Mech-_DM2.0_M9.8.pdf
PDF 4 MB Posted
- Attached to
- Building 26, Phase 2 North Wing Renovation Federal contract opportunity
- Solicitation number
- AG-03R6-S-15-0052
About this file
Drawings Mech-DM2.0_M9.8
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECH/ELECT
MECH/ELECT
2 1
7 7
A D E F G H KCB J
BA
SE
M
EN
T M
EC
H
A N
IC
A
L D
EM
O
P
LA
N
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
4. COORDINATE ALL DEMO WITH EXISTING PHASE 1
MECHANICAL, ELECTRICAL & PLUMBING SYSTEM TO
REMAIN (TYP.).
5. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS
ABATEMENT CONTRACTOR.
USFS BUILDING 26 - BASEMENT MECHANICAL DEMO PLAN 16
DM2.0 : DM2.0 1/8" = 1'-0"
NORTH
DM2.0
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
GENERAL NOTES:
2014 MORRISON-MAIERLE, INC.
1. MECH / ELECT 005: MAJORITY OF WORK COMPLETED IN
PHASE 1. NO DEMO. REQ'D IN THIS AREA; COORDINATE
WITH NEW WORK.
2. MECH / ELECT 028: REMOVE EXISTING STEAM BOILER,
HOT WATER STORAGE TANKS AND ALL ASSOCIATED
STEAM HEATING COMPONENTS AND PIPING WITHIN THIS
BOILER ROOM. REMOVE ALL STEAM AND CONDENSATE
PIPING CONNECTED TO THIS HEATING SYSTEM
INCLUDING RADIATORS AND CONTROLS. ROOM TO BE
COMPLETELY CLEARED AND READY FOR INSTALLATION
OF NEW SYSTEMS & EQUIPMENT.
3. EXISTING COMPUTER ROOM CONDITIONING SYSTEM,
PROTECT.
4. REMOVE ALL STEAM HEATING COMPONENTS AND PIPING
WITHIN THIS AREA INCLUDING RADIATORS AND
CONTROLS. AREA TO BE COMPLETELY CLEARED OF
EXISTING HEATING SYSTEM COMPONENTS AND READY
FOR INSTALLATION OF NEW SYSTEMS & EQUIPMENT.
5. EXISTING COOLING TOWER, PROTECT.
6. EXISTING CEILING-MOUNTED ELECTRIC HEATER,
PROTECT.
7. EXISTING VARIABLE-REFRIGERANT SYSTEM PIPING AND
EQUIPMENT; INSTALLED UNDER PHASE 1, PROTECT.
(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR
BOX TO REMAIN, PROTECT.
DEMO. EXISTING STEAM RADIATOR & ALL
ASSOCIATED PIPING AND CONTROLS BACK TO
BOILER ROOM, TYP. RECYCLE RADIATORS, TYP.
PLAN LEGEND
(E) EXISTING PHASE 1 FLOOR-MOUNTED
CONSOLE-TYPE FAN-COIL UNIT (ON FLOOR
ABOVE) TO REMAIN, PROTECT UNIT AND ALL
ASSOCIATED PIPING IN BASEMENT, TYP.
101.4
1 1
1 1 1
A D E F G H KCB J
FI
R
ST
F
LO
O
R M
EC
H
A N
IC
A
L D
EM
O
P
LA
N
USFS BUILDING 26 - FIRST FLOOR MECHANICAL DEMO PLAN 16
DM2.1 : DM2.1 1/8" = 1'-0"
NORTH
DM2.1
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
GENERAL NOTES:
2014 MORRISON-MAIERLE, INC.
1. REMOVE EXISTING STEAM HEATING COMPONENTS AND
PIPING WITHIN THIS AREA INCLUDING RADIATORS AND
CONTROLS. CLEAR EXISTING HEATING SYSTEM
COMPONENTS AND READY FOR INSTALLATION OF NEW
SYSTEMS & EQUIPMENT.
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
4. COORDINATE ALL DEMO WITH EXISTING PHASE 1
MECHANICAL, ELECTRICAL & PLUMBING SYSTEM TO
REMAIN (TYP.).
5. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS
ABATEMENT CONTRACTOR.
PLAN LEGEND
(E) EXISTING PHASE 1 THERMOSTAT TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 CEILING CASSETTE
FAN-COIL UNIT TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 HIGH-WALL FAN-COIL UNIT
TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 FLOOR-MOUNTED
CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,
PROTECT.
(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR
BOX TO REMAIN, PROTECT.
DEMO. EXISTING STEAM RADIATOR & ALL
ASSOCIATED PIPING AND CONTROLS BACK TO
BOILER ROOM, TYP. RECYCLE RADIATORS, TYP.
DOWN
DOWN
1 1
1 11 1
1 1
A D E F G H KCB J
SE
C
O N
D F
LO
O
R M
EC
H
A N
IC
A
L D
EM
O
P
LA
N
USFS BUILDING 26 - SECOND FLOOR MECHANICAL DEMO PLAN 16
DM2.2 : DM2.2 1/8" = 1'-0"
NORTH
DM2.2
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
GENERAL NOTES:
2014 MORRISON-MAIERLE, INC.
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
4. COORDINATE ALL DEMO WITH EXISTING PHASE 1
MECHANICAL, ELECTRICAL & PLUMBING SYSTEM TO
REMAIN (TYP.).
5. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS
ABATEMENT CONTRACTOR.
KEY NOTES:
1. REMOVE EXISTING STEAM HEATING COMPONENTS AND
PIPING WITHIN THIS AREA INCLUDING RADIATORS AND
CONTROLS. CLEAR EXISTING HEATING SYSTEM
COMPONENTS AND READY FOR INSTALLATION OF NEW
SYSTEMS & EQUIPMENT.
2. DEMO EXISTING ELECTRIC WALL HEATER, COMPLETE.
PLAN LEGEND
(E) EXISTING PHASE 1 THERMOSTAT TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 CEILING CASSETTE
FAN-COIL UNIT TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 HIGH-WALL FAN-COIL UNIT
TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 FLOOR-MOUNTED
CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,
PROTECT.
(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR
BOX TO REMAIN, PROTECT.
DEMO. EXISTING STEAM RADIATOR & ALL
ASSOCIATED PIPING AND CONTROLS BACK TO
BOILER ROOM, TYP. RECYCLE RADIATORS, TYP.
1 1
1 1
1 1
1 1
A D E F G H KCB J
A T
T
IC
M
EC
H A
N
IC
A L
D
EM
O P
LA
N
USFS BUILDING 26 - ATTIC MECHANICAL DEMO PLAN 16
DM2.3 : DM2.3 1/8" = 1'-0"
NORTH
DM2.3
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
GENERAL NOTES:
2014 MORRISON-MAIERLE, INC.
1. REMOVE ALL EXISTING VENTILATION DUCTWORK
WITHIN ATTIC WITHIN THIS AREA. DUCTS
REPRESENTED SCHEMATICALLY ONLY. FIELD
VERIFICATION REQUIRED.
2. ROOFTOP VENTS TO REMAIN. DEMO ALL DUCTWORK
UP TO VENTS.
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
4. COORDINATE ALL DEMO WITH EXISTING PHASE 1
MECHANICAL, ELECTRICAL & PLUMBING SYSTEM TO
REMAIN (TYP.).
5. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
6. COORDINATE REMOVAL OF PIPING WITH ASBESTOS
ABATEMENT CONTRACTOR.
STAIR
RESTROOM
MECH / ELECT
ELECT/DATA
ELEVATOR
MACHINE
ELEVATOR
A
VESTIBULE
VESTIBULE
UH3
UH4
FC130
(ABOVE)
FC129
(ABOVE)
BS130
BS129
BLR3 BLR4
P4
P5
MECH/ELECT
MECH/ELECT
3 5
3 5
A D E F G H KCB J
BA
SE
M
EN
T M
EC
H
A N
IC
A
L
PL
A N
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
USFS BUILDING 26 - BASEMENT MECHANICAL PLAN16
M2.0 : M2.0 1/8" = 1'-0"
NORTH
M2.0
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
GENERAL NOTES:
2014 MORRISON-MAIERLE, INC.
1. NEW MECHANICAL ROOM (DASHED OUTLINE) - SEE M2.0A
FOR ENLARGED PLAN AND SCHEMATIC OF EQUIPMENT
AND PIPING LAYOUT.
2. CONNECT NEW HEAT PUMP WATER CIRCULATION PIPING
TO EXST PIPING (FROM PHASE 1) IN MECH. RM SOUTH
REFER TO M2.0A.
3. ROUTE (3)4" HEAT PUMP WATER CIRCULATION PIPING
BETWEEN MECH. RM NORTH & MECH. RM SOUTH. REFER
TO M2.0A FOR INTERCONNECTION INFORMATION.
4. PIPING CONTINUED ON ENLARGED BOILER ROOM PLAN,
M2.0A.
5. MOUNT PIPING TIGHT TO BOTTOM OF STRUCTURE.
6. NOTE NOT USED.
7. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT ON MAIN
FLOOR ABOVE: FLOOR-MTD. CONSOL. REFER TO M2.1.
8. CORE-DRILL PIPING THRU CONC. WALL.
9. SYSTEM #3 REFRIG. BRANCH PIPING UP IN WALL ABOVE TO
FIRST FLOOR CEILING. NOTE: THIS BRANCH OF REFRIG.
PIPING MUST BE ROUTED AS SHOWN IN ORDER TO
PROVIDE PROPER BALANCE OF REFIG. SYSTEM.
10. BOILERS BLR3 & BLR4 AND PRIMARY HEAT PUMP WATER
CIRCULATION PUMPS P4 & P5 TO BE INSTALLED AT THESE
APROX. LOCATIONS. REFER TO M2.0A.
11. ELECT. UNIT HEATER (AS SCHEDULED) SUSPENDED FROM
CEILING. TEMPORARY HEAT FOR PHASE 2.
12. EXISTING COMPUTER ROOM CONDITIONING SYSTEM,
PROTECT.
13. EXISTING COOLING TOWER, PROTECT.
PLAN LEGEND
(E) EXISTING PHASE 1 FLOOR-MOUNTED
CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,
PROTECT.
(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR
BOX TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 CEILING-MOUNTED ELECT. HEATER
TO REMAIN, PROTECT.
F
P
3" 3"
3" 3"
76 GPM76 GPM
HVAC PIPING LEGEND
SYMBOL DESCRIPTION
HORIZONTAL ELBOW
HORIZONTAL TEE
AUTOMATIC FLOW CONTROL
BALL VALVE
CHECK VALVE
STRAINER
UNION
HOSE END DRAIN
PRESSURE GAUGE
TEMPERATURE SENSOR
THERMOMETER
PRESSURE RELIEF VALVE
T
NOTE:
(E) DESIGNATES EXIST. PIPING OR
EQUIPMENT.
SYMBOL DESIGNATES CONNECTION
OF NEW TO EXIST.
1. CONNECT NEW HYDRONIC HEATING PIPING TO EXISTING 'CAPPED ENDS' AT
THIS LOCATION, TYP. 3. PIPING TO EXTEND TO NEW HEAT PUMP SYSTEM HP3
AND HP4 LOCATED IN MECH/ELECT 028.
2. NEW BOILERS BLR3, BLR4 AS SCHEDULED. CONNECT TO COMMON PIPING
BRIDGE AT 'CAPPED ENDS'.
3. NEW HYDRONIC SYSTEM PRIMARY PUMPS P4, P5 AS SCHEDULED. CONNECT
TO 'CAPPED ENDS' AS SHOWN.
4. ADDITIONAL HEAT PUMP(S) TO BE CONNECTED TO HYDRONIC HEATING
SYSTEM UNDER FUTURE CONSTRUCTION PHASE (PHASE 3).
2" 2" 2" 2"
NOTE:
NOT ALL REFRIG. PIPING NOT SHOWN ON THIS
PLAN FOR CLARITY. REFER TO VRF SYSTEM
PIPING SCHEMATICS M9.5 & M9.6.
4"
4"
4"
3" W/ BALL VALVE(S).
CAPPED FOR FUTURE
3" W/ BALL VALVE(S).
CAPPED FOR FUTURE
4"
4"
4"
NOTE:
(E) DESIGNATES EXIST. PIPING OR
EQUIPMENT.
SYMBOL DESIGNATES CONNECTION
OF NEW TO EXIST.
HP4 (X3)
HP3(X3)
TO HP3
TO HP4
1. VRF SYSTEM #3: REFRIGERANT PIPING LINES (X3) UP IN CHASE TO FIRST
FLOOR. REFER TO M2.1 FOR CONTINUATION. REFER TO VRF SYSTEM
SCHEMATIC SHEET M9.5. NOTE: REFRIG. PIPING FROM THIS CHASE TO HP3 NOT
SHOWN FOR CLARITY.
2. VRF SYSTEM #4: REFRIGERANT PIPING LINES (X3) UP IN CHASE TO
FIRST/SECOND FLOOR. REFER TO M2.1 & M2.2 FOR CONTINUATION. REFER TO
VRF SYSTEM SCHEMATIC SHEET M9.6. NOTE: REFRIG. PIPING FROM THIS
CHASE TO HP4 NOT SHOWN FOR CLARITY.
3. HEAT PUMPS TO BE MOUNTED ON FIELD-FABRICATED GALVANIZED STEEL
STANDS. OBSERVED FLOOR ELEVATION CHANGES IN THE BOILER ROOM.
CONSTRUCT STAND LEGS TO FIT EXST. CONDITIONS.
4. (3) 4"Ø HEAT PUMP WATER CIRCULATION PIPING TIGHT TO CEILING; BETWEEN
NORTH & SOUTH MECHANICAL ROOMS. REFER M2.0 FOR CONTINUATION.
MECH / ELECT
005MECH/ELECT
MECH/ELECT
BA
SE
M
EN
T B
O
IL
ER
R
O O
M P
LA
N
P
IP
IN
G
SC
H
EM
A T
IC
USFS BUILDING 26 - ENLARGED MECH. ROOM PLAN16
M2.0A : M2.0 1/4" = 1'-0"
NORTH M2.0A
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
2014 MORRISON-MAIERLE, INC.
MECH. RM 028 (NORTH) -
M2.0A : M2.0 NO SCALE
HYDRONIC PIPING SCHEMATIC 4
M2.0A : M2.0 NO SCALE
MECH. RM 005 (SOUTH) - HYDRONIC PIPING SCHEMATIC
PRIVATE
OFFICE
HR
CONFERENCE
OFFICE
OFFICE
OPEN
OFFICE
(12 STAFF)
OPEN
OFFICE
(16 STAFF)
ENTRY
HALL
RECEPTION
(2 STAFF)
BREAK
PRIVATE
OFFICE
JANITOR
WOMENS
RESTROOM
MENS
RESTROOM
EXECUTIVE
ASSISTANT
(2 STAFF)
REGIONAL
FORESTER
DEPUTY
REGIONAL
FORESTER
DEPUTY
REGIONAL
FORESTER
COFFEE / COPY
LARGE
CONFERENCE
TELE/DATA
PRINT / COPY / FAX
CONFERENCE
ENTRY
ELEVATOR
A
STAIR
PORCH
STAIR
CONFERENCE
OPEN
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
OPEN
OFFICE
OPEN
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
FC132A
TYP. 8
T
FC132B
FC132C
FC132D
FC132E
FC132F
FC132G
FC132H
BS132A
FC130
FC128B
T
T
FC129
T
FC128A
EH6
T
133 BS133
FC134
FC133A
TYP. 4
FC133B
FC133C
FC133D
FC136
T T T
FC135
BS136
BS134
BS135
134 135 136
BS128
T
BS132B
11 11
SMALL
CONFERENCE
FC139
BS139
T
A D E F G H KCB J
FI
R
ST
F
LO
O
R M
EC
H
A N
IC
A
L
PL
A N
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS
IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL
PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD
VERIFIED. THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND
DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING
SYSTEMS WITH OTHER TRADES. REFER TO ARCHITECTURAL,
STRUCTURAL, PLUMBING, AND ELECTRICAL DRAWINGS AND FIRE
PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS
NECESSARY FOR COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR PROPER
EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION INSTRUCTION
FOR RUNNING THE COMBUSTION AIR AND VENT PIPING AS WELL
AS THE TERMINATION THROUGH THE ROOF. FOLLOW ALL SAFETY
INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL
DRAWINGS TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.
8. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING AND
DUCTWORK PASSING THROUGH RATED CONSTRUCTION.
KEY NOTES:
USFS BUILDING 26 - FIRST FLOOR MECHANICAL PLAN16
M2.1 : M2.1 1/8" = 1'-0"
NORTH
M2.1
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
2014 MORRISON-MAIERLE, INC.
GENERAL NOTES:
1. VRF SYSTEM #3: REFRIGERANT LINES IN CHASE FROM
BASEMENT BELOW AND UP IN CHASE TO 2ND FLOOR BRANCH
SELECTOR BOXES (BS227, BS229, BS233). REFER TO M2.0A AND
M2.2 FOR CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC
FOR PIPE SIZES.
2. VRF SYSTEM #4: REFRIGERANT LINES UP/DN IN CHASE FROM
BASEMENT AND TO SECOND FLOOR. REFER TO M2.0A & M2.2 FOR
CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC FOR PIPE
SIZES.
3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
CEILING-MOUNTED CASSETTE.
4. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
FLOOR-MOUNTED CONSOL. NOTE: REFRIG. PIPING FOR ALL
FLOOR-MOUNTED FAN-COILS FROM BASEMENT BELOW. REFER
TO M2.0 FOR PIPING LAYOUT.
5. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT: HIGH-WALL
MOUNTED UNIT.
6. VRF SYSTEM ZONE REFRIGERANT LINE BRANCH SELECTOR BOX.
IN ACCESSIBLE LOCATION ABOVE LAY-IN CEILING.
7. ROUTE REFRIGERANT PIPING UP AND BETWEEN FLOOR JOISTS.
ROUTE PIPING OVER STRUCTURAL BEAM(S).
8. EXISTING PLASTER CEILING IN THESE AREAS TO REMAIN. PIPING,
DUCTWORK OR EQUIPMENT ABOVE THESE AREAS MUST BE
ROUTED BETWEEN JOISTS. COORD. CUTTING OF CEILING
PLASTER W/ GEN. CONT'R.
9. SYSTEM #3 REFRIG. BRANCH PIPING DOWN IN WALLTO
BASEMENT. NOTE: THIS BRANCH OF REFRIG. PIPING MUST BE
ROUTED AS SHOWN IN ORDER TO PROVIDE PROPER BALANCE OF
REFIG. SYSTEM. REFER TO M2.0 FOR PIPING CONTINUATION.
10. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW ON WALL.
REFER TO DETAIL. NOTE: THIS IS A FIRE-RATED WALL,
FIRE-CAULK AROUND HEATER PENETRATIONS AS REQUIRED.
REFER TO SPECIFICATIONS. MOUNT HEATER TO MAINTAIN
MANUFACTURER'S CLEARANCE REQUIREMENTS. MAINTAIN A
MINIMUM OF 18" CLEAR ON THE STRIKE SIDE OF DOOR.
11. CORE-DRILL REFRIG. PIPING THRU CONC. WALL. ALSO REFER TO
M3.1 FOR ADDITIONAL CORE-DRILLING.
12. ROUTE REFRIGERANT PIPING UP AND BETWEEN FLOOR JOISTS.
ROUTE PIPING OVER STRUCTURAL BEAM(S).
PLAN LEGEND
(E) EXISTING PHASE 1 THERMOSTAT TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 CEILING CASSETTE
FAN-COIL UNIT TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 HIGH-WALL FAN-COIL UNIT
TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 FLOOR-MOUNTED
CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,
PROTECT.
(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR
BOX TO REMAIN, PROTECT.
DOWNDOWN
OFFICE
OFFICE
OFFICE
SMALL
CONFERENCE
SMALL
CONFERENCE
SMALL
CONFERENCE
OPEN
OFFICE
(23 STAFF)
OPEN
OFFICE
(22 STAFF)
STAIR
ELEVATOR
A
TELE/DATA
JAN
FC233A
BS233
FC229B
FC227C
FC224B
FC224A
T
T
T
T
T
T
T T
FC226
BS229
T T
T T T T
PORCH
FILES
PRIVATE
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
PRINT/COPY/COFFEE
PRIVATE
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
OPEN
OFFICE
CONF
OPEN
OFFICE
STAIR
PRIVATE
OFFICE
CONFERENCE
PRIVATE
OFFICE
LARGE
CONFERENCE
PRIVATE
OFFICE
PRIVATE
OFFICE
MENS
RR
WOMENS
RR
PORCH
T
T
T
FC223A
TYP. 5
FC223B
FC222A
FC222B
FC222C
FC222D
FC222E
FC222F
T
TYP. 6
FC223C
T
BS221
BS217
FC217F
FC217E
FC217G
FC213A
FC213B
BS213
FC217A FC217B
FC217C
FC217D
FC221
8 8 8 8
8 8
T
BS223
BS226
BS224
FC227B
FC227A
FC229A
BS227
BS222
FC223E
FC233B
FC223D
6 6
5 5 5
T
EH7
A D E F G H KCB J
SE
C
O N
D F
LO
O
R M
EC
H
A N
IC
A
L
PL
A N
USFS BUILDING 26 - SECOND FLOOR MECHANICAL PLAN16
M2.2 : M2.2 1/8" = 1'-0"
NORTH
M2.2
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
2014 MORRISON-MAIERLE, INC.
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
GENERAL NOTES:
1. VRF SYSTEM #4: REFRIGERANT LINES IN CHASE
FROM BASEMENT. REFER TO M2.1 & M2.0A FOR
CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC,
M 9.5 FOR PIPE SIZES.
2. VRF SYSTEM #4: REFRIGERANT LINES IN CHASE
FROM BASEMENT. REFER TO M2.1 & M2.0A FOR
CONTINUATION. REFER TO VRF SYSTEM SCHEMATIC,
M 9.6 FOR PIPE SIZES.
3. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
CEILING-MOUNTED CASSETTE.
4. NOTE NOT USED.
5. VRF SYSTEM HEATING/COOLING FAN-COIL UNIT:
HIGH-WALL MOUNTED UNIT.
6. VRF SYSTEM ZONE REFRIGERANT LINE BRANCH
SELECTOR BOX. IN ACCESSIBLE LOCATION ABOVE
LAY-IN CEILING.
7. INSULATE PIPING IN ACCORDANCE WITH
MANUFACTURE'S RECOMMENDATIONS.
8. EXISTING PLASTER CEILING IN THESE AREAS TO
REMAIN. PIPING, DUCTWORK OR EQUIPMENT ABOVE
THESE AREAS MUST BE ROUTED BETWEEN JOISTS
WITHIN ATTIC. COORD. CUTTING OF CEILING PLASTER
W/ GEN. CONT'R.
9. CORE-DRILL REFRIGERANT PIPING THRU CONC.
WALL. ALSO REFER TO M3.2 FOR ADDITIONAL
CORE-DRILLING.
10. COORDINATE PIPING ROUTING AND CORE-DRILLING
WITH PLUMBING, THIS AREA.
11. ELECTRIC HEATER (AS SCHEDULED) MOUNTED LOW
ON WALL. REFER TO DETAIL.
PLAN LEGEND
(E) EXISTING PHASE 1 THERMOSTAT TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 CEILING CASSETTE
FAN-COIL UNIT TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 HIGH-WALL FAN-COIL UNIT
TO REMAIN, PROTECT.
(E) EXISTING PHASE 1 FLOOR-MOUNTED
CONSOLE-TYPE FAN-COIL UNIT TO REMAIN,
PROTECT.
(E) EXISTING PHASE 1 REFRIGERANT BRANCH SELECTOR
BOX TO REMAIN, PROTECT.
STAIR
RESTROOM
MECH / ELECT
ELECT/DATA
ELEVATOR
MACHINE
ELEVATOR
A
VESTIBULE
VESTIBULE
FC130
(ABOVE)
FC129
(ABOVE)
3 4
MECH/ELECT
MECH/ELECT
EXST CONDENSATE DRAIN
PIPING, PROTECT
A D E F G H KCB J
BA
SE
M
EN
T C
O N
D
EN
SA
T
E
PI
PI
N
G P
LA
N
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
USFS BUILDING 26 - BASEMENT CONDENSATE PIPING PLAN16
M3.0 : M3.0 1/8" = 1'-0"
NORTH
M3.0
KEY NOTES:
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
GENERAL NOTES:
2014 MORRISON-MAIERLE, INC.
1. REFER TO M2.0A FOR ENLARGED MECHANICAL ROOM
PLAN.
2. CONDENSATE PIPING DROP FROM MAIN FLOOR ABOVE.
REFER TO M3.1 FOR CONTINUATION.
3. CONDENSATE DRAIN PIPING IN CHASE FROM FLOORS
ABOVE. REFER TO M3.1 & M3.2.
4. ROUTE CONDENSATE PIPING TO FLOOR DRAIN OR
APPROVED RECEPTOR WITHIN BOILER ROOM.
5. CORE-DRILL CONDENSATE PIPING THRU CONC. WALL.
6. MOUNT PIPING AS TIGHT TO BOTTOM OF STRUCTURE AS
POSSIBLE.
PRIVATE
OFFICE
HR
CONFERENCE
OFFICE
OFFICE
OPEN
OFFICE
(12 STAFF)
OPEN
OFFICE
(16 STAFF)
ENTRY
HALL
RECEPTION
(2 STAFF)
BREAK
PRIVATE
OFFICE
JANITOR
WOMENS
RESTROOM
MENS
RESTROOM
EXECUTIVE
ASSISTANT
(2 STAFF)
REGIONAL
FORESTER
DEPUTY
REGIONAL
FORESTER
DEPUTY
REGIONAL
FORESTER
COFFEE / COPY
LARGE
CONFERENCE
PRINT / COPY / FAX
CONFERENCE
ENTRY
ELEVATOR
A
STAIR
TELE/DATA
PORCH
STAIR
CONFERENCE
OPEN
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
OPEN
OFFICE
BOOTH
TELE
OPEN
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
FC132A
FC132B
FC132C
FC132D
FC132E
FC132F
FC132G
FC132H
FC134
FC133A
FC133B
FC133C
FC133D
FC136
FC135
7 7
FC128A
EXST MECH. SYSTEMS,
PROTECT
EXST MECH.
SYSTEMS,
PROTECT
EXST MECH.
SYSTEMS,
PROTECT
EXST MECH. SYSTEMS,
PROTECT
FC130
FC128B
FC129
FC129
A D E F G H KCB J
FI
R
ST
F
LO
O
R V
EN
T
IL
A
T
IO
N A
N D
C O
N D
EN
SA
T E
PI
PI
N G
P
LA
N
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
USFS BUILDING 26 - FIRST FLOOR VENTILATION AND CONDENSATE PIPING PLAN16
M3.1 : M3.1 1/8" = 1'-0"
NORTH
M3.1
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
2014 MORRISON-MAIERLE, INC.
GENERAL NOTES:
1. CORE-DRILL DUCT AND/OR PIPING PENETRATIONS THRU
CONC. WALL. ALSO REFER TO M2.1 FOR ADDITIONAL
CORE-DRILLING.
2. CONDENSATE DRAIN PIPING DOWN IN NEW FRAMED-
WALL TO BASEMENT CEILING BELOW. CORE-DRILL THRU
CONC. FLOOR AS REQ'D. REFER TO M3.0 FOR
CONTINUATION.
3. COORDINATE DUCTWORK, PIPING ROUTING AND
CORE-DRILLING WITH PLUMBING, THIS AREA.
4. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT
MECH. ROOM. ROUTE PIPING FULL-SIZED TO NEAREST
FLOOR DRAIN OR APPROVED RECEPTOR. REFER TO
M3.0.
5. 14"Ø SA DUCT UP TO ATTIC ABOVE. REFER TO M3.2 &
M3.3 FOR CONTINUATION.
6. EXISTING PLASTER CEILING IN THIS AREA. DO NOT
ROUTE DUCTWORK OR CONDENSATE PIPING.
7. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.
8. CONDENSATE DRAIN DOWN IN NEW WALL TO SINK DRAIN.
REFER TO DETAIL 14/M9.7.
9. CONDENSATE DRAIN PIPING UP IN NEW FRAMED-WALL
ABOVE. CORE-DRILL THRU CONC. FLOOR ABOVE AS
REQ'D. REFER TO M3.1 FOR CONTINUATION.
10. TRANSFER AIR GRILLE DUCTED TO CEILING OF
ADJACENT AREA. ROUTE A SHORT SECTION OF
DUCTWORK THRU FULL-HEIGHT WALL AND OVER TO
CEILING OF ADJACENT AREA AS SHOWN. LINE
DUCTWORK WITH 1" LINER. REFER TO DETAIL 12/M9.7.
11. ROUTE CONDENSATE DRAIN WITHIN JOIST SPACE &
OVER STRUCTURAL BEAM. REPAIR CEILING AS REQ'D.
COORD. W/ GEN. CONT'R.
DOWNDOWN
OFFICE
OFFICE
OFFICE
SMALL
CONFERENCE
SMALL
CONFERENCE
SMALL
CONFERENCE
OPEN
OFFICE
(23 STAFF)
OPEN
OFFICE
(22 STAFF)
STAIR
ELEVATOR
A
TELE/DATA
ELECTRICAL
OFFICE
OFFICE
OFFICE
SMALL
CONFERENCE
SMALL
CONFERENCE
SMALL
CONFERENCE
OPEN
OFFICE
(23 STAFF)
OPEN
OFFICE
(22 STAFF)
STAIR
ELEVATOR
A
TELE/DATA
ELECTRICAL
PORCH
PRIVATE
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
PRINT/COPY/COFFEE
PRIVATE
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
PRIVATE
OFFICE
OPEN
OFFICE
CONF
OPEN
OFFICE
STAIR
PRIVATE
OFFICE
CONFERENCE
PRIVATE
OFFICE
LARGE
CONFERENCE
PRIVATE
OFFICE
PRIVATE
OFFICE
MENS
RR
WOMENS
RR
PORCH
FC233A
FC229B
FC227C
FC224B
FC224A
FC226
FC223A
FC223B
FC222A
FC222B
FC222C
FC222D
FC222E
FC222F
FC223C
FC223D
FC217FFC217E FC217G FC213A FC213B
FC217A
FC217B
FC217C FC217D
FC221
FC227B
FC227A
FC229A
FC223E
FC233B
HRV2
(ATTIC)
PRIVATE
OFFICE
7 7 7 7
EXST MECH.
SYSTEMS,
PROTECT
EXST MECH.
SYSTEMS,
PROTECT
EXST MECH.
SYSTEMS,
PROTECT
A D E F G H KCB J
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
USFS BUILDING 26 - SECOND FLOOR VENTILATION AND CONDENSATE PIPING PLAN16
M3.2 : M3.2 1/8" = 1'-0"
NORTH
M3.2
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
2014 MORRISON-MAIERLE, INC.
GENERAL NOTES:
SE
C
O N
D F
LO
O
R V
EN
T
IL
A
T
IO
N A
N D
C O
N D
EN
SA
T E
PI
PI
N G
P
LA
N
1. CORE-DRILL DUCT AND/OR PIPING PENETRATIONS THRU
CONC. WALL WITHIN SOFFIT SPACE. ALSO REFER TO
M2.2 FOR ADDITIONAL CORE-DRILLING.
2. SAWCUT OR CORE-DRILLE PENETRATIONS THRU
CONC. FLOOR AS REQ'D FOR NEW DUCTWORK.
3. 14"Ø SA DUCT UP/DOWN IN CHASE. REFER TO M3.1 &
M3.3 FOR CONTINUATION.
4. DUCTWORK CONTINUED IN ATTIC ABOVE. REFER TO M3.3
FOR DUCTWORK PLAN.
5. CONDENSATE DRAIN FROM HRV UNIT IN ATTIC ABOVE.
REFER TO M3.3. REFER TO CONDENSATE DRAIN DETAIL
16/M9.7.
6. CONDENSATE DRAIN DOWN IN NEW FRAMED WALL TO
FIRST FLOOR CEILING BELOW. CORE-DRILL THRU CONC.
FLOOR AS REQ'D. REFER TO M3.1 FOR CONTINUATION.
7. CONDENSATE DRAIN FROM VRF SYSTEM FAN COIL UNIT.
8. CONDENSATE DRAIN DOWN IN NEW WALL TO SINK DRAIN.
REFER TO DETAIL 14/M9.7.
9. CONDENSATE DRAIN DOWN IN CHASE TO BASEMENT
MECH. ROOM. REFER TO M3.0 FOR CONTINUATION.
10. EXISTING PLASTER CEILING IN THIS AREA. DO NOT
ROUTE DUCTWORK OR CONDENSATE PIPING.
11. CONDENSATE DRAIN DOWN IN NEW FRAMED WALL TO
LAVATORY DRAIN. REFER TO DETAIL 14/M9.7.
12. CONNECT NEW 10"Ø EXHAUST BRANCH TO EXST 10"Ø
TAP (INSTALLED IN PHASE 1).
NOTE:
ATTIC IS UNCONDITIONED. ALL DUCTWORK
IS TO BE INSULATED WITH R-8 DUCT WRAP.
REFER TO DUCT MATERIAL SCHEDULE.
L3
L4
ATTIC
NORTHEAST
ATTIC
NORTH
ATTIC WALKWAY
ATTIC WALKWAY
ATTIC WALKWAY
A T
T I C
W
A L K
W A
Y A
T T
L K
W A
Y
A T
T
L K
W A
Y
6 6 6
4 4
A D E F G H KCB J
A T
T
IC
V
EN
T
IL
A T
IO
N
P
LA
N
1. IT IS NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE
ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT THIS
PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE
FIELD VERIFIED. THESE DRAWINGS REPRESENT
SCHEMATIC SYSTEMS.
3. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING,
AND DUCTWORK AS REQUIRED BY LOCAL CODES.
4. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND
PIPING SYSTEMS WITH OTHER TRADES. REFER TO
ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELECTRICAL DRAWINGS AND FIRE PROTECTION SHOP
DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
5. ALL DUCT AND PIPING IS SCHEMATICALLY DRAWN AND
COORDINATION BETWEEN TRADES MUST BE DONE FOR
PROPER EQUIPMENT, PIPING, AND DUCTWORK PLACEMENT
AND DESIGN.
6. FOLLOW MANUFACTURES WRITTEN INSTALLATION
INSTRUCTION FOR RUNNING THE COMBUSTION AIR AND
VENT PIPING AS WELL AS THE TERMINATION THROUGH THE
ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
7. COORDINATE ALL CONCRETE PENETRATIONS WITH
STRUCTURAL DRAWINGS TO VERIFY HOW AND WHERE
CONCRETE CAN BE CUT.
8. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH
SURROUNDINGS.
9. MECHANICAL CONTRACTOR SHALL FIRE SEAL ALL PIPING
AND DUCTWORK PASSING THROUGH RATED
CONSTRUCTION.
KEY NOTES:
USFS BUILDING 26 - ATTIC VENTILATION PLAN16
M3.3 : M3.3 1/8" = 1'-0"
NORTH
M3.3
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
2014 MORRISON-MAIERLE, INC.
GENERAL NOTES:
1. HEAT RECOVERY VENTILATION UNIT, HRV2 TO BE
MOUNTED IN INSULATED ATTIC ENCLOSURE. HRV UNIT
TO BE SUSPENDED FROM EXISTING ROOF FRAMING
ABOVE WITH THREADED RODS AND VIBRATION
ISOLATORS. ENCLOSURE TO BE CONSTRUCTED BY GEN.
CONT'R. OF WOOD-FRAMED WALLS AND SHEATHED WITH
PLYWOOD. 2"-THK RIGID "BLUE BOARD" INSULATION IS
TO BE ADHERED TO THE ENTIRE TOP AND 4 SIDES.
EXISTING CEILING INSULATION IN THE ATTIC IS TO BE
REMOVED IN THE AREA BELOW THE ENCLOSURE TO
ALLOW HEAT FROM THE CONDITIONED SPACE BELOW TO
RISE INTO ENCLOSURE. HINGED ACCESS DOORS ARE TO
BE PROVIDED FOR UNIT MAINTENANCE. COORD.
MAINTENANCE ACCESS REQUIREMENTS WITH GEN.
CONT'R. ROUTE CONDENSATE DRAIN AS SHOWN ON
M3.2. REFER TO DETAIL 8/M9.7.
2. CUT 12X12 OPENING THRU EXIST. CEILING TO ALLOW
CONDITIONED ROOM AIR FROM CEILING PLENUM BELOW
TO TRANSFER UP INTO HRV ENCLOSURE. TRANSFER
GRILLE MOUNTED TO TOP SURFACE.
3. EXISTING GLASS TO BE REMOVED FROM THE DORMER'S
CENTER WINDOW. NEW LOUVER TO BE MOUNTED IN THE
WINDOW OPENING. COORD. WITH GEN. CONT'R AND
COORD. WITH ARCHITECTURAL PLANS WINDOW
SCHEDULE.
4. FRESH AIR VENTILATION BRANCH DOWN TO SUPPLY
GRILLE IN 2ND FLOOR CEILING BELOW. REFER TO M3.2
FOR CONTINUATION.
5. 14"Ø SA DUCT DOWN IN NEW SECOND FLOOR CHASE TO
FIRST FLOOR BELOW. REFER TO M3.2 & M3.1 FOR
CONTINUATION.
6. KEEP ATTIC WALKWAY CLEAR OF DUCTWORK: ROUTE
DUCTS AS HIGH AS POSSIBLE WHERE DUCT BRANCHES
CROSS THE WALKWAY.
7. 16"Ø RETURN AIR DUCTS (6-FT FLEX MAX) DOWN TO
SECOND FLOOR CEILING GRILLES. REFER TO M3.2 FOR
CONTINUATION.
8. CORE-DRILL THRU CONCRETE WALL FOR NEW 8"Ø
VENTILATION DUCT.
DUCT MATERIAL SCHEDULE
SHAPE FUNCTION DESCRIPTION MATERIAL GAUGE INSULATION R-VALUE NOTES
RECT. OUTSIDE AIR
OUTSIDE TO HRV (IN ATTIC)
SHEET METAL 24 GA. WRAP R-8 1
RECT. RELIEF AIR
RELIEF FROM HRV (IN ATTIC)
SHEET METAL 24 GA. NONE - -
RECT. EXHAUST
EXH. FROM RESTROOMS TO
HRV (ATTIC)
SHEET METAL 24 GA. WRAP R-8 1
RECT. EXHAUST
EXH. FROM RESTROOMS TO
HRV (CONDITIONED SPACE)
SHEET METAL 24 GA. NONE - -
ROUND EXHAUST
EXH. FROM RESTROOMS TO
HRV (CONDITIONED SPACE)
<12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL
24 GA. NONE - -
RECT. SUPPLY
SUPPLY FROM HRV (IN ATTIC)
SHEET METAL 24 GA. WRAP R-8 1
RECT. SUPPLY
SUPPLY FROM HRV
(CONDITIONED SPACE)
SHEET METAL 24 GA. WRAP R-5 1
ROUND SUPPLY
SUPPLY FROM HRV (IN ATTIC) <12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL
24 GA. WRAP R-8 1
ROUND SUPPLY
SUPPLY FROM HRV
(CONDITIONED SPACE)
<12"=SNAPPY DUCT, >12" SPIRAL SHEET METAL
24 GA. WRAP R-5 1
ROUND SUP./RET. 4' LENGTH MAX - AT GRD'S FLEX N/A INTEGRAL -- --
NOTES:
1. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT THE EXPOSED SEAMS/EDGES/CORNERS.
2. ALL DUCTWORK DIMENSIONS SHOWN ON PLAN ARE INSIDE CLEAR FREE AREA DIMENSIONS.
REMARKS:
1. PROVIDE SEISMIC BRACING OF ALL DUCTWORK AS REQUIRED BY LOCAL CODES.
2. INTERNALLY LINE WITH NON FIBROUS DUCT LINER.
HVAC LEGEND
PIPING
REFRIGERANT
CONDENSATE
RISE / FALL IN PIPING
FITTINGS
DUCTWORK
SUPPLY/RETURN DUCTWORK
VERTICAL TRANSITION SUPPLY DUCT
VERTICAL TRANSITION RETURN DUCT
CEILING SUPPLY AIR DIFFUSER
CEILING RETURN GRILLE
CEILING EXHAUST GRILLE
FLOOR REGISTER
AIR DEVICE NUMBER & CFM
DUCT TURNING VANES
MANUAL VOLUME DAMPER
BACKDRAFT DAMPER
FIRE/SMOKE DAMPER
HRV
EXHAUST FAN
CONTROLS
THERMOSTAT
PRESSURE SENSOR
DUCT MOUNTED SMOKE DETECTOR
WALL SWITCH
CONTROL PANEL FOR B.A.S.
PROJECT INFORMATION
PROJECT LOCATION: MISSOULA MT
PROJECT ALTITUDE: 3209 FEET ABOVE SEA LEVEL
SUMMER DESIGN TEMP: 91°F DRY BULB, 62°F WET BULB (ASHRAE 99% DESIGN)
ALL MECHANICAL AND PLUMBING EQUIPMENT SHALL BE SEISMICALLY BRACED
PER THE 2009 INTERNATIONAL BUILDING CODE. SEISMIC DESIGN
REQUIREMENTS FOR THE PROJECT ARE AS FOLLOWS:
SEISMIC DESIGN CATEGORY: D
IMPORTANCE FACTOR (Ip): 1.0
IMPORTANCE FACTOR FOR GAS PIPING: 1.5
THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE BRACING
AND RESTRAINTS. BRACING & RESTRAINT DETAILS SHALL BE INCLUDED IN SHOP
DRAWING SUBMITTAL FOR REVIEW AND BY THE ENGINEER.
SEISMIC NOTES
HVAC PIPING LEGEND
SYMBOL DESCRIPTION
ELBOW
TEE
SYSTEM PUMP
CIRCULATOR PUMP
BALL VALVE
CONTROL VALVE - 2 WAY
CONTROL VALVE - 3 WAY
CHECK VALVE
HOSE END DRAIN
STRAINER
CIRCUIT BALANCING VALVE
AUTOMATIC AIR VENT -
INSTALL AT ALL HIGH POINTS IN
SYSTEM
TEMPERATURE GAUGE
PRESSURE GAUGE
FLOW METER
TEMPERATURE SENSOR
PRESSURE SENSOR
F
T
P
DIRECT DIGITAL CONTROL POINTS
HARDWARE POINTS SOFTWARE POINTS
NOTES
POINT NAME AI AO BI BO AV BV ADJ. SCH. TRD. ALM. DISP.
SYSTEM PUMPS (P4, P5)
SYSTEM PUMP 4 STATUS X X X
SYSTEM PUMP 5 STATUS X X X
SYSTEM PUMP 4 START/ STOP X X X
SYSTEM PUMP 5 START/ STOP X X X
SYSTEM PUMP 4 FAILURE X
SYSTEM PUMP 5 FAILURE X
SYSTEM PUMP 4 RUNTIME EXCEEDED X
SYSTEM PUMP 5 RUNTIME EXCEEDED X
BOILERS (BLR3, BLR4)
HOT WATER SUPPLY TEMP. X X X BAS
HOT WATER RETURN TEMP. X X X BAS
BOILER 3 STATUS X X X BAS
BOILER 4 STATUS X X X BAS
BOILER PUMP 3 STATUS X X X BAS
BOILER PUMP 4 STATUS X X X BAS
BOILER PUMP 3 START/ STOP X X X BAS
BOILER PUMP 4 START/ STOP X X X BAS
BOILER 3 ENABLE X X BAS
BOILER 4 ENABLE X X BAS
OUTSIDE AIR TEMP. X X BAS
BOILER 3 FAILURE X BAS
BOILER 4 FAILURE X BAS
BOILER PUMP 3 FAILURE X BAS
BOILER PUMP 4 FAILURE X BAS
BOILER 3 RUNTIME EXCEEDED X BAS
BOILER 4 RUNTIME EXCEEDED X BAS
HOT WATER SUPPLY TEMP. LIMIT EXCEEDED X BAS
HEAT PUMPS (HP3, HP4)
REFER TO DAIKIN I-TOUCH CONTROL SPECIFICATIONS FOR POINTS INTERFACE WITH BAS
CONTROL VALVE (CV3, CV4)
X X BAS
ALARM CONTACTS X X X X BAS
DEFINITIONS:
AI= ANALOG INPUT
AO= ANALOG OUTPUT
BI= BINARY INPUT
BO= BINARY OUTPUT
AV= ANALOG VALUE
BV= BINARY VALUE
REFERENCES:
1. REFER TO SPEC. SECTION 230900
INSTRUMENTATION AND
CONTROL FOR HVAC FOR MORE
INFORMATION.
DEFINITIONS:
ADJ. = ADJUSTABLE
SCH. = SCHEDULE
TRD. = TREND
ALM. = ALARM
DISP. = DISPLAY
BAS = BUILDING AUTOMATION SYST.
REFERENCES:
2. REFER TO SPEC. SECTION 230993
SEQUENCE OF OPERATIONS FOR
HVAC CONTROL FOR MORE
INFORMATION.
PIPE MATERIAL SCHEDULE
SYSTEM MATERIAL SIZES INSULATION THICKNESS** ADD'L DETAILS
HYDRONIC SUPPLY/RETURN (BOILER)
'L' COPPER / STEEL
<=1
" 1
WRAP WITH ASJ
SEE BELOW
>1
" 2" WRAP WITH ASJ
HEAT PUMP WATER SUPPLY/RETURN -
CONDITIONED SPACE
'L' COPPER / STEEL /
AQUATHERM BLUE PIPE
(SDR11)
ALL NONE SEE BELOW
COMBUSTION AIR & VENT PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW
CHILLED WATER - CONDITIONED SPACE
'L' COPPER / STEEL /
AQUATHERM BLUE PIPE
(SDR11)
ALL 1
WRAP WITH ASJ
SEE BELOW
REFRIGERANT PIPING REFER TO SPECIFICATIONS. ALSO REFER TO DAIKIN INSTALLATION INSTRUCTIONS.
NATURAL GAS PIPING THREADED BLACK IRON ALL NONE PAINT ORANGE
CONDENSATE DRAIN PIPING SCHEDULE 40 PVC ALL NONE SEE BELOW
** BASED ON INSULATION HAVING A CONDUCTIVITY
(K) NOT EXCEEDING 0.27 BTU PER INCH/H*FT^2*DEG F
1. PROVIDE SEISMIC BRACING OF PIPING 2 1/2" AND LARGER
OR AS REQUIRED BY LOCAL CODES.
2. INSULATION SHALL BE FIBERGLASS WITH ALL SERVICE
JACKET
3. ALL SERVICE INSULATION JACKET IS TO BE SEALED AT
ALL SEAMS, EDGES, ETC.
4. PROVIDE PVC COATED JACKET OVER INSULATION FOR
MECHANICAL ROOM PIPING.
5. ANY CONNECTIONS THAT ARE DISSIMILAR METALS SHALL
REQUIRE BRASS UNIONS OR FLANGE SEPARATION.
PIPE MATERIAL REMARKS:
FSD
GENERAL CONTROLS NOTE
THIS PROJECT WILL INCLUDE THE INSTALLATION OF A BUILDING AUTOMATION SYSTEM (BAS). SEE SPECIFICATION SECTIONS 230900
"INSTRUMENTATION AND CONTROL FOR HVAC" AND 230993 "SEQUENCE OF OPERATIONS FOR HVAC CONTROLS"
IT SHALL BE THE RESPONSIBILITY OF THE TEMPERATURE CONTROLS CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND
SOFTWARE NOT SPECIFICALLY REFERRED TO ON THE PLANS OR IN THE SPECIFICATION TO ACHIEVE THE SEQUENCE OF OPERATIONS
DESCRIBED IN SPECIFICATION SECTION 230993 "SEQUENCE OF OPERATIONS FOR HVAC CONTROLS", THE SEQUENCES SHOWN ON THE
DRAWINGS OR ANY OTHER LOCATION IN THE CONTRACT DOCUMENTS.
PROVIDE EVERYTHING SHOWN ON THE POINTS LIST AS WELL AS EVERYTHING IN THE SEQUENCES OR ANY OTHER PART OF THE CONTRACT
DOCUMENTS REGARDLESS OF IF THEY ARE LISTED ON THE POINTS LIST.
NOTE: ALL INSTRUMENTATION AND DEVICES INSTALLED IN PHASE 2 SHALL BE OF THE SAME MANUFACTURER AND TYPE AS
INSTALLED IN PHASE 1. ALL CONTROLS SHALL BE COMPATIBLE. UTILIZE EXISTING CONTROLS INFRASTRUCTURE. THIS IS A
GENERAL CONTROLS SPECIFICATION AND SOME CONTROLS ITEMS INDICATED IN THIS SPECIFICATION SECTION MAY NOT BE
REQUIRED. FIELD VERIFY ALL EXISTING CONTROLS DEVICES, INFRASTRUCTURE, AND EXPANSION CAPABILITIES. PROVIDE ALL
INCIDENTALS AS REQUIRED TO MAKE THIS A FULLY FUNCTIONAL SYSTEM.
M
EC
H A
N
IC
A L
LE
G
EN
D
S
S C
H
ED
U
LE
S
M9.1
2014 MORRISON-MAIERLE, INC.
BU
IL
D
IN
G
P H
A
SE
N O
R T
H W
IN
G
R
EN
O V
A T
IO
N
U S
FO
R
ES
T
S
ER
V
IC
E, N
O R
T H
ER
N
R
EG
IO
N
R
EG
IO
N A
L O
FF
IC
E www.aearchitects.com
O W
N
ER
PR
O
JE
C
T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS PC
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10 05.18.15
ACCESSORIES:
1. FACTORY PROVIDED STRAINERS FOR EACH HEAT PUMP: DAIKIN BWU26A20
2. PROVIDE WITH COOL/HEAT SELECTOR
VARIABLE REFRIGERANT VOLUME HEAT PUMP SCHEDULE
SYSTEM MARK MANUFACTURER
ASSEMBLY MODEL
NUMBER
INDIVIDUAL MODEL
NUMBER
COMBINATION SIZING
PERCENTAGE
HEATING DATA COOLING DATA
REFRIGERANT TYPE
UNIT PHYSICAL DATA
REMARKS, ACCESSORIES AND CONTROLS
HEATING CAP.
(BTU/H)
HEATING SIZING
CONDITIONS (EWT / LWT)
COP
COOLING CAP.
(BTU/H)
FLOW RATE
(GPM)
HEAD
(FT)
COOLING SIZING
CONDITIONS (EWT / LWT)
EER
WIDTH (IN) HEIGHT (IN) DEPTH (IN) WEIGHT (LBS)
VRF
SYSTEM
#3
HP3(1)
DAIKIN
RWEYQ252PTJU-HR
RWEYQ84PTJU-HR
126% 317,432
70°F / 63.5°F 4.5 265,036
76.2 8.9 75°F / 82.6°F 12.8
R410A 30.7 39.4 21.7 331 SEE BELOW
HP3(2)
RWEYQ84PTJU-HR R410A 30.7 39.4 21.7 331 SEE BELOW
HP3(3)
RWEYQ84PTJU-HR R410A 30.7 39.4 21.7 331 SEE BELOW
VRF
SYSTEM
#4
HP4(1)
RWEYQ252PTJU-HR
RWEYQ84PTJU-HR
123% 316,891
70°F / 63.5°F 4.5 260,430
76.2 8.9 75°F / 82.6°F 12.8
R410A 30.7 39.4 21.7 331 SEE BELOW
HP4(2)
RWEYQ84PTJU-HR R410A 30.7 39.4 21.7 331 SEE BELOW
HP4(3)
RWEYQ84PTJU-HR R410A 30.7 39.4 21.7 331 SEE BELOW
VARIABLE REFRIGERANT VOLUME FAN COIL AND BRANCH SELECTOR BOX SCHEDULE
SYSTEM MARK ROOMS SERVED MANF. MODEL NUMBER TYPE
SOUND
(dBA)
SUPPLY FAN EVAPORATOR COIL UNIT PHYSICAL DATA
CONDENSATE
PUMP
REMARKS
ASSOCIATED BRANCH SELECTOR
CFM
(COOLING)
WORKING FLUID
REQUIRED
SENS. COOL
(BTU/H)
AVAILABLE
TOT. COOL
(BTU/H)
AVAILABLE
SENS. COOL
(BTU/H)
REQUIRED
HEAT
(BTU/H)
AVAILABLE
HEAT
(BTU/H)
WIDTH
(IN)
HEIGHT
(IN)
DEPTH
(IN)
WEIGHT
(LBS)
MARK MODEL
DIMENSIONS (WxHxD) WEIGHT (LBS)
V R
F
S
Y S
T E
M
FC128A OPEN OFFICE 128 DAIKIN FXZQ12MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-33 335 40% PROP. GLY. 7.5 10.3 7.5 6.9 13.5 22.6 11.3 22.6 42 YES SEE BELOW
BS128 BSVQ36PVJU 15.3 x 8.1 x 12.8 26
FC128B PRIVATE OFFICE 131 DAIKIN FXLQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 4.6 6.4 5.5 3.5 8.5 22.6 11.3 22.6 42 YES SEE BELOW
FC129 PRIVATE OFFICE 129 DAIKIN FXLQ07MVJU9 FLOOR STANDING 32-35 245 40% PROP. GLY. 5.1 6.4 5.4 5.0 8.5 39.4 23.6 8.7 57 YES SEE BELOW BS129 BSVQ36PVJU 15.3 x 8.1 x 12.8 26
FC130 PRIVATE OFFICE 130 DAIKIN FXLQ07MVJU9 FLOOR STANDING 32-35 245 40% PROP. GLY. 4.8 6.4 5.4 3.9 8.5 39.4 23.6 8.7 57 YES SEE BELOW BS130 BSVQ36PVJU 15.3 x 8.1 x 12.8 26
FC132A
OPEN OFFICE [RLMHW]
DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
BS132A BSVQ60PVJU 13.3 x 8.1 x 12.8 26
FC132B
OPEN OFFICE [RLMHW]
DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC132C OPEN OFFICE 132 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC132D OPEN OFFICE 132 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC132E
OPEN OFFICE [RLMHW]
DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
BS132B BSVQ60PVJU 13.3 x 8.1 x 12.8 26
FC132F
OPEN OFFICE [RLMHW]
DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC132G OPEN OFFICE 132 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC132H OPEN OFFICE 132 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.7 12.8 10.3 6.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC133A OPEN OFFICE 133 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.6 12.8 10.3 5.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
BS133 BSVQ60PVJU 13.3 x 8.1 x 12.8 26
FC133B OPEN OFFICE 133 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.6 12.8 10.3 5.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC133C OPEN OFFICE 133 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.6 12.8 10.3 5.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC133D OPEN OFFICE 133 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.6 12.8 10.3 5.5 17.5 22.6 11.3 22.6 42 YES SEE BELOW
FC134 PRIVATE OFFICE 134 DAIKIN FXZQ15MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 30-36 388 40% PROP. GLY. 7.8 12.8 10.3 6.4 17.5 22.6 11.3 22.6 42 YES SEE BELOW BS134 BSVQ36PVJU 15.3 x 8.1 x 12.8 26
FC135 CONFERENCE 135 DAIKIN FXAQ18PVJU HIGH WALL-MOUNTED 37-43 500 40% PROP. GLY. 8.0 15.4 12.8 4.9 20.0 41.3 11.4 9.3 31 YES SEE BELOW BS135 BSVQ36PVJU 15.3 x 8.1 x 12.8 26
FC136 PRIVATE OFFICE 136 DAIKIN FXZQ12MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-33 335 40% PROP. GLY. 6.8 10.3 7.5 6.0 13.5 22.6 11.3 22.6 42 YES SEE BELOW BS136 BSVQ36PVJU 15.3 x 8.1 x 12.8 26
FC139 SMALL CONFERECE DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 2.5 6.4 5.5 3.0 8.5 22.6 11.3 22.6 42 YES SEE BELOW BS139 BSVQ36PVJU 15.3 x 8.1 x 12.8 26
FC227A PRIVATE OFFICE 231 DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY. 3.7 6.4 5.5 4.0 8.5 22.6 11.3 22.6 42 YES SEE BELOW
BS227 BSVQ36PVJU 15.3 x 8.1 x 12.8 26FC227B PRIVATE OFFICE 228 DAIKIN FXZQ07MVJU9 CEILING-MOUNTED CASSETTE -COMPACT MULTI FLOW 29-31 320 40% PROP. GLY.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .