ak-13506_Earthwork Report.pdf

PDF 217 KB Posted

Attached to
AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2
Solicitation number
69056719B000032
Issued by

About this file

This document contains an earthwork report and related federal contract opportunity for the AK DOT 135(6) Glenn Highway Rehabilitation Kings River Bridge project. The report provides station-by-station cut and fill data for the roadway rehabilitation from MP 66.0 to MP 67.2, totaling over 116,000 cubic yards of earthwork. The related federal contract opportunity is solicitation number 69056719B000032 for the roadway project issued by the Department of Transportation Federal Highway Administration. The opportunity type is an invitation for bid due on an unspecified date. The scope of work involves rehabilitation of the Glenn Highway from Kings River Bridge station 3395+00 to 3457+00.

View the file

Other files

File Type Posted
Bid Tabulation_AK DOT 135(6).pdf PDF
BidSum.pdf PDF
QA_11-07-2022.pdf PDF
Amendment A005.pdf PDF
QA_11-01-2022.pdf PDF
QA_10-28-2022.pdf PDF
QA2_10-27-2022.pdf PDF
QA_10-27-2022.pdf PDF
QA_10-26-2022.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_10-24-2022.pdf PDF
QA_10-21-2022.pdf PDF
QA_10-19-2022.pdf PDF
QA_10-18-2022.pdf PDF
QA2_10-13-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-13-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-06-2022.pdf PDF
AK DOT 135(6) - Kings River Bridge - EXISTING BRIDGE AS_BUILTS.pdf PDF
ak-13506-Signoff-Plans.pdf PDF
ak-13506-Blue Top-RTB Report.pdf PDF
ak-13506-Red Top-XYZ Report.pdf PDF
Geotech Report No 08-19 Kings River Bridge Final Geotechnical Report.pdf PDF
AK DOT 135(6) - Kings River Bridge - EXISTING BRIDGE INSPECTION 2019.pdf PDF
ak-13506-Signoff_ControlSheet.xlsx XLSX spreadsheet
Physical Data 1.zip ZIP file
ak-13506-Red Top-RTB Report.pdf PDF
ak-13506-Signoff-Superelvation.pdf PDF
ak-13506-Signoff_Alignments.pdf PDF
IFB 69056719B000032 .pdf PDF
ak-13506-Signoff_SWPPP_Binder.pdf PDF
FINAL_GR10-14_Glenn Highway Preliminary Geotechnical Recommendations Report.pdf PDF
Physical Data 2.zip ZIP file
ak-13506-Blue Top-XYZ Report.pdf PDF
ak-13506-Slope Stake Note-FHWA Version 2.pdf PDF
ak-13506-Slope Stake Note-XYZ Report.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK DOT 135(6), GLENN HIGHWAY REHABILITATION KINGS RIVER SECTION: MP 66.0 TO MP 67.2

Earthwork Data Listing

For

AK DOT 135(6)

GLENN HIGHWAY REHABILITATION

KINGS RIVER BRIDGE SECTION:

MP 66.0 TO MP 67.2

GLENN HIGHWAY

3395+00 TO 3419.21.50

3422+54.50 TO 3457+00

AK DOT 135(6) GLENN HW REHABILITATION

KINGS RIVER BRIDGE SECTION MP 66.0 TO MP 67.2

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

3395+00.00 0 0 0 0 0 0 0 3395+25.00 226.17 32.93 28.79 0.43 18.8 29.25 193.72 3395+50.00 222.9 33.56 28.52 0.43 18.8 29.25 193.72 3395+75.00 219.29 25.79 27.12 0.43 18.8 29.25 193.72 3396+00.00 218.71 11.24 23.23 0.43 18.8 29.25 193.72 3396+25.00 223.56 2.69 21.45 0.43 18.8 29.25 193.72 3396+50.00 225.75 2.21 24.26 0.43 18.8 29.25 193.72 3396+75.00 226.25 1.99 25.4 0.43 18.8 29.25 193.72 3397+00.00 251.62 2.55 31.01 0.43 18.8 29.25 193.72 3397+25.00 314.9 3.25 38.76 0.43 18.7 29.12 193.03 3397+50.00 388.97 2.21 41.62 0.43 18.5 28.85 191.64 3397+75.00 395.23 1.02 41.25 0.43 18.31 28.58 190.25 3398+00.00 378.4 0.64 40.18 0.43 18.12 28.31 188.86 3398+25.00 400.89 0.58 41.3 0.43 17.93 28.04 187.47 3398+50.00 409.39 0.55 40.82 0.43 17.74 27.77 186.08 3398+75.00 409.54 0.57 40.97 0.43 17.54 27.5 184.7 3399+00.00 418.78 0.64 42.92 0.43 17.35 27.23 183.32 3399+25.00 435.06 0.66 45.12 0.43 17.15 26.96 181.93 3399+50.00 448.02 0.68 47.12 0.43 16.96 26.69 180.54 3399+75.00 458.51 0.63 48.49 0.43 16.77 26.42 179.15 3400+00.00 510.79 0.63 53.36 0.43 16.58 26.15 177.76 3400+25.00 540.72 0.67 57.62 0.42 16.38 25.88 176.21 3400+50.00 516.07 0.69 58.19 0.41 16.19 25.56 174.03 3400+75.00 478.26 0.86 57.03 0.4 16 25.22 171.43 3401+00.00 444.56 1.02 55.37 0.38 15.81 24.89 168.92 3401+25.00 435.89 0.84 55.31 0.37 15.62 24.57 166.74 3401+50.00 426.73 0.67 55.04 0.38 15.42 24.31 165.38 3401+75.00 414.82 0.79 54.26 0.38 15.23 24.07 164.65 3402+00.00 408.22 0.86 53.21 0.39 15.04 23.85 164.14

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

SHEET 1 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3402+25.00 421.74 0.78 52.64 0.4 14.85 23.63 163.54 3402+50.00 444.77 1.25 52.18 0.41 14.65 23.38 162.44 3402+75.00 466.89 3.36 50.49 0.42 15.36 24.44 169.14 3403+00.00 472.29 3.58 39.31 0.44 21.07 32.52 211.89 3403+12.50 240.15 0.96 10.62 0.22 12.98 19.69 123.55 3403+25.00 245.71 1.13 11.55 0.22 12.96 19.66 123.4 3403+50.00 476.15 1.85 39.44 0.44 20.86 32.23 210.37 3403+75.00 459.47 1.04 44.25 0.42 15 23.94 166.52 3404+00.00 466.6 1.07 41.87 0.41 14.17 22.69 158.95 3404+25.00 498.54 0.85 37.77 0.41 14.17 22.69 158.95 3404+50.00 519.45 0.66 33.28 0.41 14.17 22.69 158.95 3404+75.00 514.9 0.54 32.33 0.41 14.17 22.69 158.95 3405+00.00 510.08 0.4 34.41 0.41 14.17 22.69 158.95 3405+25.00 511.7 0.26 38.79 0.41 14.17 22.69 158.95 3405+50.00 531.07 0.36 41.11 0.41 14.17 22.69 158.95 3405+75.00 566.46 0.47 42.1 0.41 14.17 22.69 158.95 3406+00.00 592.04 0.57 29.18 0.41 14.17 22.69 158.95 3406+25.00 611.01 0.66 15 0.41 14.17 22.69 158.95 3406+50.00 629.87 0.66 14.65 0.41 14.17 22.69 158.95 3406+75.00 605.63 0.59 13.92 0.41 14.17 22.69 158.95 3407+00.00 581.67 0.53 13.3 0.41 14.17 22.69 158.95 3407+25.00 596.67 0.56 12.56 0.41 14.17 22.69 158.95 3407+50.00 599.53 0.41 11.72 0.41 14.17 22.69 158.95 3407+75.00 596.8 0.25 11.36 0.41 14.17 22.69 158.95 3408+00.00 598.27 0.25 11.42 0.41 14.17 22.69 158.95 3408+25.00 610.73 0.25 11.55 0.41 14.17 22.69 158.95 3408+50.00 639.18 0.25 11.45 0.41 14.17 22.69 158.95 3408+75.00 638.2 0.25 11.09 0.41 14.17 22.69 158.95 3409+00.00 603.17 0.32 10.91 0.41 14.17 22.69 158.95 3409+25.00 510.63 0.42 26.19 0.41 14.17 22.69 158.95

SHEET 2 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3409+50.00 458.37 0.45 42.94 0.41 14.17 22.69 158.95 3409+75.00 508.62 0.41 45.12 0.41 14.17 22.69 158.95 3410+00.00 555.71 0.35 46.46 0.41 14.17 22.69 158.95 3410+25.00 519.68 0.5 47.93 0.41 14.17 22.69 158.95 3410+50.00 397.32 0.58 44.57 0.41 14.17 22.69 158.95 3410+75.00 339.93 0.47 39.97 0.41 14.17 22.69 158.95 3411+00.00 384.19 0.44 41.43 0.41 14.17 22.69 158.95 3411+25.00 431.11 0.44 43.25 0.41 14.17 22.69 158.95 3411+50.00 469.64 0.44 43.87 0.41 14.17 22.69 158.95 3411+75.00 519.27 0.45 45.25 0.41 14.17 22.69 158.95 3412+00.00 556.43 0.46 46.73 0.41 14.17 22.69 158.95 3412+25.00 575.89 0.45 47.76 0.41 14.17 22.69 158.95 3412+50.00 594.96 0.44 48.26 0.41 14.17 22.69 158.95 3412+75.00 632.38 0.34 49.68 0.41 14.17 22.69 158.95 3413+00.00 645.31 0.35 49.62 0.41 14.17 22.69 158.95 3413+25.00 633.4 0.41 48.67 0.41 14.17 22.69 158.95 3413+50.00 615.62 0.39 48.93 0.41 14.17 22.69 158.95 3413+75.00 568.24 0.46 48.49 0.41 14.17 22.69 158.95 3414+00.00 543.72 0.5 47.51 0.41 14.17 22.69 158.95 3414+25.00 452.88 0.37 45.42 0.41 15.52 24.62 169.37 3414+50.00 324.67 9.75 21.93 0.41 23.25 35.46 225.64 3414+61.00 133.39 4.76 0 0.18 13.03 19.53 119.46 3414+75.00 168.33 7.73 7.5 0.23 16.58 24.85 152.04 3415+00.00 228.13 89.12 32.63 0.41 22.79 34.83 222.38 3415+25.00 160.29 171.69 29.29 0.41 15.07 23.99 166.11 3415+50.00 148.47 208 20.42 0.41 14.17 22.69 158.95 3415+75.00 138.1 232.66 20.08 0.41 14.17 22.69 158.95 3416+00.00 129.2 246.89 18.6 0.41 14.17 22.69 158.95 3416+25.00 121.97 265.62 17.25 0.41 14.17 22.69 158.95 3416+50.00 117.88 278.61 16.92 0.41 14.17 22.69 158.95

SHEET 3 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3416+75.00 115.36 283.77 17.26 0.41 14.17 22.69 158.95 3417+00.00 113.14 293.08 17.52 0.41 14.17 22.69 158.95 3417+25.00 112.84 304.07 17.86 0.41 14.21 22.76 159.29 3417+50.00 115.27 313 19.25 0.4 15.1 23.98 165.2 3417+66.00 74.92 213.56 14.33 1.11 9.64 16.48 111.21 3417+75.00 41.49 133.96 8.82 1.07 5.1 9.43 63.28 3418+00.00 108.51 414.94 24.29 2.51 14.21 25.62 172.41 3418+25.00 93.98 478.78 24.14 1.66 15.24 25.55 165.97 3418+41.00 53.55 316.45 14.87 1.55 9.84 16.79 101.99 3418+50.00 29.95 167.45 7.85 1.29 5.23 9.52 56.16 3418+75.00 81.55 454.76 20.84 3.13 14.52 25.81 152.99 3419+00.00 75.79 457.12 20.8 2.39 14.69 25.03 149.18 3419+21.50 58.99 434.02 18.93 1.7 12.79 21.25 127.03 3422+54.50 0 0 0 0 0 0 0 3422+75.00 24.79 323.18 17.53 1.62 12.19 20.26 121.24 3423+00.00 34.73 399.64 23.34 2.38 14.69 25.04 149.5 3423+25.00 43.17 328.21 14.62 3.12 14.52 25.82 153.51 3423+35.00 20.84 100.87 2.19 1.43 5.81 10.58 62.73 3423+50.00 41.18 119.07 3.34 1.47 9.24 15.86 97.37 3423+75.00 79.41 268.17 6.13 1.7 15.3 25.84 170.56 3424+00.00 81.79 356.56 8.2 2.52 14.25 25.82 176.07 3424+10.00 35.67 123.92 4.19 1.19 5.67 10.54 71.52 3424+25.00 61.45 102.54 3.32 1.06 9.03 15.53 105.85 3424+50.00 113.25 112.02 6.12 0.43 15.13 24.12 167.31 3424+63.69 61.01 103.08 6.9 0.23 7.8 12.53 88.14 3424+75.00 49.36 99.14 5.77 0.19 6.41 10.3 72.56 3425+00.00 108.72 217.8 12.63 0.43 14.21 22.83 160.7 3425+25.00 99.77 220.93 18.63 0.43 18.06 28.23 188.48 3425+50.00 88.71 265.79 19.77 0.43 18.06 28.23 188.48 3425+75.00 78.81 353.21 17.13 0.43 14.21 22.83 160.7

SHEET 4 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3426+00.00 64.3 397.21 20.38 0.43 14.17 22.77 160.39 3426+25.00 54.26 399.81 21.84 0.43 14.17 22.77 160.39 3426+50.00 50.33 431.78 22.67 0.43 14.17 22.77 160.39 3426+75.00 49.04 463.58 23.45 0.43 14.17 22.77 160.39 3427+00.00 49.65 488.32 23.84 0.43 14.17 22.77 160.39 3427+25.00 56.16 506.25 22.3 0.43 15 23.94 166.42 3427+50.00 70.85 459.58 19.94 0.43 16.68 26.29 178.46 3427+64.41 51.26 221.1 10.73 0.25 10.37 16.21 108.33 3427+75.00 37.97 152.43 7.04 0.18 7.98 12.41 82.16 3428+00.00 120.72 355.32 20.81 0.43 20.02 30.97 202.53 3428+25.00 128.02 367.38 23.09 0.43 21.69 33.31 214.56 3428+50.00 71.98 420.86 19.13 0.43 23.36 35.64 226.59 3428+75.00 39.92 489.27 19.02 0.43 24.19 36.81 232.61 3429+00.00 23.3 756.39 23.16 0.43 24.19 36.81 232.61 3429+25.00 7.31 1087.51 28.12 0.43 24.19 36.81 232.61 3429+50.00 0.02 1093.97 25.62 0.43 24.19 36.81 232.61 3429+60.00 0 370.58 8.2 0.17 9.68 14.73 93.04 3429+70.00 1.66 306.53 7.8 0.17 9.68 14.73 93.04 3429+80.00 21.65 230.09 7.84 0.17 9.68 14.73 93.04 3429+90.00 104.79 152.16 8.39 0.17 9.68 14.73 93.04 3430+00.00 217.94 100.5 9.27 0.17 9.68 14.73 93.04 3430+10.00 287.03 77.41 9.64 0.17 9.68 14.73 93.04 3430+20.00 318.47 70.3 9.94 0.17 9.68 14.73 93.04 3430+30.00 304.55 70.05 10.02 0.17 9.68 14.73 93.04 3430+40.00 257.08 68.54 10.21 0.17 9.68 14.73 93.04 3430+50.00 207.74 51.99 10.27 0.17 9.68 14.73 93.04 3430+60.00 239.52 36.17 9.89 0.17 9.68 14.73 93.04 3430+70.00 406.19 34.3 9.74 0.17 9.68 14.73 93.04 3430+80.00 640.94 32.82 9.8 0.17 9.68 14.73 93.04 3430+90.00 843.27 31.42 10.14 0.17 9.68 14.73 93.04

SHEET 5 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3431+00.00 973.37 30.04 10.68 0.17 9.68 14.73 93.04 3431+25.00 2640.5 75.15 27.22 0.43 24.19 36.81 232.61 3431+50.00 2824.65 76.73 27.28 0.43 24.19 36.81 232.61 3431+75.00 3018.25 74.19 26.76 0.43 23.36 35.64 226.59 3432+00.00 3192.41 71.48 26.63 0.52 21.69 33.78 223.14 3432+25.00 3264.1 60.79 26.41 0.62 20.02 31.91 219.69 3432+38.68 1738.42 26.33 13.89 0.34 10.25 16.47 115.12 3432+50.00 1386.66 19.75 11.38 0.28 8.1 13.1 92.54 3432+75.00 2998.61 38.66 24.65 0.62 16.68 27.23 195.62 3433+00.00 2887.85 35.1 23.91 0.59 15 24.75 181.02 3433+25.00 2717.15 32.03 23.32 0.55 14.32 23.58 172.28 3433+50.00 2398.76 24.06 22.41 0.45 15.27 24.46 170.96 3433+66.00 1297.81 10.52 13.83 0.97 9.86 16.56 110.92 3433+80.00 999.33 6.08 11.89 1.42 8.22 14.71 98.25 3434+00.00 1219.29 4.19 17.67 1.74 11.62 20.46 137.74 3434+25.00 1369.95 1.49 23.89 1.54 14.57 24.79 165.13 3434+50.00 1312.29 0.15 21.46 1.11 14.71 24.43 160.36 3434+75.00 1063.29 0.09 17.76 1.11 14.71 24.45 160.74 3435+00.00 718.79 11.46 16.79 1.11 14.71 24.45 160.74 3435+25.00 505.71 37.96 15.94 1.11 14.71 24.45 160.74 3435+50.00 427.17 48.07 15.36 1.11 14.71 24.45 160.74 3435+60.00 177.1 16.75 6.12 0.44 5.89 9.78 64.3 3435+70.00 189.64 15.66 6.24 0.44 5.89 9.78 64.3 3435+80.00 196.55 14.2 6.34 0.44 5.89 9.78 64.3 3435+90.00 189.98 12.88 6.36 0.44 5.89 9.78 64.3 3436+00.00 168.19 12.33 6.29 0.44 5.89 9.78 64.3 3436+10.00 165.05 12.2 6.27 0.44 5.89 9.74 63.55 3436+20.00 186.11 12.65 6.28 0.43 5.89 9.69 62.81 3436+30.00 215.96 13.42 6.25 0.43 5.89 9.69 62.81 3436+40.00 243.47 14.42 6.23 0.43 5.89 9.69 62.81

SHEET 6 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3436+50.00 237.46 15.97 6.2 0.43 5.89 9.69 62.81 3436+60.00 196.08 18.3 6.14 0.43 5.89 9.69 62.81 3436+70.00 156.85 20.99 6.02 0.43 5.89 9.69 62.81 3436+80.00 123.12 23.39 5.92 0.43 5.89 9.69 62.81 3436+90.00 83.4 24.75 4.89 0.43 5.89 9.69 62.81 3437+00.00 62.49 24.32 4 0.43 5.89 9.69 62.81 3437+25.00 156.26 57.1 10.8 1.07 14.71 24.23 157.02 3437+50.00 154.77 55.5 9.92 1.07 14.71 24.23 157.02 3437+75.00 150.26 55.99 8.69 1.07 14.71 24.23 157.02 3438+00.00 147.5 51.74 9.17 1.09 14.71 24.34 158.88 3438+25.00 144.63 46.06 11.22 1.11 14.71 24.45 160.74 3438+50.00 146.34 41.91 11.12 1.11 14.71 24.45 160.74 3438+75.00 158.11 32.34 8.29 1.11 14.71 24.45 160.74 3439+00.00 184.73 15.05 11.14 1.11 14.71 24.45 160.74 3439+25.00 263.59 2.49 15.21 1.11 14.71 24.45 160.74 3439+50.00 367.87 0.14 15.44 1.11 14.71 24.45 160.74 3439+75.00 456.25 0.15 15.89 1.11 14.71 24.45 160.74 3440+00.00 465.4 0.33 22.6 1.11 14.71 24.49 161.23 3440+25.00 382.59 0.75 29.36 1.11 14.71 24.52 161.79 3440+32.89 101.6 0.32 9.36 0.35 4.64 7.74 51.08 3440+50.00 205.44 0.64 18.63 0.76 10.07 16.79 110.78 3440+75.00 271.69 0.91 22.31 1.11 14.71 24.53 161.86 3441+00.00 235.82 0.85 16.88 1.59 14.56 24.75 162.66 3441+15.00 128.82 0.44 7.87 1.34 8.68 15.17 99.05 3441+29.00 115.28 0.41 6.26 1.4 8.2 14.5 94.2 3441+50.00 163.37 0.62 8.67 1.26 12.75 21.38 142.44 3441+75.00 187.53 4.87 10.51 0.41 14.89 23.71 164.18 3442+00.00 192.02 17.27 11.38 0.41 14.17 22.69 158.95 3442+25.00 199.98 41.25 14.21 0.41 14.17 22.69 158.95 3442+50.00 214.39 79.81 18.77 0.44 15 24.06 168.75

SHEET 7 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3442+65.00 131.31 64.69 12.86 0.28 11.32 17.8 120.25 3442+75.00 86.51 46.98 8.89 0.19 8.02 12.53 83.57 3443+00.00 171.63 138.42 28.21 0.44 16.18 25.71 177.26 3443+25.00 126.71 174.11 34.32 0.41 14.17 22.69 158.95 3443+50.00 132.29 208.15 36.26 0.41 14.17 22.69 158.95 3443+75.00 137.19 239.75 39.09 0.41 14.17 22.69 158.95 3444+00.00 138.7 270.37 42.29 0.41 14.17 22.69 158.95 3444+25.00 133.76 302.79 45.47 0.41 14.17 22.69 158.95 3444+50.00 129.17 342.29 48.08 0.41 14.17 22.69 158.95 3444+75.00 126.76 369.83 48.45 0.41 14.17 22.69 158.95 3445+00.00 124.32 404.45 51.44 0.41 14.17 22.69 158.95 3445+14.47 70.94 255.98 31.63 0.24 8.2 13.14 92 3445+25.00 51.36 187.38 22.88 0.17 5.97 9.56 66.95 3445+38.48 65.45 227.39 29.37 0.22 7.64 12.24 85.71 3445+50.00 55.46 185.84 25.09 0.19 6.53 10.46 73.25 3445+75.00 120.87 424.54 53.82 0.41 14.17 22.69 158.95 3446+00.00 122.91 396.25 49.38 0.41 14.17 22.69 158.95 3446+25.00 123.1 308.43 44.82 0.41 14.17 22.69 158.95 3446+50.00 122.71 251.74 44.01 0.41 14.17 22.69 158.95 3446+75.00 123.79 227.59 44.21 0.41 14.17 22.69 158.95 3447+00.00 150.71 200.51 45.28 0.41 14.17 22.69 158.95 3447+25.00 286.38 198.21 51.44 0.41 14.17 22.69 158.95 3447+50.00 520.06 231.04 59.24 0.41 14.17 22.69 158.95 3447+75.00 689.46 253.75 63.53 0.41 14.17 22.69 158.95 3448+00.00 785.14 269.06 66.46 0.41 14.17 22.69 158.95 3448+25.00 845.51 266.63 66.52 0.41 14.17 22.69 158.95 3448+50.00 855.21 131.5 51.33 0.41 14.17 22.69 158.95 3448+75.00 818.96 3.35 36.36 0.41 14.17 22.69 158.95 3449+00.00 752.25 3.02 35.04 0.41 14.17 22.69 158.95 3449+25.00 679.97 1.42 33 0.41 14.17 22.69 158.95

SHEET 8 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3449+50.00 596.86 0.76 31.08 0.41 14.17 22.69 158.95 3449+75.00 524.89 0.81 31.56 0.41 14.17 22.69 158.95 3450+00.00 482.44 6.95 33.28 0.41 14.17 22.69 158.95 3450+25.00 449.87 14.5 33.69 0.41 14.17 22.69 158.95 3450+50.00 406.68 26.14 35.59 0.41 14.17 22.69 158.95 3450+63.75 238.63 25.18 23.32 0.22 7.79 12.48 87.42 3450+75.00 220.29 25.18 21.86 0.18 6.38 10.21 71.53 3451+00.00 507.42 41.26 47.79 0.41 14.17 22.69 158.95 3451+25.00 544.77 20.38 44.54 0.41 14.17 22.69 158.95 3451+50.00 542.93 11.31 40.44 0.41 14.17 22.69 158.95 3451+75.00 509.5 4.31 40.04 0.41 14.17 22.69 158.95 3452+00.00 501.06 0.67 44.86 0.41 14.17 22.69 158.95 3452+25.00 488.25 0.62 48.84 0.41 14.17 22.69 158.9 3452+50.00 507.37 0.6 53.09 0.4 14.17 22.66 158.3 3452+75.00 532.06 0.43 56.5 0.38 14.16 22.61 157.32 3453+00.00 466.48 1.33 54.81 0.38 14.16 22.57 156.58 3453+25.00 401.09 1.35 48.26 0.37 14.17 22.54 156.2 3453+50.00 400.3 0.53 44.45 0.38 14.17 22.56 156.65 3453+75.00 464.29 0.58 52.19 0.39 14.17 22.63 157.74 3454+00.00 567.97 0.58 60.25 0.41 14.17 22.69 158.92 3454+25.00 666.83 0.64 61.91 0.42 14.17 22.75 159.96 3454+50.00 731.09 0.64 63.49 0.43 14.17 22.77 160.39 3454+75.00 694.56 0.84 59.73 0.43 14.17 22.77 160.39 3455+00.00 624.75 0.86 56.09 0.43 14.17 22.77 160.39 3455+25.00 571.05 1.1 55.9 0.43 14.17 22.77 160.39 3455+50.00 539.15 1.34 55.36 0.43 14.18 22.77 160.39 3455+75.00 530.82 1.03 52.53 0.43 14.18 22.77 160.39 3456+00.00 502.59 0.99 46.36 0.43 14.17 22.77 160.39 3456+25.00 509.5 3.56 44.14 0.43 14.17 22.77 160.39 3456+50.00 532.12 12.56 44.24 0.43 14.17 22.77 160.39

SHEET 9 OF 10 SIGNOFF 11/12/2020

WFLHD

STATION

UNADJUST.

RDWY. EX.

EMBANKMENT

TOPSOIL

TOTAL EX.

AGGREGATE

SHOULDER

ASPHALT

CONCRETE

AGGREGATE

BASE

SELECT

BORROW

KINGS RIVER BRIDGE REPLACEMENT EARTHWORK ‐ 3395+00 to 3457+00

3456+75.00 450.57 21.28 41.79 0.43 14.17 22.77 160.39 3457+00.00 376.98 25.38 38.81 0.43 14.17 22.77 160.39

TOTAL 116,606.19 27,444.83 7,497.44 152.40 3,706.28 5,934.66 40,174.98

TOTAL A 39355.81 5944.44 3317.4 53.65 1532.44 2438.08 16566.15

TOTAL B 77250.38 21500.39 4180.04 98.75 2173.84 3496.58 23608.83

TOTAL A+B 116606.19 27444.83 7497.44 152.4 3706.28 5934.66 40174.98

SHEET 10 OF 10 SIGNOFF 11/12/2020