67.pdf
PDF 1 MB Posted
- Solicitation number
- AG-82B1-S-10-0081
About this file
drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Camp Crook abstract.xlsx | XLSX spreadsheet | |
| Signed PREAWARD Intent to Award.pdf | ||
| SF 30 AMEND 7.PDF | ||
| C 1.2A.pdf | ||
| 4-plex basement plumbing.pdf | ||
| C 1.1A.pdf | ||
| Camp Crook pre bid and QA.2.docx | DOCX document | |
| C 9.1A.pdf | ||
| Buffalo dump 2.pdf | ||
| Buffalo Dump 1.pdf | ||
| SF 30 AMEND 6.PDF | ||
| Amend 5 SF 30.pdf | ||
| SF 30. Amendment 04.pdf | ||
| AMEND 3.PDF | ||
| SF 30 AMEND 1.PDF | ||
| SF 30 AMEND 2.PDF | ||
| 20.pdf | ||
| 69.pdf | ||
| 66.pdf | ||
| 36.pdf | ||
| 17.pdf | ||
| 4.pdf | ||
| 6.pdf | ||
| 51.pdf | ||
| SF 1442.pdf | ||
| 14.pdf | ||
| 21.zip | ZIP file | |
| WAGE DETERMINATION.txt | TXT text file | |
| 38.pdf | ||
| 78.pdf | ||
| 1.pdf | ||
| 63.pdf | ||
| 28.pdf | ||
| 12.pdf | ||
| 10.pdf | ||
| 37.pdf | ||
| 64.pdf | ||
| 11.pdf | ||
| 73.pdf | ||
| 23.pdf | ||
| 72.pdf | ||
| 47.pdf | ||
| 50.pdf | ||
| 41.pdf | ||
| 5.pdf | ||
| 30.pdf | ||
| 68.pdf | ||
| 13.pdf | ||
| 76.pdf | ||
| 54.pdf |
Show 40 more
Latest 50 of 99 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASEMENT
CRAWL SPACE
CRAWL SPACE
KITCHEN
DINING RM.
BEDROOM 1
LIVING RM.
BEDROOM 2
BATH
HALL
EXISTING DOOR
TO REMAIN
EXISTING WINDOW
& CASING TO BE
REMOVED.
PROTECT ADJACENT
FINISHES
EXISTING DOOR,
FRAME, AND
HARDWARE TO BE
REMOVED. PROTECT
ADJACENT FINISHES
DEMO WALLS OR
DEMO BUILT
ELEMENT
EXISTING WALLS OR
BUILT ELEMENT TO
REMAIN
EXISTING WINDOW
TO REMAIN
EXISTING WINDOW
& CASING TO BE
REMOVED.
PROTECT ADJACENT
FINISHES
D2.1D
S O
U T H
R E S
ID
E N
C E D
E M
O B
A S E M
E N
T
M A
IN
F
L O
O R P
L A
N S
1/4" = 1'-0"D2.1D : D2.1D
11 SOUTH RESIDENCE DEMO BASEMENT/ FOUNDATION PLAN
C A
M P C
R O
O K
C U
S T E R N
A T
IO
N A
L F
O R
E S T
C A
M P C
R O
O K
S D
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09051
U S D
A F
O R E S T
S E R
V
IC
E
R E G
IO
N
12.16.09
R
E G I S T E R E D P
RO
F ESS IONA
L A R C H I T E C
T
S O
UTH DA K
O
T A
RE
G . NO .
JAMES R. McDONALD
NORTH
1/4" = 1'-0"D2.1D : D2.1D
13 SOUTH RESIDENCE DEMO MAIN FLOOR PLAN NORTH
DEMOLITION LEGEND
GENERAL DEMOLITION NOTES
1. ALL FLOOR, WALL, AND CEILING SURFACES TO BE THOROUGHLY CLEANED FOLLOWING DEMOLITION WORK TO REMOVE DIRT AND DUST AND PREPARE SURFACES FOR NEW FINISHES.
2. REMOVE ALL MISCELLANEOUS FASTENERS/NAILERS OR MATERIAL WITH NO PURPOSE. CAREFULLY REMOVE SUCH ITEMS IN ORDER TO MINIMIZE DAMAGE TO EXISTING MATERIALS. PATCH HOLES AS REQUIRED
FOLLOWING REMOVAL TO ASSURE A UNIFORM APPEARANCE.
3. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE CONTRACT DOCUMENTS. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF ANY
QUESTIONABLE CONDITIONS.
4. THOROUGHLY CLEAN ALL MISCELLANEOUS SCRATCHES, GOUGES, OR MARS ON WALLS, CEILINGS, TRIM, FRAMES, AND CASING NOT SPECIFICALLY CALLED OUT IN KEY NOTES, TYPICALLY. PREPARE AND FINISH
ELEMENTS AS REQUIRED TO ACHIEVE A UNIFORM APPEARANCE.
5. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS AND/OR STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITION WORK.
6. PREP & PATCH ALL HOLES IN EXISTING CEILING OR WALL FINISHES TO REMAIN FROM ALL ELECTRICAL / MECHANICAL ELEMENTS TO BE REMOVED OR RELOCATED, TYPICALLY.
7. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN KIND EXISTING FOLLOWING
INTEGRATION.
8. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BETWEEN EXISTING
CONDITIONS AND THE CONTRACT DOCUMENTS PRIOR TO COMMENCING WORK.
9. CONTRACTOR SHALL BE AWARE THAT LEAD PAINT CONTAINING MATERIALS AND VERMICULITE IS PRESENT IN THE CONSTRUCTION AREA. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND TAKING THE
NECESSARY PRECAUTIONS TO SAFELY CONDUCT THE WORK INDICATED.
DEMOLITION KEYNOTES#
CONTRACTOR SHALL DEMOLISH ALL INTERIOR PARTITION WALLS OR WALL PANELING AS SHOWN.
CONTRACTOR SHALL ENSURE THAT ALL POSTS/BEAMS THAT ARE BEARING SHALL REMAIN.
DEMOLISH ALL EXISTING LAUNDRY UTILITY SERVICES. CAP AND TERMINATE AS NEEDED.
DEMOLISH ALL EXISTING WALLS AND CLOSET ACCESSORIES AS REQUIRED.
DIAGONAL HATCH INDICATES APPROXIMATE AREAS OF VERMICULITE CEILING INSULATION.
CONTRACTOR SHALL BE AWARE THAT THIS MATERIAL IS HAZARDOUS AND THE APPROPRIATE
ABETMENT PROCEDURES NECESSARY.
CONTRACTOR SHALL DEMOLISH EXISTING WOOD STAIR TREADS AS NECESSARY TO ACCOMMODATE
NEW DOOR ELEVATION.
CONTRACTOR SHALL DEMOLISH EXISTING WINDOW. CONTRACTOR SHALL REMOVE INTERIOR
CASING/ TRIM AS NECESSARY. PROTECT ADJACENT FINISHES.
CONTRACTOR SHALL DEMOLISH EXTERIOR WALL AS NEEDED TO ACCOMMODATE NEW WORK.
PROVIDE SHORING AS NEEDED. OLD WINDOW LOCATIONS SHALL BE INFILL FRAMED AS REQUIRED.
CONTRACTOR SHALL DEMO ALL EXISTING METAL SOFFIT, FASCIA AND KNEE BRACES. CONTRACTOR
TO DEMO EXISTING RAIN GUTTERS.
CONTRACTOR SHALL DEMOLISH AND INFILL EXISTING GABLE VENTS. CONTRACTOR SHALL DEMO
EXISTING WALL TO ACCOMMODATE NEW VENT LOCATIONS.
CONTRACTOR SHALL REMOVE EXISTING FINISH FLOORING AND ANY ROTTED SUB-FLOORING.
PREPARE FOR NEW FINISHES. SEE: ROOM FINISH SCHEDULE FOR MORE INFORMATION.
CONTRACTOR SHALL DEMO EXISTING BASE BOARD THROUGHOUT ROOM. PROTECT ADJACENT
SURFACES AS NEEDED.
CONTRACTOR SHALL DEMOLISH EXISTING DOOR. CONTRACTOR SHALL REMOVE INTERIOR CASING/
TRIM AS NECESSARY. CONTRACTOR SHALL CUT DOOR HEADER TO ACCOMMODATE NEW DOOR ELEV.
AS REQUIRED. PROTECT ADJACENT FINISHES WHERE NECESSARY.
CONTRACTOR SHALL REMOVE EXISTING CASING FROM DOOR. PREPARE AREA FOR NEW CASING.
CONTRACTOR SHALL REMOVE ALL PIPING, WIRING AND MISC. ELECTRIC ASSSOCAIAT5E WITH
COMPLETE BASEMENT DEMOLITION. TERMINATE ALL PLUMBING AS NEEDED AND REMOVE ALL
BASEMENT WIRING BACK TO PANEL.
CONTRACTOR SHALL REMOVE ALL ASSOCIATED DUCTWORK SERVING OLD BASEMENT. SALVAGE
EXISTING SUPPLY TRUNKS, COORDINATE W/ NEW FURNACE LOCATION.
11 11
CONTRACTOR SHALL DEMOLISH EXISTING GYP BD. AND CEMENT BACKER BD. WALLS AND CEILING
BATHROOM FINISH IN ITS ENTIRETY TO MITIGATE MOLD ISSUE.
CONTRACTOR SHALL REMOVE AND DEMOLISH EXISTING STEEL SIDING. CONTRACTOR SHALL USE CARE
DURING REMOVAL TO AVOID DAMAGE TO EXISTING RIGID INSULATION, WINDOWS AND TRIM WORK.
CONTRACTOR SHALL DEMOLISH EXISTING 2 X 6 WALL ASSEMBLY IN ITS ENTIRETY TO ACCOMMODATE
NEW WORK.
9 CONTRACTOR SHALL SALVAGE AND PROTECT EXISTING FLOOR SHEATHING.
DEMOLISH EXISTING ROOF AND OVERFRAMING FROM ORIGINAL ADDITION.
D2.1D : D2.1D
N.T.S.
17 18 19 20EXIST. NORTH ELEV.
D2.1D : D2.1D N.T.S.
EXIST. EAST ELEV.
16:D2.1D
:D .1
D
D2.1D : D2.1D N.T.S.
EXIST. SOUTHEAST ELEV.
18:D 2.1
D
D2.1D : D2.1D N.T.S.
EXIST. SOUTH ELEV.
19:D1.1D
D2.1D : D2.1D N.T.S.
EXIST. NORTHWEST ELEV.
20:D 2.1D
1. EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE DRAWINGS THROUGH EXISTING AS-BUILT DATA AND FIELD VERIFICATION. CONTRACTOR RESPONSIBLE TO VERIFY EXISTING CONDITIONS BEFORE CONSTRUCTION / ORDERING / INSTALLATION & NOTIFY THE
CONTRACTING OFFICER IMMEDIATELY IF ANY DISCREPANCY EXISTS FOR WRITTEN CLARIFICATION.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. CONTRACTOR IS EXPECTED TO USE QUALITY, ACCEPTABLE STANDARD CONSTRUCTION PRACTICES & TECHNIQUES.
3. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS & REGULATIONS AS PRESCRIBED BY THE 2009 INTERNATIONAL RESIDENTIAL BUILDING CODE, ALL APPLICABLE PLUMBING CODES, ALL APPLICABLE MECHANICAL CODES, ALL APPLICABLE ELECTRICAL CODES.
4. MECHANICAL / PLUMBING / ELECTRICAL SHALL BE COORDINATED AND INSTALLED BY CONTRACTOR TO BE CONSISTENT WITH THE INTENT OF THE DRAWINGS AND SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES.
5. CONTRACTOR RESPONSIBLE FOR DOCUMENTATION OF ACCURATE AS-BUILTS INFORMATION / DRAWINGS AT THE CONCLUSION OF THE PROJECT FOR SUBMITTAL TO THE CONTRACTING OFFICER.
6. CONTRACTOR TO MAINTAIN INTEGRITY OF EXISTING BUILDING / SYSTEMS AT ALL TIMES. NOTIFY CONTRACTING OFFICER BEFORE COMPROMISING ANY SYSTEM DUE TO THE NEW CONSTRUCTION. SOME DEMOLITION / CONSTRUCTION MAY BE REQUIRED TO BE PERFORMED AFTER
BUSINESS HOURS - COORDINATE W/ CONTRACTING OFFICER.
7. DO NOT SCALE FROM DRAWINGS. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE CONTRACTING OFFICER IMMEDIATELY FOR WRITTEN CLARIFICATION.
8. CONTRACTOR SHALL RECOGNIZE THE REMODEL ON THESE STRUCTURES MAY BE PHASED IN ORDER TO ACCOMMODATE EXISTING TENANTS. CONTRACTOR SHALL COORDINATE ALL WORK ACTIVITIES WITH CONTRACTING OFFICER AND DISTRICT RANGER.
9. CONTRACTOR SHALL PROVIDE ALL SHORING AS NEEDED DURING THE CONSTRUCTION PROCESS.
10. CONTRACTOR SHALL BE AWARE THAT LEAD PAINT CONTAINING MATERIALS AND VERMICULITE IS PRESENT IN THE CONSTRUCTION AREA. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND TAKING THE NECESSARY PRECAUTIONS TO SAFELY CONDUCT THE WORK INDICATED.
11. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS & LABOR ASSOCIATED WITH COMPLETING THIS PROJECT, UNLESS OTHERWISE NOTED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES.
13. CONTRACTOR TO REFER TO ALL STRUCTURAL NOTES WITHIN DOCUMENTS.
GENERAL PROJECT NOTES
CONTRACTOR SHALL DEMO EXISTING PLUMBING FIXTURE IN ITS ENTIRETY. CONTRACTOR SHALL
ATTEMPT TO MAINTAIN AND REUSE EXIST. PLUMBING LINES AND VENT LOCATIONS.
CONTRACTOR SHALL REMOVE ALL PLUMBING (WATER/SEWER) IN BASEMENT AND CRAWL SPACES
SHOULD BE REMOVED AND REPLACED. RAW WATER TO WATER CLOSETS AND ANY OTHER EXT. HOSE
BIBS - TREATED WATER IN ALL OTHER LOCATIONS.
| D2.1D.dwg |
| D2.1D |
File details come from the government source that posted it. Updated .