68.pdf
PDF 265 KB Posted
- Solicitation number
- AG-82B1-S-10-0081
About this file
drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Camp Crook abstract.xlsx | XLSX spreadsheet | |
| Signed PREAWARD Intent to Award.pdf | ||
| SF 30 AMEND 7.PDF | ||
| C 1.2A.pdf | ||
| 4-plex basement plumbing.pdf | ||
| C 1.1A.pdf | ||
| Camp Crook pre bid and QA.2.docx | DOCX document | |
| C 9.1A.pdf | ||
| Buffalo dump 2.pdf | ||
| Buffalo Dump 1.pdf | ||
| SF 30 AMEND 6.PDF | ||
| Amend 5 SF 30.pdf | ||
| SF 30. Amendment 04.pdf | ||
| AMEND 3.PDF | ||
| SF 30 AMEND 1.PDF | ||
| SF 30 AMEND 2.PDF | ||
| 20.pdf | ||
| 69.pdf | ||
| 66.pdf | ||
| 36.pdf | ||
| 17.pdf | ||
| 4.pdf | ||
| 6.pdf | ||
| 51.pdf | ||
| SF 1442.pdf | ||
| 14.pdf | ||
| 21.zip | ZIP file | |
| WAGE DETERMINATION.txt | TXT text file | |
| 38.pdf | ||
| 78.pdf | ||
| 1.pdf | ||
| 63.pdf | ||
| 28.pdf | ||
| 12.pdf | ||
| 10.pdf | ||
| 37.pdf | ||
| 64.pdf | ||
| 11.pdf | ||
| 73.pdf | ||
| 23.pdf | ||
| 72.pdf | ||
| 47.pdf | ||
| 50.pdf | ||
| 67.pdf | ||
| 41.pdf | ||
| 5.pdf | ||
| 30.pdf | ||
| 13.pdf | ||
| 76.pdf | ||
| 54.pdf |
Show 40 more
Latest 50 of 99 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASEMENT
NEW
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
NEW
GARAGE
101 NEW
GARAGE
A2.0D
S O
U T H
R E S
ID
E N
C E
G A
R A
G E F
O U
N D
A T
IO
N P
L A
N S
1/4" = 1'-0"A2.0D : A2.0D
C A
M P C
R O
O K
C U
S T E R N
A T
IO
N A
L F
O R
E S T
C A
M P C
R O
O K
S D
2 2 2 N O R T H H I G G I N S
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PH 4 0 6 . 7 2 1 . 5 6 4 3
M I S S O U L A, M T 59802 www.aearchitects.com
B I L L I N G S, M T 59101
FAX 4 0 6 . 2 4 8 . 2 4 2 7
PH 4 0 6 . 2 4 8 . 2 6 3 3
6 0 8 N O R T H 2 9 T H
A R C H I T E C T U R E
O W N E R
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
ISSUE DATE
REVISIONS
P R O J E C T
D R A W
IN
G
PROJECT No 09051
U S D
A F
O R E S T
S E R
V
IC
E
R E G
IO
N
12.16.09
R
E G
I S T
E R E D
P
RO
F ESS IONA
L A
R C H
I T E C
T
S O
UTH DA KO
T A
RE
G . NO .
JAMES R. McDONALD
NORTHSOUTH RESIDENCE FOUNDATION PLAN GARAGE WALL SECTION19
A4.2D
26'-6"
26'-6"
A2.0D : A2.0D
24'-0"
A2.0D
KEYNOTES#
(N) 8" CONCRETE FOUNDATION WALL AND 1'-4" X 10 DP. FOOTING. SEE: STRUCTURAL SHTS2.1B
FOR MORE INFORMATION.
MAINTAIN PARTIAL ACCESS FROM EXISTING FOUNDATION TO NEW CRAWL SPACE/ FOUNDATION UNDER
ADDITION.
BACKFILL EXISTING BASEMENT WITH 18" OF 3 4" MINUS CRUSHED GRAVEL.
NEW 24" X 30" ACCESS HATCH ABOVE. PROVIDE THUMB PULL HARDWARE AND FLOOR FINISH AS
SPECIFIED IN ROOM FINISH SCHEDULE. COORDINATE W/ STRUCTURAL.
(N) SLAB ON GRADE WITH PERIMETER FTG. SEE: STRUCTURAL FOR MORE INFORMATION.7
1/4" = 1'-0"
NORTH6 SOUTH RESIDENCE GARAGE FOUNDATION PLAN
TYPICAL FRAME WALL CONSTRUCTION
- 1/2" GYP. BD. INTERIOR (FIRE TREATED
- 6 MIL.TEAR RESISTANT VAPOR BARRIER
- 2x6 WALL FRAME 16" O.C. W/
- R-19 BATT INSULATION
- EXTERIOR SHEATHING PER STRUCTURAL
- AIR INFILTRATION BARRIER
- 'TRU WOOD' SHINGLES AS SHOWN PER
ELEVATIONS.
ATTIC SPACE6
(N) ASPHALT SHINGLE
ROOFING TO MATCH EXISTING
RESIDENCE ROOFING IN-KIND.
5/8" O.S.B PER STRUCT.
MANUF. PRESS PLATE TRUSSES
(SEE STRUCTURAL)
PRE-FIN. SHT. MTL.
DRIPEDGE
PRE-FIN. SHT. MTL.
CONT. GUTTER
'TRU WOOD' FIBER CEMENT SHINGLES AS
SHOWN PER ELEVATIONS
'TYVEK' AIR INFILTRATION WRAP
EXT. SHEATHING PER
STRUCTURAL
R-19 BATT INSULATION
6 MIL. TEAR RESISTANT VAPOR BARRIER
2'-0"
1-1/2" X 11-1/4" 'HARDITRIM'
SKIRT BOARD
R-38 BLOWN IN
INSULATION
5/8" GYP. BOARD
CONC. SLAB AND THICKENED
EDGE WITH REINFORCING PER
STRUCTURAL
GRAVEL BASE ON SUB GRADE
PER GEOTECHNICAL AND
STRUCTURAL
FINAL GRADE
A2.0D : A2.0D 1/4" = 1'-0"
SOUTH RESIDENCE GARAGE SECTION8
2'-0"
M
IN
3/8" = 1'-0"A2.0D : A2.0D
SECURELY INFILL EXISTING BASEMENT R.O. WITH PLYWOOD AND DOWEL TIE BACK INTO EXIST.
CONCRETE AFTER GRAVEL BACKFILL EFFORT IS COMPLETE IN THE BASEMENT.
7 NEW SLAB CONSTRUCTION
4" CONCRETE SLAB-SEE STRUCTURAL DRAWINGS
10 MIL. TEAR RESISTANT VAPOR RETARDER
2" RIGID INSULATION
6" DEEP 3 4" PLUS CLEAN, DRY COMPACTED GRAVEL BASE
APPROXIMATE LOCATION OF NEW SEWER LINE CONNECTION. CONTRACTOR SHALL COORDINATE
LOCATION AND CONNECTION WITH ALL NEW AND EXISTING SANITARY SEWER LINES AND DRAIN LINES.
A4.2D
FIN. FLOOR
100'-0"
T.O. PLATE
MATCH EXIST.
INSULATION PER STRUCT.
R-38 BLOWN-IN
FIBERGLASS INSULATION.
PROVIDE NEW 2 X 4 P.T. FRAME WALL W 12" P.T. PLY WD. TO ENCLOSE BASEMENT OPENING.8
1/2" GYP. BD. (FIRE TAPED)
TYPICAL ROOF CONSTRUCTION
- NEW 'MALARKEY LEGACY SHINGLES' COLOR TO MATCH EXIST.
- PROVIDE RIDGE VENT AS REQUIRED (TYP.)
- 15# BUILDING FELT
- PROVIDE ICE & WATER SHIELD 4' ON EACH SIDE OF THE VALLEY OR CRICKET
- PRESS PLATE TRUSS (PER STRUCTURAL)
- VENT SPACERS
- R-38 BLOWN-IN FIBERGLASS INSULATION
- 6 MIL. TEAR RESISTANT POLYURETHANE VAPOR BARRIER
- 12" TYPE 'X' GYP. BD. CEILING (PAINT)
REQUIRED AT EACH RESIDENCE
1. DISCONNECT AND ABANDON THE EXISTING SEWER LINE. LINE SHALL BE TERMINATED & CAPPED
BELOW EXISTING SLAB. CONTRACTOR SHALL RECONNECT ALL LINES BELOW MAIN FLOOR AND EXIT
EXISTING HOUSE APPROXIMATELY 4' BELOW GRADE WITH NEW 4" SANITARY SEWER LINE AS SHOWN ON
THE SITE PLAN. MAINTAIN POSITIVE SLOPE TO EXISTING MAIN.
2. CONTRACTOR SHALL MAKE EVERY EFFORT TO MITIGATE STANDING WATER AROUND EXISTING HOUSE.
ALL GRADES AROUND THE EXISTING RESIDENCE SHALL BE BROUGHT TO WITHIN 6" OF NEW SIDING AND
SLOPE POSITIVELY AWAY FROM HOUSE.
3. CONTRACTOR SHALL PROVIDE A NEW RADON MITIGATION SYSTEM IN THE BASEMENT / CRAWLSPACE
AS SHOWN IN THE DETAILS. THE EXISTING BASEMENT WILL BECOME UN-OCCUPIABLE SPACE AND WILL BE
BACKFILLED WITH 3/4" PLUS CRUSHED GRAVEL. CONTRACTOR TO COORDINATE LOCATION OF INLINE FAN
& EXHAUST LOCATION.
4. CONTRACTOR SHALL REMOVE EXISTING VERMICULITE INSULATION IN ATTIC SPACE REQUIRED AS PART
OF THE MITIGATION PROCESS. APPROXIMATE AREAS ARE INDICATED ON THE PLANS.
5. CONTRACTOR SHALL PROVIDE NEW 200A SERVICE TO THE EXISTING RESIDENCE. CONTRACTOR SHALL
PROVIDE A NEW MANUAL TRANSFER SWITCH AND ASSOCIATED HARDWARE IN ORDER TO OPERATE AN
EMERGENCY GENERATOR IF NEED BE. COORDINATE LOCATION OF PANEL & TRANSFER SWITCH WITH
CONTRACTING OFFICER.
6. CONTRACTOR SHALL MAINTAIN LOCATION & CABLING OF EXISTING SATELLITE DISHES. CONTRACTOR
MAY NEED TO REMOVE & REPLACE EQUIPMENT IN ORDER TO ACCOMMODATE NEW WORK.
7. PROVIDE NEW 90% EFFICIENCY FURNACE W/ PROGRAMMABLE THERMOSTAT SIZED FOR RESIDENCE
SHOWN. CONTRACTOR SHALL COORDINATE LOCATION & RE-USE OF EXISTING DUCTWORK. GENERALLY
ALL DUCTWORK WILL BE LOCATED IN CRAWLSPACE. EXISTING TRUNK LINES CAN BE RE-CONNECTED TO.
ALL DUCTWORK WILL THEN BE INSULATED.
8. PROVIDE NEW 'RINNAI' RC80HPi ON DEMAND WATER HEATER. CONTRACTOR SHALL LOCATE AND
COORDINATE UTILITIES ACCORDINGLY.
9. REMODELED RESIDENCES SHALL ALL RECEIVE NEW GUTTERS AND PIPED DRAINAGE SYSTEMS AS
SHOWN ON SITE PLAN.
10. CONTRACTOR SHALL ROUTE 4" PERFORATED OR CORRUGATED PIPE APPROXIMATELY 1'-0" FROM THE
INSIDE OF THE EXTERIOR PERIMETER FOUNDATION WALLS. LAY PIPE IN CONTINUOUS LOOP ON SUB
GRADE OR EXISTING BASEMENT FLOOR. LAY GEO-TEXTILE CLOTH OVER PIPE TO PREVENT CLOGGING
PERFORATED HOLES. BACKFILL OVER PIPE WITH CLEAN 3 4" PLUS CLEAN AGGREGATE. CONNECT THE
ENDS OF THE LOOP TO OPPOSITE LEGS OF A 4" PVC 'T'. CONNECT 4" PVC VERTICALLY INTO THE TEE AND
ROUTE UP TO ATTIC FOR DISCHARGE. CONTRACTOR SHALL COORDINATE LOCATION OF THE INLINE FAN.
11. PLUMBING & ELECTRICAL CONTRACTOR SHALL PROVIDE A 'BASE LEVEL' OF PLUMBING AND LIGHTING
FIXTURES. CONTRACTOR SHALL SUBMIT CUT SHEETS TO CONTRACTING OFFICER FOR APPROVAL. ALL
FIXTURES SHALL BE STANDARD RESIDENTIAL GRADE UNLESS REQUIRED TO BE ACCESSIBLE. ALL FIXTURES
SHALL MEET ALL MANDATED PLUMBING AND ELECTRICAL CODES. ALL NEW PLUMBING FIXTURES SHALL
EPA 'WATERSENSE' COMPLIANT. ALL NEW LIGHT FIXTURES SHALL BE INSTALLED WITH NEW COMPACT
FLUORESCENT OR LED LIGHTING LAMPS WITH A MINIMUM CORRELATED COLOR TEMPERATURE OF 2700°K.
12. PROVIDE BLOCKING AT ALL CABINETRY, SHELVING SUPPORTS, TOILET ROOM ACCESSORIES, AND WALL
MOUNTED PLUMBING FIXTURES.
13. PROVIDE NEW R-38 BLOWN-IN FIBERGLASS INSULATION THROUGHOUT GARAGE ATTIC. PROVIDE R-50
BLOWN IN FIBERGLASS INSULATION THROUGHOUT RESIDENCE.
14. AT NEW PLUMBING, CONTRACTOR SHALL PROVIDE NEW SUPPLY, DRAIN, AND VENT LINES AS NEEDED.
COORDINATE ALL DRAIN & VENT LOCATIONS AND RE-USE ALL EXISTING ROOF PENETRATIONS AS
POSSIBLE. CONTRACTOR SHALL INSULATE ALL PIPING BELOW FLOOR. REMOVE ALL ABANDONED
PLUMBING AND CAP ALL UNUSED PLUMBING STUBS BELOW THE FLOOR LEVEL.
15. WHERE COLOR OR PRODUCT SELECTION IS REQUIRED, CONTRACTOR SHALL SUBMIT CUT SHEETS TO
CONTRACTING OFFICER FOR APPROVAL.
16. PROVIDE NEW 24x30 (MIN.) ATTIC ACCESS PANEL. LOCATE APPROXIMATELY UNDER RIDGELINE FOR
MAXIMUM HEAD CLEARANCE.
GENERAL RESIDENTIAL WORK
1. EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE DRAWINGS THROUGH EXISTING
AS-BUILT DATA AND FIELD VERIFICATION. CONTRACTOR RESPONSIBLE TO VERIFY EXISTING CONDITIONS
BEFORE CONSTRUCTION / ORDERING / INSTALLATION & NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY IF ANY DISCREPANCY EXISTS FOR WRITTEN CLARIFICATION.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. CONTRACTOR IS
EXPECTED TO USE QUALITY, ACCEPTABLE STANDARD CONSTRUCTION PRACTICES & TECHNIQUES.
3. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS & REGULATIONS AS PRESCRIBED
BY THE 2009 INTERNATIONAL RESIDENTIAL BUILDING CODE, ALL APPLICABLE PLUMBING CODES, ALL
APPLICABLE MECHANICAL CODES, ALL APPLICABLE ELECTRICAL CODES.
4. MECHANICAL / PLUMBING / ELECTRICAL SHALL BE COORDINATED AND INSTALLED BY CONTRACTOR TO
BE CONSISTENT WITH THE INTENT OF THE DRAWINGS AND SHALL BE IN ACCORDANCE WITH ALL
APPLICABLE CODES.
5. CONTRACTOR RESPONSIBLE FOR DOCUMENTATION OF ACCURATE AS-BUILTS INFORMATION /
DRAWINGS AT THE CONCLUSION OF THE PROJECT FOR SUBMITTAL TO THE CONTRACTING OFFICER.
6. CONTRACTOR TO MAINTAIN INTEGRITY OF EXISTING BUILDING / SYSTEMS AT ALL TIMES. NOTIFY
CONTRACTING OFFICER BEFORE COMPROMISING ANY SYSTEM DUE TO THE NEW CONSTRUCTION. SOME
DEMOLITION / CONSTRUCTION MAY BE REQUIRED TO BE PERFORMED AFTER BUSINESS HOURS -
COORDINATE W/ CONTRACTING OFFICER.
7. DO NOT SCALE FROM DRAWINGS. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE
CONTRACTING OFFICER IMMEDIATELY FOR WRITTEN CLARIFICATION.
8. CONTRACTOR SHALL RECOGNIZE THE REMODEL ON THESE STRUCTURES MAY BE PHASED IN ORDER TO
ACCOMMODATE EXISTING TENANTS. CONTRACTOR SHALL COORDINATE ALL WORK ACTIVITIES WITH
CONTRACTING OFFICER AND DISTRICT RANGER.
9. CONTRACTOR SHALL PROVIDE ALL SHORING AS NEEDED DURING THE CONSTRUCTION PROCESS.
10. CONTRACTOR SHALL BE AWARE THAT LEAD PAINT CONTAINING MATERIALS AND VERMICULITE IS
PRESENT IN THE CONSTRUCTION AREA. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND TAKING THE
NECESSARY PRECAUTIONS TO SAFELY CONDUCT THE WORK INDICATED.
11. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS & LABOR ASSOCIATED WITH COMPLETING THIS
PROJECT, UNLESS OTHERWISE NOTED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES.
13. CONTRACTOR TO REFER TO ALL STRUCTURAL NOTES WITHIN DOCUMENTS.
GENERAL PROJECT NOTES
NEW 14" VENTED 'HARDISOFFIT'
FIBER CEMENT SOFFIT BOARDS.
NEW 2X8 'HARDITRIM'
FASCIA BD.
NEW 1X4 'HARDITRIM'
FASCIA BD..