QA_10-18-2022.pdf

PDF 409 KB Posted

Attached to
AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2
Solicitation number
69056719B000032
Issued by

About this file

This document contains answers to technical questions regarding federal solicitation number 69056719B000032 for the AK DOT 135(6) Glenn Highway Rehabilitation Kings River Bridge Section project from MP 66.0 to 67.2. The solicitation is an invitation for bid issued by the Department of Transportation Federal Highway Administration. The document answers four questions contractors had about the solicitation, providing clarification on the correct solicitation number to use on bid bonds under Amendment A001, whether pickup trucks provided for government use would be returned during winter shutdowns under Amendment A002, confirming the availability of cross sections corresponding to an earthwork data listing in Physical Data 2.zip on SAM.gov, and providing an updated link on SAM.gov for the applicable September 8, 2022 Alaska Davis Bacon wage determination rates for highway construction projects.

View the file

Other files

File Type Posted
Bid Tabulation_AK DOT 135(6).pdf PDF
BidSum.pdf PDF
QA_11-07-2022.pdf PDF
Amendment A005.pdf PDF
QA_11-01-2022.pdf PDF
QA_10-28-2022.pdf PDF
QA2_10-27-2022.pdf PDF
QA_10-27-2022.pdf PDF
QA_10-26-2022.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_10-24-2022.pdf PDF
QA_10-21-2022.pdf PDF
QA_10-19-2022.pdf PDF
QA2_10-13-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-13-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-06-2022.pdf PDF
AK DOT 135(6) - Kings River Bridge - EXISTING BRIDGE AS_BUILTS.pdf PDF
ak-13506-Signoff-Plans.pdf PDF
ak-13506-Blue Top-RTB Report.pdf PDF
ak-13506-Red Top-XYZ Report.pdf PDF
Geotech Report No 08-19 Kings River Bridge Final Geotechnical Report.pdf PDF
AK DOT 135(6) - Kings River Bridge - EXISTING BRIDGE INSPECTION 2019.pdf PDF
ak-13506_Earthwork Report.pdf PDF
ak-13506-Signoff_ControlSheet.xlsx XLSX spreadsheet
Physical Data 1.zip ZIP file
ak-13506-Red Top-RTB Report.pdf PDF
ak-13506-Signoff-Superelvation.pdf PDF
ak-13506-Signoff_Alignments.pdf PDF
IFB 69056719B000032 .pdf PDF
ak-13506-Signoff_SWPPP_Binder.pdf PDF
FINAL_GR10-14_Glenn Highway Preliminary Geotechnical Recommendations Report.pdf PDF
Physical Data 2.zip ZIP file
ak-13506-Blue Top-XYZ Report.pdf PDF
ak-13506-Slope Stake Note-FHWA Version 2.pdf PDF
ak-13506-Slope Stake Note-XYZ Report.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK DOT 135(6)

Glenn Highway Rehabilitation, Kings River Bridge Section MP 66.0 to MP 67.2

# General Technical Question Answer Date

1 X it appears the pre-printed invitation number on the bid bond does match the solicitation number. Would you please confirm which solicitation number we should be using on our bid bond?

This will be addressed under Amendment A001. 10/6/2022

2 X Contractor is to provide 2 pickups for government’s use. Will these vehicles be returned to the contractor during the winter shut-downs?

This will be addressed under Amendment A002. 10/13/2022

3 X Are cross sections that correspond to the “Earthwork Data Listing” available?

Yes. ak-13506_Cross Section Labeled.pdf is a file listed under FAR Clause 52.236-4. Obtain this file from the Physical Data 2.zip file on sam.gov.

10/13/2022

4 X

We are trying to determine Alaska Davis Bacon Wage Rates for the above referenced project. The link provided on SAM.gov for Davis-Bacon Act WD #: AK20220007 (applicable rates published on September 8, 2022) does not contain any wage rates.

Please provide the rates for the September 8, 2022 wage determination for Highway Construction.

SAM has updated the wage determination on their site:

https://sam.gov/wage-determination/AK20220007/0 10/18/2022

Check General or Technical

File details come from the government source that posted it. Updated .