Specifications_1_-_DIV00_DIV12.pdf
PDF 9 MB Posted
- Attached to
- Building 26, Phase 2 North Wing Renovation Federal contract opportunity
- Solicitation number
- AG-03R6-S-15-0052
About this file
Specifications 1 - DIV00_DIV12
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
222 North Higgins Missoula, MT 59802 Ph. 406.721.5643 www.aearchitects.com© 2011 A&E Architects, P.C.
Project Manual
May 18, 2015
USDA FOREST SERVICE
PHASE 2 - NORTH WING RENOVATION
BUILDING 26 - FORT MISSOULA
Missoula, Montana
A
E A rc h it e c ts
P ro je c t
.0
Set No.
VOLUME 1
Divisions 00-12
USDA FOREST SERVICE – BUILDING 26
PHASE 2, NORTH WING RENOVATION
FORT MISSOULA, MISSOULA, MONTANA
TABLE OF CONTENTS TBC -1
TABLE OF CONTENTS – VOLUME 1
The following listed documents comprise the Table of Contents for the USDA FOREST SERVICE – BUILDING 26 – PHASE 2, Fort Missoula, Missoula, Montana. The numerical sequence of Sections or Divisions is interrupted, such interruptions are intentional.
PROJECT MANUAL
TABLE OF CONTENTS
PROJECT REPRESENTATIVES
GREEN GLOBES NOTICE
SERVICE SYSTEMS INTERRUPTION NOTICE
MECHANICAL NOTICE
CONSTRUCTION NOTICE
GOOD-FAITH ASBESTOS MATERIALS & LEAD COATINGS SURVEY REPORT
TECHNICAL SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY
012300 ALTERNATES
012600 CONTRACT MODIFICATION PROCEDURES
012900 SCHEDULE OF VALUES FOR APPLICATIONS FOR PAYMENT
013100 PROJECT MANAGEMENT AND COORDINATION
013200 CONSTRUCTION PROGRESS DOCUMENTATION
013233 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
014000 QUALITY REQUIREMENTS
014200 REFERENCES
015000 TEMPORARY FACILITIES AND CONTROLS
015719 TEMPORARY ENVIRONMENTAL CONTROLS
015719.11 INDOOR AIR QUALITY (IAQ) MANAGEMENT
016000 PRODUCT REQUIREMENTS
017300 EXECUTION
017329 CUTTING AND PATCHING
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
Construction Waste Management Plan Reporting Form
017700 CLOSEOUT PROCEDURES
017823 OPERATION AND MAINTENANCE DATA
017839 PROJECT RECORD DOCUMENTS
017900 DEMONSTRATION AND TRAINING
018113 SUSTAINABLE DESIGN REQUIREMENTS
Green Globes Pre-Construction Questionnaire
DIVISION 02 – EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
024296 HISTORIC REMOVAL AND DISMANTLING
DIVISION 03 – CONCRETE
033000 CAST-IN-PLACE CONCRETE
039000 CONCRETE RESTORATION AND REPAIR
TABLE OF CONTENTS TBC -2
DIVISION 04 – MASONRY
040310 HISTORIC MASONRY CLEANING
040326 HISTORIC TERRA COTTA UNIT MASONRY REPAIR
DIVISION 05 – METALS
057300 DECORATIVE METAL RAILINGS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
064116 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
064600 WOOD TRIM
064800 WOOD FRAMES
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
072100 THERMAL INSULATION
078413 PENETRATION FIRESTOPPING
078446 FIRE-RESISTIVE JOINT SYSTEMS
079200 JOINT SEALANTS
DIVISION 08 – OPENINGS
081433 STILE AND RAIL WOOD DOORS
085200 WOOD WINDOWS
087100 DOOR HARDWARE
088000 GLAZING
DIVISION 9 – FINISHES
090320 HISTORIC TREATMENT OF PLASTER
092900 GYPSUM BOARD
093013 CERAMIC TILING
095123 ACOUSTICAL TILE CEILINGS
096513 RESILIENT BASE AND ACCESSORIES
096516 RESILIENT SHEET FLOORING
096813 TILE CARPETING
099113 EXTERIOR PAINTING
099123 INTERIOR PAINTING
DIVISION 10 – SPECIALTIES
102113 SOLID PHENOLIC TOILET COMPARTMENTS
102800 TOILET, BATH, AND LAUNDRY ACCESSORIES
104413 FIRE EXTINGUISHER CABINETS
DIVISION 11 – EQUIPMENT
115213 PROJECTION SCREENS
DIVISION 12 – FURNISHINGS
TABLE OF CONTENTS TBC -3
122413 ROLLER WINDOW SHADES
123661 SIMULATED STONE COUNTERTOPS
125900 SYSTEMS FURNITURE
129313 BICYCLE RACKS
END OF TABLE OF CONTENTS – VOLUME 1
PROJECT REPRESENTATIVES
CONTRACTING OFFICER: Bruce Crockett U.S. Forest Service – Region 1
P.O. Box 7669 Missoula, MT 59807-7669
(406) 329-2198
ARCHITECT: Chris Martison, AIA, Principal A&E Architects, P.C.
222 North Higgins Avenue Missoula, MT 59802
(406) 721-5643 cmartison@aearchitects.com
Crystal Herzog, AIT A&E Architects, P.C.
222 North Higgins Avenue Missoula, MT 59802
(406) 721-5643 cherzog@aearchitects.com
STRUCTURAL: Bruce Haroldsen, P.E.
Beaudette Consulting Engineers 131 West Main Missoula, MT 59802
(406) 721-7315 bruce@bceweb.com
MECHANICAL: Brad Kastelitz, P.E.
Morrison-Maierle, Inc.
125 School House Loop Kalispell, Mt 59901
(406) 752-2216 bkastelitz@m-m.net
Jody Waverek Morrison-Maierle, Inc.
125 School House Loop Kalispell, Mt 59901
(406) 752-2216 jwaverek@m-m.net
ELECTRICAL: Arian Bloomfield, P.E.
Morrison-Maierle, Inc.
3011 Palmer St.
Missoula, MT 59808
(406) 542-8880 abloomfield@m-m.net
GREEN GLOBES NOTICE
The success of this phased Project includes the preservation, restoration, and rehabilitation of the Contributing Historic Structure, Building 26, within the Fort Missoula Historic District, and a final phased GREEN GLOBES goal of “Two Globes” for New Construction/Significant Renovations. The on-site Project Manager shall familiarize themselves with the unique historic conditions, challenges, and requirements specific to working on Building 26. At a minimum, the Contractor shall:
Ensure that all Project Manager(s) have reviewed the asbestos, lead-based paint, and hazardous materials plans before undertaking demolition activities.
Thoroughly review existing drainage and soil conditions of the site in order to implement erosion control measures prior to and during construction.
Ensure that all building materials salvaged for re-use are properly stored in a covered structure, protected from water, and that recycling bins are maintained on-site for all materials to be recycled.
Implement a detailed Waste Management Plan for the demolition and construction phases and ensure the Waste Management Plan tracks the Owner’s goals.
Keep accurate records of the cost of and the weight amount of waste diverted from the local landfills because evidence of such is required to earn GREEN GLOBES points.
Keep accurate records of the cost of and the weight of selectively demolished, salvaged, and re-used or reinstalled items and materials because evidence of such is required to earn GREEN GLOBES points.
Develop a plan to minimize dust and other contaminants during the construction, and educate all sub-trades concerning the plan; evidence of such is required to earn GREEN GLOBES points.
Document the origin and supplier and/or manufacturer of all materials for GREEN GLOBES credits for local materials; detailed documentation of such is required to earn GREEN GLOBES points.
Confirm in writing how the phased requirements for each GREEN GLOBES credit will be met to achieve the GREEN GLOBES goal of “Two Globes.”
Confirm in writing how the Contractor will assign responsibility for accomplishing specific credits to specific subcontractors or work teams on Phase 2 Work and all future phases of the entire Project.
Track and complete GREEN GLOBES points that must be satisfied during this Phase 2 Work and all future phases of the entire Project construction; document when the GREEN GLOBES requirements have been met and/or completed.
SERVICES/SYSTEMS INTERRUPTIONS NOTICE
Owner occupies Building 26. Typical business hours are Monday through Friday 7:30 a.m. to 5:30 p.m.
Contractor shall coordinate service/systems interruptions to occupied areas to occur during non-business hours and/or provide temporary services/systems to affected occupied areas for interruption(s) taking place during business hours.
Any known services/systems interruption, regardless of the time of day or day of the week, due to the Work of this Contract shall be delivered in writing to the Contracting Officer a minimum 7 calendar days in advance of interruption(s). Contractor shall provide a minimum 7 calendar days advance notice to the Contracting Officer prior to changeover from normal power source to temporary and return from temporary power source to normal.
The notice allows the Owner and building occupants to schedule work accordingly and avoid any inconvenience prior to minor interruptions.
Do not interrupt services/systems serving occupied portions of the building one-hour prior to and one-hour after typical business hours unless permitted under the following conditions and then only after providing temporary services/systems services to affected occupied areas during the interruption.
1) Submit a request for permission from the Contracting Officer a minimum 7 calendar days in advance of any services/systems services interruption.
2) Request shall include the anticipated duration of the outage and the affected building area(s).
3) Do not proceed with interruption(s) until Contracting Officer has informed building occupants affected by the interruption(s).
Contractor shall provide temporary utilities including but not limited to mechanical, electrical, plumbing, and fire and life safety systems serving existing occupied areas of Building 26, as necessary.
Contractor shall pay all costs associated with setting and removing temporary services/systems to Building 26.
MECHANICAL INTERRUPTION NOTICE
Contractor shall coordinate mechanical interruptions to occupied areas provide temporary mechanical systems to affected occupied areas for interruption(s) taking place during business hours.
1) Typical business hours in Building 26 are Monday through Friday 7:30 a.m. to 5:30 p.m.
Any known mechanical interruption, regardless of the time of day or day of the week, due to the Work of this Contract shall be delivered in writing to the Contracting Officer a minimum 7 calendar days in advance of interruption(s).
Do not interrupt mechanical equipment serving occupied portions of the building one-hour prior to and one-hour after typical business hours unless permitted under the following conditions and then only after providing temporary services/systems services to affected occupied areas during the interruption.
1) Submit a request for permission from the Contracting Officer a minimum 7 calendar days in advance of any mechanical interruption.
2) Request shall include the anticipated duration of the interruption and the affected building area(s).
3) Do not proceed with interruption(s) until Contracting Officer has informed building occupants affected by the interruption(s).
Contractor shall pay all costs associated with setting and removing temporary mechanical systems to Building 26.
CONSTRUCTION NOTICE
NOTICE: In addition to barrier(s) indicated on Drawings, Contractors shall provide temporary protection and cleanup of work occurring in finished and/or occupied areas of Building 26 including, but not limited to, protection of all existing finishes and equipment, cleaning and/or replacement of damaged material, painting, vacuuming, dusting, and etc., required to restore and/or clean the work area to the complete satisfaction of the Contracting Officer. Interior barriers between Owner occupied areas of Building 26 and area(s) of Phase 2 Work, shall provide both a physical barrier to prevent access, and a dust-proof barrier to maintain the indoor air quality of the Owner occupied area(s).
NOTICE: Some Demolition and Asbestos Abatement has occurred in portions of Building 26 in preparation for new construction of Phase 2. Extent of architectural, mechanical, and electrical demolition indicated on the Drawings may differ from actual field conditions. Coordinate selective demolition requirements based on demolition plans, field conditions, and new construction plans.
NOTICE: Portions of Phase 2 mechanical and electrical work require access to finished and/or occupied areas of Building 26. Contractor shall coordinate access to finished and/or occupied areas with the Contracting Officer.
NOTICE: Provide a minimum of 7 calendar days advanced notice to all work impacting building operations or the public and/or Owner’s use of the building.
NOTICE: At existing ADA Ramp, provide wood framed, plywood enclosure for duration of Work. Provide protected public access to ramp. Protect ramp and access from all construction activities and potential debris. Coordinate access route(s) to ADA ramp and final design with Contracting Officer.
GOOD-FAITH ASBESTOS MATERIALS &
LEAD COATINGS SURVEY REPORT
FOR THE
HISTORIC 3-STORY 39,000 ft² BUILDING NO. 26
RESIDING ON THE FORT MISSOULA FACILITY
ADDRESSED AT
322 FORT MISSOULA
MISSOULA, MT 59807
Project No: 14-037.1
Prepared for
USDA Forest Service
Northern Region 200 East Broadway Missoula, MT 59807
Prepared By Mountain Consulting Services LLC
9922 East Montgomery Drive, Suite 9 Spokane Valley, WA 99206
(509) 924-9236
March 25, 2014
Mountain Consulting Services, LLC
PROJECT NO: 14-037.1
GF-ACM/LBP SURVEY
CONTENTS
REPORT SUMMARY ..............................................................................................Section 1
GOOD-FAITH ASBESTOS MATERIALS SURVEY ................................................Section 2
GOOD-FAITH LEAD COATINGS SURVEY ............................................................Section 3
APPENDICES
A: Certifications & Accreditations B: Asbestos Bulk Samples Analysis Report C: Asbestos Bulk Sample Location Drawings D: XRF Coatings Confirmed Lead Positives Data E: XRF Coatings Assay Data & Calibrations F: Lead Bulk Coating/Material Samples Analysis Report G: Lead Bulk Sampling & XRF Room Location Drawings H: Site Photographs
March 25, 2014 Mountain Consulting Services, LLC
TOC
SECTION 1
REPORT SUMMARY
GF-ACM/LBP SUMMARY
GOOD-FAITH ASBESTOS MATERIALS & LEAD COATINGS SURVEY; HISTORIC
BUILDING #26; FORT MISSOULA FACILITY; MISSOULA, MONTANA
REPORT SUMMARY
The USDA Forest Service of Missoula, Montana, contracted Mountain Consulting Services, LLC (Mountain Consulting) to provide a good-faith asbestos materials and lead coatings survey for the 3-story; 39,000 ft²; Historic Building 26 located on the Fort Missoula facility addressed at 322 Fort Missoula in Missoula, Montana.
This project was conducted to facilitate new occupancy phased renovations for the Building 26 structure. The survey services included: Good-faith asbestos building materials survey; and, Good-faith lead coatings survey. No prior survey documentation was provided for this project.
The field survey activities for this project were conducted on March 5th & 6th of 2014 by Mr. Samuel W. Bailey Jr., MDEQ/AHERA Building Inspection MTA-3565; and, Mr. David A. Jones, Montana State/EPA Lead Risk Assessor MT-R-14998-2, of Mountain Consulting.
SURVEY DESCRIPTION
Building 26 is one of the two largest structures present with the Fort Missoula facility. The structure is a 2-story concrete, masonry & wood framed government use building built on a full concrete daylight basement foundation. The structure was originally built around 1910 with 1 generation of building addition construction and moderate interior renovation projects.
The facility is comprised of the original 27,300 square feet (ft²) 1910 3-story building; with an 11,700 ft² building addition construction era (3-story northeast & southeast wing ends) of the building. The facilities combined square footage that includes the original building and additions is approximately 39,000 ft².
Interior finishes consist of original plaster walls & ceilings with newer generations of gypsum wallboard systems and some ceramic wall tiling; suspended ceilings are either suspended lay-in-tiles or fastened to wood stringer tiles; floorings consist mostly of original 9” vinyl tiles either exposed, hidden under carpeting or hidden under wood sub-flooring & newer 12” vinyl tile system with some ceramic tiling.
Exterior finishes consist of plaster skim coated concrete walls with wood framed window & door units and ceramic tile roofing with membrane roofing on covered porch areas. Walls do not appear to be insulated and the attic space has rot wool type blown-in present over vermiculite insulations.
Heating is supplied by upgraded modern type natural gas fired steam boilers and cast iron room radiators. The building is not equipped with any localized air conditioning (HVAC) systems. Hot water is supplied by either electric or steam hot water tanks.
March 25, 2014 S-1 Mountain Consulting Services, LLC
The facility property is located in the western central light industrial portion of Missoula, Montana.
The structure is bounded by Fort Missoula G Road to the north, Fort Missoula F Road to the east, Building 24 to the south and Fort Missoula H Road to the west. The closest main arterials are US Highway 93 to the east and US Highway 12 to the south.
ASBESTOS SURVEY SUMMARY
Mountain Consulting performed destructive bulk materials testing of suspect building materials present throughout the facility, to determine the presence or absence of asbestos minerals. Mountain Consulting collected 165 bulk material samples from 52 different homogeneous suspect building materials or material systems identified during survey activities. Laboratory analysts sub-divided 15 submitted samples, and did not analyzed 2 submitted samples, resulting in a total of 178 samples analyzed for this project.
REGULATED ACM MATERIALS
The following homogeneous building materials were found to contain greater than one percent (>1%) asbestos content by laboratory analysis and are considered to be (Regulated ACM) requiring proper abatement prior to being impacted by renovation or demolition activities:
9”x 9” Vinyl Floor Tiling (VFT) (Green & Black in Colors-Checkered Pattern) located throughout the majority of the 1st and 2nd floors of the building either exposed, hidden under carpeting, hidden under vinyl sheet flooring (VSF), hidden under newer VFT or VSF & wood sub-flooring systems was found to contain asbestos. The class II, non-friable, miscellaneous materials contain 4-6% chrysotile asbestos. The total quantity of material present is 22,600 ft².
The quantities break for overlaid material types is as follow: There is approximately 1,360 ft² of this material exposed (1st floor NE office and the 2nd floor NE dormitory); approximately 5,780 ft² of this material present hidden under ACM-Free vinyl sheet flooring (VSF) (1st & 2nd floors; N & W wings); approximately 9,800 ft² of this material present hidden under carpeting (1st floor N, W & S wings; 2nd floor N & W wings); and, approximately 5,660 ft² of this material present hidden under ACM-Free VFT or VSF and wood sub-flooring (1st floor S wing hallway & 2nd floor entire S wing). It should be noted that the associated black flooring mastic material was proven to be ACM-free. Represented by bulk samples 14-037.1-72, 73 & 74.
Exposed Silver Painted Tar Coating Layers associated with the built-up tar adhered corkboard wall paneling system present within the old cooler rooms of the northeast and southeast center end rooms of the 1st floor within the building was found to contain asbestos.
The class II, non-friable, miscellaneous coatings material contains 7-10% chrysotile asbestos. It should be noted that this material is present with the walls, ceilings and assumed to be present under the elevated concrete floors within each room. Also the interior of southeast wing cooler has been remodeled with newer over installed ACM-Free sheetrock, carpeting & suspended ceiling system. The underlying cork & tar layers were proven ACM-Free. There is approximately 1,450 ft² of this material present with both rooms. Represented by bulk samples 14-037.1-99, 100 & 101.
March 25, 2014 S-2 Mountain Consulting Services, LLC
White Non-Pliable Caulking Sealant located present between the wood doorframes to exterior concrete wall joints of the exterior entry door units of the building was found to contain asbestos. This class II, non-friable, miscellaneous material contains 1-2% chrysotile asbestos. There is approximatly 440 linear feet (lf) of this material present with 24 exterior entry door units. Represented by Bulk Samples 14-037.1-129, 130 & 131.
MATERIALS ASSUMED TO BE REGULATED FOR ASBESTOS
The following homogeneous materials present with the facility are being assumed to contain asbestos based on inspector expertise, age of construction, material type and/or inaccessible suspect material (Regulated ACM):
Boiler Segments Sealant associated with enclosed cast iron segments of the 2 small boilers present within the basement mechanical rooms of the north & south wings of the building is ASSUMED to contain asbestos. This material is a class I, friable, thermal systems insulation (TSI) type. If present, there should be approximately 224 lf of material within the boilers.
Vermiculite Attic Insulation located under ACM-Free rot wool type blown-in insulation throughout the attic crawl space of the building was found to contain TRACE amounts of actinolite asbestos. There is approximately 13,000 ft² of this material present ranging in depths from 1” to 3” inches. This material has a history of producing false negative results by polarize light microscopy (PLM) and causing environment and health hazards when disturbed.
Although this material is not regulated for asbestos content by MDEQ, it should not be considered a safe material and it is recommended that this material be handled as a regulated Asbestos Containing Material. Represented by Bulk Samples 135, 136 & 137.
SUSPECT MATERIALS PRESENT BUT NOT TESTED
The following suspect building materials present with the structure were intentionally not tested for asbestos content at this time, due to either water damage intrusion potentials or warrantee voiding situations. These materials must be tested for asbestos content prior to any future impacting for renovation or demolition:
Black Membrane Roofing System (present w/flat roof decks) Red Ceramic Tile Roofing
MATERIALS PROVEN TO BE ASBESTOS-FREE
Microscopic examination of samples collected from the following suspect building materials did not detect the presence of asbestos minerals (ACM-Free):
Plaster (White Top Coat & Grey Base Coat) Wall & Ceiling System (samples 01 to 07) Sheetrock Wallboard Paneling’s (throughout building) (samples 08 to 14) Joint & Taping Compound Mud (associated with S/R systems) (sub-samples 08A to 14A)
March 25, 2014 S-3 Mountain Consulting Services, LLC
Vinyl Covered S/R (no J/C present) (samples 15 to 17 & sub-samples 15A to 17A) 2’x 4’ Suspended Ceiling Tile (wormhole pattern) (samples 18 to 20) 12”x 12” Fastened Ceiling Tile (holes pattern) (samples 21 to 23) Grey Concrete (foundation walls) (samples 24 to 26) Grey Concrete (of basement floor slabs) (samples 27 to 29) Grey Mortar (of basement CMU walls) (samples 30 to 32) Tan, Brown & Grey Glazing Putty (of BSMT window units) (samples 33 to 35) White & Gold Rope Gaskets (of BSMT boilers) (samples 36 to 38) White Seam/Joint Sealant (of BSMT fiberglass piping insulations) (samples 39 to 41) White & Grey Pebble Pattern VSF & Yellow Mastic (BSMT NW-RR) (samples 42 to 44) Grey Thin-set Grout & Adhesive (of 6” red ceramic floor tiling) (samples 45 to 47) White & Grey Terrazzo Shower Basins (samples 48 to 50) Brown Grout & Grey Adhesive (of white 4” ceramic wall tiling) (samples 51 to 53) White & Gold Plaster Skim Coating (of shower room walls) (samples 54 to 56) Formica & Cold Adhesive (of restroom countertops) (samples 57 to 59) Grey & Beige 12”x 12” VFT & Gold Mastic (of BSMT SW-RR) (samples 60 to 62) Grey-Tan Floor Leveling (of BSMT SW-RR) (samples 63 to 65) 4” Brown Vinyl Cove Base (VCB) & White Mastic (samples 66 to 68) Tan & Brown Pebble Pattern VSF & Gold Mastic (over ACM-9” VFT) (samples 69 to 71) Black Flooring Mastic (adhering ACM-9” VFT) (samples 72 to 74) Tarpaper & Brown Mastic (under ACM-9” VFT) (sub-samples 73A & 74A) Gold Carpet Mastic (over ACM-9” VFT) (samples 75 to 77) Gold Carpet Mastic (over wood-sub flooring & ceramic floor tiling) (samples 78 to 80) Tan Wall Adhesive (of wainscot wood wall paneling) (samples 81 to 83) Green-Grey Wall Adhesive (of wainscot wood wall paneling) (samples 84 to 86) Grey Mortar (of chimney brick) (samples 87 to 89) Grey Mortar (of BSMT terracotta block walls) (samples 90 to 92) Grey Thin-set Grout & Adhesive (of 6” ceramic floor tiling) (samples 93 to 95) Grey Thin-set Grout & Adhesive (of 4”x 8” ceramic wall tiling) (samples 96 to 98) Brown Corkboard & Tar Adhesive (of coolers & ACM-Silver Coating) (samples 99 to 101) Gold Adhesive (of SE BSMT wood wall paneling stringers) (samples 102 to 104) Grey Mortar (of SE BSMT new vault room CMU walls) (samples 105 to 107) Grey Concrete (of SE BSMT new vault room ceiling/lid) (samples 108 to 110) Tan & Brown 12” VFT & Gold Mastic (o/sub-floor & ACM-9” VFT) (samples 111 to 113) Green VSF & Brown Jute Backing (of stairwell mid-landings) (samples 114 to 116) Tan Door Gasket Material (of old cooler entry doors) (samples 117 to 119) Tan & Grey Rubberized Exterior Roofing (on ext. porch floors) (samples 120 to 122) White Caulking (of newer exterior entry door units) (samples 123 to 125) Brown & Tan Glazing (of exterior window units) (samples 126 to 128) Dark Grey Blown-in Insulation (of attic space over ACM-vermiculite) (samples 132 to 135) Black Tarpaper (under ceramic tile roofing) (samples 138 to 140) Black-Grey Frost Barrier Sheeting (under ceramic tile roofing) (sub-samples 138A to 140A) Red Vapor Sheeting Paper (remnants of past removed roofing) (samples 141 to 143) Red Asphalt Shingle Roofing (remnants within attic space) (samples 144 to 146)
March 25, 2014 S-4 Mountain Consulting Services, LLC
Black Damper Joint Material (of attic space air fan units) (samples 147 to 149) Grey Pliable Caulking Sealant (of attic space air fan units) (samples 150 to 152) Brown-White Pliable Bedding Adhesive (of roof system ridge cap tiling) (samples 153 to 155) Black Vinyl Stair-treads & White Adhesive (of ext. entry stair system) (samples 156 to 158) Grey Plaster Skim-Coating (of exterior concrete walls) (samples 159 to 165)
Materials that contain greater than one percent (>1%) asbestos are considered regulated building materials and must be properly removed by a certified asbestos abatement contractor prior to impacting by building renovation or demolition. Materials proven to be ACM-Free maybe impacted without any specialized personnel training and disposed of as construction debris.
No other suspect building materials associated with the structure were identified to be tested for asbestos content during this survey. The building owner or tenant is responsible, under OSHA regulations, to notify all maintenance and custodial workers of the presence and location of ACM.
Asbestos containing materials must be handled and disposed of in accordance with OSHA, NESHAP, and local regulations.
LEAD COATINGS SURVEY SUMMARY
Mountain Consulting used a “Dynasil, RMD, LPA-1” X-ray fluorescence (XRF) lead spectrum analyzer, Serial Number 3627, for nondestructive sampling for suspect lead based paints and lead glazed ceramic tile materials present throughout the building for this project. Mountain Consulting collected a total of Three-Hundred-&-Forty-Five (345) XRF suspect lead coating assays & calibration readings for this project.
Any paint films or ceramic tile glazing’s with lead concentrations of 1.0 mg/cm² (milligrams per square centimeter) or greater were classified as Regulated Lead Containing Materials. In addition, the substrate condition was visually assessed at each assay test site. Any paint or glaze coatings that produced results below the 1.0 mg/cm² threshold were bulk sampled using destructive methods to verify the actual lead content in parts per million (ppm).
The paint or ceramic tile glaze coatings associated with the following components are considered to be regulated lead containing materials by XRF Assay testing. These materials are potential lead hazards, contractors working on or around these materials should be informed of the lead content and potential lead hazard:
Fort Missoula Building 26 – Basement Interior, Lead Coatings by XRF
Component & Location Coating Condition XRF Results
White, Grey, Green, Tan & Yellow Paints on Concrete & Plaster, Walls & Ceilings Overall Satisfactory 2.0 to 9.9 mg/cm²
Brown, White & Tan Paints on Wood Window Sashes & Frames Overall Satisfactory 2.3 to 9.6 mg/cm²
White, Green & Grey Paints on Wood Doors & Doorframes Overall Satisfactory 4.7 to 9.9 mg/cm²
Silver Paint on Metal Doors Overall Satisfactory 3.2 to 4.0 mg/cm²
March 25, 2014 S-5 Mountain Consulting Services, LLC
White & Tan Paints on Wood Baseboard & Chair-Rail Moldings Overall Satisfactory 3.5 to 9.9 mg/cm²
Black & Tan Paints on Steel Hand-Railings Overall Satisfactory 4.7 to 5.4 mg/cm²
Brown, White & Tan Paints on Wood w/Stairwell System Components Overall Satisfactory 2.5 to 9.9 mg/cm²
White Paint on Wood Posts & Beams Overall Satisfactory 9.9 mg/cm²
Fort Missoula Building 26 – 1st Floor Interior, Lead Coatings by XRF
Component & Location Coating Condition XRF Results
White & Blue Paints on Plaster, Walls & Ceilings Overall Satisfactory 4.5 to 9.9 mg/cm²
Tan, White & Brown Paints on Wood Window Sashes, Sills & Frames Overall Satisfactory 1.5 to 9.7 mg/cm²
Tan & White Paints on Wood Doors & Doorframes Overall Satisfactory 2.5 to 9.9 mg/cm²
Tan Paint on Wood Baseboard & Chair-Rail Moldings Overall Satisfactory 2.9 to 7.7 mg/cm²
Brown Paint on Steel Door Frames Overall Satisfactory 3.2 mg/cm²
Silver Paint on Wood Cooler Entry Doors & Door Frames Overall Satisfactory 1.7 mg/cm²
Fort Missoula Building 26 – 2nd Floor Interior, Lead Coatings by XRF
White & Yellow Paints on Plaster, Walls & Ceilings Overall Satisfactory 4.0 to 9.9 mg/cm²
Tan & Brown Paints on Wood Window Sashes, Sills & Frames Overall Satisfactory 2.0 to 9.9 mg/cm²
Tan & White Paints on Wood Doors & Doorframes Overall Satisfactory 2.5 to 9.9 mg/cm²
Tan & Brown Paints on Wood Baseboard & Chair-Rail Moldings Overall Satisfactory 4.1 to 9.9 mg/cm²
Brown & White Paints on Steel Posts Overall Satisfactory 4.3 to 9.9 mg/cm²
Tan Paint on Wood w/Stairwell System Components Overall Satisfactory 9.9 mg/cm²
Fort Missoula Building 26 – Building Exterior, Lead Coatings by XRF
Tan Paint on Plaster/Concrete Walls Overall Satisfactory 1.6 to 6.2 mg/cm²
Tan Paint on Wood Window Sashes, Sills & Frames Overall Deteriorated 2.0 to 9.5 mg/cm²
Tan Paint on Wood Porch Ceilings & Rafters Overall Satisfactory 1.0 to 2.1 mg/cm²
Tan Paint on Wood Soffits & Rafters Overall Satisfactory 5.9 to 9.9 mg/cm²
Tan Paint on Wood Doors & Door Frames Overall Satisfactory 4.3 to 9.9 mg/cm²
Tan Paint on Wood w/Stairwell System Components Overall Satisfactory 2.3 to 2.8 mg/cm²
Mountain Consulting performed destructive bulk paint/ceramic glazed tile materials testing of suspect lead containing majority coatings present with the included building for this good-faith survey project.
March 25, 2014 S-6 Mountain Consulting Services, LLC
Mountain Consulting collected a total of 33 bulk coating samples (29 paint & 4 ceramic tile samples), from suspect coated building components that produced negative XRF assay results for this project. The results of the bulk paint/glazed ceramic tile samples collected for this project is listed as follows:
1. White Paint on Plaster Walls 0.42 %wt or 4,200 ppm
2. Grey Paint on Concrete Floors 0.59 %wt or 5,900 ppm
3. White Paint on Wood Doors/Frames/Trims 8.3 %wt or 83,000 ppm
4. White Paint on Concrete Walls 20 %wt or 200,000 ppm
5. Grey Paint on Concrete Walls 38 %wt or 380,000 ppm
6. Tan Paint on Wood Stair Components <0.014 %wt or <140 ppm
7. White Paint on Sheetrock Wallboard <0.011 %wt or <110 ppm
8. 4” White Glazed Ceramic Wall Tiling <40 mg/Kg or <40 ppm
9. 5” Red Glazed Ceramic Floor Tiling <40 mg/Kg or <40 ppm
10. Green Paint on Concrete Walls 0.035 %wt or 350 ppm
11. White Paint on Concrete Walls 0.011 %wt or 110 ppm
12. Brown Paint on Wood Window Components 0.078 %wt or 780 ppm
13. Red Paint on Concrete Floors 1.9 %wt or 19,000 ppm
14. White Paint on Steel Doors/Frames <0.053 %wt or <530 ppm
15. Gold Vanish on Wood Components <0.085 %wt or <850 ppm
16. White Paint on CMU Walls <0.030 %wt or <300 ppm
17. White Paint on Brick Chimneys 0.11 %wt or 1,100 ppm
18. Red Paint on Fiber Ceiling Tiles <0.010 %wt or <100 ppm
19. Blue Paint on Fiber Ceiling Tiles <0.010 %wt or <100 ppm
20. White Paint on Fiber Ceiling Tiles <0.010 %wt or <100 ppm
21. White Paint on Wood Doors/Frames/Trims <0.043 %wt or <430 ppm
22. 4”x 8” White Glazed Ceramic Wall Tiling <40 mg/Kg or <40 ppm
23. 4”x 8” Brown Glazed Ceramic Baseboard Tiling <40 mg/Kg or <40 ppm
24. Silver Paint on Cork Cooler Walls <0.010 %wt or <100 ppm
25. Silver Paint on Wood Cooler Doors/Frames <0.010 %wt or <100 ppm
26. Gold Varnish on Wood Paneling <0.038 %wt or <380 ppm
27. White Paint on Plaster Walls 0.035 %wt or 350 ppm
28. Green Paint on Plaster Walls 0.052 %wt or 520 ppm
29. Yellow Paint on Sheetrock Walls 0.089 %wt or 890 ppm
30. Blue Paint on Wood Trims <0.011 %wt or <110 ppm
31. White Paint on Exterior Concrete Walls 0.16 %wt or 1,600 ppm
32. Tan Paint on Exterior Steel Hand Railings 0.13 %wt or 1,300 ppm
33. Silver Paint on Cast Iron Heating Radiators 0.61 %wt or 6,100 ppm
Conversions: %wt @ 10,000 = parts per million; and, mg/Kg = ppm.
Notes: Bold-Italic = indicates non-regulated lead containing coatings.
The bulk paint samples collected for this project were submitted following proper chain of custody procedures to EMSL Analytical, Inc. located in Cinnaminson, New Jersey for analysis by method SW846, 3050B/7000B*. EMSL is an ACGIH accredited analytical laboratory.
March 25, 2014 S-7 Mountain Consulting Services, LLC
Any coating that contain lead concentrations greater than 100 parts per million (ppm); proven to be LBP by XRF Assay Testing; or, assumed to be a lead coating associated with this project are regulated by Federal and/or Montana State regulations.
Explanations of regulations are detailed as follows:
The Occupational Safety and Health Administration (OSHA) 29 CFR 1926.62 lead in construction standard does not define a definition for lead based coatings or materials, but does establish safe airborne exposure limits for employees working with lead containing materials, by permissible exposure limit (PEL). So in summation; if any material or coating contains lead above 100 ppm then abatement, renovation or demolition contractors must demonstrate worker health and safety due diligence.
This includes lead awareness training for all affected employees, establishment of proper employee personnel protective equipment (PPE), proper demarcation of effected work area(s), and performance of negative exposure assessment (NEA) lead air monitoring prior to downgrading any established PPE.
The Federal Dangerous Waste Regulation (40 CFR Part 261) requires that lead containing materials with a lead content above 5,000 ppm threshold be treated as lead hazardous waste, until toxic characterization leeching procedure (TCLP) bulk waste stream sampling prove otherwise. The TCLP lead characterization threshold is 5 ppm. TCLP lead waste stream bulk sampling and analysis was not conducted as part of this survey project.
LIMITING CONDITIONS
A complete discussion of survey parameters and applied methods are enclosed in the following sections of this report. Only general conclusions should be made from the information provided within this summary.
During this ACM/LBP survey, Mountain Consulting endeavored to observe, inventory, and sample (if appropriate) potentially regulated and or hazardous materials associated with the included facility structure/areas for renovation activities.
During renovation activities for the included structure, if any unidentified suspect materials are encountered that were not observed during this assessment may warrant additional sampling, analysis or assumption.
CLOSURE
The results, conclusions, and recommendations presented in this report were prepared following our inspection of suspected materials at the subject property. Methods used by Mountain Consulting for this study are consistent with the standard of care and professionalism normally exercised by consultants in the environmental science and engineering fields.
March 25, 2014 S-8 Mountain Consulting Services, LLC
The Client acknowledges that Mountain Consulting has been retained for the sole purpose of assisting the Client in identifying Regulated and Hazardous Materials, if any, associated with the subject facility. It is agreed that Mountain Consulting has assumed responsibility only for performing this assessment and presenting this report and conclusions to the Client. The Client acknowledges that Mountain Consulting is not acting as an “agent” for the Client, or any other user or entity, for work associated with any regulated and/or hazardous materials.
Mountain Consulting does not act or have authority to act for or in place of the Client or its successors or assigns. Mountain Consulting does not represent the Client nor does it authorize or allow any construction, renovation, remodeling, maintenance, repair, or demolition work by performing this assessment.
March 25, 2014 S-9 Mountain Consulting Services, LLC
SECTION 2
GOOD-FAITH ASBESTOS
MATERIALS SURVEY
ASBESTOS SURVEY – TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 SCOPE OF WORK
3.0 ASSESSMENT SURVEY PARAMETERS
3.1 HOMOGENEOUS AREAS
3.2 BULK SAMPLING
3.3 LABORATORY AND ANALYTICAL METHODS
4.0 RESULTS
4.1 REGULATED ASBESTOS CONTAINING MATERIALS
4.2 MATERIALS ASSUMED TO BE REGULATED ACM
4.3 SUSPECT MATERIALS PRESENT BUT NOT TESTED
4.4 MATERIALS PROVEN TO BE ACM-FREE
4.5 MATERIALS ASSUMED NOT TO CONTAIN ASBESTOS
5.0 CONCLUSIONS AND RECOMMENDATIONS
5.1 CONCLUSIONS
5.2 RECOMMENDATIONS
APPENDICES
A: Certifications and Accreditations B: Asbestos Bulk Samples Analysis Report C: Asbestos Bulk Sample Location Drawings
March 25, 2014 TOC Mountain Consulting Services, LLC
GOOD-FAITH ACM SURVEY
GOOD-FAITH ASBESTOS MATERIALS & LEAD COATINGS SURVEY; HISTORIC
BUILDING #26; FORT MISSOULA FACILITY; MISSOULA, MONTANA
ASBESTOS CONTAINING MATERIALS SURVEY REPORT
1.0 INTRODUCTION
The USDA Forest Service of Missoula, Montana, contracted Mountain Consulting Services, LLC (Mountain Consulting) to provide a good-faith asbestos materials survey for the suspect building materials present with the 3-story; 39,000 ft²; Historic Building 26 located on the Fort Missoula facility addressed at 322 Fort Missoula in Missoula, Montana.
This project was conducted to facilitate new occupancy phased renovations for the Building 26 structure. No prior survey documentation was provided for this project.
The field survey activities for this project were conducted on March 5th & 6th of 2014 by Mr. Samuel W. Bailey Jr., EPA Accredited AHERA Building Inspector; Certification: BIR-13-038/MTA-3565;
Expiration: October 8, 2014. (See Appendix A for inspector and laboratory certifications.)
2.0 SCOPE OF WORK
The scope of work was designed to meet the requirements for asbestos inspection and due diligence notification in the Occupational Safety and Health Administration (OSHA) Asbestos Standard (29 CFR 1926.1101); the National Emission Standards for Hazardous Air Pollutants (NESHAP 40 CFR 61); applicable portions of the Asbestos Hazardous Emergency Response Act (AHERA) & regulations in 40 CFR 763; and, the Administrative Rules of Montana, Title 17, Chapter 74, Subchapter 3, governed by the Montana Department of Environmental Quality (MDEQ).
The survey was conducted through visual evaluation, classification and analysis of suspected asbestos-containing materials (ACMs) used in the construction or remodeling of the surveyed building. The survey included the following tasks:
Visual survey and assessment of the location and condition of suspected materials.
Collection and analysis of bulk samples from suspected asbestos containing materials.
Preparation of a report summarizing the identification and assessment of any asbestos containing materials and material found not to contain asbestos.
March 25, 2014 ACM - Page 1 Mountain Consulting Services, LLC
3.0 ASSESSMENT SURVEY PARAMETERS
3.1 HOMOGENEOUS AREAS
Homogeneous materials are those considered to be consistent throughout an area based on color, texture, and construction era. For the purpose of this survey, homogeneous areas were delineated using the construction era, material composition, and material location as the primary considerations.
Material appearance, texture, size, color, and analytical results may support assumptions about each material’s homogeneity.
3.2 BULK SAMPLING
Suspected ACMs were collected according to guidelines in 40 CFR 763.85 and were sampled to determine the type and percentage of asbestos by volume. At least three (3) samples were collected from each selected miscellaneous and thermal system insulation materials. Suspect surfacing materials were sampled according to the AHERA “3/5/7 rule.”
For other types of suspect materials, or materials assumed to be non-ACM, regulations require the on-site AHERA building inspector to determine the appropriate number of samples. The quantity of material present, manufacturer’s labels, appearance, construction or renovation era, and inspector’s expertise were used to determine the number of samples. A homogeneous material is considered to be an ACM if one or more sample results are equal to or greater than 1% asbestos.
The EPA recommends that at least three samples be analyzed by polarized-light microscopy (PLM) for the following types of materials in order to prevent false negative results (less than 1% asbestos):
Materials that contain low concentrations of asbestos fibers (less than 10%);
Materials with asbestos fibers tightly bound in a matrix;
Materials with milled asbestos fibers (fine fibers);
Materials with hand-mixed asbestos fibers; and Materials with a combination of these characteristics.
All bulk samples must have results below 1% asbestos before the material may be classified in accordance with AHERA rules as not being an ACM. However, if asbestos is detected in the material at less than 1%, OSHA worker health and safety due diligence regulations may still apply.
3.3 LABORATORY AND ANALYTICAL METHODS
Mountain Consulting performed destructive bulk materials testing of suspect building materials to verify the presence of asbestos minerals or prove asbestos-free content. Mountain Consulting collected 165 bulk material samples from 52 different homogeneous suspect building materials or material systems identified during survey activities. Laboratory analysts sub-divided 15 submitted samples, and did not analyzed 2 submitted samples, resulting in a total of 178 samples analyzed for this project.
March 25, 2014 ACM - Page 2 Mountain Consulting Services, LLC
All samples were submitted for analysis to Mountain Laboratories of Spokane, Washington using chain of custody procedures. Mountain Laboratories participates in the national voluntary laboratory accreditation program (NAVLAP) and is a NAVLAP accredited asbestos testing laboratory, NAVLAP code: 101890-0. All samples were analyzed to determine asbestos type and content using PLM with dispersion staining in accordance with the following methods:
EPA EPA 600/R-93/116, “Method for the Determination of Asbestos in Bulk Building Materials” (July 1993).
EPA “Interim Method for the Determination of Asbestos in Bulk Insulation Samples” (40 CFR Part 763, Subpart F, Appendix A; May 27, 1982).
ASTM Draft “Standard Method of Testing for Asbestos Containing Materials by Polarized Light Microscopy” (ASTM Committee D22.05; January 14, 1988).
4.0 RESULTS
This section describes suspect materials that were proven to be asbestos containing (Regulated ACM) or proven to be free of asbestos minerals (ACM-Free). (Refer to the bulk sample analysis report in Appendix B for specific sample composition and Appendix C for sample location drawings).
4.1 REGULATED ASBESTOS CONTAINING MATERIALS
ACMs are materials proven to contain at least 1% asbestos or greater. AHERA (asbestos hazards emergency response act) and NESHAP (national emissions standard for hazardous air pollutants) regulations distinguish between friable and non-friable forms of ACM. A friable material is defined as one that can be “crumbled, pulverized, or reduced to powder by hand pressure when dry.” Friability is an indication of a material’s ability to release asbestos fibers into the air.
Regulated ACMs are defined by NESHAP as all friable ACM and non-friable ACM that may be disturbed by renovation or demolition.
The following homogeneous building materials were found to contain greater than one percent (>1%) asbestos content by laboratory analysis and are considered to be (Regulated ACM) requiring proper abatement prior to being impacted by renovation or demolition activities:
9”x 9” Vinyl Floor Tiling (VFT) (Green & Black in Colors-Checkered Pattern) located throughout the majority of the 1st and 2nd floors of the building either exposed, hidden under carpeting, hidden under vinyl sheet flooring (VSF), hidden under newer VFT or VSF & wood sub-flooring systems was found to contain asbestos. The class II, non-friable, miscellaneous materials contain 4-6% chrysotile asbestos. The total quantity of material present is 22,600 ft².
The quantities break for overlaid material types is as follow: There is approximately 1,360 ft² of this material exposed (1st floor NE office and the 2nd floor NE dormitory); approximately
March 25, 2014 ACM - Page 3 Mountain Consulting Services, LLC
5,780 ft² of this material present hidden under ACM-Free vinyl sheet flooring (VSF) (1st & 2nd floors; N & W wings); approximately 9,800 ft² of this material present hidden under carpeting (1st floor N, W & S wings; 2nd floor N & W wings); and, approximately 5,660 ft² of this material present hidden under ACM-Free VFT or VSF and wood sub-flooring (1st floor S wing hallway & 2nd floor entire S wing). It should be noted that the associated black flooring mastic material was proven to be ACM-free. Represented by bulk samples 14-037.1-72, 73 & 74.
Exposed Silver Painted Tar Coating Layers associated with the built-up tar adhered corkboard wall paneling system present within the old cooler rooms of the northeast and southeast center end rooms of the 1st floor within the building was found to contain asbestos.
The class II, non-friable, miscellaneous coatings material contains 7-10% chrysotile asbestos. It should be noted that this material is present with the walls, ceilings and assumed to be present under the elevated concrete floors within each room. Also the interior of southeast wing cooler has been remodeled with newer over installed ACM-Free sheetrock, carpeting & suspended ceiling system. The underlying cork & tar layers were proven ACM-Free. There is approximately 1,450 ft² of this material present with both rooms. Represented by bulk samples 14-037.1-99, 100 & 101.
White Non-Pliable Caulking Sealant located present between the wood doorframes to exterior concrete wall joints of the exterior entry door units of the building was found to contain asbestos. This class II, non-friable, miscellaneous material contains 1-2% chrysotile asbestos. There is approximatly 440 linear feet (lf) of this material present with 24 exterior entry door units. Represented by Bulk Samples 14-037.1-129, 130 & 131.
4.2 MATERIALS ASSUMED TO BE REGULATED ACM
The following homogeneous materials present with the facility are being assumed to contain asbestos based on inspector expertise, age of construction, material type and/or inaccessible suspect material (Regulated ACM):
Boiler Segments Sealant associated with enclosed cast iron segments of the 2 small boilers present within the basement mechanical rooms of the north & south wings of the building is ASSUMED to contain asbestos. This material is a class I, friable, thermal systems insulation (TSI) type. If present, there should be approximately 224 lf of material within the boilers.
Vermiculite Attic Insulation located under ACM-Free rot wool type blown-in insulation throughout the attic crawl space of the building was found to contain TRACE amounts of actinolite asbestos. There is approximately 13,000 ft² of this material present ranging in depths from 1” to 3” inches. This material has a history of producing false negative results by polarize light microscopy (PLM) and causing environment and health hazards when disturbed.
Although this material is not regulated for asbestos content by MDEQ, it should not be considered a safe material and it is recommended that this material be handled as a regulated Asbestos Containing Material. Represented by Bulk Samples 135, 136 & 137.
March 25, 2014 ACM - Page 4 Mountain Consulting Services, LLC
4.3 SUSPECT MATERIALS PRESENT BUT NOT TESTED
The following suspect building materials present with the structure were intentionally not tested for asbestos content at this time, due to either water damage intrusion potentials or warrantee voiding situations. These materials must be tested for asbestos content prior to any future impacting for renovation or demolition:
Black Membrane Roofing System (present w/flat roof decks) Red Ceramic Tile Roofing
4.4 MATERIALS PROVEN TO BE ACM-FREE
Microscopic examination of samples collected from the following suspect building materials did not detect the presence of asbestos minerals (ACM-Free):
Plaster (White Top Coat & Grey Base Coat) Wall & Ceiling System (samples 01 to 07) Sheetrock Wallboard Paneling’s (throughout building) (samples 08 to 14) Joint & Taping Compound Mud (associated with S/R systems) (sub-samples 08A to 14A) Vinyl Covered S/R (no J/C present) (samples 15 to 17 & sub-samples 15A to 17A) 2’x 4’ Suspended Ceiling Tile (wormhole pattern) (samples 18 to 20) 12”x 12” Fastened Ceiling Tile (holes pattern) (samples 21 to 23) Grey Concrete (foundation walls) (samples 24 to 26) Grey Concrete (of basement floor slabs) (samples 27 to 29) Grey Mortar (of basement CMU walls) (samples 30 to 32) Tan, Brown & Grey Glazing Putty (of BSMT window units) (samples 33 to 35) White & Gold Rope Gaskets (of BSMT boilers) (samples 36 to 38) White Seam/Joint Sealant (of BSMT fiberglass piping insulations) (samples 39 to 41) White & Grey Pebble Pattern VSF & Yellow Mastic (BSMT NW-RR) (samples 42 to 44) Grey Thin-set Grout & Adhesive (of 6” red ceramic floor tiling) (samples 45 to 47) White & Grey Terrazzo Shower Basins (samples 48 to 50) Brown Grout & Grey Adhesive (of white 4” ceramic wall tiling) (samples 51 to 53) White & Gold Plaster Skim Coating (of shower room walls) (samples 54 to 56) Formica & Cold Adhesive (of restroom countertops) (samples 57 to 59) Grey & Beige 12”x 12” VFT & Gold Mastic (of BSMT SW-RR) (samples 60 to 62) Grey-Tan Floor Leveling (of BSMT SW-RR) (samples 63 to 65) 4” Brown Vinyl Cove Base (VCB) & White Mastic (samples 66 to 68) Tan & Brown Pebble Pattern VSF & Gold Mastic (over ACM-9” VFT) (samples 69 to 71) Black Flooring Mastic (adhering ACM-9” VFT) (samples 72 to 74) Tarpaper & Brown Mastic (under ACM-9” VFT)…