49.pdf
PDF 194 KB Posted
- Solicitation number
- AG-82B1-S-10-0081
About this file
drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Camp Crook abstract.xlsx | XLSX spreadsheet | |
| Signed PREAWARD Intent to Award.pdf | ||
| SF 30 AMEND 7.PDF | ||
| C 1.2A.pdf | ||
| 4-plex basement plumbing.pdf | ||
| C 1.1A.pdf | ||
| Camp Crook pre bid and QA.2.docx | DOCX document | |
| C 9.1A.pdf | ||
| Buffalo dump 2.pdf | ||
| Buffalo Dump 1.pdf | ||
| SF 30 AMEND 6.PDF | ||
| Amend 5 SF 30.pdf | ||
| SF 30. Amendment 04.pdf | ||
| AMEND 3.PDF | ||
| SF 30 AMEND 1.PDF | ||
| SF 30 AMEND 2.PDF | ||
| 20.pdf | ||
| 69.pdf | ||
| 66.pdf | ||
| 36.pdf | ||
| 17.pdf | ||
| 4.pdf | ||
| 6.pdf | ||
| 51.pdf | ||
| SF 1442.pdf | ||
| 14.pdf | ||
| 21.zip | ZIP file | |
| WAGE DETERMINATION.txt | TXT text file | |
| 38.pdf | ||
| 78.pdf | ||
| 1.pdf | ||
| 63.pdf | ||
| 28.pdf | ||
| 12.pdf | ||
| 10.pdf | ||
| 37.pdf | ||
| 64.pdf | ||
| 11.pdf | ||
| 73.pdf | ||
| 23.pdf | ||
| 72.pdf | ||
| 47.pdf | ||
| 50.pdf | ||
| 67.pdf | ||
| 41.pdf | ||
| 5.pdf | ||
| 30.pdf | ||
| 68.pdf | ||
| 13.pdf | ||
| 76.pdf |
Show 40 more
Latest 50 of 99 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIVING RM.
BEDROOM 1
BEDROOM 2
EXIST.
DECK
SUN ROOM
MECH.
DINING
NEW
BEDROOM
NEW
BEDROOM
KITCHEN
BATH
LAUNDRY
NEW
DECK
BATH
MUD RM
A .1
.1
D.1
112.2
A.2
111.2
A .1
.1
C .2
.1
C .2
.1
B.1
110.1
HALL
F .1
.1
F.1
106.2
F.1
106.3
F.1
106.4
F.1
106.5
F.1
106.6
F.1
106.7
F .1
.8
F .1
.9
G.1
100.1
LEGEND:
NEW POCKET DOOR
NEW DOOR
EXISTING DOOR
TO REMAIN
NEW WALL OR
NEW BUILT
ELEMENT
EXISTING WALLS OR
BUILT ELEMENT TO
REMAIN
EXISTING WINDOW
TO REMAIN
NEW WINDOW
A
GARAGE
E .1
.1
E .1
.2
A2.1B
N O
R T H
R E S
ID
E N
C E
G A
R A
G E P
L A
N S
1/4" = 1'-0"
A2.1A : A2.1A
NORTH RESIDENCE MAIN FLOOR PLAN
C A
M P C
R O
O K
C U
S T E R N
A T
IO
N A
L F
O R
E S T
C A
M P C
R O
O K
S D
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09051
U S D
A F
O R E S T
S E R
V
IC
E
R E G
IO
N
12.16.09
R
E G I S T E R E D P
RO
F ESS IONA
L A R C H I T E C
T
S O
UTH DA K
O
T A
RE
G . NO .
JAMES R. McDONALD
NORTH
A4.2B
29'-0"
7'-0" 5'-6"
KEYNOTES#
PROVIDE NEW WASHER AND DRYER SUPPLY AND DRAIN LINES. CONTRACTOR SHALL
COORDINATE NEW VENTING AS REQUIRED.
INDICATES NEW FURNACE AND TANKLESS WATER HEATER. CONTRACTOR SHALL
COORDINATE LOCATION OF NEW GAS CONNECTION, COMBUSTION AIR, EXHAUST
AND SUPPLY LINE TO AND FROM NEW EQUIPMENT. CONTRACTOR SHALL RECONNECT
EXISTING TRUNK LINES IN BASEMENT TO MAINTAIN DISTRIBUTION TO EXISTING
MAIN FLOOR. ROUTE NEW DUCT IN ADDITION AS NEEDED. ALL DUCTWORK TO BE
WRAPPED AND INSULATED.
A4.1B
A4.1B
19 NORTH RES. GARAGE PLAN
A2.1D : A2.1D 1/4" = 1'-0"
NORTH
A4.1B
A4.1B
A4.2B
A4.2B
A4.2B
A4.2B
REQUIRED AT EACH RESIDENCE
1. DISCONNECT AND ABANDON THE EXISTING SEWER LINE. LINE SHALL BE TERMINATED & CAPPED BELOW EXISTING SLAB.
CONTRACTOR SHALL RECONNECT ALL LINES BELOW MAIN FLOOR AND EXIT EXISTING HOUSE APPROXIMATELY 4' BELOW
GRADE WITH NEW 4" SANITARY SEWER LINE AS SHOWN ON THE SITE PLAN. MAINTAIN POSITIVE SLOPE TO EXISTING MAIN.
2. CONTRACTOR SHALL MAKE EVERY EFFORT TO MITIGATE STANDING WATER AROUND EXISTING HOUSE. ALL GRADES
AROUND THE EXISTING RESIDENCE SHALL BE BROUGHT TO WITHIN 6" OF NEW SIDING AND SLOPE POSITIVELY AWAY FROM
HOUSE.
3. CONTRACTOR SHALL PROVIDE A NEW RADON MITIGATION SYSTEM IN THE BASEMENT / CRAWLSPACE AS SHOWN IN THE
DETAILS. THE EXISTING BASEMENT WILL BECOME UN-OCCUPIABLE SPACE AND WILL BE BACKFILLED WITH 3/4" PLUS
CRUSHED GRAVEL. CONTRACTOR TO COORDINATE LOCATION OF INLINE FAN & EXHAUST LOCATION.
4. CONTRACTOR SHALL REMOVE EXISTING VERMICULITE INSULATION IN ATTIC SPACE REQUIRED AS PART OF THE
MITIGATION PROCESS. APPROXIMATE AREAS ARE INDICATED ON THE PLANS.
5. CONTRACTOR SHALL PROVIDE NEW 200A SERVICE TO THE EXISTING RESIDENCE. CONTRACTOR SHALL PROVIDE A NEW
MANUAL TRANSFER SWITCH AND ASSOCIATED HARDWARE IN ORDER TO OPERATE AN EMERGENCY GENERATOR IF NEED BE.
COORDINATE LOCATION OF PANEL & TRANSFER SWITCH WITH CONTRACTING OFFICER.
6. CONTRACTOR SHALL MAINTAIN LOCATION & CABLING OF EXISTING SATELLITE DISHES. CONTRACTOR MAY NEED TO
REMOVE & REPLACE EQUIPMENT IN ORDER TO ACCOMMODATE NEW WORK.
7. PROVIDE NEW 90% EFFICIENCY FURNACE W/ PROGRAMMABLE THERMOSTAT SIZED FOR RESIDENCE SHOWN.
CONTRACTOR SHALL COORDINATE LOCATION & RE-USE OF EXISTING DUCTWORK. GENERALLY ALL DUCTWORK WILL BE
LOCATED IN CRAWLSPACE. EXISTING TRUNK LINES CAN BE RE-CONNECTED TO. ALL DUCTWORK WILL THEN BE INSULATED.
8. PROVIDE NEW 'RINNAI' RC80HPi ON DEMAND WATER HEATER. CONTRACTOR SHALL LOCATE AND COORDINATE UTILITIES
ACCORDINGLY.
9. REMODELED RESIDENCES SHALL ALL RECEIVE NEW GUTTERS AND PIPED DRAINAGE SYSTEMS AS SHOWN ON SITE PLAN.
10. CONTRACTOR SHALL ROUTE 4" PERFORATED OR CORRUGATED PIPE APPROXIMATELY 1'-0" FROM THE INSIDE OF THE
EXTERIOR PERIMETER FOUNDATION WALLS. LAY PIPE IN CONTINUOUS LOOP ON SUB GRADE OR EXISTING BASEMENT FLOOR.
LAY GEO-TEXTILE CLOTH OVER PIPE TO PREVENT CLOGGING PERFORATED HOLES. BACKFILL OVER PIPE WITH CLEAN 3 4"
PLUS CLEAN AGGREGATE. CONNECT THE ENDS OF THE LOOP TO OPPOSITE LEGS OF A 4" PVC 'T'. CONNECT 4" PVC
VERTICALLY INTO THE TEE AND ROUTE UP TO ATTIC FOR DISCHARGE. CONTRACTOR SHALL COORDINATE LOCATION OF THE
INLINE FAN.
11. PLUMBING & ELECTRICAL CONTRACTOR SHALL PROVIDE A 'BASE LEVEL' OF PLUMBING AND LIGHTING FIXTURES.
CONTRACTOR SHALL SUBMIT CUT SHEETS TO CONTRACTING OFFICER FOR APPROVAL. ALL FIXTURES SHALL BE STANDARD
RESIDENTIAL GRADE UNLESS REQUIRED TO BE ACCESSIBLE. ALL FIXTURES SHALL MEET ALL MANDATED PLUMBING AND
ELECTRICAL CODES. ALL NEW PLUMBING FIXTURES SHALL EPA 'WATERSENSE' COMPLIANT. ALL NEW LIGHT FIXTURES SHALL
BE INSTALLED WITH NEW COMPACT FLUORESCENT OR LED LIGHTING LAMPS WITH A MINIMUM CORRELATED COLOR
TEMPERATURE OF 2700°K.
12. PROVIDE BLOCKING AT ALL CABINETRY, SHELVING SUPPORTS, TOILET ROOM ACCESSORIES, AND WALL MOUNTED
PLUMBING FIXTURES.
13. PROVIDE NEW R-38 BLOWN-IN FIBERGLASS INSULATION THROUGHOUT GARAGE ATTIC. PROVIDE R-50 BLOWN IN
FIBERGLASS INSULATION THROUGHOUT RESIDENCE.
14. AT NEW PLUMBING, CONTRACTOR SHALL PROVIDE NEW SUPPLY, DRAIN, AND VENT LINES AS NEEDED. COORDINATE ALL
DRAIN & VENT LOCATIONS AND RE-USE ALL EXISTING ROOF PENETRATIONS AS POSSIBLE. CONTRACTOR SHALL INSULATE
ALL PIPING BELOW FLOOR. REMOVE ALL ABANDONED PLUMBING AND CAP ALL UNUSED PLUMBING STUBS BELOW THE FLOOR
LEVEL.
15. WHERE COLOR OR PRODUCT SELECTION IS REQUIRED, CONTRACTOR SHALL SUBMIT CUT SHEETS TO CONTRACTING
OFFICER FOR APPROVAL.
16. PROVIDE SWITCH FOR LIGHTING NEAR ACCESS PANELS TO ATTIC AND CRAWLSPACE LOCATIONS.
GENERAL RESIDENTIAL WORK
NEW 3 4" MDF SHELVES. PROVIDE 5 SHELVES EQUALLY SPACED FROM FLOOR TO
CEILING. (PAINT)
NEW 36" X 36" FIBERGLASS SHOWER INSERT. CONTRACTOR SHALL COORDINATE ALL
SUPPLY AND DRAIN LINES AS REQUIRED. PROVIDE SINGLE THERMO CONTROLS.
PROVIDE NEW TEMPERED GLASS SHOWER DOOR.
NEW PLUMBING FIXTURE. CONTRACTOR SHALL COORDINATE SUPPLY, DRAIN AND
VENTING REQUIREMENTS.
NEW P-LAM COUNTERTOP AND BASE CABINET. CABINET TO BE SELECTED BY
CONTRACTING OFFICER.
NEW FLOORING. REFER TO FINISH FLOOR SCHEDULE SHT. A9.1B FOR MORE INFORMATION.
CONTRACTOR SHALL RE-SECURE AND SET EXISTING DECK TO HOUSE AFTER NEW
SIDING IS INSTALLED. (STAIN)
NEW 2X4 STUDS AT 24" O.C. W/ 12" TYP "X" GYP BD. ON EACH SIDE. PROVIDE SOUND
BATTS FULL HEIGHT.
INFILL EXISTING EXTERIOR WALLS AS NEEDED TO PROVIDE UNIFORM INTERIOR
APPEARANCE. CONTRACTOR SHALL ENSURE UNIFORM AND SMOOTH TRANSITIONS
BETWEEN NEW/EXISTING SURFACES.
PROVIDE NEW DECK AS SHOWN. ALL FRAMING SHALL BE P.T. LUMBER W/ TREX
DECKING AND RAILS. PROVIDE WIND SCREEN AS SHOWN BY SHADED HATCH -
REFER TO STRUCTURAL FOR MORE INFORMATION.
NEW INTERIOR DOOR, FRAME AND HARDWARE. REFER TO DOOR SCHEDULE SHT.
A9.1B FOR MORE INFORMATION.
PROVIDE NEW WIRE SHELVES AND ROD AS SHOWN. (TYPICAL TO NEW BEDROOM
CLOSETS)
NEW VINYL CLAD WINDOWS. REFER TO WINDOW SCHEDULE SHT. A9.1B FOR MORE
INFORMATION.
15 EXISTING O.H. GARAGE DOORS. PROTECT THROUGH CONSTRUCTION.
16 PROVIDE NEW 3 4" MDF SHELF AND ROD. (PAINT)
HATCH INDICATES NEW WOOD FRAMING TO SUPPORT NEW LANDING AT BACK DOOR.
PROVIDE 3 4" O.S.B. SHEATHING AND FLOORING. SEE ROOM FINISH SCHEDULE A9.1B
FOR MORE INFORMATION.
PROVIDE NEW 2X2 UTILITY SINK AS SHOWN. COORDINATE SUPPLY AND DRAIN LINES
AS NEEDED.
NEW 24" X 30" ACCESS HATCH. PROVIDE THUMB PULL HARDWARE AND FLOOR
FINISH AS SPECIFIED IN ROOM FINISH SCHEDULE. COORDINATE W/ STRUCTURAL.
1. EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE DRAWINGS THROUGH EXISTING AS-BUILT DATA
AND FIELD VERIFICATION. CONTRACTOR RESPONSIBLE TO VERIFY EXISTING CONDITIONS BEFORE CONSTRUCTION /
ORDERING / INSTALLATION & NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF ANY DISCREPANCY EXISTS FOR
WRITTEN CLARIFICATION.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. CONTRACTOR IS EXPECTED TO
USE QUALITY, ACCEPTABLE STANDARD CONSTRUCTION PRACTICES & TECHNIQUES.
3. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS & REGULATIONS AS PRESCRIBED BY THE 2009
INTERNATIONAL RESIDENTIAL BUILDING CODE, ALL APPLICABLE PLUMBING CODES, ALL APPLICABLE MECHANICAL CODES, ALL APPLICABLE ELECTRICAL CODES.
4. MECHANICAL / PLUMBING / ELECTRICAL SHALL BE COORDINATED AND INSTALLED BY CONTRACTOR TO BE
CONSISTENT WITH THE INTENT OF THE DRAWINGS AND SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES.
5. CONTRACTOR RESPONSIBLE FOR DOCUMENTATION OF ACCURATE AS-BUILTS INFORMATION / DRAWINGS AT THE
CONCLUSION OF THE PROJECT FOR SUBMITTAL TO THE CONTRACTING OFFICER.
6. CONTRACTOR TO MAINTAIN INTEGRITY OF EXISTING BUILDING / SYSTEMS AT ALL TIMES. NOTIFY CONTRACTING
OFFICER BEFORE COMPROMISING ANY SYSTEM DUE TO THE NEW CONSTRUCTION. SOME DEMOLITION / CONSTRUCTION
MAY BE REQUIRED TO BE PERFORMED AFTER BUSINESS HOURS - COORDINATE W/ CONTRACTING OFFICER.
7. DO NOT SCALE FROM DRAWINGS. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE CONTRACTING
OFFICER IMMEDIATELY FOR WRITTEN CLARIFICATION.
9. CONTRACTOR SHALL RECOGNIZE THE REMODEL ON THESE STRUCTURES MAY BE PHASED IN ORDER TO
ACCOMMODATE EXISTING TENANTS. CONTRACTOR SHALL COORDINATE ALL WORK ACTIVITIES WITH CONTRACTING
OFFICER AND DISTRICT RANGER.
GENERAL PROJECT NOTES
6'-7"
2'-0"
3'-0"
7'-0" 8'-6"
2'-6"29'-0"
5'-0" 4'-11"
4'-6" 9'-0"
6"
3'-012"
2'-10"
4'-2" 6'-212"
3'-012"
24'-4"
5 5
8 8
12 12
14 14
PROVIDE NEW 3 4" MDF COUNTER AND P-LAM UPPER CABINETS. COLOR TO BE
SELECTED BY CONTRACTING OFFICER.
21 PROVIDE NEW 5'-0" LONG PRECAST CONCRETE SPLASH BLOCKING.
22 PROVIDE NEW FLOOR DRAIN. COORDINATE W/ NEW WASTE LINE LOCATION.
A4.2B
10. CONTRACTOR SHALL PROVIDE ALL SHORING AS NEEDED DURING THE CONSTRUCTION PROCESS.
11. CONTRACTOR SHALL BE AWARE THAT LEAD PAINT CONTAINING MATERIALS AND VERMICULITE IS PRESENT IN THE
CONSTRUCTION AREA. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND TAKING THE NECESSARY PRECAUTIONS TO SAFELY
CONDUCT THE WORK INDICATED.
12. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS & LABOR ASSOCIATED WITH COMPLETING THIS PROJECT, UNLESS
OTHERWISE NOTED.
13. CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES.
14. CONTRACTOR TO REFER TO ALL STRUCTURAL NOTES WITHIN DOCUMENTS.
GENERAL PROJECT NOTES CONT.
PROVIDE NEW 42" WIDE MIN. CONCRETE SIDEWALK - REFER TO SITE PLAN FOR MORE
INFO.
CONTRACTOR SHALL PROVIDE NEW COLD ONLY FROST FREE HOSE BIB AT EXTERIOR
OF RESIDENCE - COORDINATE PLUMBING REQUIREMENTS.
24'-0"
PROVIDE NEW 24x30 (MIN.) ATTIC ACCESS PANEL. LOCATE APPROXIMATELY UNDER
RIDGE LINE FOR MAXIMUM HEAD CLEARANCE.
A4.2B
CONTRACTOR SHALL PROVIDE NEW 5 8" TYP. "X" WATER RESISTANT GYP. BD AT
BATHROOM AND CEMENTATIOUS BACKER BOARD AT NEW. TUB LOCATION.
| A2.1B.dwg |
| A2.1B |
File details come from the government source that posted it. Updated .