47.pdf
PDF 145 KB Posted
- Solicitation number
- AG-82B1-S-10-0081
About this file
drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Camp Crook abstract.xlsx | XLSX spreadsheet | |
| Signed PREAWARD Intent to Award.pdf | ||
| SF 30 AMEND 7.PDF | ||
| C 1.2A.pdf | ||
| 4-plex basement plumbing.pdf | ||
| C 1.1A.pdf | ||
| Camp Crook pre bid and QA.2.docx | DOCX document | |
| C 9.1A.pdf | ||
| Buffalo dump 2.pdf | ||
| Buffalo Dump 1.pdf | ||
| SF 30 AMEND 6.PDF | ||
| Amend 5 SF 30.pdf | ||
| SF 30. Amendment 04.pdf | ||
| AMEND 3.PDF | ||
| SF 30 AMEND 1.PDF | ||
| SF 30 AMEND 2.PDF | ||
| 20.pdf | ||
| 69.pdf | ||
| 66.pdf | ||
| 36.pdf | ||
| 17.pdf | ||
| 4.pdf | ||
| 6.pdf | ||
| 51.pdf | ||
| SF 1442.pdf | ||
| 14.pdf | ||
| 21.zip | ZIP file | |
| WAGE DETERMINATION.txt | TXT text file | |
| 38.pdf | ||
| 78.pdf | ||
| 1.pdf | ||
| 63.pdf | ||
| 28.pdf | ||
| 12.pdf | ||
| 10.pdf | ||
| 37.pdf | ||
| 64.pdf | ||
| 11.pdf | ||
| 73.pdf | ||
| 23.pdf | ||
| 72.pdf | ||
| 50.pdf | ||
| 67.pdf | ||
| 41.pdf | ||
| 5.pdf | ||
| 30.pdf | ||
| 68.pdf | ||
| 13.pdf | ||
| 76.pdf | ||
| 54.pdf |
Show 40 more
Latest 50 of 99 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIVING RM.
BEDROOM 1
BEDROOM 2
EXIST.
DECK
SUN ROOM
DINING
KITCHEN
MUD RM
BASEMENT
CRAWL SPACE
CRAWL SPACE
EXISTING DOOR
TO REMAIN
EXISTING WINDOW
& CASING TO BE
REMOVED.
PROTECT ADJACENT
FINISHES
EXISTING DOOR,
FRAME, AND
HARDWARE TO BE
REMOVED. PROTECT
ADJACENT FINISHES
GARAGE
DEMO WALLS OR
DEMO BUILT
ELEMENT
EXISTING WALLS OR
BUILT ELEMENT TO
REMAIN
EXISTING WINDOW
TO REMAIN
D2.1B
N O
R T H
R E S
ID
E N
C E D
E M
O B
A S E M
E N
T
M A
IN
F
L O
O R
G
A R
A G
E P
L A
N S
1/4" = 1'-0"
D2.1B : D2.1B
NORTH RESIDENCE MAIN FLOOR DEMO PLAN18
C A
M P C
R O
O K
C U
S T E R N
A T
IO
N A
L F
O R
E S T
C A
M P C
R O
O K
S D
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09051
U S D
A F
O R E S T
S E R
V
IC
E
R E G
IO
N
12.16.09
R
E G I S T E R E D P
RO
F ESS IONA
L A R C H I T E C
T
S O
UTH DA K
O
T A
RE
G . NO .
JAMES R. McDONALD
NORTH
1/4" = 1'-0"D2.1B : D2.1B
NORTH RESIDENCE BASEMENT/FOUNDATION DEMO PLAN NORTH
DEMOLITION KEYNOTES#
1/4" = 1'-0"D2.1B : D2.1B
NORTH RESIDENCE GARAGE DEMO PLAN
GENERAL DEMOLITION NOTES
1. ALL FLOOR, WALL, AND CEILING SURFACES TO BE THOROUGHLY CLEANED FOLLOWING DEMOLITION WORK TO REMOVE
DIRT AND DUST AND PREPARE SURFACES FOR NEW FINISHES.
2. REMOVE ALL MISCELLANEOUS FASTENERS/NAILERS OR MATERIAL WITH NO PURPOSE. CAREFULLY REMOVE SUCH ITEMS IN
ORDER TO MINIMIZE DAMAGE TO EXISTING MATERIALS. PATCH HOLES AS REQUIRED FOLLOWING REMOVAL TO ASSURE A
UNIFORM APPEARANCE.
3. CONTRACTOR SHALL COORDINATE DEMOLITION WITH FIELD CONDITIONS AND EXTENTS OF NEW WORK SHOWN IN THESE
CONTRACT DOCUMENTS. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF ANY QUESTIONABLE CONDITIONS.
4. THOROUGHLY CLEAN ALL MISCELLANEOUS SCRATCHES, GOUGES, OR MARS ON WALLS, CEILINGS, TRIM, FRAMES, AND
CASING NOT SPECIFICALLY CALLED OUT IN KEY NOTES, TYPICALLY. PREPARE AND FINISH ELEMENTS AS REQUIRED TO
ACHIEVE A UNIFORM APPEARANCE.
5. CONTRACTOR SHALL CONDUCT ALL NECESSARY EXPLORATORY ACTIVITIES TO LOCATE AND PROTECT EXISTING SYSTEMS
AND/OR STRUCTURES TO REMAIN PRIOR TO THE START OF DEMOLITION WORK.
6. PREP & PATCH ALL HOLES IN EXISTING CEILING OR WALL FINISHES TO REMAIN FROM ALL ELECTRICAL / MECHANICAL
ELEMENTS TO BE REMOVED OR RELOCATED, TYPICALLY.
7. COORDINATE MISCELLANEOUS DEMOLITION / REMOVAL OF FINISHES TO REMAIN TO ACCOMMODATE NEW SYSTEMS
INSTALLATION. PATCH AND REPAIR FINISH TO MATCH IN KIND EXISTING FOLLOWING INTEGRATION.
8. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS
AND SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE CONTRACT
DOCUMENTS PRIOR TO COMMENCING WORK.
9. CONTRACTOR SHALL BE AWARE THAT LEAD PAINT CONTAINING MATERIALS AND VERMICULITE IS PRESENT IN THE
CONSTRUCTION AREA. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND TAKING THE NECESSARY PRECAUTIONS TO
SAFELY CONDUCT THE WORK INDICATED.
CONTRACTOR SHALL DEMOLISH ALL INTERIOR PARTITION WALLS OR WALL PANELING AS SHOWN. CONTRACTOR
SHALL ENSURE THAT ALL POSTS/BEAMS THAT ARE BEARING SHALL REMAIN.
CONTRACTOR SHALL DEMO EXIST. PLUMBING FIXTURE IN ITS ENTIRETY. TERMINATE ALL SUPPLY LINES AT
MAIN FLOOR AND CAP AS NEEDED. SAW CUT, DEMOLISH AND CAP ALL DRAIN LINES OR SANITARY SEWER LINES
IN BASEMENT SLAB. CAP AS NEEDED.
DEMOLISH ALL EXISTING LAUNDRY UTILITY SERVICES. CAP AND TERMINATE AS NEEDED.
DEMOLISH ALL EXISTING WALLS AND CLOSET ACCESSORIES AS REQUIRED.
CONTRACTOR SHALL SALVAGE EXISTING STOVE TO CONTRACTING OFFICER. COORDINATE
LOCATION FOR STORAGE. DEMO ALL ASSOCIATED PIPING AND EXHAUST.
CONTRACTOR SHALL REMOVE AND DEMOLISH EXISTING STEEL SIDING. CONTRACTOR SHALL USE CARE DURING
REMOVAL TO AVOID DAMAGE TO EXISTING RIGID INSULATION, WINDOWS AND TRIM WORK.
DIAGONAL HATCH INDICATES APPROXIMATE AREAS OF VERMICULITE CEILING INSULATION. CONTRACTOR
SHALL BE AWARE THAT THIS MATERIAL IS HAZARDOUS AND THE APPROPRIATE ABETMENT PROCEDURES
NECESSARY.
CONTRACTOR SHALL DEMOLISH EXISTING WOOD STAIR TREADS AS NECESSARY TO ACCOMMODATE NEW DOOR
ELEVATION.
CONTRACTOR SHALL DEMOLISH EXISTING CORRUGATED METAL WINDOW WELL AND OR
WINDOW. PREPARE OPENINGS TO BE BACKFILLED.
CONTRACTOR SHALL DEMOLISH EXISTING WINDOW. CONTRACTOR SHALL REMOVE INTERIOR CASING/ TRIM AS
NECESSARY. PROTECT ADJACENT FINISHES.
CONTRACTOR SHALL DEMOLISH EXTERIOR WALL AS NEEDED TO ACCOMMODATE NEW WORK. PROVIDE
SHORING AS NEEDED. OLD WINDOW LOCATIONS SHALL BE INFILL FRAMED AS REQUIRED.
CONTRACTOR SHALL DEMO ALL EXISTING METAL SOFFIT, FASCIA AND KNEE BRACES. CONTRACTOR TO DEMO
EXISTING RAIN GUTTERS.
CONTRACTOR SHALL DEMOLISH AND INFILL EXISTING GABLE VENTS. CONTRACTOR SHALL DEMO EXISTING
WALL TO ACCOMMODATE NEW VENT LOCATIONS.
CONTRACTOR SHALL SALVAGE EXISTING DECK. DECK TO BE DETACHED FROM HOUSE IN ORDER TO
ACCOMMODATE INSTALLATION OF NEW SIDING.
CONTRACTOR SHALL DEMO EXISTING PLUMBING FIXTURE IN ITS ENTIRETY. TERMINATE AND CAP ALL
PLUMBING AS REQUIRED. CONTRACTOR SHALL ATTEMPT TO MAINTAIN AND REUSE OLD VENT LOCATIONS.
CONTRACTOR SHALL REMOVE EXISTING FLOORING. PREPARE FOR NEW FINISHES. SEE: ROOM FINISH
SCHEDULE FOR MORE INFORMATION.
CONTRACTOR SHALL DEMO EXISTING BASE BOARD THROUGHOUT ROOM. PROTECT ADJACENT SURFACES AS
NEEDED.
1. EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE DRAWINGS THROUGH EXISTING AS-BUILT DATA AND
FIELD VERIFICATION. CONTRACTOR RESPONSIBLE TO VERIFY EXISTING CONDITIONS BEFORE CONSTRUCTION / ORDERING /
INSTALLATION & NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF ANY DISCREPANCY EXISTS FOR WRITTEN
CLARIFICATION.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. CONTRACTOR IS EXPECTED TO USE
QUALITY, ACCEPTABLE STANDARD CONSTRUCTION PRACTICES & TECHNIQUES.
3. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS & REGULATIONS AS PRESCRIBED BY THE 2009
INTERNATIONAL RESIDENTIAL BUILDING CODE, ALL APPLICABLE PLUMBING CODES, ALL APPLICABLE MECHANICAL CODES, ALL
APPLICABLE ELECTRICAL CODES.
4. MECHANICAL / PLUMBING / ELECTRICAL SHALL BE COORDINATED AND INSTALLED BY CONTRACTOR TO BE CONSISTENT
WITH THE INTENT OF THE DRAWINGS AND SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES.
5. CONTRACTOR RESPONSIBLE FOR DOCUMENTATION OF ACCURATE AS-BUILTS INFORMATION / DRAWINGS AT THE
CONCLUSION OF THE PROJECT FOR SUBMITTAL TO THE CONTRACTING OFFICER.
6. CONTRACTOR TO MAINTAIN INTEGRITY OF EXISTING BUILDING / SYSTEMS AT ALL TIMES. NOTIFY CONTRACTING OFFICER
BEFORE COMPROMISING ANY SYSTEM DUE TO THE NEW CONSTRUCTION. SOME DEMOLITION / CONSTRUCTION MAY BE
REQUIRED TO BE PERFORMED AFTER BUSINESS HOURS - COORDINATE W/ CONTRACTING OFFICER.
7. DO NOT SCALE FROM DRAWINGS. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE CONTRACTING OFFICER
IMMEDIATELY FOR WRITTEN CLARIFICATION.
8. CONTRACTOR SHALL RECOGNIZE THE REMODEL ON THESE STRUCTURES MAY BE PHASED IN ORDER TO ACCOMMODATE
EXISTING TENANTS. CONTRACTOR SHALL COORDINATE ALL WORK ACTIVITIES WITH CONTRACTING OFFICER AND DISTRICT
RANGER.
9. CONTRACTOR SHALL PROVIDE ALL SHORING AS NEEDED DURING THE CONSTRUCTION PROCESS.
10. CONTRACTOR SHALL BE AWARE THAT LEAD PAINT CONTAINING MATERIALS AND VERMICULITE IS PRESENT IN THE
CONSTRUCTION AREA. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND TAKING THE NECESSARY PRECAUTIONS TO
SAFELY CONDUCT THE WORK INDICATED.
11. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS & LABOR ASSOCIATED WITH COMPLETING THIS PROJECT, UNLESS
OTHERWISE NOTED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES.
13. CONTRACTOR TO REFER TO ALL STRUCTURAL NOTES WITHIN DOCUMENTS.
GENERAL PROJECT NOTESDEMOLITION LEGEND
GARAGE DEMOLITION KEYNOTES#
CONTRACTOR SHALL SALVAGE/ PROTECT EXISTING O.H. GARAGE DOORS AND HARDWARE.
CONTRACTOR SHALL REMOVE EXISTING STEEL SIDING, EXISTING KNEE BRACES, FASCIA AND DOWNSPOUTS.
CONTRACTOR SHALL DEMOLISH EXISTING WINDOWS IN THEIR ENTIRETY.
CONTRACTOR SHALL REMOVE EXISTING MAN DOOR IN ITS ENTIRETY. PREPARE R.O. FOR NEW
DOOR.
15 15
12 12
CONTRACTOR SHALL DEMOLISH EXISTING DOOR. CONTRACTOR SHALL REMOVE INTERIOR CASING/ TRIM AS
NECESSARY. PROTECT ADJACENT FINISHES WHERE NECESSARY.
CONTRACTOR SHALL REMOVE EXISTING CASING FROM DOOR. PREPARE AREA FOR NEW CASING.
CONTRACTOR SHALL REMOVE ALL PIPING, WIRING AND MISC. ELECTRIC ASSSOCAIAT5E WITH
COMPLETE BASEMENT DEMOLITION. TERMINATE ALL PLUMBING AS NEEDED AND REMOVE ALL
BASEMENT WIRING BACK TO PANEL.
CONTRACTOR SHALL REMOVE ALL ASSOCIATED DUCTWORK SERVING OLD BASEMENT. SALVAGE EXISTING
SUPPLY TRUNKS, COORDINATE W/ NEW FURNACE LOCATION.
16:A2.0B
19:A2.0B
CONTRACTOR SHALL DEMOLISH CHIMNEY, FLUE ALL ASSOCIATED COMPONENTS. SALVAGE EXISTING SUPPLY
TRUNKS AND CAP ANY EXISTING GAS LINES.
22 22
17:A2.0B
:A .0
B
:A .0
B
10 10 10
CONTRACTOR SHALL VERIFY LOCATION AND REMOVE EXISTING FURNACE, HWT. HEATER AND ALL ASSOCIATED
COMPONENTS IN THEIR ENTIRETY - CAP ANY EXISTING GAS LINES.
CONTRACTOR SHALL VERIFY LOCATION EXISTING SUMP PUMP AND DRAIN ALONG SOUTH WALL AND INSURE ITS
OPERATION AND PROTECTION DURING DEMOLITION WORK.
CONTRACTOR SHALL REMOVE ALL PLUMBING (WATER/SEWER) IN BASEMENT AND CRAWL SPACES SHOULD BE
REMOVED AND REPLACED. RAW WATER TO WATER CLOSETS AND ANY OTHER EXT. HOSE BIBS - TREATED
WATER IN ALL OTHER LOCATIONS.
| D2.1B.dwg |
| D2.1B |
File details come from the government source that posted it. Updated .