Mech-_DM2.0_M9.8.pdf

PDF 4 MB Posted

Attached to
Building 26, Phase 2 North Wing Renovation Federal contract opportunity
Solicitation number
AG-03R6-S-15-0052
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Drawings Mech-DM2.0_M9.8

View the file

Other files for this federal contract opportunity

Other files attached to Building 26, Phase 2 North Wing Renovation, newest first.
File Type Posted
S150052FinalAmendmen0003QAs.pdf PDF
S150052FinalAmendmen0002QAs.pdf PDF
102113_-_PHENOLIC-CORE_TOILET_COMPARTMENTS.pdf PDF
102800_-_TOILET_BATH_AND_LAUNDRY_ACCESSORIES.pdf PDF
093013_-_CERAMIC_TILING.pdf PDF
104413_-_FIRE_PROTECTION_CABINETS.pdf PDF
20150728Build26Phase2Sign-In.pdf PDF
123661_-_SIMULATED_STONE_COUNTERTOPS.pdf PDF
02_-_PROJECT_REPRESENTATIVES.pdf PDF
115213_-_PROJECTION_SCREENS.pdf PDF
S150052FinalAmendmen0001QAs.pdf PDF
064116_-_PLASTIC-LAMINATE-FACED_ARCHITECTURAL_CABINETS.pdf PDF
Wage_Rate_Decision_No.pdf PDF
Arch2-_A1.1.pdf PDF
Arch4-_D2.0_D7.2.pdf PDF
Civil2-_C9.1_C9.4.pdf PDF
Arch9_-_A7.0_A9.5.pdf PDF
Arch3-_A1.2.pdf PDF
Arch10_-_SP2.1_SP2.2.pdf PDF
Civil1-_C1.1_C3.2.pdf PDF
Arch8_-_A5.1_A6.10.pdf PDF
Elec1-_E0.1_E2.5.pdf PDF
Arch1-_Cover_Sheet_Signed.pdf PDF
Arch6-_A2.0_A2.3.pdf PDF
Specifications_1_-_DIV00_DIV12.pdf PDF
Security-_Basement_1st_2nd.pdf PDF
Structural2-_S2.0_S9.1.pdf PDF
Plumbing_-_DP2.0_P9.1.pdf PDF
20150707FinalAG03R6S150052Build26Phase2.pdf PDF
DOLBuildingMT150064MslaCo.htm HTM file
Arch5-_D9.1.pdf PDF
Arch7_-_A3.1_A4.2.pdf PDF
FireSprinkler-_F0.1_F9.1.pdf PDF
Specifications2-_DIV21_DIV33.pdf PDF
Elec2_-_E7.0_E9.5.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECH/ELECT

MECH/ELECT

2 1

7 7

A D E F G H KCB J

BA

SE

M

EN

T M

EC

H

A N

IC

A

L D

EM

O

P

LA

N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

4. COORDINATE ALL DEMO WITH EXISTING PHASE 1

MECHANICAL, ELECTRICAL & PLUMBING SYSTEM TO

REMAIN (TYP.).

5. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS

ABATEMENT CONTRACTOR.

USFS BUILDING 26 - BASEMENT MECHANICAL DEMO PLAN 16

DM2.0 : DM2.0 1/8" = 1'-0"

NORTH

DM2.0

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

1. MECH / ELECT 005: MAJORITY OF WORK COMPLETED IN

PHASE 1. NO DEMO. REQ'D IN THIS AREA; COORDINATE

WITH NEW WORK.

2. MECH / ELECT 028: REMOVE EXISTING STEAM BOILER,

HOT WATER STORAGE TANKS AND ALL ASSOCIATED

STEAM HEATING COMPONENTS AND PIPING WITHIN THIS

BOILER ROOM. REMOVE ALL STEAM AND CONDENSATE

PIPING CONNECTED TO THIS HEATING SYSTEM

INCLUDING RADIATORS AND CONTROLS. ROOM TO BE

COMPLETELY CLEARED AND READY FOR INSTALLATION

OF NEW SYSTEMS & EQUIPMENT.

3. EXISTING COMPUTER ROOM CONDITIONING SYSTEM,

PROTECT.

4. REMOVE ALL STEAM HEATING COMPONENTS AND PIPING

WITHIN THIS AREA INCLUDING RADIATORS AND

CONTROLS. AREA TO BE COMPLETELY CLEARED OF

EXISTING HEATING SYSTEM COMPONENTS AND READY

FOR INSTALLATION OF NEW SYSTEMS & EQUIPMENT.

5. EXISTING COOLING TOWER, PROTECT.

6. EXISTING CEILING-MOUNTED ELECTRIC HEATER,

PROTECT.

7. EXISTING VARIABLE-REFRIGERANT SYSTEM PIPING AND

EQUIPMENT; INSTALLED UNDER PHASE 1, PROTECT.

(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR

BOX TO REMAIN, PROTECT.

DEMO. EXISTING STEAM RADIATOR & ALL

ASSOCIATED PIPING AND CONTROLS BACK TO

BOILER ROOM, TYP. RECYCLE RADIATORS, TYP.

PLAN LEGEND

(E) EXISTING PHASE 1 FLOOR-MOUNTED

CONSOLE-TYPE FAN-COIL UNIT (ON FLOOR

ABOVE) TO REMAIN, PROTECT UNIT AND ALL

ASSOCIATED PIPING IN BASEMENT, TYP.

101.4

1 1

1 1 1

A D E F G H KCB J

FI

R

ST

F

LO

O

R M

EC

H

A N

IC

A

L D

EM

O

P

LA

N

USFS BUILDING 26 - FIRST FLOOR MECHANICAL DEMO PLAN 16

DM2.1 : DM2.1 1/8" = 1'-0"

NORTH

DM2.1

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

1. REMOVE EXISTING STEAM HEATING COMPONENTS AND

PIPING WITHIN THIS AREA INCLUDING RADIATORS AND

CONTROLS. CLEAR EXISTING HEATING SYSTEM

COMPONENTS AND READY FOR INSTALLATION OF NEW

SYSTEMS & EQUIPMENT.

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

4. COORDINATE ALL DEMO WITH EXISTING PHASE 1

MECHANICAL, ELECTRICAL & PLUMBING SYSTEM TO

REMAIN (TYP.).

5. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS

ABATEMENT CONTRACTOR.

PLAN LEGEND

(E) EXISTING PHASE 1 THERMOSTAT TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 CEILING CASSETTE

FAN-COIL UNIT TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 HIGH-WALL FAN-COIL UNIT

TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 FLOOR-MOUNTED

CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,

PROTECT.

(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR

BOX TO REMAIN, PROTECT.

DEMO. EXISTING STEAM RADIATOR & ALL

ASSOCIATED PIPING AND CONTROLS BACK TO

BOILER ROOM, TYP. RECYCLE RADIATORS, TYP.

DOWN

DOWN

1 1

1 11 1

1 1

A D E F G H KCB J

SE

C

O N

D F

LO

O

R M

EC

H

A N

IC

A

L D

EM

O

P

LA

N

USFS BUILDING 26 - SECOND FLOOR MECHANICAL DEMO PLAN 16

DM2.2 : DM2.2 1/8" = 1'-0"

NORTH

DM2.2

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

4. COORDINATE ALL DEMO WITH EXISTING PHASE 1

MECHANICAL, ELECTRICAL & PLUMBING SYSTEM TO

REMAIN (TYP.).

5. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS

ABATEMENT CONTRACTOR.

KEY NOTES:

1. REMOVE EXISTING STEAM HEATING COMPONENTS AND

PIPING WITHIN THIS AREA INCLUDING RADIATORS AND

CONTROLS. CLEAR EXISTING HEATING SYSTEM

COMPONENTS AND READY FOR INSTALLATION OF NEW

SYSTEMS & EQUIPMENT.

2. DEMO EXISTING ELECTRIC WALL HEATER, COMPLETE.

PLAN LEGEND

(E) EXISTING PHASE 1 THERMOSTAT TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 CEILING CASSETTE

FAN-COIL UNIT TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 HIGH-WALL FAN-COIL UNIT

TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 FLOOR-MOUNTED

CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,

PROTECT.

(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR

BOX TO REMAIN, PROTECT.

DEMO. EXISTING STEAM RADIATOR & ALL

ASSOCIATED PIPING AND CONTROLS BACK TO

BOILER ROOM, TYP. RECYCLE RADIATORS, TYP.

1 1

1 1

1 1

1 1

A D E F G H KCB J

A T

T

IC

M

EC

H A

N

IC

A L

D

EM

O P

LA

N

USFS BUILDING 26 - ATTIC MECHANICAL DEMO PLAN 16

DM2.3 : DM2.3 1/8" = 1'-0"

NORTH

DM2.3

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

1. REMOVE ALL EXISTING VENTILATION DUCTWORK

WITHIN ATTIC WITHIN THIS AREA. DUCTS

REPRESENTED SCHEMATICALLY ONLY. FIELD

VERIFICATION REQUIRED.

2. ROOFTOP VENTS TO REMAIN. DEMO ALL DUCTWORK

UP TO VENTS.

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

4. COORDINATE ALL DEMO WITH EXISTING PHASE 1

MECHANICAL, ELECTRICAL & PLUMBING SYSTEM TO

REMAIN (TYP.).

5. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS

ABATEMENT CONTRACTOR.

STAIR

RESTROOM

MECH / ELECT

ELECT/DATA

ELEVATOR

MACHINE

ELEVATOR

A

VESTIBULE

VESTIBULE

UH3

UH4

FC130

(ABOVE)

FC129

(ABOVE)

BS130

BS129

BLR3 BLR4

P4

P5

MECH/ELECT

MECH/ELECT

3 5

3 5

A D E F G H KCB J

BA

SE

M

EN

T M

EC

H

A N

IC

A

L

PL

A N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

USFS BUILDING 26 - BASEMENT MECHANICAL PLAN16

M2.0 : M2.0 1/8" = 1'-0"

NORTH

M2.0

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

1. NEW MECHANICAL ROOM (DASHED OUTLINE) - SEE M2.0A

FOR ENLARGED PLAN AND SCHEMATIC OF EQUIPMENT

AND PIPING LAYOUT.

2. CONNECT NEW HEAT PUMP WATER CIRCULATION PIPING

TO EXST PIPING (FROM PHASE 1) IN MECH. RM SOUTH

REFER TO M2.0A.

3. ROUTE (3)4" HEAT PUMP WATER CIRCULATION PIPING

BETWEEN MECH. RM NORTH & MECH. RM SOUTH. REFER

TO M2.0A FOR INTERCONNECTION INFORMATION.

4. PIPING CONTINUED ON ENLARGED BOILER ROOM PLAN,

M2.0A.

5. MOUNT PIPING TIGHT TO BOTTOM OF STRUCTURE.

6. NOTE NOT USED.

7. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT ON MAIN

FLOOR ABOVE: FLOOR-MTD. CONSOL. REFER TO M2.1.

8. CORE-DRILL PIPING THRU CONC. WALL.

9. SYSTEM #3 REFRIG. BRANCH PIPING UP IN WALL ABOVE TO

FIRST FLOOR CEILING. NOTE: THIS BRANCH OF REFRIG.

PIPING MUST BE ROUTED AS SHOWN IN ORDER TO

PROVIDE PROPER BALANCE OF REFIG. SYSTEM.

10. BOILERS BLR3 & BLR4 AND PRIMARY HEAT PUMP WATER

CIRCULATION PUMPS P4 & P5 TO BE INSTALLED AT THESE

APROX. LOCATIONS. REFER TO M2.0A.

11. ELECT. UNIT HEATER (AS SCHEDULED) SUSPENDED FROM

CEILING. TEMPORARY HEAT FOR PHASE 2.

12. EXISTING COMPUTER ROOM CONDITIONING SYSTEM,

PROTECT.

13. EXISTING COOLING TOWER, PROTECT.

PLAN LEGEND

(E) EXISTING PHASE 1 FLOOR-MOUNTED

CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,

PROTECT.

(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR

BOX TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 CEILING-MOUNTED ELECT. HEATER

TO REMAIN, PROTECT.

F

P

3" 3"

3" 3"

76 GPM76 GPM

HVAC PIPING LEGEND

SYMBOL DESCRIPTION

HORIZONTAL ELBOW

HORIZONTAL TEE

AUTOMATIC FLOW CONTROL

BALL VALVE

CHECK VALVE

STRAINER

UNION

HOSE END DRAIN

PRESSURE GAUGE

TEMPERATURE SENSOR

THERMOMETER

PRESSURE RELIEF VALVE

T

NOTE:

(E) DESIGNATES EXIST. PIPING OR

EQUIPMENT.

SYMBOL DESIGNATES CONNECTION

OF NEW TO EXIST.

1. CONNECT NEW HYDRONIC HEATING PIPING TO EXISTING 'CAPPED ENDS' AT

THIS LOCATION, TYP. 3. PIPING TO EXTEND TO NEW HEAT PUMP SYSTEM HP3

AND HP4 LOCATED IN MECH/ELECT 028.

2. NEW BOILERS BLR3, BLR4 AS SCHEDULED. CONNECT TO COMMON PIPING

BRIDGE AT 'CAPPED ENDS'.

3. NEW HYDRONIC SYSTEM PRIMARY PUMPS P4, P5 AS SCHEDULED. CONNECT

TO 'CAPPED ENDS' AS SHOWN.

4. ADDITIONAL HEAT PUMP(S) TO BE CONNECTED TO HYDRONIC HEATING

SYSTEM UNDER FUTURE CONSTRUCTION PHASE (PHASE 3).

2" 2" 2" 2"

NOTE:

NOT ALL REFRIG. PIPING NOT SHOWN ON THIS

PLAN FOR CLARITY. REFER TO VRF SYSTEM

PIPING SCHEMATICS M9.5 & M9.6.

4"

4"

4"

3" W/ BALL VALVE(S).

CAPPED FOR FUTURE

3" W/ BALL VALVE(S).

CAPPED FOR FUTURE

4"

4"

4"

NOTE:

(E) DESIGNATES EXIST. PIPING OR

EQUIPMENT.

SYMBOL DESIGNATES CONNECTION

OF NEW TO EXIST.

HP4 (X3)

HP3(X3)

TO HP3

TO HP4

1. VRF SYSTEM #3: REFRIGERANT PIPING LINES (X3) UP IN CHASE TO FIRST

FLOOR. REFER TO M2.1 FOR CONTINUATION. REFER TO VRF SYSTEM

SCHEMATIC SHEET M9.5. NOTE: REFRIG. PIPING FROM THIS CHASE TO HP3 NOT

SHOWN FOR CLARITY.

2. VRF SYSTEM #4: REFRIGERANT PIPING LINES (X3) UP IN CHASE TO

FIRST/SECOND FLOOR. REFER TO M2.1 & M2.2 FOR CONTINUATION. REFER TO

VRF SYSTEM SCHEMATIC SHEET M9.6. NOTE: REFRIG. PIPING FROM THIS

CHASE TO HP4 NOT SHOWN FOR CLARITY.

3. HEAT PUMPS TO BE MOUNTED ON FIELD-FABRICATED GALVANIZED STEEL

STANDS. OBSERVED FLOOR ELEVATION CHANGES IN THE BOILER ROOM.

CONSTRUCT STAND LEGS TO FIT EXST. CONDITIONS.

4. (3) 4"Ø HEAT PUMP WATER CIRCULATION PIPING TIGHT TO CEILING; BETWEEN

NORTH & SOUTH MECHANICAL ROOMS. REFER M2.0 FOR CONTINUATION.

MECH / ELECT

005MECH/ELECT

MECH/ELECT

BA

SE

M

EN

T B

O

IL

ER

R

O O

M P

LA

N

P

IP

IN

G

SC

H

EM

A T

IC

USFS BUILDING 26 - ENLARGED MECH. ROOM PLAN16

M2.0A : M2.0 1/4" = 1'-0"

NORTH M2.0A

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

2014 MORRISON-MAIERLE, INC.

MECH. RM 028 (NORTH) -

M2.0A : M2.0 NO SCALE

HYDRONIC PIPING SCHEMATIC 4

M2.0A : M2.0 NO SCALE

MECH. RM 005 (SOUTH) - HYDRONIC PIPING SCHEMATIC

PRIVATE

OFFICE

HR

CONFERENCE

OFFICE

OFFICE

OPEN

OFFICE

(12 STAFF)

OPEN

OFFICE

(16 STAFF)

ENTRY

HALL

RECEPTION

(2 STAFF)

BREAK

PRIVATE

OFFICE

JANITOR

WOMENS

RESTROOM

MENS

RESTROOM

EXECUTIVE

ASSISTANT

(2 STAFF)

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

COFFEE / COPY

LARGE

CONFERENCE

TELE/DATA

PRINT / COPY / FAX

CONFERENCE

ENTRY

ELEVATOR

A

STAIR

PORCH

STAIR

CONFERENCE

OPEN

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

OPEN

OFFICE

OPEN

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

FC132A

TYP. 8

T

FC132B

FC132C

FC132D

FC132E

FC132F

FC132G

FC132H

BS132A

FC130

FC128B

T

T

FC129

T

FC128A

EH6

T

133 BS133

FC134

FC133A

TYP. 4

FC133B

FC133C

FC133D

FC136

T T T

FC135

BS136

BS134

BS135

134 135 136

BS128

T

BS132B

11 11

SMALL

CONFERENCE

FC139

BS139

T

A D E F G H KCB J

FI

R

ST

F

LO

O

R M

EC

H

A N

IC

A

L

PL

A N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS

IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL

PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD

VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND

DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING

SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,

STRUCTURAL, PLUMBING, AND ELECTRICAL DRAWINGS AND FIRE

PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR PROPER

EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION INSTRUCTION

FOR RUNNING THE COMBUSTION AIR AND VENT PIPING AS WELL

AS THE TERMINATION THROUGH THE ROOF. FOLLOW ALL SAFETY

INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL

DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

8. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING AND

DUCTWORK PASSING THROUGH RATED CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - FIRST FLOOR MECHANICAL PLAN16

M2.1 : M2.1 1/8" = 1'-0"

NORTH

M2.1

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

2014 MORRISON-MAIERLE, INC.

GENERAL NOTES:

1. VRF SYSTEM #3: REFRIGERANT LINES IN CHASE FROM

BASEMENT BELOW AND UP IN CHASE TO 2ND FLOOR BRANCH

SELECTOR BOXES (BS227, BS229, BS233). REFER TO M2.0A AND

M2.2 FOR CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC

FOR PIPE SIZES.

2. VRF SYSTEM #4: REFRIGERANT LINES UP/DN IN CHASE FROM

BASEMENT AND TO SECOND FLOOR. REFER TO M2.0A & M2.2 FOR

CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC FOR PIPE

SIZES.

3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

CEILING-MOUNTED CASSETTE.

4. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

FLOOR-MOUNTED CONSOL. NOTE: REFRIG. PIPING FOR ALL

FLOOR-MOUNTED FAN-COILS FROM BASEMENT BELOW. REFER

TO M2.0 FOR PIPING LAYOUT.

5. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT: HIGH-WALL

MOUNTED UNIT.

6. VRF SYSTEM ZONE REFRIGERANT LINE BRANCH SELECTOR BOX.

IN ACCESSIBLE LOCATION ABOVE LAY-IN CEILING.

7. ROUTE REFRIGERANT PIPING UP AND BETWEEN FLOOR JOISTS.

ROUTE PIPING OVER STRUCTURAL BEAM(S).

8. EXISTING PLASTER CEILING IN THESE AREAS TO REMAIN. PIPING,

DUCTWORK OR EQUIPMENT ABOVE THESE AREAS MUST BE

ROUTED BETWEEN JOISTS. COORD. CUTTING OF CEILING

PLASTER W/ GEN. CONT'R.

9. SYSTEM #3 REFRIG. BRANCH PIPING DOWN IN WALLTO

BASEMENT. NOTE: THIS BRANCH OF REFRIG. PIPING MUST BE

ROUTED AS SHOWN IN ORDER TO PROVIDE PROPER BALANCE OF

REFIG. SYSTEM. REFER TO M2.0 FOR PIPING CONTINUATION.

10. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW ON WALL.

REFER TO DETAIL. NOTE: THIS IS A FIRE-RATED WALL,

FIRE-CAULK AROUND HEATER PENETRATIONS AS REQUIRED.

REFER TO SPECIFICATIONS. MOUNT HEATER TO MAINTAIN

MANUFACTURER'S CLEARANCE REQUIREMENTS. MAINTAIN A

MINIMUM OF 18" CLEAR ON THE STRIKE SIDE OF DOOR.

11. CORE-DRILL REFRIG. PIPING THRU CONC. WALL. ALSO REFER TO

M3.1 FOR ADDITIONAL CORE-DRILLING.

12. ROUTE REFRIGERANT PIPING UP AND BETWEEN FLOOR JOISTS.

ROUTE PIPING OVER STRUCTURAL BEAM(S).

PLAN LEGEND

(E) EXISTING PHASE 1 THERMOSTAT TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 CEILING CASSETTE

FAN-COIL UNIT TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 HIGH-WALL FAN-COIL UNIT

TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 FLOOR-MOUNTED

CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,

PROTECT.

(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR

BOX TO REMAIN, PROTECT.

DOWNDOWN

OFFICE

OFFICE

OFFICE

SMALL

CONFERENCE

SMALL

CONFERENCE

SMALL

CONFERENCE

OPEN

OFFICE

(23 STAFF)

OPEN

OFFICE

(22 STAFF)

STAIR

ELEVATOR

A

TELE/DATA

JAN

FC233A

BS233

FC229B

FC227C

FC224B

FC224A

T

T

T

T

T

T

T T

FC226

BS229

T T

T T T T

PORCH

FILES

PRIVATE

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

PRINT/COPY/COFFEE

PRIVATE

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

OPEN

OFFICE

CONF

OPEN

OFFICE

STAIR

PRIVATE

OFFICE

CONFERENCE

PRIVATE

OFFICE

LARGE

CONFERENCE

PRIVATE

OFFICE

PRIVATE

OFFICE

MENS

RR

WOMENS

RR

PORCH

T

T

T

FC223A

TYP. 5

FC223B

FC222A

FC222B

FC222C

FC222D

FC222E

FC222F

T

TYP. 6

FC223C

T

BS221

BS217

FC217F

FC217E

FC217G

FC213A

FC213B

BS213

FC217A FC217B

FC217C

FC217D

FC221

8 8 8 8

8 8

T

BS223

BS226

BS224

FC227B

FC227A

FC229A

BS227

BS222

FC223E

FC233B

FC223D

6 6

5 5 5

T

EH7

A D E F G H KCB J

SE

C

O N

D F

LO

O

R M

EC

H

A N

IC

A

L

PL

A N

USFS BUILDING 26 - SECOND FLOOR MECHANICAL PLAN16

M2.2 : M2.2 1/8" = 1'-0"

NORTH

M2.2

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

2014 MORRISON-MAIERLE, INC.

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

GENERAL NOTES:

1. VRF SYSTEM #4: REFRIGERANT LINES IN CHASE

FROM BASEMENT. REFER TO M2.1 & M2.0A FOR

CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC,

M 9.5 FOR PIPE SIZES.

2. VRF SYSTEM #4: REFRIGERANT LINES IN CHASE

FROM BASEMENT. REFER TO M2.1 & M2.0A FOR

CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC,

M 9.6 FOR PIPE SIZES.

3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

CEILING-MOUNTED CASSETTE.

4. NOTE NOT USED.

5. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:

HIGH-WALL MOUNTED UNIT.

6. VRF SYSTEM ZONE REFRIGERANT LINE BRANCH

SELECTOR BOX. IN ACCESSIBLE LOCATION ABOVE

LAY-IN CEILING.

7. INSULATE PIPING IN ACCORDANCE WITH

MANUFACTURE'S RECOMMENDATIONS.

8. EXISTING PLASTER CEILING IN THESE AREAS TO

REMAIN. PIPING, DUCTWORK OR EQUIPMENT ABOVE

THESE AREAS MUST BE ROUTED BETWEEN JOISTS

WITHIN ATTIC. COORD. CUTTING OF CEILING PLASTER

W/ GEN. CONT'R.

9. CORE-DRILL REFRIGERANT PIPING THRU CONC.

WALL. ALSO REFER TO M3.2 FOR ADDITIONAL

CORE-DRILLING.

10. COORDINATE PIPING ROUTING AND CORE-DRILLING

WITH PLUMBING, THIS AREA.

11. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW

ON WALL. REFER TO DETAIL.

PLAN LEGEND

(E) EXISTING PHASE 1 THERMOSTAT TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 CEILING CASSETTE

FAN-COIL UNIT TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 HIGH-WALL FAN-COIL UNIT

TO REMAIN, PROTECT.

(E) EXISTING PHASE 1 FLOOR-MOUNTED

CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,

PROTECT.

(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR

BOX TO REMAIN, PROTECT.

STAIR

RESTROOM

MECH / ELECT

ELECT/DATA

ELEVATOR

MACHINE

ELEVATOR

A

VESTIBULE

VESTIBULE

FC130

(ABOVE)

FC129

(ABOVE)

3 4

MECH/ELECT

MECH/ELECT

EXST CONDENSATE DRAIN

PIPING, PROTECT

A D E F G H KCB J

BA

SE

M

EN

T C

O N

D

EN

SA

T

E

PI

PI

N

G P

LA

N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

USFS BUILDING 26 - BASEMENT CONDENSATE PIPING PLAN16

M3.0 : M3.0 1/8" = 1'-0"

NORTH

M3.0

KEY NOTES:

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

GENERAL NOTES:

2014 MORRISON-MAIERLE, INC.

1. REFER TO M2.0A FOR ENLARGED MECHANICAL ROOM

PLAN.

2. CONDENSATE PIPING DROP FROM MAIN FLOOR ABOVE.

REFER TO M3.1 FOR CONTINUATION.

3. CONDENSATE DRAIN PIPING IN CHASE FROM FLOORS

ABOVE. REFER TO M3.1 & M3.2.

4. ROUTE CONDENSATE PIPING TO FLOOR DRAIN OR

APPROVED RECEPTOR WITHIN BOILER ROOM.

5. CORE-DRILL CONDENSATE PIPING THRU CONC. WALL.

6. MOUNT PIPING AS TIGHT TO BOTTOM OF STRUCTURE AS

POSSIBLE.

PRIVATE

OFFICE

HR

CONFERENCE

OFFICE

OFFICE

OPEN

OFFICE

(12 STAFF)

OPEN

OFFICE

(16 STAFF)

ENTRY

HALL

RECEPTION

(2 STAFF)

BREAK

PRIVATE

OFFICE

JANITOR

WOMENS

RESTROOM

MENS

RESTROOM

EXECUTIVE

ASSISTANT

(2 STAFF)

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

DEPUTY

REGIONAL

FORESTER

COFFEE / COPY

LARGE

CONFERENCE

PRINT / COPY / FAX

CONFERENCE

ENTRY

ELEVATOR

A

STAIR

TELE/DATA

PORCH

STAIR

CONFERENCE

OPEN

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

OPEN

OFFICE

BOOTH

TELE

OPEN

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

FC132A

FC132B

FC132C

FC132D

FC132E

FC132F

FC132G

FC132H

FC134

FC133A

FC133B

FC133C

FC133D

FC136

FC135

7 7

FC128A

EXST MECH. SYSTEMS,

PROTECT

EXST MECH.

SYSTEMS,

PROTECT

EXST MECH.

SYSTEMS,

PROTECT

EXST MECH. SYSTEMS,

PROTECT

FC130

FC128B

FC129

FC129

A D E F G H KCB J

FI

R

ST

F

LO

O

R V

EN

T

IL

A

T

IO

N A

N D

C O

N D

EN

SA

T E

PI

PI

N G

P

LA

N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - FIRST FLOOR VENTILATION AND CONDENSATE PIPING PLAN16

M3.1 : M3.1 1/8" = 1'-0"

NORTH

M3.1

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

2014 MORRISON-MAIERLE, INC.

GENERAL NOTES:

1. CORE-DRILL DUCT AND/OR PIPING PENETRATIONS THRU

CONC. WALL. ALSO REFER TO M2.1 FOR ADDITIONAL

CORE-DRILLING.

2. CONDENSATE DRAIN PIPING DOWN IN NEW FRAMED-

WALL TO BASEMENT CEILING BELOW. CORE-DRILL THRU

CONC. FLOOR AS REQ'D. REFER TO M3.0 FOR

CONTINUATION.

3. COORDINATE DUCTWORK, PIPING ROUTING AND

CORE-DRILLING WITH PLUMBING, THIS AREA.

4. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT

MECH. ROOM. ROUTE PIPING FULL-SIZED TO NEAREST

FLOOR DRAIN OR APPROVED RECEPTOR. REFER TO

M3.0.

5. 14"Ø SA DUCT UP TO ATTIC ABOVE. REFER TO M3.2 &

M3.3 FOR CONTINUATION.

6. EXISTING PLASTER CEILING IN THIS AREA. DO NOT

ROUTE DUCTWORK OR CONDENSATE PIPING.

7. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.

8. CONDENSATE DRAIN DOWN IN NEW WALL TO SINK DRAIN.

REFER TO DETAIL 14/M9.7.

9. CONDENSATE DRAIN PIPING UP IN NEW FRAMED-WALL

ABOVE. CORE-DRILL THRU CONC. FLOOR ABOVE AS

REQ'D. REFER TO M3.1 FOR CONTINUATION.

10. TRANSFER AIR GRILLE DUCTED TO CEILING OF

ADJACENT AREA. ROUTE A SHORT SECTION OF

DUCTWORK THRU FULL-HEIGHT WALL AND OVER TO

CEILING OF ADJACENT AREA AS SHOWN. LINE

DUCTWORK WITH 1" LINER. REFER TO DETAIL 12/M9.7.

11. ROUTE CONDENSATE DRAIN WITHIN JOIST SPACE &

OVER STRUCTURAL BEAM. REPAIR CEILING AS REQ'D.

COORD. W/ GEN. CONT'R.

DOWNDOWN

OFFICE

OFFICE

OFFICE

SMALL

CONFERENCE

SMALL

CONFERENCE

SMALL

CONFERENCE

OPEN

OFFICE

(23 STAFF)

OPEN

OFFICE

(22 STAFF)

STAIR

ELEVATOR

A

TELE/DATA

ELECTRICAL

OFFICE

OFFICE

OFFICE

SMALL

CONFERENCE

SMALL

CONFERENCE

SMALL

CONFERENCE

OPEN

OFFICE

(23 STAFF)

OPEN

OFFICE

(22 STAFF)

STAIR

ELEVATOR

A

TELE/DATA

ELECTRICAL

PORCH

PRIVATE

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

PRINT/COPY/COFFEE

PRIVATE

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

PRIVATE

OFFICE

OPEN

OFFICE

CONF

OPEN

OFFICE

STAIR

PRIVATE

OFFICE

CONFERENCE

PRIVATE

OFFICE

LARGE

CONFERENCE

PRIVATE

OFFICE

PRIVATE

OFFICE

MENS

RR

WOMENS

RR

PORCH

FC233A

FC229B

FC227C

FC224B

FC224A

FC226

FC223A

FC223B

FC222A

FC222B

FC222C

FC222D

FC222E

FC222F

FC223C

FC223D

FC217FFC217E FC217G FC213A FC213B

FC217A

FC217B

FC217C FC217D

FC221

FC227B

FC227A

FC229A

FC223E

FC233B

HRV2

(ATTIC)

PRIVATE

OFFICE

7 7 7 7

EXST MECH.

SYSTEMS,

PROTECT

EXST MECH.

SYSTEMS,

PROTECT

EXST MECH.

SYSTEMS,

PROTECT

A D E F G H KCB J

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - SECOND FLOOR VENTILATION AND CONDENSATE PIPING PLAN16

M3.2 : M3.2 1/8" = 1'-0"

NORTH

M3.2

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

2014 MORRISON-MAIERLE, INC.

GENERAL NOTES:

SE

C

O N

D F

LO

O

R V

EN

T

IL

A

T

IO

N A

N D

C O

N D

EN

SA

T E

PI

PI

N G

P

LA

N

1. CORE-DRILL DUCT AND/OR PIPING PENETRATIONS THRU

CONC. WALL WITHIN SOFFIT SPACE. ALSO REFER TO

M2.2 FOR ADDITIONAL CORE-DRILLING.

2. SAWCUT OR CORE-DRILLE PENETRATIONS THRU

CONC. FLOOR AS REQ'D FOR NEW DUCTWORK.

3. 14"Ø SA DUCT UP/DOWN IN CHASE. REFER TO M3.1 &

M3.3 FOR CONTINUATION.

4. DUCTWORK CONTINUED IN ATTIC ABOVE. REFER TO M3.3

FOR DUCTWORK PLAN.

5. CONDENSATE DRAIN FROM HRV UNIT IN ATTIC ABOVE.

REFER TO M3.3. REFER TO CONDENSATE DRAIN DETAIL

16/M9.7.

6. CONDENSATE DRAIN DOWN IN NEW FRAMED WALL TO

FIRST FLOOR CEILING BELOW. CORE-DRILL THRU CONC.

FLOOR AS REQ'D. REFER TO M3.1 FOR CONTINUATION.

7. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.

8. CONDENSATE DRAIN DOWN IN NEW WALL TO SINK DRAIN.

REFER TO DETAIL 14/M9.7.

9. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT

MECH. ROOM. REFER TO M3.0 FOR CONTINUATION.

10. EXISTING PLASTER CEILING IN THIS AREA. DO NOT

ROUTE DUCTWORK OR CONDENSATE PIPING.

11. CONDENSATE DRAIN DOWN IN NEW FRAMED WALL TO

LAVATORY DRAIN. REFER TO DETAIL 14/M9.7.

12. CONNECT NEW 10"Ø EXHAUST BRANCH TO EXST 10"Ø

TAP (INSTALLED IN PHASE 1).

NOTE:

ATTIC IS UNCONDITIONED. ALL DUCTWORK

IS TO BE INSULATED WITH R-8 DUCT WRAP.

REFER TO DUCT MATERIAL SCHEDULE.

L3

L4

ATTIC

NORTHEAST

ATTIC

NORTH

ATTIC WALKWAY

ATTIC WALKWAY

ATTIC WALKWAY

A T

T I C

W

A L K

W A

Y A

T T

L K

W A

Y

A T

T

L K

W A

Y

6 6 6

4 4

A D E F G H KCB J

A T

T

IC

V

EN

T

IL

A T

IO

N

P

LA

N

1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE

ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,

DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS

PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE

FIELD VERIFIED. THESE DRAWINGS REPRESENT

SCHEMATIC SYSTEMS.

3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,

AND DUCTWORK AS REQUIRED BY LOCAL CODES.

4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND

PIPING SYSTEMS WITH OTHER TRADES. REFER TO

ARCHITECTURAL, STRUCTURAL, PLUMBING, AND

ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP

DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR

COORDINATION.

5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND

COORDINATION BETWEEN TRADES MUST BE DONE FOR

PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT

AND DESIGN.

6. FOLLOW MANUFACTURES WRITTEN INSTALLATION

INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND

VENT PIPING AS WELL AS THE TERMINATION THROUGH THE

ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

7. COORDINATE ALL CONCRETE PENETRATIONS WITH

STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE

CONCRETE CAN BE CUT.

8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH

SURROUNDINGS.

9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING

AND DUCTWORK PASSING THROUGH RATED

CONSTRUCTION.

KEY NOTES:

USFS BUILDING 26 - ATTIC VENTILATION PLAN16

M3.3 : M3.3 1/8" = 1'-0"

NORTH

M3.3

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

2014 MORRISON-MAIERLE, INC.

GENERAL NOTES:

1. HEAT RECOVERY VENTILATION UNIT, HRV2 TO BE

MOUNTED IN INSULATED ATTIC ENCLOSURE. HRV UNIT

TO BE SUSPENDED FROM EXISTING ROOF FRAMING

ABOVE WITH THREADED RODS AND VIBRATION

ISOLATORS. ENCLOSURE TO BE CONSTRUCTED BY GEN.

CONT'R. OF WOOD-FRAMED WALLS AND SHEATHED WITH

PLYWOOD. 2"-THK RIGID "BLUE BOARD" INSULATION IS

TO BE ADHERED TO THE ENTIRE TOP AND 4 SIDES.

EXISTING CEILING INSULATION IN THE ATTIC IS TO BE

REMOVED IN THE AREA BELOW THE ENCLOSURE TO

ALLOW HEAT FROM THE CONDITIONED SPACE BELOW TO

RISE INTO ENCLOSURE. HINGED ACCESS DOORS ARE TO

BE PROVIDED FOR UNIT MAINTENANCE. COORD.

MAINTENANCE ACCESS REQUIREMENTS WITH GEN.

CONT'R. ROUTE CONDENSATE DRAIN AS SHOWN ON

M3.2. REFER TO DETAIL 8/M9.7.

2. CUT 12X12 OPENING THRU EXIST. CEILING TO ALLOW

CONDITIONED ROOM AIR FROM CEILING PLENUM BELOW

TO TRANSFER UP INTO HRV ENCLOSURE. TRANSFER

GRILLE MOUNTED TO TOP SURFACE.

3. EXISTING GLASS TO BE REMOVED FROM THE DORMER'S

CENTER WINDOW. NEW LOUVER TO BE MOUNTED IN THE

WINDOW OPENING. COORD. WITH GEN. CONT'R AND

COORD. WITH ARCHITECTURAL PLANS WINDOW

SCHEDULE.

4. FRESH AIR VENTILATION BRANCH DOWN TO SUPPLY

GRILLE IN 2ND FLOOR CEILING BELOW. REFER TO M3.2

FOR CONTINUATION.

5. 14"Ø SA DUCT DOWN IN NEW SECOND FLOOR CHASE TO

FIRST FLOOR BELOW. REFER TO M3.2 & M3.1 FOR

CONTINUATION.

6. KEEP ATTIC WALKWAY CLEAR OF DUCTWORK: ROUTE

DUCTS AS HIGH AS POSSIBLE WHERE DUCT BRANCHES

CROSS THE WALKWAY.

7. 16"Ø RETURN AIR DUCTS (6-FT FLEX MAX) DOWN TO

SECOND FLOOR CEILING GRILLES. REFER TO M3.2 FOR

CONTINUATION.

8. CORE-DRILL THRU CONCRETE WALL FOR NEW 8"Ø

VENTILATION DUCT.

DUCT MATERIAL SCHEDULE

SHAPE FUNCTION DESCRIPTION MATERIAL GAUGE INSULATION R-VALUE NOTES

RECT. OUTSIDE AIR

OUTSIDE TO HRV (IN ATTIC)

SHEET METAL 24 GA. WRAP R-8 1

RECT. RELIEF AIR

RELIEF FROM HRV (IN ATTIC)

SHEET METAL 24 GA. NONE - -

RECT. EXHAUST

EXH. FROM RESTROOMS TO

HRV (ATTIC)

SHEET METAL 24 GA. WRAP R-8 1

RECT. EXHAUST

EXH. FROM RESTROOMS TO

HRV (CONDITIONED SPACE)

SHEET METAL 24 GA. NONE - -

ROUND EXHAUST

EXH. FROM RESTROOMS TO

HRV (CONDITIONED SPACE)

<12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL

24 GA. NONE - -

RECT. SUPPLY

SUPPLY FROM HRV (IN ATTIC)

SHEET METAL 24 GA. WRAP R-8 1

RECT. SUPPLY

SUPPLY FROM HRV

(CONDITIONED SPACE)

SHEET METAL 24 GA. WRAP R-5 1

ROUND SUPPLY

SUPPLY FROM HRV (IN ATTIC) <12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL

24 GA. WRAP R-8 1

ROUND SUPPLY

SUPPLY FROM HRV

(CONDITIONED SPACE)

<12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL

24 GA. WRAP R-5 1

ROUND SUP./RET. 4' LENGTH MAX - AT GRD'S FLEX N/A INTEGRAL -- --

NOTES:

1. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT THE EXPOSED SEAMS/EDGES/CORNERS.

2. ALL DUCTWORK DIMENSIONS SHOWN ON PLAN ARE INSIDE CLEAR FREE AREA DIMENSIONS.

REMARKS:

1. PROVIDE SEISMIC BRACING OF ALL DUCTWORK AS REQUIRED BY LOCAL CODES.

2. INTERNALLY LINE WITH NON FIBROUS DUCT LINER.

HVAC LEGEND

PIPING

REFRIGERANT

CONDENSATE

RISE / FALL IN PIPING

FITTINGS

DUCTWORK

SUPPLY/RETURN DUCTWORK

VERTICAL TRANSITION SUPPLY DUCT

VERTICAL TRANSITION RETURN DUCT

CEILING SUPPLY AIR DIFFUSER

CEILING RETURN GRILLE

CEILING EXHAUST GRILLE

FLOOR REGISTER

AIR DEVICE NUMBER & CFM

DUCT TURNING VANES

MANUAL VOLUME DAMPER

BACKDRAFT DAMPER

FIRE/SMOKE DAMPER

HRV

EXHAUST FAN

CONTROLS

THERMOSTAT

PRESSURE SENSOR

DUCT MOUNTED SMOKE DETECTOR

WALL SWITCH

CONTROL PANEL FOR B.A.S.

PROJECT INFORMATION

PROJECT LOCATION: MISSOULA MT

PROJECT ALTITUDE: 3209 FEET ABOVE SEA LEVEL

SUMMER DESIGN TEMP: 91°F DRY BULB, 62°F WET BULB (ASHRAE 99% DESIGN)

ALL MECHANICAL AND PLUMBING EQUIPMENT SHALL BE SEISMICALLY BRACED

PER THE 2009 INTERNATIONAL BUILDING CODE. SEISMIC DESIGN

REQUIREMENTS FOR THE PROJECT ARE AS FOLLOWS:

SEISMIC DESIGN CATEGORY: D

IMPORTANCE FACTOR (Ip): 1.0

IMPORTANCE FACTOR FOR GAS PIPING: 1.5

THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE BRACING

AND RESTRAINTS. BRACING & RESTRAINT DETAILS SHALL BE INCLUDED IN SHOP

DRAWING SUBMITTAL FOR REVIEW AND BY THE ENGINEER.

SEISMIC NOTES

HVAC PIPING LEGEND

SYMBOL DESCRIPTION

ELBOW

TEE

SYSTEM PUMP

CIRCULATOR PUMP

BALL VALVE

CONTROL VALVE - 2 WAY

CONTROL VALVE - 3 WAY

CHECK VALVE

HOSE END DRAIN

STRAINER

CIRCUIT BALANCING VALVE

AUTOMATIC AIR VENT -

INSTALL AT ALL HIGH POINTS IN

SYSTEM

TEMPERATURE GAUGE

PRESSURE GAUGE

FLOW METER

TEMPERATURE SENSOR

PRESSURE SENSOR

F

T

P

DIRECT DIGITAL CONTROL POINTS

HARDWARE POINTS SOFTWARE POINTS

NOTES

POINT NAME AI AO BI BO AV BV ADJ. SCH. TRD. ALM. DISP.

SYSTEM PUMPS (P4, P5)

SYSTEM PUMP 4 STATUS X X X

SYSTEM PUMP 5 STATUS X X X

SYSTEM PUMP 4 START/ STOP X X X

SYSTEM PUMP 5 START/ STOP X X X

SYSTEM PUMP 4 FAILURE X

SYSTEM PUMP 5 FAILURE X

SYSTEM PUMP 4 RUNTIME EXCEEDED X

SYSTEM PUMP 5 RUNTIME EXCEEDED X

BOILERS (BLR3, BLR4)

HOT WATER SUPPLY TEMP. X X X BAS

HOT WATER RETURN TEMP. X X X BAS

BOILER 3 STATUS X X X BAS

BOILER 4 STATUS X X X BAS

BOILER PUMP 3 STATUS X X X BAS

BOILER PUMP 4 STATUS X X X BAS

BOILER PUMP 3 START/ STOP X X X BAS

BOILER PUMP 4 START/ STOP X X X BAS

BOILER 3 ENABLE X X BAS

BOILER 4 ENABLE X X BAS

OUTSIDE AIR TEMP. X X BAS

BOILER 3 FAILURE X BAS

BOILER 4 FAILURE X BAS

BOILER PUMP 3 FAILURE X BAS

BOILER PUMP 4 FAILURE X BAS

BOILER 3 RUNTIME EXCEEDED X BAS

BOILER 4 RUNTIME EXCEEDED X BAS

HOT WATER SUPPLY TEMP. LIMIT EXCEEDED X BAS

HEAT PUMPS (HP3, HP4)

REFER TO DAIKIN I-TOUCH CONTROL SPECIFICATIONS FOR POINTS INTERFACE WITH BAS

CONTROL VALVE (CV3, CV4)

X X BAS

ALARM CONTACTS X X X X BAS

DEFINITIONS:

AI= ANALOG INPUT

AO= ANALOG OUTPUT

BI= BINARY INPUT

BO= BINARY OUTPUT

AV= ANALOG VALUE

BV= BINARY VALUE

REFERENCES:

1. REFER TO SPEC. SECTION 230900

INSTRUMENTATION AND

CONTROL FOR HVAC FOR MORE

INFORMATION.

DEFINITIONS:

ADJ. = ADJUSTABLE

SCH. = SCHEDULE

TRD. = TREND

ALM. = ALARM

DISP. = DISPLAY

BAS = BUILDING AUTOMATION SYST.

REFERENCES:

2. REFER TO SPEC. SECTION 230993

SEQUENCE OF OPERATIONS FOR

HVAC CONTROL FOR MORE

INFORMATION.

PIPE MATERIAL SCHEDULE

SYSTEM MATERIAL SIZES INSULATION THICKNESS** ADD'L DETAILS

HYDRONIC SUPPLY/RETURN (BOILER)

'L' COPPER / STEEL

<=1

" 1

WRAP WITH ASJ

SEE BELOW

>1

" 2" WRAP WITH ASJ

HEAT PUMP WATER SUPPLY/RETURN -

CONDITIONED SPACE

'L' COPPER / STEEL /

AQUATHERM BLUE PIPE

(SDR11)

ALL NONE SEE BELOW

COMBUSTION AIR & VENT PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW

CHILLED WATER - CONDITIONED SPACE

'L' COPPER / STEEL /

AQUATHERM BLUE PIPE

(SDR11)

ALL 1

WRAP WITH ASJ

SEE BELOW

REFRIGERANT PIPING REFER TO SPECIFICATIONS. ALSO REFER TO DAIKIN INSTALLATION INSTRUCTIONS.

NATURAL GAS PIPING THREADED BLACK IRON ALL NONE PAINT ORANGE

CONDENSATE DRAIN PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW

** BASED ON INSULATION HAVING A CONDUCTIVITY

(K) NOT EXCEEDING 0.27 BTU PER INCH/H*FT^2*DEG F

1. PROVIDE SEISMIC BRACING OF PIPING 2 1/2" AND LARGER

OR AS REQUIRED BY LOCAL CODES.

2. INSULATION SHALL BE FIBERGLASS WITH ALL SERVICE

JACKET

3. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT

ALL SEAMS, EDGES, ETC.

4. PROVIDE PVC COATED JACKET OVER INSULATION FOR

MECHANICAL ROOM PIPING.

5. ANY CONNECTIONS THAT ARE DISSIMILAR METALS SHALL

REQUIRE BRASS UNIONS OR FLANGE SEPARATION.

PIPE MATERIAL REMARKS:

FSD

GENERAL CONTROLS NOTE

THIS PROJECT WILL INCLUDE THE INSTALLATION OF A BUILDING AUTOMATION SYSTEM (BAS). SEE SPECIFICATION SECTIONS 230900

"INSTRUMENTATION AND CONTROL FOR HVAC" AND 230993 "SEQUENCE OF OPERATIONS FOR HVAC CONTROLS"

IT SHALL BE THE RESPONSIBILITY OF THE TEMPERATURE CONTROLS CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND

SOFTWARE NOT SPECIFICALLY REFERRED TO ON THE PLANS OR IN THE SPECIFICATION TO ACHIEVE THE SEQUENCE OF OPERATIONS

DESCRIBED IN SPECIFICATION SECTION 230993 "SEQUENCE OF OPERATIONS FOR HVAC CONTROLS", THE SEQUENCES SHOWN ON THE

DRAWINGS OR ANY OTHER LOCATION IN THE CONTRACT DOCUMENTS.

PROVIDE EVERYTHING SHOWN ON THE POINTS LIST AS WELL AS EVERYTHING IN THE SEQUENCES OR ANY OTHER PART OF THE CONTRACT

DOCUMENTS REGARDLESS OF IF THEY ARE LISTED ON THE POINTS LIST.

NOTE: ALL INSTRUMENTATION AND DEVICES INSTALLED IN PHASE 2 SHALL BE OF THE SAME MANUFACTURER AND TYPE AS

INSTALLED IN PHASE 1. ALL CONTROLS SHALL BE COMPATIBLE. UTILIZE EXISTING CONTROLS INFRASTRUCTURE. THIS IS A

GENERAL CONTROLS SPECIFICATION AND SOME CONTROLS ITEMS INDICATED IN THIS SPECIFICATION SECTION MAY NOT BE

REQUIRED. FIELD VERIFY ALL EXISTING CONTROLS DEVICES, INFRASTRUCTURE, AND EXPANSION CAPABILITIES. PROVIDE ALL

INCIDENTALS AS REQUIRED TO MAKE THIS A FULLY FUNCTIONAL SYSTEM.

M

EC

H A

N

IC

A L

LE

G

EN

D

S

S C

H

ED

U

LE

S

M9.1

2014 MORRISON-MAIERLE, INC.

BU

IL

D

IN

G

P H

A

SE

N O

R T

H W

IN

G

R

EN

O V

A T

IO

N

U S

FO

R

ES

T

S

ER

V

IC

E, N

O R

T H

ER

N

R

EG

IO

N

R

EG

IO

N A

L O

FF

IC

E www.aearchitects.com

O W

N

ER

PR

O

JE

C

T

D R

A W

IN

G

A R C H I T E C T U R E

H I S T O R I C

I N T E R I O R S

ARCHITECTS PC

608 NORTH 29TH STREET

BILLINGS, MT 59101

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

428 EAST MENDENHALL STREET

BOZEMAN, MT 59715

PH 4 0 6 . 4 5 1 .7 3 1 0

222 NORTH HIGGINS AVENUE

MISSOULA, MT 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

PROJECT #

ISSUE DATE

REVISIONS

13104.10 05.18.15

ACCESSORIES:

1. FACTORY PROVIDED STRAINERS FOR EACH HEAT PUMP: DAIKIN BWU26A20

2. PROVIDE WITH COOL/HEAT SELECTOR

VARIABLE REFRIGERANT VOLUME HEAT PUMP SCHEDULE

SYSTEM MARK MANUFACTURER

ASSEMBLY MODEL

NUMBER

INDIVIDUAL MODEL

NUMBER

COMBINATION SIZING

PERCENTAGE

HEATING DATA COOLING DATA

REFRIGERANT TYPE

UNIT PHYSICAL DATA

REMARKS, ACCESSORIES AND CONTROLS

HEATING CAP.

(BTU/H)

HEATING SIZING

CONDITIONS (EWT / LWT)

COP

COOLING CAP.

(BTU/H)

FLOW RATE

(GPM)

HEAD

(FT)

COOLING SIZING

CONDITIONS (EWT / LWT)

EER

WIDTH (IN) HEIGHT (IN) DEPTH (IN) WEIGHT (LBS)

VRF

SYSTEM

#3

HP3(1)

DAIKIN

RWEYQ252PTJU-HR

RWEYQ84PTJU-HR

126% 317,432

70°F / 63.5°F 4.5 265,036

76.2 8.9 75°F / 82.6°F 12.8

R410A 30.7 39.4 21.7 331 SEE BELOW

HP3(2)

RWEYQ84PTJU-HR R410A 30.7 39.4 21.7 331 SEE BELOW

HP3(3)

RWEYQ84PTJU-HR R410A 30.7 39.4 21.7 331 SEE BELOW

VRF

SYSTEM

#4

HP4(1)

RWEYQ252PTJU-HR

RWEYQ84PTJU-HR

123% 316,891

70°F / 63.5°F 4.5 260,430

76.2 8.9 75°F / 82.6°F 12.8

R410A 30.7 39.4 21.7 331 SEE BELOW

HP4(2)

RWEYQ84PTJU-HR R410A 30.7 39.4 21.7 331 SEE BELOW

HP4(3)

RWEYQ84PTJU-HR R410A 30.7 39.4 21.7 331 SEE BELOW

VARIABLE REFRIGERANT VOLUME FAN COIL AND BRANCH SELECTOR BOX SCHEDULE

SYSTEM MARK ROOMS SERVED MANF. MODEL NUMBER TYPE

SOUND

(dBA)

SUPPLY FAN EVAPORATOR COIL UNIT PHYSICAL DATA

CONDENSATE

PUMP

REMARKS

ASSOCIATED BRANCH SELECTOR

CFM

(COOLING)

WORKING FLUID

REQUIRED

SENS. COOL

(BTU/H)

AVAILABLE

TOT. COOL

(BTU/H)

AVAILABLE

SENS. COOL

(BTU/H)

REQUIRED

HEAT

(BTU/H)

AVAILABLE

HEAT

(BTU/H)

WIDTH

(IN)

HEIGHT

(IN)

DEPTH

(IN)

WEIGHT

(LBS)

MARK MODEL

DIMENSIONS (WxHxD) WEIGHT (LBS)

V R

F

S

Y S

T E

M

FC128A OPEN OFFICE 128 DAIKIN FXZQ12MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-33 335 40% PROP. GLY. 7.5 10.3 7.5 6.9 13.5 22.6 11.3 22.6 42 YES SEE BELOW

BS128 BSVQ36PVJU 15.3 x 8.1 x 12.8 26

FC128B PRIVATE OFFICE 131 DAIKIN FXLQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 4.6 6.4 5.5 3.5 8.5 22.6 11.3 22.6 42 YES SEE BELOW

FC129 PRIVATE OFFICE 129 DAIKIN FXLQ07MVJU9 FLOOR STANDING 32-35 245 40% PROP. GLY. 5.1 6.4 5.4 5.0 8.5 39.4 23.6 8.7 57 YES SEE BELOW BS129 BSVQ36PVJU 15.3 x 8.1 x 12.8 26

FC130 PRIVATE OFFICE 130 DAIKIN FXLQ07MVJU9 FLOOR STANDING 32-35 245 40% PROP. GLY. 4.8 6.4 5.4 3.9 8.5 39.4 23.6 8.7 57 YES SEE BELOW BS130 BSVQ36PVJU 15.3 x 8.1 x 12.8 26

FC132A

OPEN OFFICE [RLMHW]

DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

BS132A BSVQ60PVJU 13.3 x 8.1 x 12.8 26

FC132B

OPEN OFFICE [RLMHW]

DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC132C OPEN OFFICE 132 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC132D OPEN OFFICE 132 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC132E

OPEN OFFICE [RLMHW]

DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

BS132B BSVQ60PVJU 13.3 x 8.1 x 12.8 26

FC132F

OPEN OFFICE [RLMHW]

DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC132G OPEN OFFICE 132 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC132H OPEN OFFICE 132 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC133A OPEN OFFICE 133 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.6 12.8 10.3 5.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

BS133 BSVQ60PVJU 13.3 x 8.1 x 12.8 26

FC133B OPEN OFFICE 133 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.6 12.8 10.3 5.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC133C OPEN OFFICE 133 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.6 12.8 10.3 5.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC133D OPEN OFFICE 133 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.6 12.8 10.3 5.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW

FC134 PRIVATE OFFICE 134 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.8 12.8 10.3 6.4 17.5 22.6 11.3 22.6 42 YES SEE BELOW BS134 BSVQ36PVJU 15.3 x 8.1 x 12.8 26

FC135 CONFERENCE 135 DAIKIN FXAQ18PVJU HIGH WALL-MOUNTED 37-43 500 40% PROP. GLY. 8.0 15.4 12.8 4.9 20.0 41.3 11.4 9.3 31 YES SEE BELOW BS135 BSVQ36PVJU 15.3 x 8.1 x 12.8 26

FC136 PRIVATE OFFICE 136 DAIKIN FXZQ12MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-33 335 40% PROP. GLY. 6.8 10.3 7.5 6.0 13.5 22.6 11.3 22.6 42 YES SEE BELOW BS136 BSVQ36PVJU 15.3 x 8.1 x 12.8 26

FC139 SMALL CONFERECE DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 2.5 6.4 5.5 3.0 8.5 22.6 11.3 22.6 42 YES SEE BELOW BS139 BSVQ36PVJU 15.3 x 8.1 x 12.8 26

FC227A PRIVATE OFFICE 231 DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 3.7 6.4 5.5 4.0 8.5 22.6 11.3 22.6 42 YES SEE BELOW

BS227 BSVQ36PVJU 15.3 x 8.1 x 12.8 26FC227B PRIVATE OFFICE 228 DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .