ak-13506-Slope Stake Note-FHWA Version 2.pdf
PDF 385 KB Posted
- Attached to
- AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2
- Solicitation number
- 69056719B000032
About this file
This document contains a slope stake note and slope stake report for a federal highway project. The project involves rehabilitation of the Glenn Highway in Alaska from milepost 66.0 to 67.2, including work on the Kings River bridges. The slope stake note and report provide design elevations and required staking information at regular station intervals along the project route. Specified are terrain and design elevations, centerline design slopes, and required left, center, and right stake elevations. This federal contract opportunity is an Invitation for Bid for the above Alaska Department of Transportation project. The solicitation number is provided. The opportunity is issued by the Federal Highway Administration for rehabilitation of the Glenn Highway from milepost 66.0 to 67.2, involving work on the North and South Kings River bridges.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK DOT 135(6), GLENN HIGHWAY REHABILITATION, KINGS RIVER SECTION: MP 66.0 TO MP 67.2
Slope Stake Note FHWA Ver 2.0
For
AK DOT 135(6)
GLENN HIGHWAY REHABILITATION
KINGS RIVER BRIDGE SECTION:
MP 66.0 TO MP 67.2
NORTH KINGS RIVER BRIDGE
3395+00 TO 3419.21.50
SOUTH KINGS RIVER BRIDGE
3422+54.50 TO 3457+00
08/22/2020 Western Federal Lands Highway Division Page# 1
AK DOT 135(6)
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3395+00.00 Region 1 Terrain Elevation = 573.83 Design Elevation = 569.87 DIFF = C 3.95
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
F 5.12 563.81 KRB_02 567.72 F 1.45
67.87 -4.00:1 -4.00:1 41.19
HPW 47.39 568.93 569.17 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 30.00 569.27 569.51 EOS 18.00
-0.24 -2.00% -2.00% -0.36
EOS 18.00 569.51 569.87 CL 0.00
-0.36 -2.00%
CL 0.00 569.87
RE-CROSS SECTION NOTES
08/22/2020 Western Federal Lands Highway Division Page# 2
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3395+25.00 Region 1 Terrain Elevation = 574.33 Design Elevation = 570.42 DIFF = C 3.91
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
F 5.44 564.03 KRB_02 568.45 F 1.26
69.15 -4.00:1 -4.00:1 40.44
HPW 47.39 569.47 569.71 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 30.00 569.82 570.06 EOS 18.00
-0.24 -2.00% -2.00% -0.36
EOS 18.00 570.06 570.42 CL 0.00
-0.36 -2.00%
CL 0.00 570.42
08/22/2020 Western Federal Lands Highway Division Page# 3
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3395+50.00 Region 1 Terrain Elevation = 574.83 Design Elevation = 570.96 DIFF = C 3.87
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
F 5.13 564.88 KRB_02 569.10 F 1.15
67.89 -4.00:1 -4.00:1 39.99
HPW 47.39 570.01 570.25 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 30.00 570.36 570.60 EOS 18.00
-0.24 -2.00% -2.00% -0.36
EOS 18.00 570.60 570.96 CL 0.00
-0.36 -2.00%
CL 0.00 570.96
08/22/2020 Western Federal Lands Highway Division Page# 4
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3395+75.00 Region 1 Terrain Elevation = 575.32 Design Elevation = 571.50 DIFF = C 3.82
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
F 4.08 566.47 KRB_02 569.68 F 1.11
63.70 -4.00:1 -4.00:1 39.84
HPW 47.39 570.55 570.79 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 30.00 570.90 571.14 EOS 18.00
-0.24 -2.00% -2.00% -0.36
EOS 18.00 571.14 571.50 CL 0.00
-0.36 -2.00%
CL 0.00 571.50
08/22/2020 Western Federal Lands Highway Division Page# 5
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3396+00.00 Region 1 Terrain Elevation = 575.84 Design Elevation = 572.04 DIFF = C 3.80
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 0.08 570.01 KRB_02 570.67 F 0.66
53.01 -5.00% -4.00:1 38.03
DIT 51.39 570.09 571.33 TSG 35.39
-1.00 -4.00:1 -2.00% -0.35
HPW 47.39 571.09 571.68 EOS 18.00
-0.35 -2.00% -2.00% -0.36
TSG 30.00 571.44 572.04 CL 0.00
-0.24 -2.00%
EOS 18.00 571.68
-0.36 -2.00%
CL 0.00 572.04
08/22/2020 Western Federal Lands Highway Division Page# 6
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3396+25.00 Region 1 Terrain Elevation = 576.36 Design Elevation = 572.58 DIFF = C 3.78
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 0.68 571.32 KRB_02 570.76 C 0.11
54.12 +4.00:1 -5.00% 41.63
DIT 51.39 570.63 570.87 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 47.39 571.63 571.87 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 30.00 571.98 572.22 EOS 18.00
-0.24 -2.00% -2.00% -0.36
EOS 18.00 572.22 572.58 CL 0.00
-0.36 -2.00%
CL 0.00 572.58
08/22/2020 Western Federal Lands Highway Division Page# 7
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3396+50.00 Region 1 Terrain Elevation = 576.87 Design Elevation = 573.12 DIFF = C 3.74
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 1.47 572.65 KRB_02 570.49 C 0.17
57.28 +4.00:1 -5.00% 45.90
DIT 51.39 571.18 570.66 DIT 42.40
-1.00 -4.00:1 -4.00:1 -1.75
HPW 47.39 572.18 572.42 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 30.00 572.52 572.76 EOS 18.00
-0.24 -2.00% -2.00% -0.36
EOS 18.00 572.76 573.12 CL 0.00
-0.36 -2.00%
CL 0.00 573.12
08/22/2020 Western Federal Lands Highway Division Page# 8
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3396+75.00 Region 1 Terrain Elevation = 577.37 Design Elevation = 573.67 DIFF = C 3.71
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 2.38 574.10 KRB_02 571.82 C 0.14
58.54 +3.00:1 -5.00% 42.19
DIT 51.39 571.72 571.96 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 47.39 572.72 572.96 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 30.00 573.07 573.31 EOS 18.00
-0.24 -2.00% -2.00% -0.36
EOS 18.00 573.31 573.67 CL 0.00
-0.36 -2.00%
CL 0.00 573.67
08/22/2020 Western Federal Lands Highway Division Page# 9
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3397+00.00 Region 1 Terrain Elevation = 577.89 Design Elevation = 574.21 DIFF = C 3.68
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 11.60 583.86 KRB_02 572.41 C 0.09
86.19 +3.00:1 -5.00% 41.25
DIT 51.39 572.26 572.50 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 47.39 573.26 573.50 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 30.00 573.61 573.85 EOS 18.00
-0.24 -2.00% -2.00% -0.36
EOS 18.00 573.85 574.21 CL 0.00
-0.36 -2.00%
CL 0.00 574.21
08/22/2020 Western Federal Lands Highway Division Page# 10
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3397+25.00 Region 1 Terrain Elevation = 578.42 Design Elevation = 574.75 DIFF = C 3.67
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 13.78 586.59 KRB_02 572.93 C 0.11
92.25 +3.00:1 -5.00% 41.66
DIT 50.89 572.81 573.04 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 46.89 573.81 574.04 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 29.50 574.16 574.39 EOS 18.00
-0.23 -2.00% -2.00% -0.36
EOS 18.00 574.39 574.75 CL 0.00
-0.36 -2.00%
CL 0.00 574.75
08/22/2020 Western Federal Lands Highway Division Page# 11
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3397+50.00 Region 1 Terrain Elevation = 578.98 Design Elevation = 575.29 DIFF = C 3.69
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 14.67 588.04 KRB_02 573.33 C 0.25
94.42 +3.00:1 -5.00% 44.44
DIT 50.39 573.36 573.58 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 46.39 574.36 574.58 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 29.00 574.71 574.93 EOS 18.00
-0.22 -2.00% -2.00% -0.36
EOS 18.00 574.93 575.29 CL 0.00
-0.36 -2.00%
CL 0.00 575.29
08/22/2020 Western Federal Lands Highway Division Page# 12
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3397+75.00 Region 1 Terrain Elevation = 579.55 Design Elevation = 575.83 DIFF = C 3.71
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 14.49 588.40 KRB_02 573.49 C 0.64
78.87 +2.00:1 -5.00% 52.15
DIT 49.89 573.91 574.12 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 45.89 574.91 575.12 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 28.50 575.26 575.47 EOS 18.00
-0.21 -2.00% -2.00% -0.36
EOS 18.00 575.47 575.83 CL 0.00
-0.36 -2.00%
CL 0.00 575.83
08/22/2020 Western Federal Lands Highway Division Page# 13
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3398+00.00 Region 1 Terrain Elevation = 580.13 Design Elevation = 576.37 DIFF = C 3.75
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 14.66 589.13 KRB_02 573.92 C 0.74
78.72 +2.00:1 -5.00% 54.24
DIT 49.39 574.47 574.67 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 45.39 575.47 575.67 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 28.00 575.81 576.01 EOS 18.00
-0.20 -2.00% -2.00% -0.36
EOS 18.00 576.01 576.37 CL 0.00
-0.36 -2.00%
CL 0.00 576.37
08/22/2020 Western Federal Lands Highway Division Page# 14
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3398+25.00 Region 1 Terrain Elevation = 580.69 Design Elevation = 576.92 DIFF = C 3.78
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 14.84 589.86 KRB_02 574.38 C 0.83
78.59 +2.00:1 -5.00% 55.93
DIT 48.89 575.02 575.21 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 44.89 576.02 576.21 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 27.50 576.37 576.56 EOS 18.00
-0.19 -2.00% -2.00% -0.36
EOS 18.00 576.56 576.92 CL 0.00
-0.36 -2.00%
CL 0.00 576.92
08/22/2020 Western Federal Lands Highway Division Page# 15
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3398+50.00 Region 1 Terrain Elevation = 581.26 Design Elevation = 577.46 DIFF = C 3.80
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 15.05 590.62 KRB_02 578.62 C 2.87
78.50 +2.00:1 +4.00:1 50.87
DIT 48.39 575.57 575.75 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 44.39 576.57 576.75 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 27.00 576.92 577.10 EOS 18.00
-0.18 -2.00% -2.00% -0.36
EOS 18.00 577.10 577.46 CL 0.00
-0.36 -2.00%
CL 0.00 577.46
08/22/2020 Western Federal Lands Highway Division Page# 16
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3398+75.00 Region 1 Terrain Elevation = 581.80 Design Elevation = 578.00 DIFF = C 3.80
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 15.00 591.12 KRB_02 580.39 C 4.10
77.89 +2.00:1 +4.00:1 55.79
DIT 47.90 576.12 576.29 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 43.89 577.12 577.29 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 26.50 577.47 577.64 EOS 18.00
-0.17 -2.00% -2.00% -0.36
EOS 18.00 577.64 578.00 CL 0.00
-0.36 -2.00%
CL 0.00 578.00
08/22/2020 Western Federal Lands Highway Division Page# 17
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3399+00.00 Region 1 Terrain Elevation = 582.33 Design Elevation = 578.54 DIFF = C 3.79
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 14.93 591.60 KRB_02 581.76 C 4.93
77.25 +2.00:1 +4.00:1 59.10
DIT 47.40 576.67 576.83 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 43.39 577.67 577.83 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 26.00 578.02 578.18 EOS 18.00
-0.16 -2.00% -2.00% -0.36
EOS 18.00 578.18 578.54 CL 0.00
-0.36 -2.00%
CL 0.00 578.54
08/22/2020 Western Federal Lands Highway Division Page# 18
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3399+25.00 Region 1 Terrain Elevation = 582.85 Design Elevation = 579.08 DIFF = C 3.77
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 15.07 592.30 KRB_02 583.68 C 6.31
77.05 +2.00:1 +4.00:1 64.62
DIT 46.90 577.23 577.38 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 42.90 578.23 578.38 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 25.50 578.57 578.72 EOS 18.00
-0.15 -2.00% -2.00% -0.36
EOS 18.00 578.72 579.08 CL 0.00
-0.36 -2.00%
CL 0.00 579.08
08/22/2020 Western Federal Lands Highway Division Page# 19
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3399+50.00 Region 1 Terrain Elevation = 583.38 Design Elevation = 579.62 DIFF = C 3.76
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 15.06 592.83 KRB_02 584.80 C 6.88
76.52 +2.00:1 +4.00:1 66.92
DIT 46.40 577.78 577.92 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 42.40 578.78 578.92 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 25.00 579.12 579.26 EOS 18.00
-0.14 -2.00% -2.00% -0.36
EOS 18.00 579.26 579.62 CL 0.00
-0.36 -2.00%
CL 0.00 579.62
08/22/2020 Western Federal Lands Highway Division Page# 20
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3399+75.00 Region 1 Terrain Elevation = 583.96 Design Elevation = 580.17 DIFF = C 3.79
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 14.80 593.13 KRB_02 586.23 C 7.77
75.50 +2.00:1 +4.00:1 70.48
DIT 45.90 578.33 578.46 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 41.90 579.33 579.46 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 24.50 579.68 579.81 EOS 18.00
-0.13 -2.00% -2.00% -0.36
EOS 18.00 579.81 580.17 CL 0.00
-0.36 -2.00%
CL 0.00 580.17
08/22/2020 Western Federal Lands Highway Division Page# 21
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3400+00.00 Region 1 Terrain Elevation = 584.51 Design Elevation = 580.71 DIFF = C 3.81
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 14.91 593.79 KRB_02 587.36 C 8.36
90.15 +3.00:1 +4.00:1 72.82
DIT 45.40 578.88 579.00 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 41.40 579.88 580.00 TSG 35.39
-0.35 -2.00% -2.00% -0.35
TSG 24.01 580.23 580.35 EOS 18.00
-0.12 -2.00% -2.00% -0.36
EOS 18.00 580.35 580.71 CL 0.00
-0.36 -2.00%
CL 0.00 580.71
08/22/2020 Western Federal Lands Highway Division Page# 22
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3400+25.00 Region 1 Terrain Elevation = 585.05 Design Elevation = 581.23 DIFF = C 3.82
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 14.48 593.99 KRB_02 588.44 C 8.92
88.18 +3.00:1 +4.00:1 75.06
DIT 44.72 579.51 579.52 DIT 39.39
-1.00 -4.00:1 -4.00:1 -1.00
HPW 40.71 580.51 580.52 TSG 35.39
-0.30 -1.76% -2.00% -0.35
TSG 23.51 580.81 580.87 EOS 18.00
-0.10 -1.76% -2.00% -0.36
EOS 18.00 580.91 581.23 CL 0.00
-0.32 -1.76%
CL 0.00 581.23
08/22/2020 Western Federal Lands Highway Division Page# 23
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3400+50.00 Region 1 Terrain Elevation = 585.57 Design Elevation = 581.72 DIFF = C 3.85
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 13.92 594.36 KRB_02 589.36 C 9.63
85.26 +3.00:1 +4.00:1 79.09
DIT 43.48 580.44 579.72 DIT 40.55
-1.00 -4.00:1 -4.00:1 -1.29
HPW 39.48 581.44 581.01 TSG 35.39
-0.12 -0.72% -2.00% -0.35
TSG 23.01 581.56 581.36 EOS 18.00
-0.04 -0.72% -2.00% -0.36
EOS 18.00 581.59 581.72 CL 0.00
-0.13 -0.72%
CL 0.00 581.72
08/22/2020 Western Federal Lands Highway Division Page# 24
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3400+75.00 Region 1 Terrain Elevation = 586.08 Design Elevation = 582.19 DIFF = C 3.88
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 13.36 594.67 KRB_02 590.89 C 10.96
82.39 +3.00:1 +3.00:1 74.51
DIT 42.31 581.31 579.93 DIT 41.61
-1.00 -4.00:1 -4.00:1 -1.56
HPW 38.31 582.31 581.48 TSG 35.39
0.05 +0.31% -2.00% -0.35
TSG 22.51 582.26 581.83 EOS 18.00
0.01 +0.31% -2.00% -0.36
EOS 18.00 582.25 582.19 CL 0.00
0.06 +0.31%
CL 0.00 582.19
08/22/2020 Western Federal Lands Highway Division Page# 25
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3401+00.00 Region 1 Terrain Elevation = 586.51 Design Elevation = 582.64 DIFF = C 3.87
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 12.87 595.01 KRB_02 591.37 C 11.24
79.81 +3.00:1 +3.00:1 76.28
DIT 41.19 582.14 580.13 DIT 42.58
-1.00 -4.00:1 -4.00:1 -1.80
HPW 37.19 583.14 581.93 TSG 35.39
0.20 +1.35% -2.00% -0.35
TSG 22.01 582.94 582.28 EOS 18.00
0.05 +1.35% -2.00% -0.36
EOS 18.00 582.88 582.64 CL 0.00
0.24 +1.35%
CL 0.00 582.64
08/22/2020 Western Federal Lands Highway Division Page# 26
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3401+25.00 Region 1 Terrain Elevation = 586.93 Design Elevation = 583.06 DIFF = C 3.87
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 12.67 595.59 KRB_02 591.85 C 11.51
78.13 +3.00:1 +3.00:1 77.69
DIT 40.12 582.92 580.34 DIT 43.17
-1.00 -4.00:1 -4.00:1 -1.87
HPW 36.12 583.92 582.21 TSG 35.68
0.35 +2.38% -2.38% -0.42
TSG 21.51 583.57 582.63 EOS 18.00
0.08 +2.38% -2.38% -0.43
EOS 18.00 583.49 583.06 CL 0.00
0.43 +2.38%
CL 0.00 583.06
08/22/2020 Western Federal Lands Highway Division Page# 27
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3401+50.00 Region 1 Terrain Elevation = 587.32 Design Elevation = 583.46 DIFF = C 3.86
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 12.43 596.08 KRB_02 592.08 C 11.54
76.38 +3.00:1 +3.00:1 77.80
DIT 39.09 583.66 580.55 DIT 43.19
-1.00 -4.00:1 -4.00:1 -1.67
HPW 35.08 584.66 582.21 TSG 36.53
0.48 +3.42% -3.42% -0.63
TSG 21.01 584.18 582.84 EOS 18.00
0.10 +3.42% -3.42% -0.61
EOS 18.00 584.07 583.46 CL 0.00
0.61 +3.42%
CL 0.00 583.46
08/22/2020 Western Federal Lands Highway Division Page# 28
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3401+75.00 Region 1 Terrain Elevation = 587.72 Design Elevation = 583.83 DIFF = C 3.88
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 12.20 596.55 KRB_02 592.16 C 11.41
74.69 +3.00:1 +3.00:1 77.34
DIT 38.09 584.35 580.75 DIT 43.12
-1.00 -4.00:1 -4.00:1 -1.41
HPW 34.09 585.35 582.16 TSG 37.46
0.60 +4.45% -4.45% -0.87
TSG 20.51 584.74 583.03 EOS 18.00
0.11 +4.45% -4.45% -0.80
EOS 18.00 584.63 583.83 CL 0.00
0.80 +4.45%
CL 0.00 583.83
08/22/2020 Western Federal Lands Highway Division Page# 29
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3402+00.00 Region 1 Terrain Elevation = 588.09 Design Elevation = 584.18 DIFF = C 3.91
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 11.93 596.93 KRB_02 592.16 C 11.20
72.93 +3.00:1 +3.00:1 76.56
DIT 37.13 585.00 580.96 DIT 42.95
-1.00 -4.00:1 -4.00:1 -1.11
HPW 33.13 586.00 582.07 TSG 38.50
0.72 +5.48% -5.48% -1.12
TSG 20.01 585.28 583.19 EOS 18.00
0.11 +5.48% -5.48% -0.99
EOS 18.00 585.17 584.18 CL 0.00
0.99 +5.48%
CL 0.00 584.18
08/22/2020 Western Federal Lands Highway Division Page# 30
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3402+25.00 Region 1 Terrain Elevation = 588.44 Design Elevation = 584.50 DIFF = C 3.93
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 12.04 597.23 KRB_02 592.11 C 10.95
73.58 +3.00:1 +3.00:1 75.90
DIT 37.44 585.19 581.16 DIT 43.05
-1.26 -4.00:1 -4.00:1 -1.00
HPW 32.41 586.45 582.16 TSG 39.05
0.77 +6.00% -6.00% -1.26
TSG 19.51 585.68 583.42 EOS 18.00
0.09 +6.00% -6.00% -1.08
EOS 18.00 585.58 584.50 CL 0.00
1.08 +6.00%
CL 0.00 584.50
08/22/2020 Western Federal Lands Highway Division Page# 31
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3402+50.00 Region 1 Terrain Elevation = 588.76 Design Elevation = 584.80 DIFF = C 3.95
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 11.65 597.04 KRB_02 592.43 C 10.97
72.22 +3.00:1 +3.00:1 75.96
DIT 37.25 585.39 581.46 DIT 43.05
-1.33 -4.00:1 -4.00:1 -1.00
HPW 31.91 586.72 582.46 TSG 39.05
0.77 +6.00% -6.00% -1.26
TSG 19.01 585.95 583.72 EOS 18.00
0.06 +6.00% -6.00% -1.08
EOS 18.00 585.88 584.80 CL 0.00
1.08 +6.00%
CL 0.00 584.80
08/22/2020 Western Federal Lands Highway Division Page# 32
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3402+75.00 Region 1 Terrain Elevation = 589.03 Design Elevation = 585.08 DIFF = C 3.95
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 12.57 598.15 KRB_02 592.05 C 10.31
79.68 +3.00:1 +3.00:1 73.99
DIT 41.95 585.58 581.74 DIT 43.05
-1.00 -4.00:1 -4.00:1 -1.00
37.95 586.58 582.74 TSG 39.05
0.30 +2.00% -6.00% -1.26
HPW 23.14 586.28 584.00 EOS 18.00
0.09 +2.00% -6.00% -1.08
TSG 18.51 586.19 585.08 CL 0.00
0.03 +6.00%
EOS 18.00 586.16
1.08 +6.00%
CL 0.00 585.08
08/22/2020 Western Federal Lands Highway Division Page# 33
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3403+00.00 Region 1 Terrain Elevation = 589.34 Design Elevation = 585.33 DIFF = C 4.01
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 9.68 595.80 KRB_02 587.91 C 6.00
97.22 +3.00:1 +3.00:1 61.36
DIT 68.18 586.12 581.91 DIT 43.37
-1.19 -4.00:1 -4.00:1 -1.08
HPW 63.40 587.32 582.99 TSG 39.05
0.30 +2.00% -6.00% -1.26
TSG 48.59 587.02 584.25 EOS 18.00
0.61 +2.00% -6.00% -1.08
EOS 18.00 586.41 585.33 CL 0.00
1.08 +6.00%
CL 0.00 585.33
08/22/2020 Western Federal Lands Highway Division Page# 34
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3403+12.50 Region 1 Terrain Elevation = 589.47 Design Elevation = 585.45 DIFF = C 4.02
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 9.83 596.02 KRB_02 587.38 C 5.41
97.78 +3.00:1 +3.00:1 59.80
DIT 68.28 586.19 581.97 DIT 43.58
-1.25 -4.00:1 -4.00:1 -1.13
HPW 63.30 587.43 583.10 TSG 39.05
0.30 +2.00% -6.00% -1.26
TSG 48.48 587.14 584.37 EOS 18.00
0.61 +2.00% -6.00% -1.08
EOS 18.00 586.53 585.45 CL 0.00
1.08 +6.00%
CL 0.00 585.45
08/22/2020 Western Federal Lands Highway Division Page# 35
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3403+25.00 Region 1 Terrain Elevation = 589.61 Design Elevation = 585.56 DIFF = C 4.06
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 13.61 599.86 KRB_02 586.84 C 4.80
109.20 +3.00:1 +3.00:1 58.18
DIT 68.36 586.25 582.03 DIT 43.77
-1.29 -4.00:1 -4.00:1 -1.18
HPW 63.19 587.54 583.21 TSG 39.05
0.30 +2.00% -6.00% -1.26
TSG 48.38 587.25 584.48 EOS 18.00
0.61 +2.00% -6.00% -1.08
EOS 18.00 586.64 585.56 CL 0.00
1.08 +6.00%
CL 0.00 585.56
08/22/2020 Western Federal Lands Highway Division Page# 36
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3403+50.00 Region 1 Terrain Elevation = 589.84 Design Elevation = 585.76 DIFF = C 4.08
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 13.82 600.19 KRB_02 585.59 C 3.43
81.92 +3.00:1 +3.00:1 54.38
DIT 40.46 586.37 582.16 DIT 44.08
-0.85 -4.00:1 -4.00:1 -1.26
HPW 37.07 587.22 583.42 TSG 39.05
0.30 +2.00% -6.00% -1.26
TSG 22.26 586.93 584.68 EOS 18.00
0.09 +2.00% -6.00% -1.08
EOS 18.00 586.84 585.76 CL 0.00
1.08 +6.00%
CL 0.00 585.76
08/22/2020 Western Federal Lands Highway Division Page# 37
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3403+75.00 Region 1 Terrain Elevation = 589.87 Design Elevation = 585.94 DIFF = C 3.93
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 11.07 597.57 KRB_02 585.77 C 3.48
69.27 +3.00:1 +4.00:1 58.22
DIT 36.07 586.50 582.28 DIT 44.29
-1.29 -4.00:1 -4.00:1 -1.31
TSG 30.90 587.79 583.59 TSG 39.05
0.77 +6.00% -6.00% -1.26
EOS 18.00 587.02 584.86 EOS 18.00
1.08 +6.00% -6.00% -1.08
CL 0.00 585.94 585.94 CL 0.00
08/22/2020 Western Federal Lands Highway Division Page# 38
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3404+00.00 Region 1 Terrain Elevation = 589.73 Design Elevation = 586.09 DIFF = C 3.64
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 9.93 596.56 KRB_02 585.78 C 3.37
65.99 +3.00:1 +4.00:1 57.89
DIT 36.19 586.62 582.41 DIT 44.41
-1.32 -4.00:1 -4.00:1 -1.34
TSG 30.90 587.95 583.75 TSG 39.05
0.77 +6.00% -6.00% -1.26
EOS 18.00 587.17 585.01 EOS 18.00
1.08 +6.00% -6.00% -1.08
CL 0.00 586.09 586.09 CL 0.00
08/22/2020 Western Federal Lands Highway Division Page# 39
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3404+25.00 Region 1 Terrain Elevation = 589.20 Design Elevation = 586.22 DIFF = C 2.98
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 10.25 597.00 KRB_02 585.98 C 3.45
66.94 +3.00:1 +4.00:1 58.21
DIT 36.20 586.75 582.53 DIT 44.42
-1.32 -4.00:1 -4.00:1 -1.34
TSG 30.90 588.07 583.88 TSG 39.05
0.77 +6.00% -6.00% -1.26
EOS 18.00 587.30 585.14 EOS 18.00
1.08 +6.00% -6.00% -1.08
CL 0.00 586.22 586.22 CL 0.00
08/22/2020 Western Federal Lands Highway Division Page# 40
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3404+50.00 Region 1 Terrain Elevation = 588.90 Design Elevation = 586.32 DIFF = C 2.58
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 10.56 597.43 KRB_02 585.72 C 3.06
67.80 +3.00:1 +4.00:1 56.59
DIT 36.12 586.87 582.66 DIT 44.34
-1.30 -4.00:1 -4.00:1 -1.32
TSG 30.90 588.18 583.98 TSG 39.05
0.77 +6.00% -6.00% -1.26
EOS 18.00 587.40 585.24 EOS 18.00
1.08 +6.00% -6.00% -1.08
CL 0.00 586.32 586.32 CL 0.00
08/22/2020 Western Federal Lands Highway Division Page# 41
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3404+75.00 Region 1 Terrain Elevation = 588.56 Design Elevation = 586.41 DIFF = C 2.15
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 11.33 598.33 KRB_02 585.83 C 3.05
69.92 +3.00:1 +4.00:1 56.34
DIT 35.94 587.00 582.78 DIT 44.16
-1.26 -4.00:1 -4.00:1 -1.28
TSG 30.90 588.26 584.06 TSG 39.05
0.77 +6.00% -6.00% -1.26
EOS 18.00 587.49 585.33 EOS 18.00
1.08 +6.00% -6.00% -1.08
CL 0.00 586.41 586.41 CL 0.00
08/22/2020 Western Federal Lands Highway Division Page# 42
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3405+00.00 Region 1 Terrain Elevation = 588.35 Design Elevation = 586.46 DIFF = C 1.89
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
RP NO REF HUB RP NO REF HUB
C 11.84 598.96 KRB_02 585.96 C 3.05
71.18 +3.00:1 +4.00:1 56.10
DIT 35.66 587.12 582.91 DIT 43.88
-1.19 -4.00:1 -4.00:1 -1.21
TSG 30.90 588.31 584.12 TSG 39.05
0.77 +6.00% -6.00% -1.26
EOS 18.00 587.54 585.38 EOS 18.00
1.08 +6.00% -6.00% -1.08
CL 0.00 586.46 586.46 CL 0.00
08/22/2020 Western Federal Lands Highway Division Page# 43
Mainline 3395+00 - 3457+00 SLOPE STAKE REPORT (Ft)
STATION
3405+25.00 Region 1 Terrain Elevation = 588.31 Design Elevation = 586.49 DIFF = C 1.82
CHANGE LT STAKE ELEV SLOPE CENTERLINE SLOPE ELEV RT STAKE CHANGE
This is the start of the file's text. The full file is on GovTribe.