Text version
BASEMENT DEMOLITION PLAN16
D2.0 : D2.0
B A
S E M
E N
T D
E M
O L
IT
IO
N
P L A
N
1/8" = 1'-0"
D2.0NORTH
1. FIELD VERIFY DIMENSIONS. DO NOT SCALE DRAWINGS. VERIFY EXISTING
CONDITIONS AND NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES PRIOR
TO COMMENCING WORK.
3. COORDINATE ALL DEMOLITION WORK WITH EXISTING CONDITIONS AND NEW
WORK INDICATED.
4. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
5. PROVIDE SHORING AND BLOCKING NECESSARY TO MAINTAIN THE STRUCTURAL
INTEGRITY OF THE BUILDING. REFER TO STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
6. ANY ITEM SHOWN OR REFERENCE IN ONE INSTANCE SHALL BE AS IF SHOWN IN
ALL INSTANCES.
7. REFERENCE TO A DEMOLITION PHOTOGRAPH.
8. PROTECT ALL EXISTING SURFACES AND FINISHES TO REMAIN.
9. SALVAGE ALL EXISTING 5-PANEL AND 6-PANEL DOORS AND HISTORIC TRANSOMS.
10. WHERE DEMO IS INDICATED, REMOVE ALL ASSOCIATED COMPONENTS,
INCLUDING FASTENERS, BLOCKING, AND SIMILAR, THAT NO LONGER SERVE A
PURPOSE, COORDINATE WITH NEW WORK INDICATED.
11. ASBESTOS CONTAINING MATERIAL AND LEAD PAINT PRESENT WITHIN BUILDING;
REFER TO REPORT.
DEMOLITION GENERAL NOTES
B U
IL
D
IN
G
P
H A
S E
N
O R T
H W
IN
G
R E N
O V
A T
IO
N
U S F
O R E S T
S E R
V
IC
E
N O
R T
H E R N
R E G
IO
N
R
E G
IO
N
A L O
F F
IC
E www.aearchitects.com
O W
N E
R
P R
O J E
C T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS P
C
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10
05.18.15
CHRISTOPHER R. MARTISON
MONTANA
MISSOULA
AIA
X:XX.XX
DEMO EXISTING WOOD FRAMED WALL FURRING, THIS AREA TO EXPOSED
CONCRETE.
(E) DOOR TO REMAIN, NO WORK.
DEMO (E) DOOR, PASS THRU GRATE, WALL AND FURRING.
HATCH INDICATES TO SAW CUT AND REMOVE CONCRETE WALL.
EXISTING WALL, FINISH, OR BUILT ITEM TO BE DEMOLISHED.
EXISTING WALL OR BUILT ITEM TO REMAIN, PROTECT.
HATCH INDICATES APPROXIMATE EXTENT OF WALL FRAMING
DEMOLITION.
EXISTING DOOR TO BE DEMOLISHED, UNLESS OTHERWISE NOTED.
DEMOLISH PLUMBING FIXTURES IN THEIR ENTIRETY, REFER TO
MECHANICAL / PLUMBING.
DEMOLITION KEYSYM.
(E) HISTORIC STAIR, NEWEL POSTS, BALUSTRADE, AND RAIL TO REMAIN.
PROTECT.
DEMOLITION KEYNOTE LEGEND
DESCRIPTIONSYMBOL
SAWCUT (E) CONCRETE SLAB THIS AREA AND DEMO AS NECESSARY TO
COMPELTE (N) WORK; REFER TO MECHANICAL AND PLUMBING.
CONTRACTOR ACCESS TO MECH 005 THROUGH THESE DOORS ONLY.
AREA OF LIMITED ACCESS, COORDINATE ACCESS WITH CONTRACTING OFFICER.
3 3
3 3
7 9
DEMO (E) LAVATORIES AND CASEWORK TO FACILITATE MECHANICAL AND
PLUMBING WORK.
WHWH
WHBOILER
DF DF
STAIR
RESTROOM
MECH / ELECT
TELE/DATA
ELEV
MACHINE
ELEVATOR
A
VESTIBULE
VESTIBULE
001.1
001.3
UP
DOWN
17"
DOWN
17"
DOWN
17"
DOWN
17"
UP UP
UP
UP
003.1
ELECTRICAL
UP
002.1
004.1
008.1
RB EXT LCP
M D
M
FACP PNL M1A PNL M2A
MDR
MDP
STAIR
MECH / ELECT
A D E F G H KCB I J
DOWNDOWN
DOWN
DOWNDOWN
DOWNDOWN
DOWN
DOWNDOWN
DOWN
DOWN
BOILER
VENT
BOILER
VENT
R
R
R
A D E F G H KCB I J
SECOND FLOOR DEMOLITION PLAN16
D2.2 : D2.2
S E C
O N
D F
L O
O R
D E M
O L
IT
IO
N
P L A
N
1/8" = 1'-0"
D2.2NORTH
B U
IL
D
IN
G
P
H A
S E
N
O R T
H W
IN
G
R E N
O V
A T
IO
N
U S F
O R E S T
S E R
V
IC
E
N O
R T
H E R N
R E G
IO
N
R
E G
IO
N
A L O
F F
IC
E www.aearchitects.com
O W
N E
R
P R
O J E
C T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS P
C
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10
05.18.15
CHRISTOPHER R. MARTISON
MONTANA
MISSOULA
AIA
EXISTING WALL, FINISH, OR BUILT ITEM TO BE DEMOLISHED.
EXISTING WALL OR BUILT ITEM TO REMAIN, PROTECT.
HATCH INDICATES APPROXIMATE EXTENT OF WALL FRAMING
DEMOLITION.
EXISTING DOOR TO BE DEMOLISHED, UNLESS OTHERWISE NOTED.
EXISTING WINDOW TO BE DEMOLISHED. COORDINATE WOOD
DOUBLE-HUNG WINDOW SALVAGE WITH CONTRACTING OFFICER.
DEMOLISH PLUMBING FIXTURES IN THEIR ENTIRETY, REFER TO
MECHANICAL / PLUMBING.
DEMOLITION KEYSYM.
REMOVE AND RECYCLE (E) CAST IRON RADIATOR. DEMO
ASSOCIATED STEAM PIPING AND HARDWARE IN ENTIRETY, REFER
TO MECHANICAL.
TYPICAL CAST IRON COLUMN AND DECORATIVE PLINTH SHOE.
INVENTORY ALL (E) COLUMN PLINTHS SHOES & COORD. W/ (N) WORK
TO INSTALL ANY SALVAGED PLINTHS/SHOES TO EXPOSED COLUMNS.
:D .1
:D
.1
20:D9.1 SIM.
:D
9.
:D .1
:D
.1
SIM.
:D
.1
3 3
3 3
3 3
3 3
12 12
12 12
12 12
12 12
1. FIELD VERIFY DIMENSIONS. DO NOT SCALE DRAWINGS. VERIFY EXISTING
CONDITIONS AND NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES PRIOR
TO COMMENCING WORK.
2. COORDINATE ALL DEMOLITION WORK WITH EXISTING CONDITIONS AND NEW WORK
INDICATED.
3. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
4. PROVIDE SHORING AND BLOCKING NECESSARY TO MAINTAIN THE STRUCTURAL
INTEGRITY OF THE BUILDING. REFER TO STRUCTURAL DRAWINGS.
5. ANY ITEM SHOWN OR REFERENCE IN ONE INSTANCE SHALL BE AS IF SHOWN IN ALL
INSTANCES.
6. REFERENCE TO A DEMOLITION PHOTOGRAPH.
7. PROTECT ALL EXISTING SURFACES AND FINISHES TO REMAIN.
8. SALVAGE ALL EXISTING 5-PANEL AND 6-PANEL DOORS AND HISTORIC TRANSOMS.
9. DEMO ALL EXISTING WINDOW BLINDS, WINDOW SHADES, AND CHAIN METAL
WINDOW COVERINGS WITHIN AREA OF WORK.
10. WHERE DEMO IS INDICATED, REMOVE ALL ASSOCIATED COMPONENTS, INCLUDING
FASTENERS, BLOCKING, AND SIMILAR, THAT NO LONGER SERVE A PURPOSE,
COORDINATE WITH NEW WORK INDICATED.
11. ASBESTOS CONTAINING MATERIAL AND LEAD PAINT PRESENT WITHIN BUILDING;
REFER TO REPORT.
DEMOLITION GENERAL NOTES
X:XX.XX
(E) ELECTRICAL PANEL TO REMAIN, PROTECT.
DEMO (E) METAL PANEL ON WALL. PREP WALL FOR (N) GYP. BD.
(E) HISTORIC STAIR, NEWEL POSTS, BALUSTRADE, AND RAIL TO REMAIN.
PROTECT.
(E) DOOR AND FRAME TO REMAIN, PROTECT. REPAIR DOOR AND FRAME AS
NECESSARY. REMOVE (E) HARDWARE AND SALVAGE TO OWNER. PREP FOR
NEW HARDWARE.
(E) PLASTER WALL FINISH, CHAIR RAIL, WOOD WALL BASE WITHIN ROOM TO
REMAIN, PROTECT; LOCALIZE PATCH AND REPAIR. COORDINATE WITH (N)
WORK, TYP.
DEMO EXISTING CHASE AND ASSOCIATED PLUMBING/PIPING WITHIN.
DEMO EXISTING ELECTRICAL PANEL, REFER TO ELECTRICAL.
(E) PLASTER COLUMN TO REMAIN, PATCH AND REPAIR AS NECESSARY.
PROTECT.
13 SALVAGE FIRE EXTINGUISHER TO OWNER.
DEMO (E) LINOLEUM SHEET GOOD OR COMPOSITION TILE FLOOR FINISH
WITHIN ROOM TO ORIGINAL SUB-FLOOR, TYP.
15 DEMO (E) CARPET WITHIN ROOM TO ORIGINAL SUB-FLOOR, TYP.
16 DEMO (E) SURFACE MOUNTED CONDUIT, PATCH AND PREP WALL FINISH.
DEMO (E) RUBBER WALL BASE FROM HISTORIC WOOD WALL BASE WITHIN
ROOM.
DEMO (E) CASED OPENING TO ORIGINAL WOOD TRIM AND PLASTER WALL
FINISH.
18 EXISTING DOOR AND FRAME TO REMAIN, PROTECT.
DEMOLITION KEYNOTE LEGEND
DESCRIPTIONSYMBOL
DEMO (E) SEMI-RECESSED WALL HEATER.
SALVAGE (E) TRANSOM PREP FOR RE-INSTALLATION.
SALVAGE (E) HISTORIC DOOR AND HARDWARE TO OWNER.
SIM.
18:D9.1
CAREFULLY REMOVE AND SALVAGE HISTORIC DOOR, FRAME, AND HINGES
FOR REUSE.
SAW CUT BELOW EXISTING WINDOW TO ACCOMODATE NEW DOOR.
CAREFULLY REMOVE AND SALVAGE EXISTING HOLD-OPEN AND ASSOCIATED
ELECTRICAL, PREP FOR REINSTALLATION.
DASHED LINE INDICATES FLOOR TO CEILING PLYWOOD AND PLASTIC SHEETING
DUST-PROOF TEMPORARY BARRIER. COORDINATE W/ CONTRACTING OFFICER
AND PROTECT HISTORIC STAIR AND EXISTING FINISHES TO REMAIN, TYP.
A
002 006
A D E F G H KCB I J
DEMO BASEMENT FLOOR REFLECTED CEILING PLAN16
A2.1 : A7.1
D E M
O B
A S E M
E N
T F
L O
O R
R E F L E C
T E D
C E
IL
IN
G
P L A
N
1/8" = 1'-0"
NORTH D7.0
B U
IL
D
IN
G
P
H A
S E
N
O R T
H W
IN
G
R E N
O V
A T
IO
N
U S F
O R E S T
S E R
V
IC
E
N O
R T
H E R N
R E G
IO
N
R
E G
IO
N
A L O
F F
IC
E www.aearchitects.com
O W
N E
R
P R
O J E
C T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS P
C
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10
05.18.15
CHRISTOPHER R. MARTISON
MONTANA
MISSOULA
AIA
REMOVE EXISTING CEILING FINISHES, ASSOCIATED
FASTENERS/HANGERS, AND MISC. BLOCKING THIS AREA.
RCP DEMO LEGENDSYM.
DEMOLITION KEYNOTE LEGEND
DESCRIPTIONSYMBOL
EXISTING LIGHTING TO BE SALVAGED AND RE-USED, THIS AREA.
EXISTING PLASTER CEILING FINISH TO REMAIN, PROTECT.
1 1 1
1. WHERE DEMO IS INDICATED, REMOVE ALL ASSOCIATED COMPONENTS,
INCLUDING FASTENERS, BLOCKING, AND SIMILAR, THAT NO LONGER SERVE A
PURPOSE, COORDINATE WITH NEW WORK INDICATED, TYP.
2. EXISTING PLASTER CEILINGS REMAIN THROUGHOUT ENTIRE BUILDING. PAINT IS
FLAKING AND PORTIONS OF EXISTING HISTORIC PLASTER FINISH ARE
DELAMINATING. PRIOR TO INSTALLATION OF NEW CEILING MATERIALS, REMOVE
FLAKING OR LOOSE PAINT AND PLASTER TO SOUND PLASTER MATERIAL (FOR
BIDDING PURPOSES, ASSUME 60% OF THE PLASTER CEILING WITHIN PHASE 2
WORK).
DEMO RCP GENERAL NOTES
R R R
8' -0
(E
PL
AS
TE
R
'-0
(E
PL
AS
TE
R
ELEVATOR
A
'-1
1/
2"
B.
O
E) B
EA
M
'-1
1/
2"
B.
O
E) B
EA
M
SL
O
PE
S
(E
PL
AS
TE
R
A D E F G H KCB I J
DEMO FIRST (MAIN) FLOOR REFLECTED CEILING PLAN16
A2.1 : A7.1
D E M
O F
IR
S T
M A
IN
F L O
O R
R E F L E C
T E D
C E
IL
IN
G
P L A
N
1/8" = 1'-0"
NORTH D7.1
B U
IL
D
IN
G
P
H A
S E
N
O R T
H W
IN
G
R E N
O V
A T
IO
N
U S F
O R E S T
S E R
V
IC
E
N O
R T
H E R N
R E G
IO
N
R
E G
IO
N
A L O
F F
IC
E www.aearchitects.com
O W
N E
R
P R
O J E
C T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS P
C
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10
05.18.15
CHRISTOPHER R. MARTISON
MONTANA
MISSOULA
AIA
EXISTING PLASTER TO REMAIN.
REMOVE EXISTING ACOUSTICAL TILE CEILING, SUPPORTS AND ALL
ACCESSORIES IN THEIR ENTIRETY.
DEMO (E) LIGHT FIXTURE. REFER TO ELECTRICAL.
DEMO CEILING TO EXPOSE FLOOR STRUCTURE ABOVE.
RCP DEMO LEGENDSYM.
1. WHERE DEMO IS INDICATED, REMOVE ALL ASSOCIATED COMPONENTS,
INCLUDING FASTENERS, BLOCKING, AND SIMILAR, THAT NO LONGER SERVE A
PURPOSE, COORDINATE WITH NEW WORK INDICATED, TYP.
2. EXISTING PLASTER CEILINGS REMAIN THROUGHOUT ENTIRE BUILDING. PAINT IS
FLAKING AND PORTIONS OF EXISTING HISTORIC PLASTER FINISH ARE
DELAMINATING. PRIOR TO INSTALLATION OF NEW CEILING MATERIALS, REMOVE
FLAKING OR LOOSE PAINT AND PLASTER TO SOUND PLASTER MATERIAL (FOR
BIDDING PURPOSES, ASSUME 60% OF THE PLASTER CEILING WITHIN PHASE 2
WORK).
DEMO RCP GENERAL NOTES
DEMOLITION KEYNOTE LEGEND
DESCRIPTIONSYMBOL
REMOVE EXISTING CEILING FINISH AND ALL ASSOCIATED ACCESSORIES,
ATTACHMENTS OR DEBRIS IN ORDER FOR AREA TO BE OPEN TO
STRUCTURE ABOVE. SEE NEW WORK.
ABOVE EXISTING ACOUSTICAL CEILING TILE AND GRID, DEMO (E)
CELLULOSE FIBER CEILING FINISH.
SELECTIVELY DEMO EXISTING HISTORIC PLASTER CEILING (ABOVE) AT
EXTERIOR WALL, THIS AREA, FOR NEW STRUCTURAL CONNECTION, REFER TO
STRUCTURAL.
BOILER
VENT
BOILER
VENT
R
R
R
A D E F G H KCB I J
DEMO SECOND FLOOR REFLECTED CEILING PLAN16
A2.2 : A7.2
D E M
O S
E C
O N
D F
L O
O R
R E F L E C
T E D
C E
IL
IN
G
P L A
N
1/8" = 1'-0"
NORTH D7.2
B U
IL
D
IN
G
P
H A
S E
N
O R T
H W
IN
G
R E N
O V
A T
IO
N
U S F
O R E S T
S E R
V
IC
E
N O
R T
H E R N
R E G
IO
N
R
E G
IO
N
A L O
F F
IC
E www.aearchitects.com
O W
N E
R
P R
O J E
C T
D R
A W
IN
G
A R C H I T E C T U R E
H I S T O R I C
I N T E R I O R S
ARCHITECTS P
C
608 NORTH 29TH STREET
BILLINGS, MT 59101
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
428 EAST MENDENHALL STREET
BOZEMAN, MT 59715
PH 4 0 6 . 4 5 1 .7 3 1 0
222 NORTH HIGGINS AVENUE
MISSOULA, MT 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
PROJECT #
ISSUE DATE
REVISIONS
13104.10
05.18.15
CHRISTOPHER R. MARTISON
MONTANA
MISSOULA
AIA
EXISTING PLASTER TO REMAIN.
REMOVE EXISTING ACOUSTICAL TILE CEILING, SUPPORTS,
ADHESIVES, AND ALL ACCESSORIES IN THEIR ENTIRETY.
DEMO EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL.
RCP LEGENDSYM.
DESCRIPTIONSYMBOL
EXISTING LIGHT TO REMAIN, PROTECT.
EXISTING LIGHTING TO BE SALVAGED AND RE-USED, THIS AREA.
DEMO EXISTING CEILING FAN, NO SALVAGE.
DEMOLITION KEYNOTE LEGEND
DEMO EXISTING ACCESS HATCH. INFILL CEILING FRAME. PREP FOR NEW
WORK.
EXISTING ACCESS HATCH TO REMAIN, PROTECT.
DEMO EXISTING CEILING FINISH AND WALL FINISH ALONG WALL, THIS AREA,
FOR NEW STRUCTURAL CONNECTION, REFER TO STRUCTURAL.
(E) LIGHT TO REMAIN, PROTECT.
1. WHERE DEMO IS INDICATED, REMOVE ALL ASSOCIATED COMPONENTS,
INCLUDING FASTENERS, BLOCKING, AND SIMILAR, THAT NO LONGER SERVE A
PURPOSE, COORDINATE WITH NEW WORK INDICATED, TYP.
2. EXISTING PLASTER CEILINGS REMAIN THROUGHOUT ENTIRE BUILDING. PAINT IS
FLAKING AND PORTIONS OF EXISTING HISTORIC PLASTER FINISH ARE
DELAMINATING. PRIOR TO INSTALLATION OF NEW CEILING MATERIALS, REMOVE
FLAKING OR LOOSE PAINT AND PLASTER TO SOUND PLASTER MATERIAL (FOR
BIDDING PURPOSES, ASSUME 60% OF THE PLASTER CEILING WITHIN PHASE 2
WORK).
DEMO RCP GENERAL NOTES
7 EXISTING MECHANICAL CONSOLE TO REMAIN, PROTECT.
8 DEMO EXISTING OPENING TO EXSTING PLASTER OR CONCRETE ABOVE.
REMOVE EXISTING GYPSUM BOARD CEILING AND ALL ASSOCIATED
FRAMING AND SUPPORTS.
| D2.0 |
| D2.0 |
| D2.2.pdf |
| D2.2 |
| D2.2 |
| D7.0.pdf |
| D7.0 |
| D7.0 |
| D7.1.pdf |
| D7.1 |
| D7.1 |
| D7.2.pdf |
| D7.2 |
| A7.2 |
File details come from the government source that posted it. Updated .