S150052FinalAmendmen0003QAs.pdf

PDF 174 KB Posted

Attached to
Building 26, Phase 2 North Wing Renovation Federal contract opportunity
Solicitation number
AG-03R6-S-15-0052
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

AG-03R6-S-15-0052 Amendment 0003 Q A's

View the file

Other files for this federal contract opportunity

Other files attached to Building 26, Phase 2 North Wing Renovation, newest first.
File Type Posted
S150052FinalAmendmen0002QAs.pdf PDF
102113_-_PHENOLIC-CORE_TOILET_COMPARTMENTS.pdf PDF
102800_-_TOILET_BATH_AND_LAUNDRY_ACCESSORIES.pdf PDF
093013_-_CERAMIC_TILING.pdf PDF
104413_-_FIRE_PROTECTION_CABINETS.pdf PDF
20150728Build26Phase2Sign-In.pdf PDF
123661_-_SIMULATED_STONE_COUNTERTOPS.pdf PDF
02_-_PROJECT_REPRESENTATIVES.pdf PDF
115213_-_PROJECTION_SCREENS.pdf PDF
S150052FinalAmendmen0001QAs.pdf PDF
064116_-_PLASTIC-LAMINATE-FACED_ARCHITECTURAL_CABINETS.pdf PDF
Wage_Rate_Decision_No.pdf PDF
Arch2-_A1.1.pdf PDF
Arch4-_D2.0_D7.2.pdf PDF
Arch1-_Cover_Sheet_Signed.pdf PDF
Arch6-_A2.0_A2.3.pdf PDF
Specifications_1_-_DIV00_DIV12.pdf PDF
Security-_Basement_1st_2nd.pdf PDF
Mech-_DM2.0_M9.8.pdf PDF
Structural2-_S2.0_S9.1.pdf PDF
Plumbing_-_DP2.0_P9.1.pdf PDF
20150707FinalAG03R6S150052Build26Phase2.pdf PDF
DOLBuildingMT150064MslaCo.htm HTM file
Arch5-_D9.1.pdf PDF
Arch7_-_A3.1_A4.2.pdf PDF
FireSprinkler-_F0.1_F9.1.pdf PDF
Specifications2-_DIV21_DIV33.pdf PDF
Elec2_-_E7.0_E9.5.pdf PDF
Civil2-_C9.1_C9.4.pdf PDF
Arch9_-_A7.0_A9.5.pdf PDF
Arch3-_A1.2.pdf PDF
Arch10_-_SP2.1_SP2.2.pdf PDF
Civil1-_C1.1_C3.2.pdf PDF
Arch8_-_A5.1_A6.10.pdf PDF
Elec1-_E0.1_E2.5.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF

CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 08/06/2015

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA, Forest Service

Western Montana Acquisition Zone

24 Fort Missoula Road

Missoula, MT 59804

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

Potential Offerors

AG-03R6-S-15-0052

9B. DATED (SEE ITEM 11)

07/09/15

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 01 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return * copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

AG-03R6-S-15-0052, Amendment 0003, Building 26, Phase 2, North Wing Renovation

1. This amendment is to provide responses to questions that have been submitted on August 6, 2015 after amendment 0002 was issued. Any additional pending questions will be answered in another amendment. Please see the following pages for the questions and answers.

2. Response date for the RFP has NOT changed and RFP is still due on August 11, 2015 at 4:00 p.m. local time.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N. JEAN WINDLE

Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

AG-03R6-S-15-0052

Building 26 – Phase 2, North Wing Renovation, Fort Missoula, Missoula, MT

Amendment No. 0003, dated 08/06/15 Page 2 of 2

Building 26, Phase 2, North Wing Renovation

Solicitation Number AG-03R6-S-15-0052

Amendment 0003 – Questions and Answers Thursday, August 06, 2015

Additional Clarification and Changes:

Section 115213 Projection Screens:

-2.2, B., shall read, "B. Products: Provide Draper, Envoy, Electrically Operated Projection Screen with Motor-

In-Roller & Automatic Ceiling Closure."

-2.2, C., shall read, "C. Properties:

1. Screen case constructed to be installed with underside flush with ceiling.

2. Fully automatic ceiling closure doors conceal screen when not in use.

3. Door and box color: White

4. Size: 69 inches high by 92 inches wide. Coordinate with ceiling height indicated to ensure bottom of projection screen rests at 3'-0" above the finished floor when in the lowered position."

5. Rigid metal roller.

6. Three-position switch with cover plate: 24 volt 3-buttom switch, 1 switch per projection screen.

7. Motor with Built-in Low Voltage Controller for multiple low voltage controls."

8. Quantity: Provide a total of two (2) projection screens.

9. Locations:

a. Large Conference 213

b. Large Conference 104: Remove and salvage existing projection screen within room to Owner. Install new projection screen. Coordinate with existing conditions, patch and repair finishes, as necessary."