About this file

This bid opening summary document outlines the responses to Solicitation No. 69056719B000032 for the AK DOT 135(6), Glenn Highway Rehabilitation, Kings River Bridge Section project from MP 66.0 to MP 67.2. Six contractors submitted bids by the November 10th, 2022 deadline, with bids ranging from $17,980,145.70 to $21,738,054.00. The lowest bidder was Pruhs Construction Company, LLC at $17,980,145.70. The engineer's estimate for the project was $18,027,662.85. The bid opening was held at 2:00pm on November 10th and was overseen by Robert Kolln with three people in attendance.

View the file

Other files

File Type Posted
Bid Tabulation_AK DOT 135(6).pdf PDF
QA_11-07-2022.pdf PDF
Amendment A005.pdf PDF
QA_11-01-2022.pdf PDF
QA_10-28-2022.pdf PDF
QA2_10-27-2022.pdf PDF
QA_10-27-2022.pdf PDF
QA_10-26-2022.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_10-24-2022.pdf PDF
QA_10-21-2022.pdf PDF
QA_10-19-2022.pdf PDF
QA_10-18-2022.pdf PDF
QA2_10-13-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-13-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-06-2022.pdf PDF
AK DOT 135(6) - Kings River Bridge - EXISTING BRIDGE AS_BUILTS.pdf PDF
ak-13506-Signoff-Plans.pdf PDF
ak-13506-Blue Top-RTB Report.pdf PDF
ak-13506-Red Top-XYZ Report.pdf PDF
Geotech Report No 08-19 Kings River Bridge Final Geotechnical Report.pdf PDF
AK DOT 135(6) - Kings River Bridge - EXISTING BRIDGE INSPECTION 2019.pdf PDF
ak-13506_Earthwork Report.pdf PDF
ak-13506-Signoff_ControlSheet.xlsx XLSX spreadsheet
Physical Data 1.zip ZIP file
ak-13506-Red Top-RTB Report.pdf PDF
ak-13506-Signoff-Superelvation.pdf PDF
ak-13506-Signoff_Alignments.pdf PDF
IFB 69056719B000032 .pdf PDF
ak-13506-Signoff_SWPPP_Binder.pdf PDF
FINAL_GR10-14_Glenn Highway Preliminary Geotechnical Recommendations Report.pdf PDF
Physical Data 2.zip ZIP file
ak-13506-Blue Top-XYZ Report.pdf PDF
ak-13506-Slope Stake Note-FHWA Version 2.pdf PDF
ak-13506-Slope Stake Note-XYZ Report.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING SUMMARY

Solicitation No. 69056719B000032 Bid Opening Date 11/10/2022 Time 2:00 p.m.

Project Number/Name: AK DOT 135(6), Glenn Highway Rehabilitation, Kings River Bridge Section MP 66.0 to

MP 67.2

OFFER RECEIVED

REC'D

BY

CONTRACTOR

DATE

TIME

Schedule A

1.

11/10

11:52am

HA

Mass Excavation, Inc.

$20,232,868.99

2.

10:10am

CA

Quality Aphalt Paving

$20,950,387.00

3.

10:10am

CA

Pruhs Construction Company, LLC

$17,980,145.70

4.

1:15pm

KH

Granite Construction

$18,933,430.45

5.

1:45pm

RK

Orion $21,738,054.00

6.

7.

8.

9.

10.

Engineer’s Estimate $18,027,662.85

LOW BIDDER'S

PHONE NUMBER: 907-279-1020

Attendance: 3

Bid Opening Officer: Robert Kolln Assistants: Andres Arredondo