This document is Appendix A containing an Infection Control Risk Assessment (IRCA) that outlines required infection control precautions for Class II work during the removal and installation of flooring. The appendix specifies the tasks and responsible parties for maintaining infection control standards before, during, and after flooring work in a federal facility.
During removal and installation of flooring, the contractor is responsible for five primary tasks: providing active means to prevent airborne dust, controlling dust from cutting and scraping operations, sealing unused doors with tape, blocking off and sealing air vents, and placing dust mats at work area entrances and exits. The government is responsible for removing and isolating the HVAC system in affected areas. Upon completion of work, the contractor must wipe surfaces with disinfectant, contain construction waste in tightly covered containers, wet mop and/or vacuum using HEPA-filtered equipment before vacating the work area, and remove door and vent seals. The government is responsible for removing the HVAC system isolation. This appendix serves as a template or requirement specification document rather than a complete solicitation or contract vehicle.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A
Infection Control Risk Assessment (IRCA)
Description of Required Infection Control Precautions For Class II
During Removal/Installation of Flooring
Required Task Responsible Party
Provide active means to prevent airborne dust into the atmosphere. Contractor
Control dust while cutting, scraping, removing old carpet, etc. Contractor
Seal unused doors with tape. Contractor
Block off and seal air vents. Contractor
Place dust mat at entrance and exit of work area. Contractor
Remove and isolate HVAC system in areas where work is being performed. Government
Upon Completion of Removal/Installation of flooring
Required Task Responsible Party
Wipe surfaces with disinfectant. Contractor
Contain construction waste before transport in tightly covered containers. Contractor
Wet mop and/or vacuum with HEPA-filtered vacuum before leaving work area. Contractor
Remove door and vent seals. Contractor
Remove isolation of HVAC system in areas where work is being performed. Government