About this file

drawing

View the file

Other files

File Type Posted
Camp Crook abstract.xlsx XLSX spreadsheet
Signed PREAWARD Intent to Award.pdf PDF
SF 30 AMEND 7.PDF PDF
C 1.2A.pdf PDF
4-plex basement plumbing.pdf PDF
C 1.1A.pdf PDF
Camp Crook pre bid and QA.2.docx DOCX document
C 9.1A.pdf PDF
Buffalo dump 2.pdf PDF
Buffalo Dump 1.pdf PDF
SF 30 AMEND 6.PDF PDF
Amend 5 SF 30.pdf PDF
SF 30. Amendment 04.pdf PDF
AMEND 3.PDF PDF
SF 30 AMEND 1.PDF PDF
SF 30 AMEND 2.PDF PDF
69.pdf PDF
66.pdf PDF
36.pdf PDF
17.pdf PDF
4.pdf PDF
6.pdf PDF
51.pdf PDF
SF 1442.pdf PDF
14.pdf PDF
21.zip ZIP file
WAGE DETERMINATION.txt TXT text file
38.pdf PDF
78.pdf PDF
1.pdf PDF
63.pdf PDF
28.pdf PDF
12.pdf PDF
10.pdf PDF
37.pdf PDF
64.pdf PDF
11.pdf PDF
73.pdf PDF
23.pdf PDF
72.pdf PDF
47.pdf PDF
50.pdf PDF
67.pdf PDF
41.pdf PDF
5.pdf PDF
30.pdf PDF
68.pdf PDF
13.pdf PDF
76.pdf PDF
54.pdf PDF
Show 40 more

Latest 50 of 99 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

53 4 542

3 5 2 5

3/16"=1'-0"

BUILDING SECTION1

A2.1A : A5.1A

B U

IL

D

IN

G

S E C

T

IO

N S

W A

L L S

E C

T

IO

N S

C A

M P C

R O

O K

C U

S T E R N

A T

IO

N A

L F

O R

E S T

C A

M P C

R O

O K

S D

2 2 2 N O R T H H I G G I N S

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PH 4 0 6 . 7 2 1 . 5 6 4 3

M I S S O U L A, M T 59802 www.aearchitects.com

B I L L I N G S, M T 59101

FAX 4 0 6 . 2 4 8 . 2 4 2 7

PH 4 0 6 . 2 4 8 . 2 6 3 3

6 0 8 N O R T H 2 9 T H

A R C H I T E C T U R E

O W N E R

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

ISSUE DATE

REVISIONS

P R O J E C T

D R A W

IN

G

PROJECT No 09051

U S D

A F

O R E S T

S E R

V

IC

E

R E G

IO

N

12.16.09

3/16"=1'-0"

BUILDING SECTION4

A2.1A : A5.1A

A5.1A 1/2"=1'-0"

WALL SECTION16

A5.1A : A5.1A 1/2"=1'-0"

WALL SECTION17

A5.1A : A5.1A 1/2"=1'-0"

WALL SECTION18

A5.1A : A5.1A 1/2"=1'-0"

WALL SECTION19

A5.1A : A5.1A 1/2"=1'-0"

WALL SECTION20

A5.1A : A5.1A

18 19

2'-10"

METAL PANEL 1 WALL

- METAL PANEL 1

- 2" THERMAX EXTERIOR

THERMAL SHEATHING

- 716" OSB SHEATHING

- 6", 18 GA. STEEL STUDS

@ 16" O.C.

- 6" BATT INSULATION

- 6 MIL VAPOR BARRIER

- 58" GYP. BD.

- SCHEDULED FINISH

METAL SOFFIT

PANEL

GRADE

COMPACTED

BACKFILL

312"

METAL PANEL ROOF

- METAL ROOF PANEL

- SELF ADHERED SHEET MEMBRANE

- 12" DENSDECK(PRIMED) FULLY ADHERED

- 112" STEEL DECK

- 10" STEEL PURLINS @ 5'-0" O.C.

- FULL THICKNESS INSULATION (RHINO

PRO VALUE SYSTEM R-50)

- VAPOR BARRIER FABRIC

- STEEL RETAINER STRAPS

- STEEL BUILDING FRAME

FACE OF FOUNDATION

CENTER OF COLUMN

SLAB ON GRADE FLOOR

- SCHEDULED FINISH

- 5" CONCRETE SLAB REINFORCED

W/ #4 @ 16" O.C.E.W.

- 15 MIL VAPOR BARRIER (POLY-OLEFIN)

- 4", 34" MINUS ROAD MIX

- 4' ENGINEERED BACKFILL, SEE SOILS

REPORT

- 3' ENGINEERED MATT, SEE

SOILS REPORT

SCHEDULED BASE

T.O.SLAB

0'-0"

2" RIGID INSULATION BOARD

(BLUE BOARD)

FOUNDATION, SEE STRUCTURAL

T.O.STEEL @ GRID LINE

10'-10"

T.O.STEEL

9'-2"

4'-0"

12" STEEL CHANNEL

(PAINT EXPOSED FACE)

12", 18 GA. STEEL

STUDS @ 16" O.C.

STEEL BUILDING FRAME

(BEYOND)

8" GYP. BD. T&B

W/ "J" MOULDING

METAL PANEL ROOF

- SEE 16/A5.1A

- SCHEDULED CEILING

STEEL BUILDING FRAME

(BEYOND)

SCHEDULED CEILING

SIM.

612"

FACE OF FOUNDATION

CENTERLINE OF COLUMN

METAL PANEL 1 WALL

- SEE 16/A5.1A, SIM.

- 10", 18 GA. STEEL STUDS

@ 16" O.C.

T.O.STEEL @ GRID LINE

17'-3"

ARCHITECTURAL PRECAST

CAP

1'-2"

GRADE

SIM. STONE WALL

- SIM. STONE VENEER

- SCRATCH COAT

- GALV. METAL LATH

- (1) LAYER #15 "D" FELT

- 716" OSB SHEATHING

- 358" STEEL STUD FRAME

@ 16" O.C.

- SEE 16/A5.1A FOR WALL CONST.

METAL SOFFIT

PANEL

COMPACTED FILL

1'-6"

STOREFRONT

- 412" CLEAR ANODIZED

ALUMINUM THERMALLY

BROKE SECTION

- ARGON FILLED 1" INSULATED

GLAZING SYSTEM

ARCHITECTURAL PRECAST HEAD

SIM. STONE WALL

- SEE 17/A5.1A

T.O.CAP

9'-2"

METAL PANEL 2 WALL

- METAL PANEL 2

- 2" THERMAX EXTERIOR THERMAL SHEATHING

- 716" OSB SHEATHING

- 6", 18 GA. STEEL STUDS @ 16" O.C.

- 6" BATT INSULATION

- 6 MIL VAPOR BARRIER

- 58" GYP. BD.

- SCHEDULED FINISH

T.O.PLATE

14'-1 1/2"

T.O.SLAB

0'-0"

SLAB ON GRADE FLOOR

- SEE 16/A5.1A

2" RIGID INSULATION BOARD

(BLUE BOARD)

FOUNDATION, SEE STRUCTURAL

SCHEDULED

BASE

8" GYP. BD.

358", 20 GA. STEEL

STUDS @ 16" O.C.

SCHEDULED CEILING

STEEL BUILDING FRAME

(BEYOND)

1'-6"

SINGLE PLY ROOF

- SINGLE PLY ROOF MEMBRANE

FULLY ADHERED

- TAPERED POLYISO CRICKET

- 12" DENSDECK (PRIMED) FULLY

ADHERED

- 112" STEEL DECK

- 10" STEEL PURLINS

- FULL THICKNESS INSULATION

(RHINO PRO VALUE SYSTEM)

- STEEL BUILDING FRAME

- VAPOR BARRIER FABRIC

- STEEL RETAINING STRAPS

- STEEL BUILDING FRAME

SLAB ON GRADE FLOOR

- SEE 16/A5.1A

SCHEDULED BASE

T.O.SLAB

0'-0"

SCHEDULED CEILING

T.O.STEEL

9'-2"

358", 20 GA. STEEL

HEADER STUDS TO

UNDERSIDE OF

PURLIN @ 48" O.C.

SCHEDULED CEILING

T.O.PLATE @ GRID LINE

17'-3"

METAL PANEL ROOF

- SEE 16/A5.1A

2" RIGID INSULATION BOARD

(BLUE BOARD)

FOUNDATION, SEE STRUCTURAL

GRADE

COMPACTED FILL

20 METAL PANEL 1 WALL

- SEE 16/A5.1A

STOREFRONT

- SEE 18/A5.1A

STEEL AWNING

STOREFRONT

- SEE 18/A5.1A

612"

SIM.

METAL PANEL 1 WALL

- SEE 16/A5.1A

7'-9"

FACE OF FOUNDATION

CENTERLINE OF COLUMN

METAL SOFFIT

PANEL

STEEL BUILDING

FRAME (BEYOND)

3'-0"

3'-0"

ENGINEERED BACKFILL &

MATT, SEE SOILS REPORT

(TYP.)

ENGINEERED BACKFILL &

MATT, SEE SOILS REPORT

(TYP.)

312"

FACE OF FOUNDATION

CENTERLINE OF COLUMN

T.O.WINDOW

13'-4"

SINGLE PLY ROOFING CONTINUES

TO LINE OF PARAPET LAPPED UNDER

METAL PANEL ROOF ASSEMBLY

09051 A5.1A.dwg
Layout1

File details come from the government source that posted it. Updated .