S150052FinalAmendmen0001QAs.pdf
PDF 355 KB Posted
- Attached to
- Building 26, Phase 2 North Wing Renovation Federal contract opportunity
- Solicitation number
- AG-03R6-S-15-0052
About this file
AG-03R6-S-15-0052 Amendment 0001 Q A's with new DOL Wage Rate
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF
CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 11
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 08/05/2015
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA, Forest Service
Western Montana Acquisition Zone
24 Fort Missoula Road
Missoula, MT 59804
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
Potential Offerors
AG-03R6-S-15-0052
9B. DATED (SEE ITEM 11)
07/09/15
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 01 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return * copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
AG-03R6-S-15-0052, Amendment 0001, Building 26, Phase 2, North Wing Renovation
1. This amendment is to provide responses to questions that were asked on the PreBid tour on Tuesday, July 28, 2015, and some questions that have been submitted on or before August 5, 2015. Any additional pending questions will be answered in another amendment. Please see the following pages for the questions and answers.
2. This amendment also provides a copy of updated Wage Rate Decision Number MT150064, Mod 03, dated 07/17/2015, which replaces Wage Rate Decision Number MT150064, Mod 01, dated 04/24/2015.
3. Response date for the RFP has NOT changed and RFP is still due on August 11, 2015 at 4:00 p.m. local time.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N. JEAN WINDLE
Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Building 26 – Phase 2, North Wing Renovation, Fort Missoula, Missoula, MT
Amendment No. 0001, dated 08/05/15 Page 2 of 11
Building 26, Phase 2, North Wing Renovation
Solicitation Number AG-03R6-S-15-0052
Amendment 0001 – Questions and Answers
Q1.) Will the existing steam radiators be removed?
A1.) Yes. All steam radiators located within Phase 2 “area of work “ shall be removed and disposed in accordance with the plans.
Q2.) Are the steam radiators from Phase 1 going to be disposed of and do they have lead based paint?
A2.) This questioned was generated because we have radiators that have been pulled and stored in the north wing from
Phase 1and were noticed in the pre-bid tour. Yes, it is assumed that the radiators do have lead based paint and all of these from phase 1 will be removed with the exception of 1, and that steam radiator will be installed under phase 2 – see note 3, detail 16, Sheet A3.2.
Q3.) Does the refrigerator door stay?
A3.) See demolition note 7 on sheet D2.1 for retaining the historic refrigerator door.
Q4.) What are the ceiling heights?
A4.) You will need to review all of the drawings because there are some dropped ceiling areas.
Q5.) Would there be photos available for the attic?
A5.) Photos will be available for the attic and posted on FBO.
Q6.) What is the estimated start date?
A6.) Please refer to Section F but 240 calendar days to complete from when the Notice To Proceed is issued. The estimated start date is approximately October 5, 2015.
Q7.) Where is the access to the buidling?
A7.) This questions was generated due to the fact that the south wing portion of the building will be occupied with employees, so access into the building will be outside the stairwell. All employees will access the stairs and covered porch area between grid lines G and H. Contractor will access from exterior doorsfrom covered porch located between Grid lines D and E.
Q8.) Will the current contractor be done when Phase 2 is started?
A8.) Yes, it is anticipated that the current contractor will be completed with Phase 1 before Phase 2 begins.
Q9.) What is the status of accessibility of wheel chair ramp?
A9.) Wheel chair ramp must be accessible during the construction period and will need to be covered for protection during construction. See demolition note 25, sheet D2.1 and sheet A2.1. Note that the enclosed access will be used on a daily basis and shall be installed prior to any other work being completed. In addition, the sidewalk improvements on the west side of the road shall also be completed prior to any other work. See sheets CD2.1 and C2.1; as well as, associated details for that work. No construction vehicles will be allowed to block the street or grassed areas at this location.
Q10.) Are the parking lots to be completed in the fall?
A10.) Yes, and make sure to review the specifications and drawings to note the differences in asphalt thickness, mill thickness and base reclamation between the North and South parking lots.
Q11.) Is all the Phasing the same as the building phasing?
A11.) No. The phasing listed on the drawings for the parking lots is different from the building phasing. Note that anyplace that is described in the civil drawings as Phase 1 refers to the North Parking lot and anywhere that is described in the civil drawings as Phase 2 refers to the South Parking lot. Parking lot phasing notes are shown on Sheet C1.1.
Q12.) Will there be any trees removed from the premises?
A12.) No, at this time there are no trees required to be removed.
Amendment No. 0001, dated 08/05/15 Page 3 of 11
Q13.) Question on light poles being removed and reused?
A13.) Key Note 1 on sheets CD2.1 and CD2.2 shall include removal and disposal of existing light poles.
Q14.) Would like to propose an alternate for consideration/product substitution request for prior approval.
A14.) Substitution/Prior Approval requests will not be approved or considered prior to contract award. Many items in the specifications and drawings show Brand Name products as a Basis of Design. All products that state “Basis of
Design” or have other approved manufacturers listed shall allow for an approved equal. Substitutions for these products may be submitted for review and approval after the contract is awarded. Products that meet all the salient characteristics of the specified “Basis of Design” product will be approved provided they also meet the Buy American requirements. If the Contractor chooses to bid based on a product that has not been approved, there is a possibility that when that product is submitted for approval that it may be rejected if it does not meet the salient characteristic of the Basis of Design product. Refer to Specification Sections 013300 and 016000 for Submittal Procedures and Product Requirements for additional information. Products that state a manufacturer and do not include “Basis of Design” are products that are required to be used to match other products that have currently been installed in the building.
Q15.) Was all of the asbestos removed in Phase 1 of this project and if not what is involved now?
A15.) No, only the asbestos that was affecting the Phase 1 areas was removed; however, asbestos in the attic was removed from grid lines D-K, so under Phase 2 asbestos removal in the attic is between grid lines A and D. All other asbestos affected by any type of construction or demolition in Phase 2 shall be removed and disposed in accordance with State and
Federal requirements. See the full Good Faith asbestos report at the fron of the specifications.
Q16.) This is in regards to the network cabling portion of work for the upcoming phase 2 project. We are providing a lifetime warranty on the cat 6 and fiber optic systems for phase 1. Is the material/manufacturer used in phase 2 required to match what was installed in phase 1and tie into the lifetime warranty or can any manufacturer's material be installed in phase 2 as long as the warranty requirements are met?
A16.) See A14 above. Note that all rack, bakerboards and power requirements have been completed in the IT rooms unless otherwise noted on the plans.
Q17.) Does the joist/floor connection upgrade only occur between the 1st and 2nd floors? If it occurs at other locations, please clarify.
A17.) Yes, refer to SD 2.2, S2.2 and 1/S9.1.
Q18.) It is correct to assume that there are no structural upgrades in the Phase 1 area of work?
A18.) The structural upgrades for Phase 1 areas were completed during Phase 1 work. Structural work included in Phase
2 is included in the plans.
Q19.) Is there a specific requirement for the covering over the ramp in the courtyard?
A19.) No, contractor is responsible for complete protection on all sides of the ramps at all times. It is assumed that this ramp will be used on a daily basis throughout the contract period. Reference A9.Proposal shall be provided to the CO for approval prior to installation.
Q20.) Can you clarify what note 12 means on sheet A2.2? “discretely secure door in closed position”
A20.) All fasteners securing door in place shall not be exposed.
Q21.) Would the owner have any interest in receiving a quote for the network cabling and fire alarm direct from
SmartTech? I believe that there would be significant opportunities for overall cost reduction.
A21.) All pricing shall be submitted to the GC.
Q22.) Specification 024296 1.6 calls for hazardous materials to be removed by the owner under a separate contract. This conflicts with specification 024119. Can you clarify which is correct?
A22.) Delete Section 1.6.C.1 and Section 1.6.C.2 in Specification 024296. All materials whether hazardous or not to be removed by Contractor and dispose of in accordance with State and Federal Requirements.
Amendment No. 0001, dated 08/05/15 Page 4 of 11
Q23.) Regarding Building 26, phase 2 Fort Missoula, I am writing about a possible substitution for the windows. I see that Pella Architectural series are spec’d with a particular Pella color. Are Pella windows necessary to match a previous renovation, and if not would it be possible to submit a substitution request. If a substitution request is possible, the spec calls for a performance rating of LC – 50. Is this a hard spec as our windows meet an LC – 40 rating.
A23.) Refer to response in A14.
Q24.) My guy that went to the pre-bid conference noted that MC Cable was used in Phase 1. Will it allowed in this phase – such as new walls and ceilings – while still using EMT for home runs? I noticed in the conductor specification that MC cable was okay for use in existing walls/ceiling and fixture whips only. The same thing goes for ENT (smurf) tubing for data wiring.
A24.) All work shall be installed as shown on drawings and specifications.
Q25.) We are Installing MechoShade for phase 1 of Fort Missoula renovation.
Mechoshade was approved for substitution for the first phase in addenda(4?).For the 2nd phase we will be supplying a Mechoshade bid to the GC's Bidding. Should we do another substitution at this point or will the specification for phase 2 change to Mechoshade matching the first phase?
A25.) Refer to response in A14.
Q26.) Electrical sheet E2.4 & E2.5 General note 5 says that powered furniture should get 3 data cables and 1 voice cable....Keyed note 1 says powered furniture gets 2 data and 1 voice cable. Which is correct?
A26.) General note 5 shall be changed to “2 data and 1 phone.”
Q27.) Thank you for chatting with me today regarding AG-03R6-S-15-0052. I noticed in the specifications (Div 12) the bike racks specified are Dero Hoop Stainless Steel and I would like to propose an alternate for consideration. I have attached a substitution request (to be used as a Comparable Product Alternative) with associated product information for your review.
The Sportworks No Scratch Tofino bike rack is currently the sole specification for JBLM in Tacoma, WA and is a premium product for the same price as the standard Dero Hoop. Here are links to the product and also to the specifications for your review.
Product – Tofino Bike Rack: http://www.sportworks.com/product/tofino-no-scratch-bike-rack
A27.) Refer to response in A14.
Q28.) Please consider Nu-Age plastic film/sheeting as an “equal or better” to what is currently specified for the project referenced above.
A28.) Refer to response in A14.
Q28.) We just wanted to verify where to physically mail our proposal for the subject line project on 8/11/2015. We have: USDA, Forest Service, Western Montana Acquisition Zone, 24 Fort Missoula Road, Missoula, MT 59804?
A28.) Please refer to block 13 and block 8 on the SF 1442 which lists the address you have identified above.
Additional Clarification and Changes
Cover Sheet - Electrical DE2.1 shall be renumbered DE7.1. Electrical DE2.2 shall be renumbered DE7.2.
Sheet C2.2, Detail 14: Replace sidewalk length of 66.3’ with 61.3’. Disregard all other sidewalk dimensions and refer to Sheet C3.2, Detail 14 for accurate dimensions.
Sheet A2.2 - Add keynote 24 to exterior strike side jamb of door 218.2.
Sheet A4.2 - Detail 16:
o -Detail title shall read, "South Elevation".
o -The first floor window opening, immediately west of gridline 2, shall be shown as a new door #132.1, as indicated in plan A2.1 and Door Schedule A9.2.
http://www.sportworks.com/product/tofino-no-scratch-bike-rack
Amendment No. 0001, dated 08/05/15 Page 5 of 11
Sheet A9.1 - Finish Schedule:
o -028 Mech/Elect: north, east, south, and west walls shall be PNT-3.
o -129, 130, 131, 134, 136, 216, 217, 219, 220, 227, 228, 229, 230, 231, 232, 233 Offices: north, east, south, and west walls shall be PNT-2.
o -Add note to Room Finish Legend, "Prime and paint all exposed electrical conduit and fire sprinkler piping at exterior porches (Porch 100, 126, 138, 200, 210, and 234) to match existing wood joist, typically."
Sheet A9.2 - Door Schedule, remove remarks from door 219.1. Add the following remark to door 218.2, "Restore existing door, frame and brick mould. Prep door and frame for new hardware."
Sheet A9.3 - Window Schedule:
o -Windows #132.2 and #132.3, Glass, shall read, "Clear Low-E Insulated" o -Delete window #137.1.
See revised specifications o 02 – PROJECT REPRESENTATIVES o 064116 – PLASTIC LAMINATE FACED ARCHITECTURAL CABINETS o 093013 – CERAMIC TILING o 102113 – PHENOLIC-CORE TOILET COMPARTMENTS o 102800 – TOILET BATH AND LAUNDRY ACCESSORIES o 104413 – FIRE PROTECTION CABINETS o 115213 – PROJECTION SCREENS o 123661 – SIMULATED STONE COUNTERTOPS
Amendment No. 0001, dated 08/05/15 Page 6 of 11
Wage Rate Decision No. MT150064, Mod. 3, dated 07/17/2015
General Decision Number: MT150064 07/17/2015 MT64
Superseded General Decision Number: MT20140064
State: Montana
Construction Type: Building
County: Missoula County in Montana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the
EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The
EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/02/2015
1 04/24/2015
2 07/10/2015
3 07/17/2015
ASBE0082-002 08/01/2014
Rates Fringes
Heat and Frost Insulator.........$ 33.42 17.85
BOIL0011-002 10/01/2013
BOILERMAKER......................$ 33.67 23.85
BRMT0007-002 06/01/2014
BRICKLAYER.......................$ 26.21 12.64
CARP0028-008 06/01/2014
CARPENTER (Including Drywall
Hanging, Metal Stud
Installation, and Formwork)......$ 21.50 11.57
MILLWRIGHT.......................$ 30.00 11.57
Amendment No. 0001, dated 08/05/15 Page 7 of 11
Zone Definition:
The hourly rate applicable to each project is determined by measuring the road miles over the shortest practical route from the County Courthouse of the following towns to the ceter of the job: Billings, Bozeman, Butte, Great Falls, Helena, Kalispell, Lewiston, Miles City, and Missoula
Zone 1: 0 to 30 miles - Base Rate
Zone 2: 31 to 60 miles - $3.70
Zone 3: over 60 miles - $5.60
* ELEC0768-008 06/01/2015
ELECTRICIAN......................$ 28.53 12.57
ELEV0019-005 01/01/2014
ELEVATOR MECHANIC................$ 47.76 27.085+a+b
FOOTNOTE:
a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit.
b. Eight paid holidays: New Year's Day; Memorial Day;
Independence Day; Labor Day; Veteran's Day; Thanksgiving
Day; Friday after Thanksgiving and Christmas Day
ENGI0400-004 05/01/2013
POWER EQUIPMENT OPERATOR:
(Zone 1)
(1) Crane, Forklift, Front
End Loader..................$ 24.32 11.40
(2) Excavator...............$ 24.79 11.40
ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court
House of the following listed towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,
MISSOULA
Zone 1: 0 to 30 miles - Base Pay
Zone 2: 30 to 60 miles - Base Pay + $3.50
Zone 3: Over 60 miles - Base Pay + $5.50
IRON0014-014 07/01/2013
Amendment No. 0001, dated 08/05/15 Page 8 of 11
IRONWORKER, STRUCTURAL,
REINFORCING AND ORNAMENTAL.......$ 25.90 20.53
LABO1686-007 05/01/2012
LABORER (Zone 1)
Common or General...........$ 19.08 8.42
Mason Tender-Brick..........$ 19.48 8.42
ZONE DEFINITIONS FOR LABORERS
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Courthouse of the following listed town to the center of the job:
Billings, Bozeman, Butte, Helena, Great Falls, Missoula, Kalispell
TRAVEL ZONES:
ZONE 1: 0 to 30 miles, Base Pay
ZONE 2: 30-60, add $3.05 to Base Pay
ZONE 3: Over 60 miles, add $4.85 to Base Pay
PAIN0260-003 06/01/2010
PAINTER: Brush and Spray........$ 18.35 6.84
PLUM0459-006 05/01/2013
PIPEFITTER, Excludes HVAC
Pipe Installation................$ 27.58 12.93
PLUMBER, Includes HVAC Pipe
Installation.....................$ 27.58 12.93
ROOF0189-003 07/01/2011
ROOFER...........................$ 23.69 10.02
SFMT0669-002 04/01/2015
SPRINKLER FITTER (Fire
Sprinklers)......................$ 31.35 18.12
SHEE0103-008 07/01/2013
Amendment No. 0001, dated 08/05/15 Page 9 of 11
SHEET METAL WORKER (HVAC Duct and System Installation Only)....$ 27.33 13.16
SUMT2011-039 01/04/2011
OPERATOR: Backhoe...............$ 20.56 6.35
PAINTER: Roller.................$ 17.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that
Amendment No. 0001, dated 08/05/15 Page 10 of 11 no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Amendment No. 0001, dated 08/05/15 Page 11 of 11
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION