BidSum.pdf
PDF 105 KB Posted
- Attached to
- AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2
- Solicitation number
- 69056719B000032
About this file
This bid opening summary document outlines the responses to Solicitation No. 69056719B000032 for the AK DOT 135(6), Glenn Highway Rehabilitation, Kings River Bridge Section project from MP 66.0 to MP 67.2. Six contractors submitted bids by the November 10th, 2022 deadline, with bids ranging from $17,980,145.70 to $21,738,054.00. The lowest bidder was Pruhs Construction Company, LLC at $17,980,145.70. The engineer's estimate for the project was $18,027,662.85. The bid opening was held at 2:00pm on November 10th and was overseen by Robert Kolln with three people in attendance.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID OPENING SUMMARY
Solicitation No. 69056719B000032 Bid Opening Date 11/10/2022 Time 2:00 p.m.
Project Number/Name: AK DOT 135(6), Glenn Highway Rehabilitation, Kings River Bridge Section MP 66.0 to
MP 67.2
OFFER RECEIVED
REC'D
BY
CONTRACTOR
DATE
TIME
Schedule A
1.
11/10
11:52am
HA
Mass Excavation, Inc.
$20,232,868.99
2.
10:10am
CA
Quality Aphalt Paving
$20,950,387.00
3.
10:10am
CA
Pruhs Construction Company, LLC
$17,980,145.70
4.
1:15pm
KH
Granite Construction
$18,933,430.45
5.
1:45pm
RK
Orion $21,738,054.00
6.
7.
8.
9.
10.
Engineer’s Estimate $18,027,662.85
LOW BIDDER'S
PHONE NUMBER: 907-279-1020
Attendance: 3
Bid Opening Officer: Robert Kolln Assistants: Andres Arredondo
File details come from the government source that posted it. Updated .