Site Visit Agenda/Discussion Items and some Q A's.

View the file

Other files for this federal contract opportunity

Other files attached to Co-Located Sitka Office Renovation, newest first.
File Type Posted
A09.pdf PDF
A08.pdf PDF
Sitka_Amendment_Drawings_Civil_A07.pdf PDF
Sitka_Amendment_Sign_Pages_A07.pdf PDF
A07.pdf PDF
A06.pdf PDF
A05.pdf PDF
Sig-in_sheet.pdf PDF
A04.pdf PDF
A03.pdf PDF
panel_a_woodshop_A02.pdf PDF
FlagPoleLight_A02.pdf PDF
E1SitkaElecSitePlan-20140730_A02.pdf PDF
237219FIXED_PLATE_AIR_A02.pdf PDF
260529_A02.pdf PDF
235216-BIOMASS_BOILER_A02.pdf PDF
A02.pdf PDF
236200-AIR_TO_WATER_HEAT_PUMPS_A02.pdf PDF
260548_A02.pdf PDF
221429_sf-SUMP_PUMPS_A02.pdf PDF
CreeAreaAREEDGDASpecSheet_A02.pdf PDF
M-P-Drawingreplacement-20140730_A02.pdf PDF
panel_b_autoshop_A02.pdf PDF
211000_SF-Fire-Suppression_Systems_A02.pdf PDF
A01.pdf PDF
Wage_determination.pdf PDF
D60441FINAL_sitka_geotech.pdf PDF
Factor_2_form.pdf PDF
Factor_3_form.pdf PDF
lpta_questionnaire.pdf PDF
SitkaOfficeSiteDev_ACM_LBP_reports.pdf PDF
Factor_1_form.pdf PDF
070914_Drawings.pdf PDF
SITKA_solicitation.pdf PDF
ColocatedSitkaOfficeSiteDev7_8_14.pdf PDF
Sitka_Specifications.pdf PDF
LPTA_Factor_1_form.pdf PDF
lpta_questionnaire.pdf PDF
Technical_Criteria_Pre-Notice.pdf PDF
LPTA_Factor_3_form.pdf PDF
LPTA_Factor_2_form.pdf PDF
DRAFTColocatedSitkaOfficeSiteDev6-14-14.pdf PDF
DRAFT_Sitka_CD_Drawings.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0116-S-14-0021

CO-LOCATED SITKA OFFICE RENOVATION

PRE-PROPOSAL CONFERENCE AGENDA

Introductions:

Michael Johnson – Contracting Officer (CO)

David Morton – Tongass NF Facilities Engineer (TFE)

Perry Edwards – Tongass NF Sitka District Ranger

Others?

Preproposal Conference: (CO)

A preproposal conference and site visit is for informational purposes only. It may answer some offeror questions; we will post all written questions and answers via amendment on the Federal Business Opportunities website.

Statements or representations made during this conference and the site-visit are not legally binding. Changes resulting from the conference and site visit are official only if issued through an amendment to the RFP.

We aren’t always successful capturing everyone’s verbal questions during the conferences and site visits. We will capture as much as we can and provide them in an amendment. To guarantee your question is captured and answered, it is recommended you write your questions on paper and provide them to the Contracting Officer at the end of the conference and site visit before you depart.

Sign-In: (CO)

Sign in sheet in the back of the room. Please make sure you sign in.

Brief introduction of the project: (CO)

Shared the intent of the final product, moving personnel from a leased facility by converting forest service owned facility into a workplace that represents the forest service and what we do.

LEED Certification Reminder:

TFE provided an overview of the LEED development and that the A-E firm that designed the project remains on contract with the Forest Service through the construction.

The CO reminded the group of the note on the schedule page of the solicitation that the final payment will not be paid until successful completion of the LEED certification process. The contract is not complete until this action is accomplished.

Bid Schedule:

TFE provided a brief review of the base items and each option.

The CO provided the following:

Lump Sum process – Post award – The contractor and the government will create percent complete milestones to be mutually agreed upon.

Mobilization – Separate item in Base? Contractors to email the CO directly with their thoughts. Open to revising prior to proposal due date. (NOTE: at the completion of the meeting and the site visit the CO determined it would be in the best interest of the contractors and the

Government to add a Mobilization line item.)

Furniture – Reminder contractors to source and procure required cubicle panels and furniture. In accordance with contract clause

52.232-5(b)(2) the government will pay for any of these materials that are delivered and secured on-site.

SCHEDULE: (CO)

Description Start/Option Exercise Complete

Base – Site Work NTP + 10 days July 30 2015

Base – Wood Shop NTP + 10 days Mar 30 2015

Opt 1 – Existing Shell Mar 30 2015 Sept 30 2015

Opt 2 – New Addition Mar 30 2015 Oct 30 2015

Opt 3 – Interior 1 Jun 30 2015 Oct 15 2016

Opt 4 – Interior 2 June 30 2015 Oct 15 2016

Opt 5 – Furniture Dec 30 2015 Nov 15 2016

Opt 6 – Lights/Flagpoles May 30 2016 Dec 30 2016

Opt 7 – Radio Tower May 30 2016 Oct 30 2016

Site: (CO)

Bunkhouse – As a reminder the bunkhouse will be occupied during the performance of this contract. Contractors are required to ensure access and utilities remain available to residents. Site visit will provide more clarity.

Ranger House – It is up to the successful contractor in regards to dismantling, demolishing or just removing the building. There apparently are some parties in Sitka interested in the structure. There may be an opportunity to sell. It is the contractor’s sole discretion and responsibility.

Contents – During the site visit you will see various equipment and materials in the buildings. We are working with a contractor to assist with the removal and transfer of the contents. The materials will be gone by the time the contractor receives the Notice to Proceed.

Site Visit – Please stay together in a group as we go through the site. Please refrain from having side discussions and conversations as it can be distracting for others. Do not handle or disturb any of the equipment or materials that are currently on the site or within the buildings we will be visiting. If there are workers in the buildings, refrain from engaging them in conversation.

Evaluation Criteria: (CO)

Questionnaire Submittal – Directly from the contractor’s project reference to the FS

Technical Forms – Forms and letters of intent from subcontractors.

Bonding Company Letter – Acceptable Surety in accordance with Department of Treasury Circular 570; 2014 Revision.

Submittal of Evaluation Documents – Will be revised in next amendment to show 5 weekdays PRIOR to the established due date of the RFP.

Reminder: (CO)

Preproposal conference and site visit is for informational purposes only.

Statements or representations made during this conference and the site-visit are not legally binding. Changes resulting from the conference and site visit are official only if issued through an amendment to the RFP.

Adjourn Conference – Meet at the site, Wood/Auto Shop, for the Site Visit.

Questions: The following are some of the questions that were asked and answered are readily available at the time of this amendment. Questions that were asked and not yet answered will be addressed in a future amendment.

For generation of the materials on site – is blasting required?

o It is not a mandatory method.

Is there any thought to adding an Economic Price Adjustment clause since this project runs a long period of time?

o Not feasible at this time on this project.

When are hardcopy bid bonds due?

o If e-mail proposal – scanned copy of bid bond with proposal. Hard Copy may be received after the solicitation due date and time with your hard copy original documents.

o If faxing proposal – faxed copy of bid bond with your proposal. Hard

Copy may be received after the solicitation due date and time with your hard copy original documents.