Plumbing_-_DP2.0_P9.1.pdf

PDF 1 MB Posted

Attached to
Building 26, Phase 2 North Wing Renovation Federal contract opportunity
Solicitation number
AG-03R6-S-15-0052
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Drawings Plumbing-DP2.0_P9.1

View the file

Other files for this federal contract opportunity

Other files attached to Building 26, Phase 2 North Wing Renovation, newest first.
File Type Posted
S150052FinalAmendmen0003QAs.pdf PDF
S150052FinalAmendmen0002QAs.pdf PDF
02_-_PROJECT_REPRESENTATIVES.pdf PDF
115213_-_PROJECTION_SCREENS.pdf PDF
S150052FinalAmendmen0001QAs.pdf PDF
064116_-_PLASTIC-LAMINATE-FACED_ARCHITECTURAL_CABINETS.pdf PDF
Wage_Rate_Decision_No.pdf PDF
102113_-_PHENOLIC-CORE_TOILET_COMPARTMENTS.pdf PDF
102800_-_TOILET_BATH_AND_LAUNDRY_ACCESSORIES.pdf PDF
093013_-_CERAMIC_TILING.pdf PDF
104413_-_FIRE_PROTECTION_CABINETS.pdf PDF
20150728Build26Phase2Sign-In.pdf PDF
123661_-_SIMULATED_STONE_COUNTERTOPS.pdf PDF
Civil2-_C9.1_C9.4.pdf PDF
Arch9_-_A7.0_A9.5.pdf PDF
Arch3-_A1.2.pdf PDF
Arch10_-_SP2.1_SP2.2.pdf PDF
Civil1-_C1.1_C3.2.pdf PDF
Arch8_-_A5.1_A6.10.pdf PDF
Elec1-_E0.1_E2.5.pdf PDF
DOLBuildingMT150064MslaCo.htm HTM file
Arch5-_D9.1.pdf PDF
Arch7_-_A3.1_A4.2.pdf PDF
FireSprinkler-_F0.1_F9.1.pdf PDF
Specifications2-_DIV21_DIV33.pdf PDF
Elec2_-_E7.0_E9.5.pdf PDF
Arch2-_A1.1.pdf PDF
Arch4-_D2.0_D7.2.pdf PDF
Arch1-_Cover_Sheet_Signed.pdf PDF
Arch6-_A2.0_A2.3.pdf PDF
Specifications_1_-_DIV00_DIV12.pdf PDF
Security-_Basement_1st_2nd.pdf PDF
Mech-_DM2.0_M9.8.pdf PDF
Structural2-_S2.0_S9.1.pdf PDF
20150707FinalAG03R6S150052Build26Phase2.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHWH

DF DF

STAIR

RESTROOM

MECH / ELECT

TELE/DATA

ELEV

MACHINE

ELEVATOR

A

VESTIBULE

VESTIBULE

UP UP

UP

DOWN

17"

DOWN

17"

DOWN

17"

DOWN

17"

UP UP

UP

UP

ELECTRICAL

UPSTAIR

MECH / ELECT

ALL EXISTING FIRE SPRINKLER PIPING TO

REMAIN, PROTECT

EXISTING FIRE SPRINKLER MAIN TO

REMAIN. PROTECT

A D E F G H KCB J 1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS

IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL

PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO LEFT

ALONE. BLACK IS TO BE REMOVED.

5. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS ABATEMENT

CONTRACTOR.

BA

SE

M

EN

T P

LU

M

BI

N

G D

EM

O

P

LA

N

KEY NOTES:

USFS BUILDING 26 - BASEMENT PLUMBING DEMO PLAN 16

DP2.0 : DP2.0 1/8" = 1'-0"

NORTH

DP2.0

1. EXISTING WATER SERVICE ENTRY. PREP EXISTING WATER LINE

FOR CONNECTION TO NEW PIPING.

2. REMOVE ALL DOMESTIC WATER PIPING AND PLUMBING FIXTURES

TO CREATE A CLEAR PATH TO ROUTE NEW WATER SERVICE LINE.

3. EXISTING DOMESTIC WATER AND WASTE PIPING SERVING

FIXTURES ABOVE SHALL BE REMOVED, COMPLETE.

4. EXISTING DOMESTIC WATER, WASTE PIPING AT CEILING SHALL BE

REMOVED, COMPLETE. CAP LINES WASTE LINES AS REQUIRED.

5. EXISTING RADON SYSTEM SHALL REMAIN IN PLACE.

6. REMOVE EXISTING LAV'S AND CASEWORK FOR ACCESS TO WATER

ENTRANCE IN CORNER OF ROOM.

7. EXISTING SANITARY SEWER DOWN THROUGH FLOOR. CUT LINE 12

TO 24" ABOVE FLOOR FOR CONNECTION TO NEW SANITARY

WASTE. SEE SHEET P2.0.

8. EXISTING SANITARY SEWER VENT TO REMAIN.

9. EXISTING VENT PIPING AT CEILING SHALL BE REMOVED,

COMPLETE. CAP VENT LINE ABOVE SHOWER WALL AND ABOVE

FLOOR IN NORTH WEST CORNER.

10. EXISTING FIRE PROTECTION RISER AND FIRE PROTECTION

SYSTEM. INSTALLED UNDER PHASE 1. PROTECT.

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

LEGEND:

HATCH AREA = DEMO AREA. REMOVE ALL DOMESTIC

AND SANITARY PLUMBING REPRESENTED IN

HATCHED AREA AS INDICATED BY THE KEYNOTES.

DOWN DOWN

DOWN DOWN

DOWNDOWN

UP UP

RAMP

DOWN

RAMP

DOWN

RAMP

DOWN

DOWN DOWN

UP UP

101.4

(N)

FSR R R R

A D E F G H KCB J

FI

R

ST

F

LO

O

R P

LU

M

BI

N

G D

EM

O

P

LA

N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS

IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL

PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

4. ALL GRAYSCALE DUCTWORK/PIPING/EQUIPMENT IS TO LEFT

ALONE. BLACK IS TO BE REMOVED.

5. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS ABATEMENT

CONTRACTOR.

KEY NOTES:

USFS BUILDING 26 - FIRST FLOOR PLUMBING DEMO PLAN 16

DP2.1 : DP2.1 1/8" = 1'-0"

NORTH

DP2.1

1. ALL EXISTING PLUMBING SHALL BE REMOVED FROM THIS ROOM.

UNLESS NOTED OTHERWISE.

2. EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING IN THIS

AREA SHALL BE REMOVED.

3. CORE DRILL PENETRATION THROUGH FLOOR FOR NEW 2 1/2"

VENT. COORDINATE WITH EXISTING PIPES IN THIS AREA TO

IDENTIFY BEST INSTALLATION LOCATION. REFER TO SHEETS P2.0

AND P2.1.

4. SANITARY SEWER VENT TO REMAIN.

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

HATCH AREA = DEMO AREA. REMOVE ALL DOMESTIC

AND SANITARY PLUMBING REPRESENTED IN

HATCHED AREA AS INDICATED BY THE KEYNOTES.

LEGEND:

DOWNDOWN

DOWN

DOWNDOWN

DOWNDOWN

DOWNDOWN

DOWN

DOWN

(E)

SWR

(N)

FSR

BOILER

VENT

BOILER

VENT

R

R

R

DOWN

A D E F G H KCB JA D E F G H KCB J

SE

C

O N

D F

LO

O

R P

LU

M

BI

N

G D

EM

O

P

LA

N

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS,

BOXES AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE

FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

4. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

5. COORDINATE REMOVAL OF PIPING WITH ASBESTOS ABATEMENT

CONTRACTOR.

KEY NOTES:

USFS BUILDING 26 - SECOND FLOOR PLUMBING DEMO PLAN 16

DP2.2 : DP2.2 1/8" = 1'-0"

NORTH

DP2.2

1. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED PIPING IN

THIS ROOM.

2. EXISTING VENT PIPE IN THIS AREA SHALL BE REMOVED.

3. CORE DRILL PENETRATION THROUGH FLOOR FOR NEW 2 1/2"

VENT. COORDINATE WITH EXISTING PIPES IN THIS AREA TO

IDENTIFY BEST INSTALLATION LOCATION. REFER TO SHEET P2.1 &

P2.2.

4. EXISTING SANITARY SEWER VENT TO REMAIN.

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

WHWH

DF DF

2" CW (E)

1-1/2" HW (E)

1" HWR (E)

FIRE SPRINKLER

RISER

8 4" SAN (E) 4" SAN (E)

S

A N

S

A N

E

2" V (E)

S

A N

E

EXISTING WET FIRE SPRINKLER MAIN

EXISTING DRY FIRE SPRINKLER MAIN

FIRE RISER

LOCATION

FIRE RISER LOCATION

FIRE RISER LOCATION

FIRE RISER

LOCATION

WATER

SERVICE

2" CW

C

W

2" CW 3/4" HW 3/4" HWR2" CW

3/4" HW

3/4" HWR

1" HWR (E)

2 1/2" CW (E)

1 1/4" HW (E)

C

W

H

W R

H

W

3/4" HW 1" HW

H

W

C

W

1 1/2" CW

WATER SERVICE

3/4" HWR

3/4" HW

2" CW

3/4" HWR

3/4" HW

3/4" CW

3/4" HWR

3/4" HW

3/4" CW

2"SAN

2 1/2" V

(EXISTING)

(EXISTING)

2"SAN

S

A N

CO

CO

2" CW

1" HW

3/4" HWR

NEW

STAIR

RESTROOM

MECH / ELECT

ELECT/DATA

ELEVATOR

MACHINE

ELEVATOR

A

VESTIBULE

VESTIBULE

ELECTRICAL

WHA1

FS1

A D E F G H KCB J

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

SANITARY SEWER

SANITARY VENT

FIRE PROTECTION

PIPE LEGEND

BA

SE

M

EN

T P

LU

M

BI

N

G P

LA

N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH

OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS,

CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD VERIFIED.

THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND DUCTWORK AS

REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING SYSTEMS WITH

OTHER TRADES. REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP DRAWINGS FOR

ADDITIONAL DETAILS NECESSARY FOR COORDINATION.

5. ABSOLUTELY NOT FITTINGS OR PIPING CONNECTIONS ARE ALLOWED UNDER

THE CONCRETE SLAB.

6. ALL NATURAL GAS PIPING IS TO BE WELDED IN CONCEALED SPACES.

7. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS.

8. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO INDIVIDUAL

FIXTURES.

9. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL DRAWINGS

TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

10. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH SURROUNDINGS.

11. PLUMBING CONTRACTOR SHALL FIRE SEAL ALL PIPING AND DUCTWORK

PASSING THROUGH RATED CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - BASEMENT PLUMBING PLAN 16

P2.0 : P2.0 1/8" = 1'-0"

NORTH

P2.0

1. 1/2" CW AND HW UP TO L2 ON FIRST FLOOR ROOM 107. SEE SHEET P2.1 FOR

CONTINUATION.

2. INSTALL AND CAP 1" BRANCH FOR CONNECTION TO FUTURE WATER

CLOSETS.

3. INSTALL AND CAP 1/2" BRANCHES FOR FUTURE CONNECTION TO

LAVATORIES.

4. INSTALL AND CAP 3/4" HW, CW BRANCHES FOR FUTURE CONNECTION TO

SHOWERS

5. PIPING TO PENETRATE CONCRETE WALL AT THIS LOCATION. COORDINATE

WITH MECHANICAL, ELECTRICAL AND FIRE PROTECTION.

6. INSTALL BRANCH WITH BALL VALVE AND CAP FOR FUTURE CONSTRUCTION

OF RESTROOM.

7. 2 1/2" VENT INSTALLED AND CAPPED FOR FUTURE CONNECTION OF

RESTROOM VENTING.

8. 2 1/2" VENT UP TO THROUGH FIRST AND SECOND FLOORS. SEE SHEETS P2.1

AND P2.2 FOR CONTINUATION. COORDINATE FINAL VENT LOCATION WITH

EXISTING PIPING IN THIS AREA.

9. CONNECTION POINT FOR NEW CONSTRUCTION.

10. UP TO S2 ON FIRST AND SECOND FLOOR, SEE SHEET P2.1 AND P2.2 FOR

CONTINUATION.

11. INSTALL WATER HAMMER ARRESTOR.

12. THE BUILDING WILL HAVE TWO WATER SERVICES, THE SECOND 2" COLD

WATER SERVICE SHALL CONNECT TO EXISTING CAPPED 2" CW MAIN.

13. ROUTE NEW 2" SANITARY WASTE ALONG CEILING. START RUN AS CLOSE TO

CEILING AS POSSIBLE. THIS PIPING SHALL BE RUN IN CAST IRON.

14. CONNECT NEW 2" SANITARY CAST IRON WASTE TO EXISTING 4" WASTE

THROUGH FLOOR.

15. PROVIDE NEW WASTE AND VENT PIPING TO BE ROUTED FROM NEW FLOOR

SINK TO NEAREST EXISTING UNDERSLAB WASTE AND NEAREST EXISTING

VENT. CONTRACTOR TO MAINTAIN INTEGRITY OF ALL UNDERSLAB PIPING

INCLUDING WASTE AND VENT.

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

A D E F G H KCB J

CONF/

NURSE

CONFERENCE

OFFICE

125OFFICE

OPEN

OFFICE

OPEN

OFFICE

ENTRY

HALL

RECEPTION

BREAK

PRIVATE

OFFICE

HR

JANITOR

WOMENS

RESTROOM

MENS

RESTROOM

EXECUTIVE

ASSISTANT

(2 STAFF)

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

COFFEE / PRINT

115LARGE

CONFERENCE

TELE/DATA

PRINT / COPY / FAX

CONFERENCE

ENTRY

ELEVATOR

A

PORCH

STAIR

PORCH

CONFERENCE

(N)

FSR

OFFICE

OFFICE

OFFICE

OPEN

OFFICE

OPEN

OFFICE

OFFICE

OFFICE

OPEN

OFFICE

CONFERENCE

STAIR

PORCH

SMALL

CONFERENCE

S2

L2

3/4" HWR

3/4" HW

2" VENT

1 1/2" SAN

3/4" CW

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

SANITARY SEWER

SANITARY VENT

FIRE PROTECTION

PIPE LEGEND

FI

R

ST

F

LO

O

R P

LU

M

BI

N

G P

LA

N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS

IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL

PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND

DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

5. ABSOLUTELY NOT FITTINGS OR PIPING CONNECTIONS ARE

ALLOWED UNDER THE CONCRETE SLAB.

6. ALL NATURAL GAS PIPING IS TO BE WELDED IN CONCEALED

SPACES.

7. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS.

8. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO

INDIVIDUAL FIXTURES.

9. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

10. PLUMBING CONTRACTOR SHALL FIRE SEAL ALL PIPING AND

DUCTWORK PASSING THROUGH RATED CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - FIRST FLOOR PLUMBING PLAN 16

P2.1 : P2.1 1/8" = 1'-0"

NORTH

P2.1

1. INSTALL S2, EXTEND HWR, HW, CW, SAN, AND VENT UP TO S2

SINKS ON SECOND FLOOR. SEE SHEET P2.2.

2. 2 1/2" VENT UP THROUGH FLOOR. SEE SHEET P2.2 FOR

CONTINUATION.

3. INSTALL LAVATORY TO AND CONNECT TO EXISTING SANITARY AND

VENT AND CW AND HW UP FROM BELOW. SEE SHEET P2.0.

4. CONNECT 2" SANITARY TO EXISTING SANITARY LINE NEAR THIS

VICINITY. FIELD VERIFY.

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

A D ECB

(N)

FSR

V

V

V

V

2" V (E)

2" CW (E)

1 1/4" HW (E)

1" HWR (E)

FCO

FD1

FCO

FCO

FD1

FD1

WC2

WC2

UR1

UR1

L1

L1

L1

L1

WC1

WC2

EWC-1

SS1

WCO

WCO

WCO

V

V

2" V

V

2" V 2" V

1" HW

H

W

C

W

1-1/4" CW

1-1/4" CW

3/4" HW

1-1/2" CW

1-1/2" CW

H

W

2" CW

1-1/2" CW

2 CW

1" HW

2" CW2" CW

1" HW 1" HW

TP1

TP1

TP1

WHA1

WHA1

WHA1

WC2

H

W

3" V UP (E)

WC1

OFFICE

OFFICE

OFFICE

SMALL

CONFERENCE

SMALL

CONFERENCE

OPEN

OFFICE

OPEN

OFFICE

STAIR

ELEVATOR

A

PORCH

PORCH

TELE/DATA

211JANITOR

SMALL

CONFERENCE

DOWN

WOMENS

RR

MENS

RR

OFFICE

(N)

FSR

DOWN

OFFICE

OPEN

OFFICE

LARGE

CONFERENCE

CONFERENCE

OPEN

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

FILES

OFFICE

CONFERENCE

OFFICE

STAIR

PORCH

PLOT

HALL

OFFICE

OFFICE

V

V

V

V

2" V (E)

2" CW (E)

1 1/4" HW (E)

1" HWR (E)

FCO

FD1

FCO

FCO

FD1

FD1

WC2

WC2

UR1

UR1

L1

L1

L1

L1

WC1

WC2

EWC-1

SS1

WCO

WCO

WCO

V

V

2" V

V

2" V 2" V

1" HW

H

W

C

W

1-1/4" CW

1-1/4" CW

3/4" HW

1-1/2" CW

1-1/2" CW

H

W

2" CW

1-1/2" CW

2 CW

1" HW

2" CW2" CW

1" HW 1" HW

TP1

TP1

TP1

WHA1

WHA1

WHA1

WC2

H

W

3" V UP (E)

S2

WCO

3/4" HWR

3/4" HW

2" VENT

1 1/2" SAN

3/4" CW

WC1

S2

WCO

F G H KJ

F

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

SANITARY SEWER

SANITARY VENT

FIRE PROTECTION

PIPE LEGEND

SE

C

O N

D F

LO

O

R P

LU

M

BI

N

G P

LA

N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS

IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL

PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND

DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

5. ABSOLUTELY NOT FITTINGS OR PIPING CONNECTIONS ARE

ALLOWED UNDER THE CONCRETE SLAB.

6. ALL NATURAL GAS PIPING IS TO BE WELDED IN CONCEALED

SPACES.

7. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS.

8. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO

INDIVIDUAL FIXTURES.

9. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

10. PLUMBING CONTRACTOR SHALL FIRE SEAL ALL PIPING AND

DUCTWORK PASSING THROUGH RATED CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - SECOND FLOOR PLUMBING PLAN 16

P2.2 : P2.2 1/8" = 1'-0"

NORTH

P2.2

1. EXISTING (PHASE 1 CONSTRUCTION) DOMESTIC COLD WATER,

HOT WATER, HOT WATER RECIRC., AND VENT UP THROUGH

WALL CHASE AT THIS LOCATION.

2. COMPLETE THE HOT WATER RECIRC. LOOP INSTALLED IN PHASE

1.

3. CONNECT VENT PIPING TO ANY VENT 3" OR LARGER IN THE

VICINITY. FIELD COORDINATE.

4. 2" VENT UP THROUGH WALL FROM L2 (ROOM 107) BELOW

ROUGH-IN IN PHASE 1 CONSTRUCTION.

5. INSTALL AND CONNECT FLOOR CLEANOUT TO EXISTING WASTE

PIPING INSTALLED IN PHASE 1.

6. INSTALL WATER CLOSETS AND CONNECT TO EXISTING WASTE

PIPING INSTALLED IN PHASE 1.

7. INSTALL LAVATORIES AND CONNECT TO EXISTING WASTE PIPING

INSTALLED IN PHASE 1.

8. INSTALL SERVICE SINK AND CONNECT TO EXISTING WASTE

PIPING INSTALLED IN PHASE 1.

9. INSTALL FLOOR DRAIN AND CONNECT TO EXISTING WASTE

PIPING INSTALLED IN PHASE 1.

10. INSTALL URINAL AND CONNECT TO EXISTING WASTE PIPING

INSTALLED IN PHASE 1.

11. 2 1/2" VENT FROM BELOW (SEE SHEET P2.1) UP INTO ATTIC

CONNECT INTO EXISTING VENT SYSTEM FOR TERMINATION

THROUGH ROOF.

12. CORE DRILL AND ROUTE HW AND CW THROUGH WALL TO

CONNECT TO S2 ON EAST SIDE OF WALL. VENTING FROM BOTH

SINKS SHALL PENETRATE UP THROUGH CEILING AND EITHER

CONNECT TO AN EXISTING VTR 3" OR LARGER IN ATTIC OR

PROVIDE 3" VTR IN AN EXISTING PENETRATION. FIELD

COORDINATE.

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

SECOND FLOOR RESTROOMS ENLARGED PLAN8

P2.2 : P2.2 1/4" = 1'-0"

PIPE SCHEDULE

SYSTEM PIPE MATERIAL SIZE INSULATION THICKNESS REMARKS

COLD WATER SERVICE - BELOW GRADE EXISTING

DOM. COLD WATER - ABOVE GRADE TYPE L COPPER ALL 1/2" PRO-PRESS OR SWEAT

DOM. COLD WATER - MAIN SUPPLY

TYPE L COPPER OR

AQUATHERM (GREEN)

ALL 1/2"

PRO-PRESS OR SWEAT, OR HEAT FUSION (AQUATHERM)

DOM. HOT WATER - ABOVE GRADE TYPE L COPPER ALL 1" PRO-PRESS OR SWEAT

DOM. HOT WATER - MAIN SUPPLY

TYPE L COPPER OR

AQUATHERM (GREEN)

ALL 1"

PRO-PRESS OR SWEAT, OR HEAT FUSION (AQUATHERM)

WASTE PVC ALL NONE NEW SANITARY WASTE

WASTE CAST IRON ALL NONE PROVIDE FOR WASTE PIPING IDENTIFIED ON PLANS

VENT PVC ALL NONE NEW VENT PIPING

NATURAL GAS PIPING STEEL ALL NONE - -

NOTE:

1. INSULATION THICKNESS IS BASED ON A CONDUCTIVITY NOT EXCEEDING .27 BTU PER INCH/H * FT^2 * °F

2. PLASTIC PIPE SHALL NOT BE INSTALL WITHIN THE FIRST 18" OF A WATER HEATER.

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MOUNTING TYPE MANUFACTURER MODEL NUMBER WASTE VENT COLD HOT ACCESSORIES

BP1 BACKFLOW PREVENTER PIPE LEAD FREE BRONZE WILKINS 375XL N/A N/A 1 1/2" N/A

SHUT-OFF VALVES, STRAINER, AND AIR GAP FITTING - DRAIN TO NEAREST FLOOR DRAIN

BV1 BALL VALVE PIPE L.F. BRONZE - FULL PORT WATTS LFB6081 N/A N/A VARIES VARIES 2 PIECE

EWC1 ELECTRIC WATER COOLER WALL DUAL HEIGHT ELKAY LZSTLG8WS 2" 1

" N/A

ADA DUAL HEIGHT, WITH BOTTLE FILLING STATION.

FCO FLOOR CLEAN OUT FLOOR CAST IRON J.R. SMITH 4031 SERIES 2"-4" N/A N/A N/A ADJUSTABLE WITH NICKEL BRONZE TOP

FD1 FLOOR DRAIN FLOOR CAST IRON J.R. SMITH 2005 2" 2" N/A N/A

ADJUSTABLE WITH PRO-SET TRAP GUARD, TRAP PRIMER CONNECTION

FS1 FLOOR SINK FLOOR CAST IRON J.R. SMITH 3420-Y 2" 2" N/A N/A

HALF GRATE, NO HUB, TRAP PRIMER CONNECTION

L1 LAVATORY COUNTERTOP VITREOUS CHINA KOHLER K-11160 2" 1

MEZZO, CENTER HOLE WITH MAC FAUCETS #FA400-109 FAUCET (AC), CHROME, WITH .5 GPM AERATOR

L2 LAVATORY WALL HUNG VITREOUS CHINA KOHLER K-2005 2" 1

CENTER HOLE WITH MAC FAUCETS #FA400-109 FAUCET (AC), CHROME, WITH .5 GPM AERATOR, SMITH 0700 CARRIER

PRV1 PRESSURE REDUCING VALVE PIPE LEAD FREE BRASS WATTS LFU5B-Z3 N/A N/A 1 1/2" N/A

THERMAL EXPANSION BYPASS, REDUCED PRESSURE RANGE IS 25 - 75 PSI (ADJUSTABLE)

S2 SINK COUNTER TOP STAINLESS STEEL ELKAY LR2521 2" 1 1/2"

" MOEN 7735 ADA FAUCET

SS1 SERVICE SINK FLOOR MOLDED STONE FIAT MSB-2424 3" 1

FIAT MODEL #830-AA FAUCET & HOSE, MOP BRACKETS, WALL GAURD

TP1 TRAP PRIMER PIPE BRONZE SIOUX CHIEF 695-01 N/A N/A

" N/A

PRESSURE OPERATED - PROVIDE WYE FITTING & (2) FOUR

" FIP BRANCH CONNECTORS

UR1 URINAL

WALL - ADA-LIP 17", NON ADA-LIP 24"

VITREOUS CHINA KOHLER K-4904-ET 2" 1-

" N/A

WITH J.R. SMITH CARRIER MODEL #0637 & SLOAN #186-0.125 (0.125 gpf) AC-POWERED FLUSH VALVE

WC1 ADA HEIGHT WATER CLOSET FLOOR - 17" TO TOP OF SEAT VITREOUS CHINA KOHLER K-4405 4" 2" 1" N/A

WITH ELONGATED BOWL, BEMIS 1955CT SEAT, SLOAN #111-1.28 AC POWERED FLUSH VALVE

WC2 STANDARD HEIGHT WATER CLOSET FLOOR VITREOUS CHINA KOHLER K-4406 4" 2" 1" N/A

WITH ELONGATED BOWL, BEMIS 1955CT SEAT, SLOAN #111-1.28 AC POWERED FLUSH VALVE

WCO WALL CLEAN OUT WALL/PIPE CAST IRON SMITH 4402 2" N/A N/A N/A WITH STAINLESS STEEL WALL COVER

WHA1 WATER HAMMER ARRESTOR PIPE COPPER SIOUX CHIEF 655-BS N/A N/A LINE SIZE N/A - -

WM WATER METER PIPE TURBINE BY UTILITY BY UTILITY N/A N/A 2" N/A SUPPLIED BY OTHERS - FEES AND INSTALLATION BY CONTRACTOR

NOTE: NO SUBSTITUTIONS ALLOWED. THE CONTRACTOR SHALL PROVIDE THE SAME MODELS AS PROVIDED IN PHASE 1.

CLEANOUT TEE

FLOOR LINE

CONNECT TO WASTE

LINE

STAINLESS STEEL

WALL COVER

AND SCREW

WALL

EXTEND WASTE OR

VENT LINE WHERE

INDICATED

M

I N

HANGER ROD

TURN BUCKLE (AS

REQUIRED)

INSULATION

PIPE

SHEET METAL

SADDLE INSERT

CLEVIS TYPE HANGER FOR

PIPE 2" & LARGER

HANGER ROD

TURN BUCKLE

(AS REQUIRED)

INSULATION

PIPE

SHEET METAL

SADDLE INSERT

PIPE STRAP TYPE HANGER

FOR PIPE LESS THAN 2"

15 WALL CLEANOUT DETAIL

PIPE HANGER DETAIL18 STACK WASTE DETAIL19

P9.1: P9.1 NO SCALE

WATER SERVICE ENTRANCE16

WALL CLEANOUT

WALL CLEANOUT

VENT PIPING

LAVATORY (TYP.)

BUILDING WALL

TRANSITION

HDPE

TO COPPER

AT 1-0" A.F.F.

FOUNDATION

WALL

1 1/2" DCW EXISTING SERVICE

SEE SHEET P2.0.

PIPE AIR GAP TO FLOOR DRAIN

BYPASS WITH LOCKING HANDLE

STRAINER

REDUCED PRESSURE BACKFLOW PREVENTOR ( BP1)

BALL VALVE (BV1) - TYP.

PRESSURE REDUCING VALVE (PRV1)

2" DCW TO BUILDING

PRESSURE GAUGE (PG1) - TYP.

WATER METER (WM) WITH PULSE SIGNAL FOR

MONITORING

NOTE:

REMOTE WATER METER READER(S)

LOCATED AS DIRECTED BY UTILITY.

NOTES:

1. PROVIDE REMOTE WATER METER READER AND LOCATE AS REQUIRED BY LOCAL UTILITY.

2. PROVIDE LOCKING SHUTOFF VALVES ON BYPASS LINE. BYPASS LINE MAY BE SMALLER THAN MAIN LINE

(GENERALLY

MAIN LINE). BYPASS MUST HAVE SAME TYPE OF BACKFLOW PROTECTION AS MAIN LINE.

3. BACK FLOW PREVENTORS SHALL BE MOUNTED 18" MIN ABOVE FLOOR AND NO MORE THAT 48" MAX ABOVE

FLOOR MIN. 6" FROM WALLS, ECT. MUST BE ACCESSIBLE WITH NO OBSTRUCTIONS

1/2'' CW TO TRAP

CONNECT AS REQ'D

FLOOR DRAIN OR FLOOR SINK W/TRAP

PRIMER CONNECTION

FIN FLOOR

"LOCKABLE" ACCESS

PANEL

1/2'' CW

UNION

WALL FRAMING

BOX. SECURE TO

FRAMED WALL

CONNECT TO CW

PIPE IN WALL

TRAP PRIMER IN WALL

1/2'' GV

TRAP PRIMER DETAIL17

PVC SLEEVE

P9.1: P9.1 NO SCALE

P9.1: P9.1 NO SCALE

P9.1: P9.1 NO SCALE P9.1: P9.1 NO SCALE

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

SANITARY SEWER

SANITARY VENT

FIRE PROTECTION

PIPE LEGEND

WITHIN 5'

WATER SERVICE NOTE:

THIS IS THE SECOND WATER SERVICE FOR THE BUILDING AND IT IS TO BE TIED TOGETHER WITH THE EXISTING

PHASE 1 SERVICE PER KEYNOTE 9 ON SHEET P2.0.

M.E.P. COORDINATION SCHEDULE

MARK LOCATION DESCRIPTION

ELECTRICAL DATA CONTROL

NOTES

STARTER/

DISCONNECT

LOAD VOLT-PH TYPE DIV TYPE DIV

CONTROL TYPE DIVISION OF RESPONSIBILITIES:

BAS

C

CO2

L

PS

T

UC

NA

FACP

BUILDING AUTO CONTROL

CARBON MONOXIDE DETECTORS

CONTINUOUS OPERATION

LIGHT SWITCH

PRESSURE SWITCH

THEMOSTAT

UNIT CONTROLLER - TIED TO B.A.S.

NOT APPLICABLE

FIRE ALARM CONTROL PANEL

22/22

22/26

23/23

23/26

26/26

FURNISHED AND INSTALLED BY DIV. 22, WIRED BY DIV. 22

FURNISHED AND INSTALLED BY DIV. 22, WIRED BY DIV. 26

FURNISHED AND INSTALLED BY DIV. 23, WIRED BY DIV. 23

FURNISHED AND INSTALLED BY DIV. 23, WIRED BY DIV. 26

FURNISHED AND INSTALLED BY DIV. 26, WIRED BY DIV. 26

STARTER/DISCONNECT TYPE NOTES:

FD

CSFD

RVSS

VFD

MSS

MOCP

FW

NA

FUSED DISCONNECT

COMBINATION STARTER/DISCONNECT - HOA

REDUCED VOLTAGE SOLID-STATE

VARIABLE FREQUENCY DRIVE - HOA

MANUAL STARTER SWITCH

MOTOR OVER-CURRENT PROTECTION

FACTORY-WIRED SINGLE PT. CONNECTION

NOT APPLICABLE

1.

2.

3.

4.

5.

6.

7.

8.

INTEGRAL DISCONNECTS AND OVERLOADS

INTEGRAL OVERLOADS

INTEGRAL OVERLOADS, RECEPTACLE

RECEPTACLE

SINGLE POINT CONNECTION

PROVIDE RECEPTACLE AND DATA CONNECTION FOR PANEL

MOUNT ON UNI-STRUT IN FRONT OF UNIT

UNIT PROVIDED WITH REMOTE, FACTORY-WIRED CONTROL

PANEL. DIV 26 TO PROVIDE FIELD-INTERCONNECT CIRCUITS,

PER MANUFACTURER REQUIREMENTS.

GENERAL NOTES:

1. ALL DUCT SMOKE DETECTORS FURNISHED BY DIV. 26, INSTALLED BY DIV. 23 AND WIRED BY DIV. 26. DIV 26 SHALL WIRE

ALL FANS TO SHUT DOWN WHEN ALARM IS INITIATED BY ANY DUCT SMOKE DETECTOR.

EWC1 HALL 234 WATER COOLER 4.2 A 115-1 NA 22/26 - -

L1

RESTROOM 214, 215

LAVATORY FAUCET FRACT. 115-1 NA 22/22 4 - -

UR1 RESTROOM 214 URINAL FLUSH VALVE FRACT. 12V NA 22/26 - -

WC1

RESTROOM 214, 215

W.C. FLUSH VALVE FRACT. 12V NA 22/26 - -

WC2

RESTROOM 214,215

W.C. FLUSH VALVE FRACT. 12V NA 22/26 - -

PL

U

M

BI

N G

S C

H

ED

U

LE

S A

N D

D

ET

A

IL

S

P9.1

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

File details come from the government source that posted it. Updated .