- AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2
- Solicitation number
- 69056719B000032
About this file
This document provides details on a federal contract opportunity for highway rehabilitation work. The solicitation is for Project AK DOT 135(6), Glenn Highway Rehabilitation, Kings River Bridge Section from Milepost 66.0 to Milepost 67.2. The solicitation number is 69056719B000032 and is being issued by the Department of Transportation Federal Highway Administration. Interested parties should review the attachments for full project requirements. The IFB is for rehabilitation work on the specified section of the Glenn Highway including the Kings River Bridge. The response deadline and award date are not provided in this document.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
INDEX TO SHEETS
INDEX TO SHEETS (CONTINUED)
M.24-26
M.18-23
M.17
M.16
M.15
M.14
M.13
M.12
M.11
M.10
M.9
M.8
M.7
M.6
M.5
M.4
M.3
M.2
M.1
L.1
K.15
K.14
K.12-13
K.11
K.6-10
K.3-5
K.1-2
J.4-15
J.3
J.2
J.1
I. SAFETY
H. DRAINAGE
G. PLANTING
F. EROSION CONTROL
E. ROAD APPROACH
D. PLAN & PROFILE
C. TYPICAL SECTION
B. SUMMARIES
A. GENERAL INFORMATION
REBAR LIST
BORING LOGS
STRUCTURE TRANSITION RAILING
STEEL BRIDGE RAILING
APPROACH SLAB
GIRDER DETAILS
GIRDERS
FRAMING PLAN AND TYPICAL SECTION
PIER 2 DETAILS
PIER 2
WINGWALLS
ABUTMENT DETAILS
ABUTMENT 3
ABUTMENT 1
RIPRAP DETAILS
RIPRAP LAYOUT
FOUNDATION PLAN
GENERAL NOTES AND ESTIMATE
GENERAL LAYOUT
UNDERGROUND UTILITY CONDUIT LOCATIONS
ALASKA DELINEATORS STANDARD DETAILS
PERMANENT REFERENCE SIGN DETAILS
MILLED RUMBLE STRIPS SHOULDER DETAILS
PERMANENT INLAY PAVEMENT MARKING DETAILS
PERMANENT SIGN DETAILS
PERMANENT TRAFFIC CONTROL PLAN
TABULATION OF PERMANENT TRAFFIC CONTROL QUANTITIES
STANDARD DRAWINGS
SUPPLEMENTAL DETAILS
TEMPORARY TRAFFIC CONTROL ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL MISCELLANEOUS SIGN DETAILS
TABULATION OF TEMPORARY TRAFFIC CONTROL QUANTITIES
M. BRIDGE
L. UTILITY
K. PERMANENT TRAFFIC CONTROL
J. TEMPORARY TRAFFIC CONTROL
TERMINAL AND GRADING
MGS W-BEAM GUARDRAIL TYPE TANGENT
MGS W-BEAM GUARDRAIL STEEL POSTS
TABULATION OF ROADSIDE BARRIER QUANTITIES
STANDARD DRAWINGS
DRAINAGE FLUME DETAILS
TABULATION OF DRAINAGE QUANTITIES
STANDARD DRAWING
PLANTING AREAS
MISCELLANEOUS DETAILS
CHECK DAM DETAILS
COMPOST SOCK DETAILS
TEMPORARY EROSION CONTROL PLAN
TABULATION OF EROSION CONTROL QUANTITIES
ROAD APPROACH DETAILS
SURVEY CONTROL
SPECIAL CLEARING AND GRUBBING LIMITS
PLAN AND PROFILE
TABULATION OF PLAN AND PROFILE QUANTITIES
SUBEXCAVATION DETAILS
PAVEMENT TRANSITION DETAILS
TYPICAL SECTION
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
I.3
I.2
I.1
H.3-8
H.2
H.1
G.2
G.1
F.10
F.9
F.7-8
F.3-6
F.1-2
E.1
D.8
D.7
D.2-6
D.1
C.3
C.2
C.1
B.1-5
A.4
A.3
A.2
A.1
A.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c p w w o r k d a k a b .d g n
AK DOT 135(6)
A
M
S e p te m b e r
K
H a r r is o n
N in h P h a
C h e c k e d b y
D e s ig n e d b y
Scale in miles
1 0.5 0 1 2 3
N
VICINITY MAP
PALMER
SUTTON
3395+00
AK DOT 135(6)
BEGIN PROJECT
3457+00
AK DOT 135(6)
END PROJECT
A.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k a d .d g n
AK DOT 135(6)
P
J a n u a r y
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
19.0 MILES NE OF PALMER)
(LOCATED APPROXIMATELY
KINGS RIVER BRIDGE
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M -
Typical Section
Plan & Profile
Road Approach
Erosion Control
Planting Drainage Safety Temporary
Traffic Control
Permanent Traffic Control
Utility Bridge ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-2000 SOIL EROSION CONTROL,
TURBIDITY MONITORING LPSM All ALL
A0140 15702-3000 SOIL EROSION CONTROL,
SUPERVISOR LPSM All ALL
A0160 15702-5000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION BERM LPSM All ALL
A0180 15703-1000 SOIL EROSION CONTROL, SOIL Contract Quantity
STABILIZATION (TEMPORARY) ACRE 12 12
A0200 15705-1500 SOIL EROSION CONTROL, COMPOST
SOCK (SLOPE PROTECTION) LNFT 6,685 815 7,500
A0220 15705-1500 SOIL EROSION CONTROL, COMPOST
SOCK (INLET PROTECTION) LNFT 300 300
A0240 15705-1500 SOIL EROSION CONTROL, COMPOST
SOCK (OUTLET PROTECTION) LNFT 300 300
A0260 15705-1600 SOIL EROSION CONTROL,
ABSORBENT BOOM LNFT 500 500
A0280 15706-0200 SOIL EROSION CONTROL, CHECK
DAM (TEMPORARY) EACH 80 10 90
A0300 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
A0320 20101-0000 CLEARING AND GRUBBING ACRE 17 17 Contract Quantity
A0340 20210-0000 SPECIAL CLEARING AND GRUBBING ACRE 17 17 Contract Quantity
A0360 20301-0700 REMOVAL OF DELINEATOR EACH 37 37
A0380 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0400 20301-2400 REMOVAL OF SIGN EACH 19 19
A0420 20302-1200 REMOVAL OF GUARDRAIL LNFT 1,469 1,469 Contract Quantity
A0440 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0460 20401-0000 ROADWAY EXCAVATION CUYD 124,104 12,396 136,500
A0480 20402-0000 SUBEXCAVATION CUYD 120 120
A0500 20411-0000 SELECT BORROW TON 75,931 7,569 83,500
A0520 20435-2000 BACKFILL, GRANULAR (POROUS Contract Quantity
BACKFILL) CUYD 520 520
A0540 20801-0000 STRUCTURE EXCAVATION CUYD 25 25 Contract Quantity
A0560 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 (OUTLET PROTECTION) CUYD 95 95
MileStone: 100% PS&E(Final) Date Completed: 09/28/22 Report Date: 09/28/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-S ep -2
:0 A
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
C
M yF ile s\
V P ro je ct s\ A K D
O T
(0
S ig n o ff
A K D
O T
(6
E E su m m a ry
.x ls m ]S h ee t
STATE PROJECT
B.1DOT 135(6)AK
SHEET
NUMBER
Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M -
Typical Section
Plan & Profile
Road Approach
Erosion Control
Planting Drainage Safety Temporary
Traffic Control
Permanent Traffic Control
Utility Bridge ALLOWANCE Bid
Schedule
A0580 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 (DRAINAGE FLUME) CUYD 32 32
A0600 25101-0600 PLACED RIPRAP, METHOD A,
CLASS 6 CUYD 6,650 700 7,350
A0620 25120-0100 RIPRAP DITCH, METHOD A, CLASS
1 LNFT 990 60 1,050
A0640 30101-2000 AGGREGATE BASE GRADING D TON 12,150 1,350 13,500
A0680 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 7,240 260 7,500
A0700 41201-0000 TACK COAT TON 12 12
A0720 55101-0200 CONCRETE FILLED STEEL PIPE
PILE, IN PLACE (36-INCH
DIAMETER, O.75-INCH) LNFT 351 351
A0740 55101-0200 CONCRETE FILLED STEEL PIPE
PILE, IN PLACE (24-INCH
DIAMETER, 0.50-INCH) LNFT 1,239 1,239
A0760 55104-1000 DYNAMIC PILE LOAD TEST EACH 3 3
A0780 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 250 250
A0800 55203-1000 STRUCTURAL CONCRETE, CLASS D Contract Quantity
(AE), FOR APPROACH SLABS,
TYPE 1 CUYD 56 56
A0820 55302-3700 PRECAST, PRESTRESSED CONCRETE Contract Quantity
DECKED BULB TEE GIRDER
(66-INCH) LNFT 2,030 2,030
A0840 55401-1000 REINFORCING STEEL LB 61,000 61,000 Contract Quantity
A0860 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 24,800 24,800
A0880 55601-1100 BRIDGE RAILING, STEEL, TWO Contract Quantity
RAIL (TUBE) LNFT 666 666
A0900 55901-0000 MEMBRANE WATERPROOFING Contract Quantity
(SPRAY-ON) SQYD 1,332 1,332
A0920 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 28 28 Contract Quantity
A0940 60201-0800 24-INCH PIPE CULVERT LNFT 210 210
A0960 60201-1000 36-INCH PIPE CULVERT LNFT 634 634
A0980 61701-4650 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS B STEEL POSTS (8-INCH
BLOCK) LNFT 875 875
A1000 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 6 6
-S ep -2
:0 A
M
MileStone: 100% PS&E(Final) Date Completed: 09/28/22 Report Date: 09/28/22
C
M yF ile s\
V P ro je ct s\ A K D
O T
(0
S ig n o ff
A K D
O T
(6
E E su m m a ry
.x ls m ]S h ee t (2
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2DOT 135(6)AK
Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M -
Typical Section
Plan & Profile
Road Approach
Erosion Control
Planting Drainage Safety Temporary
Traffic Control
Permanent Traffic Control
Utility Bridge ALLOWANCE Bid
Schedule
A1020 61707-2000 STRUCTURE TRANSITION RAILING, Contract Quantity
SBT SYSTEM LNFT 74 74
A1040 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 200 200
A1060 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 120 120
A1080 62201-1350 BULLDOZER, 200HP MINIMUM
FLYWHEEL POWER HOUR 120 120
A1100 62201-2050 ROLLER HOUR 120 120
A1120 62201-2100 COMPACTOR HOUR 120 120
A1140 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 120 120
A1160 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 120 120
A1180 62202-2000 VACUUM SWEEPER LPSM ALL
A1200 62301-0000 GENERAL LABOR HOUR 200 200
A1220 62402-0500 FURNISHING AND PLACING Contract Quantity
TOPSOIL, 8-INCH DEPTH ACRE 2.5 2.5
A1240 62406-0300 PLACING CONSERVED TOPSOIL, Contract Quantity
4-INCH DEPTH ACRE 12 12
A1260 62501-0000 TURF ESTABLISHMENT ACRE 14 14 Contract Quantity
A1280 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 15 15 Contract Quantity
A1300 62630-0350 PLANTINGS, TREES, BALLED AND
BURLAPPED (SITKA ALDER, 2
GALLON) EACH 225 225
A1320 62630-0350 PLANTINGS, TREES, BALLED AND
BURLAPPED (SITKA SPRUCE, 2
GALLON) EACH 50 50
A1340 62630-0350 PLANTINGS, TREES, BALLED AND
BURLAPPED (PAPER BIRCH, 2
GALLON) EACH 50 50
A1360 63302-0000 SIGN SYSTEM SQFT 334.50 334.50
A1380 63309-0000 DELINEATOR (TYPE A) EACH 11 11
A1400 63313-1000 RUMBLE STRIP, SHOULDER LNFT 9,433 9,433
A1420 63401-0000 PAVEMENT MARKINGS (TYPE M,
SOLID WHITE) LNFT 12,109 12,109
A1440 63401-0000 PAVEMENT MARKINGS (TYPE M,
SOLID YELLOW) LNFT 12,400 12,400
-S ep -2
:0 A
M
MileStone: 100% PS&E(Final) Date Completed: 09/28/22 Report Date: 09/28/22
C
M yF ile s\
V P ro je ct s\ A K D
O T
(0
S ig n o ff
A K D
O T
(6
E E su m m a ry
.x ls m ]S h ee t (3
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.3DOT 135(6)AK
Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M -
Typical Section
Plan & Profile
Road Approach
Erosion Control
Planting Drainage Safety Temporary
Traffic Control
Permanent Traffic Control
Utility Bridge ALLOWANCE Bid
Schedule
A1460 63401-0000 PAVEMENT MARKINGS (TYPE M,
BROKEN WHITE) LNFT 210 210
A1480 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM All ALL
A1500 63501-2000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM LPSM All ALL
A1520 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 (8 FT WIDE
MINIMUM) EACH 8 8
A1540 63502-1250 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER, TYPE 42-INCH EACH 600 600
A1560 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 100 100
A1580 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 50 50
A1600 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 10 10
A1620 63502-1700 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE C EACH 100 100
A1640 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 4 4
A1660 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 1,000 1,000
A1680 63503-0700 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS LNFT 12,000 12,000
A1700 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE (ORANGE) LNFT 2,000 2,000
A1720 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 1,151 1,151
A1740 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 4,800 4,800
A1760 63507-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR DAY 150 150
A1780 63701-0000 FIELD OFFICE EACH 1 1
A1800 63704-0000 VEHICLE EACH 2 2
A1820 64707-1000 MITIGATION, ARCHAEOLOGICAL
SITE MONITORING (PRINCIPAL
INVESTIGATOR) HOUR 1,080
-S ep -2
:0 A
M
MileStone: 100% PS&E(Final) Date Completed: 09/28/22 Report Date: 09/28/22
C
M yF ile s\
V P ro je ct s\ A K D
O T
(0
S ig n o ff
A K D
O T
(6
E E su m m a ry
.x ls m ]S h ee t (4
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.4DOT 135(6)AK
Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M -
Typical Section
Plan & Profile
Road Approach
Erosion Control
Planting Drainage Safety Temporary
Traffic Control
Permanent Traffic Control
Utility Bridge ALLOWANCE Bid
Schedule
A1840 64707-1000 MITIGATION, ARCHAEOLOGICAL
SITE MONITORING (FIELD
TECHNICIAN) HOUR 4,320
A1860 64707-1000 MITIGATION, ARCHAEOLOGICAL
SITE MONITORING (TRIBAL
MONITOR) HOUR 4,320
-S ep -2
:0 A
M
MileStone: 100% PS&E(Final) Date Completed: 09/28/22 Report Date: 09/28/22
C
M yF ile s\
V P ro je ct s\ A K D
O T
(0
S ig n o ff
A K D
O T
(6
E E su m m a ry
.x ls m ]S h ee t (5
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.5DOT 135(6)AK
TYPICAL SECTION
[3] [3]
[2][2] [2]
[6]
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k c a .d g n
AK DOT 135(6)
u g u s t
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
NO SCALE
S lo p e s ta k e
C le a r in g l im it
FOOTNOTE:
Red top
Point available in survey notes
Tu rf es tab lis hmen t l im its See Safety Edge Detail
0.25 D
0.25 D
Existing ground
Slope stake
Existing ground
Pull aggregate base to cover safety edge
1:4
Profile grade
1:4
10'-0"
[4
Va ria ble
[4
Va
[1] 2% Crown
[4]
Va
CL
D
Traveled way
12'-0"
Traveled way
12'-0"
Shoulder
6'-0"
Shoulder
6'-0"
5'-0"10'-0"
ROUNDING DETAIL
FILL SLOPE
See pavement structure depths this sheet
Aggregate base grading D, 7-inch compacted depth
See Fill Slope Rounding Detail
C le a r in g l im it
C le a r in g l
[4]
Va
SAFETY EDGE
DETAIL
C le a r in g l conserved topsoil over all fills
Place 4" depth of
Existing ground
See Cut Slope
Rounding Detail
GLENN HIGHWAY MP 66.0 - MP 67.2
3395+00.00 to 3419+21.50 AND 3422+54.50 to 3457+00.00
B=5'-0"5'-0"
300 FT TYP.
R ig h t-o f-w a y
R ig h t-o f-w a y two equal lifts with tack coat between lifts
5-inch compacted depth, placed in
Asphalt concrete pavement, type 1, [8]
ROUNDING DETAIL
CUT SLOPE
Select borrow, 36-inch compacted depth
T y p special ditches as shown in the Staking Report.
See Sheet D.2-5 for special ditch locations. Construct[9] and road approaches. See Sheet C.2 and Section E.
Included quantities for traveled way and turnout widening, [8] guy wire anchors.
cut slope rounding to avoid impact to overhead power pole
See SCR Subsection 201.04 for areas that require reduced [7] proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than "B" reduce "B" to the cut height [6] improvements. See Sheet D.7 for limits.
Special clearing and grubbing are required for safety[5]
Construct slopes as shown in the Staking Report.[4] and K.
accomodate milled rumble strips construction. See Section I
Where guardrail is required, the shoulder width is 6'-6" to[3]
See Sheet C.2 for widening locations.
[2] on the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated [1] stimil tnemhssilbatse fruT
DETAILS
PAVEMENT TRANSITION
NO SCALE
TRAVELED WAY PAVEMENT
WIDTH WIDENING DETAIL
AT 3419+21.50 AND 3422+54.50
CONNECTION TO EXISTING
PAVEMENT DETAIL
1:35
CONNECTION TO BRIDGE
APPROACH SLABS DETAIL
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k c b .d g n
AK DOT 135(6)
F e b r u a r y
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
CONSTRUCTION TURNOUT
WIDTH WIDENING DETAIL
AT 3395+00.00 AND 3457+00.00
3395+00.00 LT - 3403+00.00 LT
3427+00.00 RT - 3433+00.00 RT
150'-0"300'-0"150'-0"
Sawcut and tack
Pavement Structure
See Sheet C.1 for
Existing pavement pavement Structure
See Sheet C.1 for slab approach structure
See Sheet M.15 for bridge
CL
1:2
-2.000%
1:2
-2.000%
DETAILS
SUBEXCAVATION
BRIDGE SUBEXCAVATION AREAS
DETAILS
TYPICAL SUBEXCAVATION SECTION
[2]
[3]
3418+91.50.00 TO 3419+21.50 and 3422+54.50 TO 3422+84.50
3418+91.50.00 TO 3419+21.50 and 3422+54.50 TO 3422+84.50
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k c c .d g n
AK DOT 135(6)
e p te m b e r
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
Subexcavation area
Subexcavation area
Aggregate base grading D, 7-inch compacted depth with tack coat between lifts compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, 5-inch
[1
Va ria ble [1]
Variable
[1]
Vari able
FOOTNOTE:
NO SCALE
Existing ground
36'-0"
Profile grade
Begin bridge 3419+41.50
End bridge 3422+34.50
30'-0" 30'-0"
Backfill, granular (porous backfill)
Subexcavation
S e e f o o tn o te details.
edge and clearing limit details. See Section I for guardrail
See sheet C.1 for cut and fill slope rounding details, safety[3] and 3422+84.50 are 568.0 feet and 566.55 feet, respectively.
3418+91.50 and 3419+21.50, and between 3422+54.50
The bottom elevations of subexcavation areas between [2]
Construct slopes as shown in the Staking Report.[1]
Select borrow, 36-inch compacted depth
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
13102 203306.181 116086.292 564.782 61°44'04.388521" N 148°45'45.901514" W 622.244 0.99992331 5/8"IR W/FHWA ALUM CAP 1.
13103 203562.495 116758.866 576.247 61°44'06.785582" N 148°45'31.839818" W 633.716 0.99992309 5/8"IR W/FHWA ALUM CAP
13104 203686.664 117396.702 589.467 61°44'07.887925" N 148°45'18.551076" W 646.948 0.99992277 5/8"IR W/FHWA ALUM CAP
13105 203382.650 118086.918 584.551 61°44'04.764914" N 148°45'04.345457" W 642.052 0.99992334 5/8"IR W/FHWA ALUM CAP
13106 202627.909 118286.106 575.324 61°43'57.297469" N 148°45'00.512075" W 632.846 0.99992388 5/8"IR W/FHWA ALUM CAP
13107 201899.565 118320.532 571.846 61°43'50.121032" N 148°45'00.088075" W 629.385 0.99992406 5/8"IR W/FHWA ALUM CAP
13108 201134.652 118384.069 572.347 61°43'42.579095" N 148°44'59.074585" W 629.906 0.99992407 5/8"IR W/FHWA ALUM CAP
13109 200406.419 118691.919 587.086 61°43'35.351983" N 148°44'52.976880" W 644.667 0.99992352 1 1/2"DIA ALUM CAP DOT 90
13110 200107.704 119297.105 634.249 61°43'32.296561" N 148°44'40.538405" W 691.848 0.99992157 5/8"IR W/FHWA ALUM CAP
13111 200152.535 119773.789 660.617 61°43'32.647224" N 148°44'30.629133" W 718.224 0.99992054 5/8"IR W/FHWA ALUM CAP
13112 200325.736 120339.571 689.221 61°43'34.244364" N 148°44'18.819309" W 746.833 0.99991946 5/8"IR W/FHWA ALUM CAP
PROJECT : Kings River Section COORDINATE SYSTEM : MV-1, local system developed by ADOT VERTICAL DATUM : Differential levels holding beginning elevation at CP13101
PROJECT UNITS : US SURVEY FOOT
To convert the local coordinates to NAD83(CORS) State Plane U.S. Survey Foot coordinates, translate using +2,624,893.36529 N, +1,738,991.40294 E, and scale using 0.9999202167
C
M yF ile s\
Pr oj ec ts
\A la sk a\
G le nn _H ig hw ay \K in gs
_R iv er _B ri dg e\ de si gn
\P W
K in gs _R iv er
_S ec tio n_
C on tr ol
S he et .x l
-A pr
-2
1:
P
M W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.8
SHEET
NUMBER
DOT 135(6)AK
SURVEY CONTROL
Basis of Coordinates:
The Basis of Coordinates is NGS Station PURIN, located near Milepost 91 of the Glenn Highway. Said station has MV‐1 coordinates of 231,730.0664 N, 232,079.1864 E.
Basis of Bearings:
The Basis of Bearings is a local plane bearing between NGS Station PURIN and NGS Station PAQB. NGS Station PAQB bears S 64º53’54”W a distance of 189,974.66 U.S.
Survey Feet from NGS Station PURIN. NGS Station PAQB has MV‐1 coordinates of 151,137.6479 N, 60,046.5335 E Basis of Vertical Control:
The Basis of Vertical Control is NAVD88 as determined by a series of level loops performed by DOT
ROAD APPROACH DETAILS
-4
-15% (max.)
15% ( max.
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k q a .d g n
AK DOT 135(6)
J u ly
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
3.
2.
1.
ROAD APPROACH SYMBOL
Mainline station
CL
Approach number
W
C L o f a p p r o a c h
Edge of shoulder
Edge of traveled way
Edge of shoulder
PLAN VIEW
E d g e o f s h o u ld e r of highwayCL
Profile grade
+/-2% max.
difference 8%
Maximum algebraic
VPI
Landing
L
R1 R2
L
PROFILE VIEW
90°
12' 12'
-inch4
3 2-inch
VERTICAL CURVE
MAXIMUM CREST
VERTICAL CURVE
MAXIMUM SAG
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E n d p a v e m e n t
CONNECTION DETAIL
7"
5"
Select borrow
L1 L2
Landing
E n d r o a d a p p r o a c h
End road approach
Approach
Finish approach with 5-inch aggregate base.
Pave to the end of radius return unless otherwise indicated.
the roadway's clear zone. Perform work under Section 622.
Construct approach foreslopes 1H:6V or flatter slope within structure as shown for mainline. See Sheet C.1 for details.
Finish landing to mainline with the same pavement
Approach width of mainline road grade varied
Mainline road
Asphalt concrete pavement, type 1
Aggregate base grading D 5-inch aggregate base grading D
Approach grade
End pavement see Note 1
NOTE:
[3]
[4]
[2]
[2]
[2]
[2]
[2]
SHEET 1 OF 2
CONTROL QUANTITIES
TABULATION OF EROSION
[6]
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k g a .d g n
AK DOT 135(6)
u g u s t
H a r r is
P h
C h e c k e d b y
D e s ig n e d b y
[5]
FOOTNOTE:
NOTE:
4.
3.
2.
1.
flume details and quantities.
See Section H for culvert outlet riprap protection and drainage to accomodate permits and actual operations.
Contractor may modify the erosion control plans as necessary fit field conditions and as approved by the CO.
Final locations and spacings of devices may be changed to control devices shown are as symbols and not actual locations.
Erosion control plans as shown are approximate. Erosion areas of channel guide banks.
Apply only to special clearing area. Do not apply to the[6]
Apply only to the areas of channel guide banks.[5]
See SCR Section 158.[4]
Use as required and as directed by the CO.[3]
Contract quantity.
[2] channel guide banks. Estimated diversion length is 1600 FT.
Temporary diversion berm is required for construction of[1]
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k g a .d g n
AK DOT 135(6)
J u ly
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
SHEET 2 OF 2
CONTROL QUANTITIES
TABULATION OF EROSION
NOTE:
4.
3.
2.
1.
flume details and quantities.
See Section H for culvert outlet riprap protection and drainage to accomodate permits and actual operations.
Contractor may modify the erosion control plans as necessary fit field conditions and as approved by the CO.
Final locations and spacings of devices may be changed to control devices shown are as symbols and not actual locations.
Erosion control plans as shown are approximate. Erosion
DI
STURBED
AREA
PROTE
CTE
D
AREA
End treatment varies
DI
STURBED
AREA
PROTE
CTE
D
AREA
End treatment varies
Compost sock
Compost sock
F.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft p w w o r k d a k g g .d g n
AK DOT 135(6)
e c e m b e r
H a r r is
W
F L
H D C
A
C h e c k e d b y
D r a w n b y
SHEET 2 OF 2
COMPOST SOCK DETAILS
CULVERT OUTLET PROTECTION
COMPOST SOCK
CULVERT INLET PROTECTION
COMPOST SOCK
NOTES:
6.
5.
4.
3.
2.
1.
and discarded.
Remove all stakes and rope, if used, from the project one-third of the sock height.
Remove accumulated sediment before it reaches
Repair or replace damaged or displace compost socks.
installed on slopes.
Use wood stakes to secure compost socks in place if toe of slopes to allow runoff to pool.
Place compost socks no closer than 5-feet from the
Install stakes per manufacturer's recommendations.
NO SCALE
socks 1'-6" to achieve a continuous run
Overlap end sections of compost
6''
12" (min.)
16" min
(ft)
(ft)
GRADE
DITCH
6%
5%
4%
3%
2% on ditch grades steeper than 6%
* Do not use gravel bag check dams
GRAVEL BAG CHECK DAM5%
4%
3%
2%
Gravel bag
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
CROSS SECTION
FLAT-BOTTOM DITCH
SPACING (max.)
CHECK DAM
SPACING (max.)
CHECK DAM
SPACING (max.)
CHECK DAM
GRADE
DITCH
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING
FILTER ROCK
PROFILE VIEW
7%-9%
6%
5%
4%
3%
2%
CHECK DAM DETAILS
NO SCALE
F.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k g h .d g n
AK DOT 135(6)
e c e m b e r
H a r r is h P h
C h e c k e d b y
D r a w n b y
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Expose stakes 2-inches (min.) above top of fiber roll.
Drive stakes into undisturbed soil of trench bottom.
2-foot (max.) spacing.
stakes. Drive stakes at each end of the fiber roll and at
Stake fiber rolls in place with 11#8-inch x 11#8-inch wood
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to gravel bags as directed by the CO.
Construct check dams from fiber rolls, filter rock, or
6"
(ft)
12'' (typ.)
6'' min
6" min.
Trench 2" min.
12" (min.)
9" Ø min.
Fiber roll
Trench 2" min.
dams on ditch grades steeper than 5%.
fiber roll. Do not use fiber roll check
* Spacing calculated based on 9" Ø min
CROSS SECTION
Flow
Se e
Not e
CROSS SECTION
CROSS SECTION
V-DITCH
See Note 6 the ends to prevent flow around
Curve ends upstream similar for flat-bottom ditches.
Check dam installation details are
V-ditch design shown.
See Note 5
Flow Line
STAKING DETAIL
FIBER ROLL
uphill side of fiber roll
Place excavated material on
FIBER ROLL CHECK DAM
Filter rock
Filter rock
FILTER ROCK CHECK DAM
" 6
Check dam spacing
Ponded water
Ditch grade
Flow See Note 6 the ends to prevent flow around
Curve ends upstream
PLAN VIEW
4"
NOTE:
:2 ty p
MISCELLANEOUS DETAILS
1:4
Riprap ditch, method A, class 1
1:2 - 1:4
F.10
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k g j.
d g n
AK DOT 135(6)
F e b r u a r y
C h e c k e d b y
D e s ig n e d b y
[1]
FOOTNOTE:
SWPPP NOTICE SIGN
project information. Install signs in accordance to Section 635.
panel from aluminum. Adjust text as needed for specific
Black border and text on white background. Fabricate sign
See SCR Subsection 107.01A(d) for installation locations.
RIPRAP DITCH
4'
.5
1:4 - 4'
1:3 - 3'
1:2 - 2'
3"
4"C
3"
2"C
2"
2"C
14"
"2
"B2
42"
"8
3" IN = 8
5" TH = 8
1BORDER R = 1
W626-1
REVISED:
DETAIL APPROVED FOR USE 12/2006
WESTERN FEDERAL LANDS HIGHWAY DIVISION
" dia. 12" long 2
DECIDUOUS TREES UNDER 12'
OVER 12' AND CONIFERS OVER 4'
PLANTING METHODS
TREES AND SHRUBS
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
G.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 135(6) AK
U S
C c p w w o r k d
W .d g n
A u g u s t thoroughly with water the ball of earth by soaking it
Settle the loose soil around or outside ball
2.
1.
BALLED AND BURLAPPED TREES AND SHRUBS
METHOD OF PLANTING CONTAINER OR
AND METHOD OF GUYING DECIDUOUS TREES
METHOD OF PLANTING BARE ROOT TREES AND SHRUBS
METHOD OF STAKING
or Pine stakes.
Provide construction grade, rough or dressed Douglas Fir hose and wire guying.
Approved commerical plant ties may be used in lieu of anchors driven firmly into the ground wood stakes or approved metal galvanized wire and scarify sides to prevent sealing
Roughen subsoil in bottom of hole as it stood in nursery level to the natural ground
Set plant in hole same the center point the tree and twisted at two-thirds the height of trunk at least equal to
Wire anchored from the marker conspicuous
Approved deciduous trees where required
Wrapping material on
Depression to collect water completely saturated and filled on top until all voids are the roots by pouring water roots. Soak the topsoil around
Work topsoil carefully around
Place roots in natural position.
and scarify sides to prevent sealing
Roughen subsoil in bottom of hole
Prune any broken roots prior to placing around roots conditioner and throughly mixed
Topsoil mixed with specified soil deciduous trees where required
Wrapping material on
Topsoil to collect water around plant on level ground or slope container or ball diameter
Make a depression twice the prior to placing around ball conditioner and throughly mixed
Topsoil mixed with specified soil down upper half of burlap
Cut bindings, and peel
Place mulch as directed
Trees and shrubs.
stood in nursery or container to the natural ground as it
Set plant in hole same level wrapping paper under hose plastic hose with tree, nylon, rubber or reinforced driven prior to backfilling with tree, wrapping paper under hose rubber or reinforced plastic hose the point at which ties are to be made ground and stapled or tied to the stake.
a point two-thirds the height of tree above approved plastic ties tied to the tree at b o u t tw o th ir d s t h e h e ig h t o f th e t r e e g u y c a b le s r e q u ir e d indicated by dotted lines. Do not cut leader
For bare root trees and shrubs, prune for nursery stock and3 1branches about for collected material as 2 1about
14 gage or heavier
Cut stake off about 12" above
" dia. x 12" long nylon, rubber2
Fasten wires to 2" x 4" x 24"
2" x 2" wood stake
14 gage or heavier galvanized wire or
12" max., 6" min.
(min.)
12"
(min.)
12" m a x
10.4 x 16 20301 -1900
25101 -0300
25101 -0300
60201 -0800
60201 -1000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
O
U
TL
ET
P
R O
TE
C
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
D
R A
IN
A G
E
FL
U M
E)
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH CUYD CUYD LNFT LNFT Lt Rt 3396+50 3 80 19 72 3403+12 4 20 70 Left Approach 3414+61 4 20 70 Left Approach 3414+61 4 20 1 70 Right Approach 3422+58 NA 4 32 Drainage Flumes 3429+25 20 1600 19 200 3437+00 10 360 19 88 3442+50 13 720 19 124 3448+50 10 250 19 78 3454+38 2 50 72 18°
PROJECT TOTAL 3124 1 95 32 210 634
Allowable Pipe Material
NOTE:
1. Steel pipe culvert minimum wall thickness is the larger of 0.109" or the thickness 3. HDPE pipe is not allowed when final installation is exposed. Furnish HDPE end sections for AS Aluminized steel required by the Std. 602-1 fill height table. all HDPE pipe. End section is part of HDPE pipe. See Std. 602-5 for acceptable cell class. GS Galvanized steel
2. Aluminized steel pipe culvert minimum wall thickness is the larger of 0.105" or the 4. Do not use aluminized steel material in abrasive conditions. HDPE High Density Polyethylene thickness required by the Std. 602-1 fill height table (steel). (blank) Any appropriate material
Except PVC plastic
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0 ak -1
_e a.
xl sx
]S he et
-A ug
-2
3:
P
M N in h
Ph an
/2
K H ar ri so n
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
H.1
SHEET
NUMBER
DOT 135(6)AK
Note: The quantities shown hereon are approximate and are subject to field adjustments.
H.2
NUMBER
SHEET
U
S S u r ft p w w o r k d a k e e .d g n
AK DOT 135(6)
J a n u a r y
H a r r is
J m e s N e ig h o r
C h e c k e d b y
D e s ig n e d b y
1V:2H or flatter slope
FLUME DETAILS
DRAINAGE
Placed riprap, method A, class 3
1.
2.
B
B
A
Existing ground Existing ground
SECTION A-A SECTION B-B
Existing ground
6'
NO SCALE
2' 2' 2'
NOTE:
DRAINAGE FLUME
PLAN VIEW
Guardrail
CROSS SECTION VIEW
pavement structure
See Sheet C.1 for
A
Placed riprap, method A, class 3
6'
Placed riprap, method A, class 3Placed riprap, method A, class 3
8'
Aggregate base
Slab
Bridge Approach
Finished grade
At 3422+58 the slope and place riprap.
with no abrupt deviations. Extend the drain beyound the toe of
Shape the channel to proper grade and cross-section as shown finished grade. Install flume perpendicular to slope contours.
Excavate to place riprap so that the top of flume sides are at
QUANTITY
RIPRAP
ESTIMATED
CLASS
RIPAP
QUANTITY
GEOTEXTILE
ESTIMATED
SECTION
END
WITH
SECTION
END
WITHOUT
D
SIZE
CULVERT
QUANTITY
RIPRAP
ESTIMATED
CLASS
RIPAP
QUANTITY
GEOTEXTILE
ESTIMATED
SECTION
END
WITH
SECTION
END
WITHOUT
D
SIZE
CULVERT
NO SCALE
FOR INFORMATION ONLY
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
OUTLET WITHOUT DITCH
FOR INFORMATION ONLY
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
OUTLET WITH DITCH
L
LENGTH
APRON
H
DEPTH
APRON
L
LENGTH
APRON
H
DEPTH
APRON
REVISED: 8/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
CULVERT OUTLETS
PLACED RIPRAP AT
W251-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 135(6) AK
U S
C c p w w o r k d a k e f.
d g n
O c to b e r
Variable slopeVariable slope
D
4D m in
H m in
H
D
H ditch slope
Match existing ditch slope
Match existing
D or Span
Dia.
or Span
Dia.
or Span
Dia.
or Span
Dia.
(INCHES) (FEET) (CUYD) (SQYD)
(INCHES) (FEET) (CUYD) (SQYD)
2' (min.)
2' (min.)
(INCHES)
(INCHES)
14.5
12.5
49.8
38.7
18.5
13.2
5.2
3.2
1.7
44.4
34.0
15.6
10.8
3.9
2.2
1.0
14.5
12.5
38.5
29.8
15.1
10.7
4.4
2.7
1.3
35.6
27.2
13.3
9.3
3.6
2.0
0.9
3.
2.
1.
SECTION A-A SECTION B-B
SECTION C-C SECTION D-D SECTION E-E
PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH
END SECTION
CULVERT WITH STANDARD
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
PLAN VIEW
END SECTION
CULVERT WITH STANDARD
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
PLAN VIEW
NOTE:
A
1 1
A B B
C C DD
E
E
E
E b o tt o m w id th b o tt o m w id th for payment.
Do not measure riprap placement excavation
Furnish separation and stabilization geotextile.
less than 10%.
Use for aprons serving culverts with slopes or flatter
Sloped 1V:2H
Original ground
Geotextile m in
H
L
D it c h
D ground
Original
Geotextile Flowline m in
D
Geotextile m in
D m in
D ground
Original
Geotextile
D it c h
D
L ground
Original
Geotextile m in
H Original ground
L L
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
H.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 135(6) AK
O c to b e r
U
C p w w o r k d a k e g .d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
602-2
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
COUPLING BAND
METAL PIPE CULVERT
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 corrugations on rerolled pipe ends.
STATE PROJECT
NUMBER
SHEET
H.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 135(6) AK
O c to b e r
U p w w o r k d a k e h .d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
rerolled with 3" × 1" pipe corrugations.
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
LEGEND:
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2017
REVISED: 4/1994 6/2005
> 54"
12" to 54"
6"
4"
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
STATE PROJECT
NUMBER
SHEET
H.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 135(6) AK
U S
C c p w w o r k d a k e i.
d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
Bedding material (uncompacted)
Impermeable backfill material.
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
POLYVINYL CHLORIDE (PVC) PLASTIC ROUND PIPE CULVERT
PIPE
SIZE
FILL HEIGHT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 1784
SMOOTH WALL (SOLID WALL) RIBBED
PIPE
SIZE
MINIMUM
COVER
CELL CLASS.
NO. 12454
CELL CLASS.
NO. 12364
MINIMUM
COVER CELL CLASS.
NO. 12454C
CELL CLASS.
NO. 12364C
A B C D
END SECTION DIMENSIONS
FILL HEIGHT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 3350
SMOOTH WALL (SOLID WALL) CORRUGATED RIBBED
PIPE
SIZE
PIPE
SIZE
PIPE
SIZE
CELL CLASSIFICATION
NUMBER 335434C
CELL CLASS.
NO. 435400C CELL CLASS.
NO. 335434C
MINIMUM
COVER CELL CLASS.
NO. 334433C
MINIMUM
COVER
MINIMUM
COVER
POLYETHYLENE (PE) PLASTIC ROUND PIPE CULVERT
PIPE SIZE
602-5
STANDARD APPROVED FOR USE 12/1993
DRAFT: 2/2009
REVISED: 4/1994 6/2005
PLASTIC PIPE CULVERT
12 57
INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET)HEIGHT (FEET)
MAXIMUM FILL
INCHESINCHES
DIAMETER
MAXIMUM FILL HEIGHT (FEET)INCHESINCHES
DIAMETER 1.4771.2921.3851.1540.9230.8570.607
MINIMUM WALL THICKNESS (INCHES)
INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET) INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET)
MINIMUM WALL THICKNESS (INCHES)
0.358 0.438 0.358 0.438
66.5
63.5
45.5
24.5
14.5
INCHES
DIMENSIONS
INCHES
DIAMETER
STATE PROJECT
NUMBER
SHEET
H.7
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 135(6) AK
U S
C c p w w o r k d S td
.d g n
J a n u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
PLASTIC PIPE END SECTION
SIDE
TOP
FRONT
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve.
If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
A
D
C
B
PIPE SIZE (D) WIDENING
DITCH WIDENING
602-6
TREATMENT IN CUT SLOPES
PIPE CULVERT INLET 30"
24"
18"
7'
6'
5'
STATE PROJECT
NUMBER
SHEET
H.8
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DOT 135(6) AK
U S
C c p w w o r k d a k e j.
d g n
J a n u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
dimension of all pipe arch culverts.
D equals the diameter of all round pipe or the rise 1.
TYPE II
TYPE I
SECTION B-B
SECTION A-A
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
Pipe culvert
E n d o f p ip e
FLOW
Flat b ottom di tch a t culv ert in let
FLOW
Tape r at 1
0:1 r atio
Taper a t 10:1 ratio
FLOW
2D or
FLOW
Taper at 10
:1 rat io
2D or
N o r m a l d it c h l in e subgrade elevation
Maximum 2D or
S u b g r a d e s h o u ld e r o r e n d s e c ti o n
E n d o f p ip e b e v e l
Flat b ottom ditc h at c ulvert inlet
A
A
B
B section
End
PLAN PLAN
Original ground in mountainous terrain flat terrain. Taper at 5:1
Taper at 10:1 in rolling or 5:1 in mountainous terrain.
or flat terrain. Taper at
Taper at 10:1 in rolling
Normal ditch line
Pipe culvert
Original ground cut slope
Normal
(See table)
Ditch widening
Subgrade shoulder Normal ditch lineSubgrade shoulder
Pavement surface
Berm
Pavement surface
Subgrade
End section
Berm pipe as staked
Slope at ditch at end section
Flow line of pipe as staked
Slope at cut slope
Normal
D in lieu of 45° pipe elbow
30° pipe elbows may be required
At skewed pipe locations, 22.5° or
Standard 45° pipe elbow.
slope
1:3 max ditch line
Normal maximum slope
1:1.5
Cut Slope slope
1:3 max maximum slope
1:1.5
Cut Slope
D ditch line
Normal
Subgrade
1'
1'
NOTE:
B e r m
D
B e r m
D
(min.)
4' d ip a t c e n te r
(Min.)
4'
QUANTITIES
ROADSIDE BARRIER
TABULATION OF
I.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k s a .d g n
AK DOT 135(6)
A u g u s t
K
H a r r is o n
N
P h a n
C h e c k e d b y
D e s ig n e d b
STEEL POSTS
MGS W-BEAM GUARDRAIL
I.2
STATE PROJECT
NUMBER
SHEET
U p w w o r k d a k s b .d g n
AK DOT 135(6)
F e b r u a r y a r r is h P h
C h e c k e d b y
P r e p a r e d b y
8" or 12" block
6' Post
(one omitted post)
Unsupported span
" x 10" or 14" guardrail bolt8
Note 2
See
" plain round washer4
W6 x 9 or W6 x 8.5
"4
" dia.4
" dia. (typ.)4
Note 2
See
"4
"4
6"
N o te
S e e
6' POST, 8" OR 12" BLOCK
Post spacing 6'-3""2 13'-1
43'-9" (min.)
56'-3" (min.) Distance between omitted posts
(max.)
12'-6"
(t yp
6" ty p ty p
(typ.)
2'-0"
8" or 12" o r
8" or 12"
" recess nut8 fill slope
Variable
TOP symmetry ofCL
FRONTSIDE
BLOCK
steeper than fill slope
Variable slope but not shown on Typical Section
Aggregate base or as
W beam rail
(See Note 2)
Modified Block on terminal sections
All posts except those
DETAIL
POST AND BLOCK
4.
3.
2.
1.
SHAPE POST
STRUCTURAL
terminal sections approach and departure
Widening required for
Subgrade shoulder. 1V:10H or flatter slope
OMITTED POST DETAIL
Hinge point block (typ.)
Post and rail as applicable ground line at face of
Edge of pavement or
Traffic s t le n g th
P o s t le n g th
6" ending 100' after the P.T.
12.5' on curves starting 100' before the P.C. and
Install reflectors every 25' on tangents and every the location shown on typical guardrail elevation.
" recessed head nut and steel washer at8 5bolt with
" button head8 5Attach guardrail reflector using a and accepted manufacturing practices.
functioning of the part, including its appearance, intended to be those consistent with the proper
Dimensional tolerances not shown or implied are length of guardrail run.
material. Use consistent material throughout the
Modified block may be wood, plastic, or composite
Size of block shown elsewhere in the plans.
the hinge point.
distance between the back of the guardrail post and guardrail cross section includes a 2-foot minimum may be omitted in locations where the typical
When encountering impenetrable material, one post
(must be mid-span) reflector locations
Permissible guardrail bolts and nuts (8 per splice)
" guardrail splice4
" x 18 of traffic direction
Lap in splice, typ.
Mid-span
TYPICAL ELEVATION
TYPICAL CROSS SECTION
guardrail post bolt, typ.
" x 10" or 14"8
GUARDRAIL REFLECTOR
groundline at face of rail
Edge of pavement or
See Note 2
SIDE
TOP
PLAN VIEW
NOTES:
See Note 1
POST FACE
See Note 4
ZY
Y Z
X=End offset. See manufacturer's information for the range of acceptable end offsets for each MASH compliant terminal.
* This 20' x 75' area must be free fixed object hazards. Any signs or other highway appurtenances must be mounted on breakaway supports.
s id e s lo p e
A p p r o a c h in g
STANDARD GUARDRAIL TERMINAL WIDENING DETAIL
AB
B
A
SECTION B-B
5.
4.
3.
2.
1.
AND GRADING
TYPE TANGENT TERMINAL
MGS W-BEAM GUARDRAIL
SECTION A-A
I.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k s c .d g n
AK DOT 135(6)
A u g u s t
H a r r is
W F L C
A
C h e c k e d b y
D r a w n b y
Install a reflectorized object marker on the impact head.
the diagonally hatched area also.
do not pave the diagonally hatched area. If not present, pave approximate location show. If this post/anchor is present
Some terminal systems have an additional post/anchor at the
In the case, the slope may be steepened to 4:1.
approaching side slope except where is the flatter than 4:1.
From point to point make the side slope match the away from the road.
slope when the shoulder slopes toward the road as well as in the plans or when approved by the CO. Match the shoulder. The slope may be increased to 10:1 if identified
Construct the shaded area to match the slope of the adjacent to the manufacture's recommendations.
configuration and layout. Install tangent terminal according manufacturer's drawing for actual post, rail, strut, etc.
The terminal details shown are for illustration only. See
Front face of rail
Normal guardrail offset
X
Back of post
Pave shaded area
75'
Edge of traveled way Normal guardrail fence offset
Slope limits (approximate)
See Note 4
See Note 2
Hinge Point
See Note 3 x m in
42' (min.)
Hinge Point
See Note 3
See Note 3 for side slope
50' (typ.)
pay limit
Guardrail
(min.)
6'
(min.)
4'
2' (min.)
Varies
Edge of traveled way
Edge of traveled way
QUANTITIES
TEMPORARY TRAFFIC CONTROL
TABULATION OF
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k n a .d g n
AK DOT 135(6)
J u n e
H a r r is h P h
C h e c k e d b y
D e s ig n e d b
J.2
NUMBER
SHEET
U
S S u r ft p w w o r k d a k n p .d g n
AK DOT 135(6)
F e b r u a r y tt H in s d s w ti e C a r lo s
C h e c k e d b y
D e s ig n e d b y
MISCELANEOUS SIGN DETAILS
TEMPORARY TRAFFIC CONTROL
"4 33"8
570"4
"8
5" D
"4
5" D
"4
"8
4" D
3"
4" D
"8
60''
"2
4"D
"2
"8 13"4
353"8
"8
5"D
"8
4'D
"8
5"D
"8
"2 1255""2
4"
4"D
4"
REF-A
REF-C
REF-B
NOTE:
60"
78" installations. See SCR 107.03A for project information phone number.
The CO will mark the exact locations in the field for sign conference.
Distance "#" will be determined by the CO at the preconstruction
".2
". Indent = 04
", Thickness = 08
Radius = 1
Border dimensions of reference sign A-C are as follows:
3.
2.
1.
WORK
ZONE
SUPPLEMENTAL DETAILS
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
NO
CENTER
LINE
LOOSE
GRAVEL
MOTORCYCLES
USE EXTREME
CAUTION
PAVEMENT
ENDS
BEGIN
DOUBLE
TRAFFIC
FINES
WORK
ZONE
R2-6aP
FINES
DOUBLE
SPEED
LIMIT
AHEAD
SPEED ZONE
25 MPH
LIMIT
SPEED
END
DOUBLE
TRAFFIC
FINES
SPEED
LIMIT
DOT R16-100
DOT R16-101
J.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d a k n b .d g n
AK DOT 135(6)
A u g u s t
H a r r is h P h
C h e c k e d b y
D e s ig n e d b y
Traffic
Traffic
Work zone as determined by the CO
Work zone Area of Influence
100' 100' 100' 100'