u th o r

C h e c k e r

M M

-D D

-Y Y

Y Y

J A

N

F

IN

A L

S U

B M

IT

T

A L

IM

M

IG

R

A T

IO

N

C

U S

T O

M S

E N

F O

R C

E M

E N

T

IC

E

GENERAL NOTES

1. THE CONTRACTOR SHALL CONDUCT ALL OPERATIONS IN STRICT ACCORDANCE WITH THE

SAFETY REQUIREMENTS IMPOSED BY THE OWNER AND OSHA. IT IS SOLELY THE

CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND

REGULATIONS GOVERNING THIS WORK. THE CONTRACTOR SHALL REMOVE ALL DEBRIS

FROM THE OWNER'S PROPERTY AND DISCARD ACCORDING TO LOCAL REGULATIONS.

2. THIS STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER IT IS FULLY

COMPLETED. HOWEVER, THE CONTRACTOR IS SOLELY RESPONSIBLE TO DETERMINE THE

ERECTION PROCEDURES AND SEQUENCES REQUIRED TO ENSURE STABILITY OF THE

STRUCTURE AND ITS COMPONENT PARTS DURING CONSTRUCTION. ANY TEMPORARY

BRACING, CONNECTIONS, GUYS, OR TIE-DOWNS THAT MAY BE NECESSARY DURING

ERECTION ARE NOT SHOWN ON STRUCTURAL DRAWINGS. IF APPLIED, THEY SHALL BE

REMOVED AS CONDITIONS PERMIT, AND SHALL REMAIN THE PROPERTY OF THE

CONTRACTOR. THIS CONSTRUCTION STABILITY REQUIREMENT APPLIES CONTINUOUSLY

AND IS NOT LIMITED TO NORMAL WORKING HOURS.

3. ALL TEMPORARY SHORING DRAWINGS SHALL BE PREPARED AND STAMPED BY A LICENSED

ENGINEER.

4. EXISTING UTILITIES AND ALL OTHER OBSTRUCTIONS TO WORK SHALL BE TEMPORARILY

REMOVED AND RE-INSTALLED (INCLUDING NECESSARY MODIFICATIONS) BY THE

CONTRACTOR AFTER COMPLETION OF NEW WORK.

5. DIMENSIONS PERTAINING TO EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO ANY FABRICATION, CONSTRUCTION, OR ERECTION.

6. ALL DETAILS, SECTIONS, AND NOTES PROVIDED ON STRUCTURAL DRAWINGS ARE

INTENDED TO BE TYPICAL FOR SIMILAR SITUATIONS ELSEWHERE, UNLESS SPECIFICALLY

NOTED OTHERWISE. FOR ANY DETAILS AND DIMENSIONS NOT PROVIDED, REFER TO

ARCHITECTURAL DRAWINGS. ALL DIMENSIONS AND ELEVATIONS SHOWN ON STRUCTURAL

DRAWINGS WERE INTENDED TO CONFORM WITH THE INFORMATION PROVIDED ON

ARCHITECTURAL DRAWINGS. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO

THE ARCHITECT OR STRUCTURAL ENGINEER FOR RESOLUTION BEFORE PROCEEDING WITH

ANY ADDITIONAL WORK.

7. OPENING SIZES AND LOCATIONS SHOWN FOR PIPES, DUCTS, ETC. ARE SHOWN FOR

GENERAL INFORMATION ONLY. REFER TO RELATED DRAWINGS (ARCH., MECH., ELECT,

ETC.) FOR OTHER POSSIBLE EQUIPMENT SUPPORTS; WALL, FLOOR AND ROOF OPENINGS;

SLEEVES; AND OTHER EMBEDDED ITEMS NOT SPECIFICALLY INDICATED ON STRUCTURAL

DRAWINGS. COORDINATE ALL REQUIRED DIMENSIONS WITH APPLICABLE TRADE

CONTRACTORS PRIOR TO ANY STEEL FABRICATION OR CONCRETE PLACEMENT. ANY

OPENINGS REQUIRED TO BE LARGER THAN OPENINGS SHOWN SHALL BE VERIFIED PRIOR

TO CONSTRUCTION.

8. ALL FRAMING MEMBERS PROVIDED FOR MECHANICAL TRADES, LINTELS, ROOF OPENINGS,

ETC. ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR SHALL SUBMIT

MANUFACTURER'S DESIGN DATA FOR THE PROPOSED EQUIPMENT PRIOR TO STEEL SHOP

DRAWING SUBMITTAL, SO STRUCTURAL ENGINEER CAN VERIFY AND REDESIGN THE

SUPPORT FRAMING (IF NECESSARY) TO ACCOMMODATE THE ACTUAL CONDITION.

9. ALL SPECIAL INSPECTIONS REQUIRED BY THE BUILDING OFFICIAL SHALL BE CONDUCTED IN

ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE GOVERNING BUILDING CODE.

REFER TO THE SPECIAL INSPECTION REQUIREMENTS ON SHEET S-004 & S-005.

10. REFER TO THE PROJECT SPECIFICATIONS FOR SHOP DRAWINGS AND SUBMITTAL

REQUIREMENTS.

11. SHOP DRAWINGS AND SUBMITTALS PREPARED BY SUPPLIERS AND/OR SUBCONTRACTORS

SHALL BE REVIEWED AND STAMPED BY THE GENERAL CONTRACTOR PRIOR TO

SUBMISSION TO THE STRUCTURAL ENGINEER. ALL DEVIATIONS FROM THE CONTRACT

DOCUMENTS SHALL BE CIRCLED AND NOTED ON THE SHOP DRAWINGS BY THE

CONTRACTOR. THE SCOPE OF THE STRUCTURAL ENGINEER'S REVIEW WILL BE LIMITED TO

CHECKING CONTRACTOR'S GENERAL CONFORMANCE WITH THE CONTRACT DOCUMENTS

AND DESIGN CONCEPT. NO SHOP WORK IS PERMITTED TO COMMENCE UNTIL THE RETURN

OF THE SHOP DRAWINGS BY THE GENERAL CONTRACTOR. DO NOT BEGIN SHOP WORK

UNTIL SHOP DRAWINGS ARE RETURNED WITH ENGINEER’S COMMENTS.

12. USE THE PROJECT SPECIFICATIONS IN CONJUNCTION WITH THE STRUCTURAL DRAWINGS

TO DETERMINE THE COMPLETE PROJECT REQUIREMENTS. ANY DISCREPANCIES OR

CONFLICTS FOUND BETWEEN THE PROJECT SPECIFICATIONS AND THE STRUCTURAL

DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT OR STRUCTURAL

ENGINEER IMMEDIATELY. THE STRICTEST PROVISION SHALL GOVERN UNLESS THE A/E

DETERMINES OTHERWISE.

CAST-IN-PLACE CONCRETE

ALL CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF THE CURRENT ACI 301,

"SPECIFICATIONS FOR STRUCTURAL CONCRETE" AND ACI 117 "STANDARD SPECIFICATIONS

FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS" WITH THE

FOLLOWING SUPPLEMENTAL REQUIREMENTS:

1. ALL CONCRETE SHALL BE NORMAL WEIGHT WITH TYPE I OR TYPE II PORTLAND CEMENT

CONFORMING TO ASTM C150 AND AGGREGATES CONFORMING TO ASTM C33.

2. CONCRETE SHALL DEVELOP THE FOLLOWING 28-DAY COMPRESSIVE STRENGTH (F'c):

A. ALL CONCRETE WORK UNLESS NOTED OTHERWISE - 4,000 PSI.

B. CONCRETE SHALLOW SPREAD FOOTINGS BEARING ON SOIL - 3,000 PSI

3. GROUT UNDER STEEL COLUMN AND BEAM BEARINGS SHALL BE NON-METALLIC,

NON-SHRINK, NON-GAS FORMING, EXPANSIVE TYPE "SONOGROUT" BY

SONNEBORN/CONTECH, "SEALTIGHT 588" BY W.R. MEADOWS, "EUCO NS" BY THE EUCLID

CHEMICAL COMPANY, OR "MASTERFLOW 928" BY MASTERBUILDERS. GROUT UNDER STEEL

BEARINGS SUPPORTING EQUIPMENT SHALL BE "SIKADUR-42" HIGH STRENGTH POURABLE

EPOXY RESIN GROUT BY THE SIKA CORPORATION. TYPICAL, UNLESS NOTED OTHERWISE.

4. CONCRETE SHALL BE PLACED AT THE SITE WITHIN 90 MINUTES AFTER WATER HAS BEEN

ADDED TO THE CEMENT AND AGGREGATE. ADDITION OF WATER TO THE MIX AT THE

PROJECT SITE WILL NOT BE ALLOWED. ALL WATER MUST BE ADDED AT THE BATCH PLANT.

MAXIMUM WATER CEMENT RATIO FOR SLAB ON GRADE SHALL BE 0.45.

5. MAXIMUM LENGTH OF WALL POUR BETWEEN CONSTRUCTION JOINTS SHALL NOT EXCEED

60 FEET. JOINTS NOT INDICATED ON STRUCTURAL DRAWINGS ARE NOT PERMITTED

WITHOUT WRITTEN APPROVAL FROM STRUCTURAL ENGINEER.

6. MAXIMUM LENGTH OF SLAB POUR BETWEEN CONSTRUCTION JOINTS SHALL NOT EXCEED

100 FEET, WHILE MAXIMUM AREA OF A SINGLE SLAB POUR SHALL NOT EXCEED 10,000

SQUARE FEET. JOINTS NOT INDICATED ON STRUCTURAL DRAWINGS ARE NOT PERMITTED

WITHOUT WRITTEN APPROVAL FROM STRUCTURAL ENGINEER.

7. CHLORIDE BASED ADMIXTURES ARE PROHIBITED IN ALL REINFORCED CONCRETE. OTHER

ADMIXTURES SHALL CONFORM TO ASTM C494.

8. MAXIMUM SLUMP SHALL BE 4" +/- 1", AS DETERMINED IN ACCORDANCE WITH ASTM C143.

9. AIR ENTRAIN ALL CONCRETE EXPOSED TO WEATHER 6% +/- 1 1/2%.

10. CONCRETE FINISH:

A. INTERIOR FLOOR SLABS - HARD TROWELED FINISH

B. PAVING SLABS/SIDEWALKS - FLOAT/BROOM

11. CJ SHOWN ON PLAN INDICATES EITHER SLAB CONTRACTION JOINT OR CONSTRUCTION

JOINT AT CONTRACTOR'S OPTION, REFER TO DETAIL 01/S-501.

12. WHERE INDICATED ON DRAWINGS PROVIDE NO. 15 LB. ASPHALT ROOFING FELT BOND

BREAKER BETWEEN SLABS AND WALLS.

13. ALL REINFORCING STEEL SHALL BE DEFORMED AND CONFORM TO ASTM A615 GRADE 60,

EXCEPT AS NOTED. WELDED REINFORCING STEEL SHALL BE DEFORMED AND CONFORM

TO ASTM A706 GRADE 60. ALL WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064,

AND BE FURNISHED IN FLAT SHEETS.

14. CONCRETE COVER ON REINFORCING STEEL SHALL BE PER CURRENT ACI 318 UNLESS

NOTED OTHERWISE.

15. REINFORCEMENT SHALL BE CONTINUOUS ACROSS CONSTRUCTION JOINTS, UNLESS

NOTED OTHERWISE.

16. REINFORCING BARS REQUIRED FOR PROPER SUPPORT OF THE PRINCIPAL REINFORCING

SHALL BE DETAILED AND SUPPLIED BY THE CONTRACTOR WHETHER OR NOT THEY ARE

INDICATED ON THE DRAWINGS.

17. ALL HOOK BARS SHALL HAVE 90 DEGREE ACI STANDARD HOOKS, UNLESS NOTED

OTHERWISE. HOOKS MAY BE ROTATED TO MAINTAIN CLEARANCES. ALL BAR SPLICES AND

LAPS, WHEN NOT SPECIFICALLY DIMENSIONED ON DRAWINGS, SHALL BE PER ACI

STANDARD REQUIREMENTS. CLASS B LAPS SHALL BE USED, UNLESS NOTED OTHERWISE.

18. TOP AND BOTTOM BARS DESIGNATED AS CONTINUOUS IN STRUCTURAL DRAWINGS SHALL

BE LAPPED AS FOLLOWS:

A. TOP BARS NEAR MIDSPAN

B. BOTTOM BARS DIRECTLY OVER SUPPORTS

19 ALL LAP SPLICES, WHEN NOT SPECIFICALLY DIMENSIONED ON DRAWINGS, SHALL BE PER

ACI 318-14 SECTION 25.5.2.1. LAPPING BARS OF TWO DIFFERENT SIZES SHALL BE PER ACI

318-14 SECTION 25.5.2.2.

20. PROVIDE HORIZONTAL EXTERIOR CORNER BARS WITH SAME SIZE AND SPACING AS WALL

REINFORCING BARS, UNLESS NOTED OTHERWISE.

21. THE PLACEMENT OF CONDUITS IN CONCRETE SHALL ONLY BE ACCEPTED IN ISOLATED

CASES AND SHALL ADHERE TO THE FOLLOWING:

A. CONDUITS PLACED IN SLAB ON GRADE SHALL BE PLACED DIRECTLY ON THE SUBGRADE

OR VAPOR RETARDER. OUTSIDE DIAMETER OF CONDUIT SHALL NOT EXCEED 1/4 OF SLAB

THICKNESS.

B. ALUMINUM CONDUITS, PIPES, OR SLEEVES ARE NOT PERMITTED.

C. OUTSIDE DIAMETER OF CONDUITS SHALL BE 1" OR LESS WHERE EMBEDDED IN

STRUCTURAL SLABS, AND 1 1/2" OR LESS WHERE EMBEDDED IN BEAMS, WALLS OR

COLUMNS.

D. BUNCHING OF CONDUITS IS NOT PERMITTED. CONDUITS SHALL BE SPACED 3

DIAMETERS OR GREATER ON CENTER. NO CROSSOVERS ARE PERMITTED IN SLABS.

E. MINIMUM CONCRETE COVER ON CONDUITS SHALL BE 1 1/2".

22. ALL INTERIOR FLOOR SLABS SHALL BE FINISHED TO THE FOLLOWING TOLERANCES AND

SHALL BE MEASURED PER ASTM E1155 LATEST EDITION AND SHALL BE MEASURED WITHIN

72 HOURS OF SLAB CONCRETE PLACEMENT:

FF (FLATNESS): 30

FL (LEVELNESS): 20

FOUNDATIONS

1. ALL EXCAVATION WORK SHALL PROCEED WITH CAUTION TO AVOID DAMAGE TO UNKNOWN

UNDERGROUND UTILITIES.

2. THE FOUNDATION DESIGN IS BASED UPON THE RECOMMENDATIONS OUTLINED IN THE

GEOTECHNICAL STUDY BY xxxxxxxxx (PROJECT NO. xxxxxxxxxx DATED NOVEMBER xx,20xx).

CONTRACTOR SHALL REVIEW ENTIRE GEOTECHNICAL INVESTIGATION REPORT PRIOR TO

EXCAVATION WORK.

3. ALL EXCAVATION AND FILL SHALL BE PERFORMED ACCORDING TO THE ABOVE

REFERENCED GEOTECHNICAL REPORT.

4. ALL EXCAVATIONS SHALL BE INSPECTED BY A REPRESENTATIVE OF THE GEOTECHNICAL

ENGINEER, OR AN APPROVED GEOTECHNICAL TESTING AGENCY TO VERIFY THE PROPER

BEARING MATERIAL EXISTS PRIOR TO PLACING ENGINEERED FILL, FOUNDATION CONCRETE

AND/OR SLAB ON GRADE. FOUNDATION ELEVATIONS SHOWN ARE FOR BIDDING PURPOSES

ONLY, AND MAY VARY TO SUIT ACTUAL SUBSURFACE SOIL CONDITIONS.

5. SHALLOW SPREAD FOOTINGS BEARING ON NATURAL SOIL OR NEW GRANULAR

ENGINEERED FILL ARE DESIGNED FOR A MAXIMUM SOIL BEARING PRESSURE OF 2,500 PSF.

SOILS UNSUITABLE FOR SUPPORTING FOUNDATIONS SHALL BE REMOVED AND BACKFILLED

TO THE DESIGN BEARING ELEVATION, AS DIRECTED BY THE GEOTECHNICAL ENGINEER.

6. ALL FOUNDATION BEARING SURFACES SHALL BE UNDISTURBED, LEVEL (WITHIN 1 IN 12),

AND UNLESS NOTED OTHERWISE, ALL FOOTINGS MAY BE POURED NEAT (WITHOUT SIDE

FORMS) WHERE SOIL CONDITIONS PERMIT.

7. ALL COLUMN DOWELS AND ANCHOR BOLTS SHALL BE SET BY A TEMPLATE METHOD PRIOR

TO CONCRETE PLACEMENT.

MASONRY

MASONRY WORK SHALL CONFORM TO ALL REQUIREMENTS OF THE CURRENT [[ACI 530

"BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES" AND ACI 530.1

"SPECIFICATION FOR MASONRY STRUCTURES"]] IBC 2015]] [TMS 402 "BUILDING CODE FOR

MASONRY STRUCTURES" AND TMS 602 "SPECIFICATION FOR MASONRY STRUCTURES"]] IBC

2018]], WITH THE FOLLOWING SUPPLEMENTAL REQUIREMENTS:

1. HOLLOW CONCRETE MASONRY UNITS (CMU) SHALL BE IN ACCORDANCE WITH ASTM C90,

NORMAL WEIGHT. MINIMUM 28-DAY COMPRESSIVE STRENGTH OF UNITS SHALL BE 2,000 PSI

BASED ON THE NET AREA.

2. MORTAR FOR CONCRETE MASONRY SHALL BE TYPE S, IN ACCORDANCE WITH ASTM C270,

AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 1800 PSI IN 28 DAYS. ALL UNITS

SHALL BE LAID WITH FULL MORTAR COVERAGE ON HEAD, BED (FACE SHELLS), WEBS, AND

COLLAR JOINTS.

3. ALL MASONRY REINFORCING STEEL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .