M-P-Drawingreplacement-20140730_A02.pdf
PDF 14 MB Posted
- Attached to
- Co-Located Sitka Office Renovation Federal contract opportunity
- Solicitation number
- AG-0116-S-14-0021
About this file
M-P Drawing Replacement Sheets
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASIS OF DESIGN:
OFFICE BUILDING:
THE OFFICE BUILDING PORTION OF THE PROJECT WILL RENOVATE AN EXISTING WAREHOUSE BUILDING (10,000 SF) AND
ADD ROUGHLY 1000 SQUARE FEET FOR A TOTAL OF 11,115 SQUARE FOOT OF OFFICE SPACE.
THE OFFICE BUILDING ONLY WILL BE A LEED V3.0 SILVER RATED BUILDING WITH AN EXPLICIT FOCUS ON ENERGY AND WATER EFFICIENCY. EQUIPMENT, SPECIFICATIONS AND SEQUENCES HAVE BEEN SELECTED TO OPTIMIZE THE ENERGY PERFORMANCE OF THE BUILDING. CONTRACTORS SHOULD FAMILIARIZE THEMSELVES WITH THE LEED RATING
PROGRAM, SUBMITTALS, AND COMMISSIONING REQUIREMENTS.
THE OFFICE BUILDING PORTION WILL INCLUDE A DIRECT DIGITAL CONTROL(DDC) SYSTEM WITH STANDALONE CONTROLS. THE DDC WILL MONITOR ZONE TEMPERATURE AND CO2 LEVELS AS WELL AS ERV SUPPLY AIR QUANTITIES.
THE BIOMASS BOILER CONTROLS, HEAT PUMP STAGING CONTROLS AND RADIANT FLOOR MIXING CONTROLS SHALL USE INCLUDED CONTROLS (BOILER) OR STANDALONE CONTROLS (HEAT PUMP STAGING AND HOT WATER MIXING).
BUILDING SHALL ALSO INCLUDE A MEASUREMENT AND VERIFICATION (M&V) SYSTEM THAT IS INSTALLED BY CONTRACTOR WITH MAJOR PANEL EQUIPMENT(ION 7550, ION 6200'S) PROVIDED BY OWNER. CONTRACTOR SHALL BUDGET FOR INSTALLATION OF OWNER PROVIDED PANEL AND ALL ACCESSORY ITEMS INCLUDING BUT NOT LIMITED TO (CT'S, SMART CT'S, BTU METERS, FLOW METERS, WATER METERS, IMMERSION TEMPERATURE SENSORS) AS DETAILED
IN M&V SHEET.
THE MAIN OFFICE BUILDING WILL BE HEATED USING A BIOMASS (PELLET WOOD) BOILER AS A PRIMARY HEAT PLANT WITH 3 HYDRONIC HEAT PUMP SYSTEMS AS A BACKUP SYSTEM. A LARGE (400 GALLON) THERMAL STORAGE TANK
WILL BE PROVIDED AND USED TO SUPPLY ALL THERMAL HEATING ENERGY FOR THE PROJECT.
HOT WATER WILL BE DELIVERED TO RADIANT FLOOR ZONES BASED ON OUTDOOR RESET WHICH VARIES THE TEMPERATURE OF THE WATER BASED ON THE OUTDOOR TEMPERATURE. ALL PRIMARY RADIANT FLOOR PUMPING TO BE VARIABLE SPEED SET TO MAINTAIN CONSTANT PRESSURE. ALL ZONES WILL USE 2-WAY ZONES VALVES CONTROLLED BY DDC. THE HYDRONIC SYSTEM WILL INCLUDE A 35% SOLUTION OF PROPYLENE GLYCOL IN WATER FOR FREEZE
PROTECT.
VENTILATION WILL BE SERVED FROM A CENTRAL ENERGY RECOVERY VENTILATION (ERV) SYSTEM SETUP TO VENTILATE THE OFFICE SPACE BASED ON CO2 CONTROL. THIS ONE ERV SYSTEM WILL DO ALL OF THE BUILDING'S AIR EXCHANGE AND EXHAUST FUNCTIONS. SUPPLY AIRFLOW TO THE BUILDING WILL BE MONITORED VIA THE DDC SYSTEM. ZONAL CO2 SENSORS WILL BE SETUP TO DISPLAY CO2 LEVELS AND TRIGGER ERV SPEED CHANGES AS REQUIRED TO MEET
ACCEPTABLE INDOOR AIR QUALITY
OCCUPANTS SHOULD HAVE CONTROL OF ZONE TEMPERATURES, OPERABLE WINDOWS AND CEILING FANS.
COMFORT COOLING WILL USE OPERABLE WINDOWS, CEILING FANS AND A SLIGHTLY NEGATIVE PRESSURE ERV SYSTEM TO PROVIDE SOME COOLING RELIEF. THE MAIN OFFICE PORTION WILL NOT BE MECHANICALLY COOLED FOR THIS
PROJECT
SHOP BUILDING:
THE EXISTING WOOD/AUTO SHOP SHALL REMODELED TO A STORAGE/AUTO SHOP. THE SHOP BUILDING IS ROUGHLY 3,065 SQUARE FEET. SHOP BUILDING WILL KEPT AT FREEZE PROTECT TEMPERATURES OF 40 DEG F. THIS IS ACCOMPLISHED USING A STANDALONE THERMOSTAT WIRED INTO A RELAY TO POWER ON OFF THE HEAT PUMPS.
VENTILATION SYSTEMS WILL BE SERVED USING A HEAT RECOVERY VENTILATION SYSTEM POWERED ON OCCUPANCY.
THE AUTO SHOP BUILDING WILL USE OPERABLE BAY DOOR AND OPERABLE WINDOWS FOR VENTILATION SYSTEMS.
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
JONATHAN HELLER
07/07/2014 No.13805
AG-0116-S-14-0021
Amendment 002
M
M
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
BIOMASS HEAT PLANT
TAG MFR MODEL OUTPUT
kBTU/hr
CAPACITY,
GAL EWT LWT GPM VOLT/PH WATTS NOTES
B-1 FROLING P4-MODEL 32 30-109 33 115 170 26 (PEAK) 240/1PH 1200
BOILER TO INCLUDE LATEST REVISION TOUCH-SCREEN DASHBOARD, INCLUSIVE DAY
HOPPER, GROUNDED PELLET FEEDER HOSES, BUFFER TANK SENSOR MANAGEMENT
PACKAGE, FLUE COLLAR ADAPTOR, OUTSIDE AIR COLLAR. INCLUDE THE FOLLOWING
ACCESSORY ITEMS: VISUALIZATION SOFTWARE, PELLET DEDUSTER
INDOOR HEAT PUMPS
TAG LOCATION/
SERVICE MFR MODEL INDOOR
UNIT TYPE
OUTDOOR
UNIT
HEAT CAPACITY
(BTUH)
COOL CAPACITY
(BTUH)
VOLTS/
PHASE
POWER
(W) MCA
WEIGHT
(LBS) NOTES
IHP-4 TELECOM
ROOM 126 MITSUBISHI PKA-A18HA4 DUCTLESS OHP-4 --- 18,000 208/1 PH 30 1 29 POWER PROVIDED BY OHP-4, STAGE 2 SERVER ROOM COOLING.
PAIR WITH T-19. SEE SEQUENCE SPEC FOR SETPOINTS
IHP-5 STORAGE MITSUBISHI PKA-A24KA4 DUCTLESS OHP-5 26,000 24,000 208/1 PH 56 1 46 POWER PROVIDED BY OHP-5. PAIR WITH T-21. ROUTE CONDENSATE
TO APPROVED LOCATION, INCLUDE PUMP IF NECESSARY
IHP-6 AUTO SHOP MITSUBISHI PKA-A24KA4 DUCTLESS OHP-6 26,000 24,000 208/1 PH 56 1 46 POWER PROVIDED BY OHP-6. PAIR WITH T-22. ROUTE CONDENSATE
TO APPROVED LOCATION, INCLUDE PUMP IF NECESSARY
IHP-7 TELECOM
ROOM 126 MITSUBISHI PKA-A18HA4 DUCTLESS OHP-7 --- 18,000 208/1 PH 30 1 29 POWER PROVIDED BY OHP-7, STAGE 3 SERVER ROOM COOLING.
PAIR WITH T-20. SEE SEQUENCE SPEC FOR SETPOINTS
OUTDOOR HEAT PUMPS
TAG SERVICE MFR MODEL
HEAT CAPACITY
@ 17F (BTUH)
COOL CAPACITY
(BTUH) SEER COP VOLTS/
PHASE MCA MOCP
WEIGHT
(LBS) NOTES
OHP-1 HEAT PUMP BOILER/RADIANT
FLOOR DAIKIN EDLQ054BA6VJU 30,100 --- ---
4.07 (@
47°F) 208/1 PH 26.5 30 397
OHP-2 HEAT PUMP BOILER/RADIANT
FLOOR DAIKIN EDLQ054BA6VJU 30,100 --- ---
4.07 (@
47°F) 208/1 PH 26.5 30 397
OHP-3 HEAT PUMP BOILER/RADIANT
FLOOR DAIKIN EDLQ054BA6VJU 30,100 --- ---
4.07 (@
47°F) 208/1 PH 26.5 30 397
OHP-4 TELECOM ROOM AC MITSUBISHI PUY-A18NHA4-BS --- 18,000 15.3 --- 208/1 PH 13 20 89
LOCATE CONDENSOR UNIT IN SHOP BUILDING (REFER TO
SHEET M2.5 FOR LOCATION). SEA COAST MODEL
OHP-5 STORAGE/SHOP MITSUBISHI PUZ-A24NHA4-BS 18,000 24,000 17 2.4 (@
17°F) 208/1 PH 18 30 165 SEA COAST MODEL
OHP-6 STORAGE/SHOP MITSUBISHI PUZ-A24NHA4-BS 18,000 24,000 17 2.4 (@
17°F) 208/1 PH 18 30 165 SEA COAST MODEL
OHP-7 TELECOM ROOM AC MITSUBISHI PUY-A18NHA4-BS --- 18,000 15.3 --- 208/1 PH 13 20 89 INSTALL WITH LOW AMBIENT COOLING BAFFLE. SEA
COAST MODEL
STORAGE TANKS
TAG MFR MODEL SIZE (GAL) DIMENSIONS (IN) NOTES
HWS-1 JOHN WOOD COMPANY 400JWHST 400 95.25x36 (H x D) ASME RATED. FIELD WRAP STORAGE TANK WITH R-14 INSULATION JACKET. INSULATE ALL CONNECTIONS AND HOT WATER
PIPING PER SPECIFICATIONS
PUMPS
TAG MFR MODEL
FLOW
(GPM)
HEAD (FT
WG) HP
PIPE
CONNECTION (IN)
MOTOR
TYPE
POWER
(W) MCA VOLTS/
PHASE
WEIGHT
(LB) NOTES
PMP-1 GRUNDFOS UP 15-42 12 5.5 1/25 1.5 PSC 85 0.74 120/1PH 7.3 BOILER CIRCULATION. CONTROLLED FROM BOILER
PMP-2 GRUNDFOS MAGNA3 40-120
FN
26.2 (MAX) 30 3/4 1.25 ECM 16-422 0.19-1.89 208/1PH 36.9
PRIMARY HYDRONIC PUMP. VARIABLE SPEED MOTOR TO BE CONTROLLED
USING AUTOADAPT PRESSURE CONTROL
PMP-3 GRUNDFOS UP 43-110 F 26.2 30 3/4 1.5 PSC 590 5.1 115/1PH 41.2 BACKUP HYDRONIC PUMP. SINGLE SPEED. MANUAL BACKUP
PMP-4 LITTLE GIANT VCMX-20ULST 0.7 15 1/30 0.125 PSC 93 1.5 115/1PH 5.5
IHP-4,7 CONDENSATE PUMP, WIRE INTO EMERGENCY POWER CIRCUIT, SEE
P2.1 FOR ROUTING DETAILS
PMP-5 STANCOR SE50 74 37 1/2 2 PSC --- --- 115/1PH --- ELEVATOR SUMP PUMP. SEE P2.0 FOR ROUTING DETAILS. SEND ALARM
SIGNAL TO DDC
PMP-6,7 BLUE DIAMOND MAXIBLUE 0.06 16.5 --- --- PSC --- --- 115/1PH 1.5 INSTALL WITH RESOVOIR SENSING OPTION
JONATHAN HELLER
07/07/2014 No.13805
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
MOTORIZED DAMPERS
TAG MFR MODEL
FLOW
(CFM)
VOLTS/
PHASE
POWER (W) NOTES
M-1 RUSKIN CD40 1400 24V/1PH 5W POWER, 1.5W HOLDING ERV-1 SUPPLY. INCLUDE BLADE EDGE SEAL. FAIL OPEN M-2 RUSKIN CD40 1400 24V/1PH 5W POWER, 1.5W HOLDING ERV-1 EXHAUST. INCLUDE BLADE EDGE SEAL. FAIL OPEN
M-3 RUSKIN CD40 300 24V/1PH 5W POWER, 1.5W HOLDING ERV-2 SUPPLY. INCLUDE BLADE EDGE SEAL. FAIL OPEN. DAMPERS OPEN WITH
RELAY FROM ERV POWER
M-4 RUSKIN CD40 300 24V/1PH 5W POWER, 1.5W HOLDING ERV-2 SUPPLY. INCLUDE BLADE EDGE SEAL. FAIL OPEN. DAMPERS OPEN WITH
RELAY FROM ERV POWER
ENERGY RECOVERY VENTILATOR
TAG MFR MODEL FLOW (CFM) RECOVERY EFF. VOLTS/ PHASE POWER (W) WEIGHT (LBS) NOTES
ERV-1 BPE (CORE ONLY) XE-MIR-2000 1400 80% --- --- 376
ERV-2 LOSSNAY LGH-F300RX3-E 300 70% 208/1 PH 260 73 SET TO EXTRA HIGH. CYCLE ON OCCUPANCY SENSOR (REFER TO SHEET M2.5 FOR SENSOR LOCATIONS)
FANS
TAG MFR MODEL FLOW (CFM) SP (") VOLTS/ PHASE PEAK WATTS OPERATING WATTS WEIGHT (LBS) NOTES
SF-1 ZIEHL-ABEGG/TMI GR35C-ZIK.DC.CR 1400 1.5 208/1PH 1350 566 39.6 1,2
EF-1 ZIEHL-ABEGG/TMI GR35C-ZIK.DC.CR 1400 1.5 208/1PH 1350 566 39.6 1,2
NOTE:
1) ECM, DIRECT DRIVE. CONTROL PER SEQUENCE OF OPERATIONS. PROVIDE VARIABLE SPEED CONTROLS, MANUAL CONTROL OF FAN AND A DDC INPUT. SEE FAN SPEC FOR DETAILS.
2) FANS ARE TO BE MOUNTED WITHIN A SELF CONTAINED INDEPENDENT MODULE. THE ASSEMBLY OF THIS MODULE IS TO BE DOUBLE WALL CONSTRUCTION. THE INNER LINING IS TO BE PERFORATED METAL CONTAINING ACOUSTICALLY RATED INSULATION, AND THE MODULE ASSEMBLY IS TO HAVE A SOLID EXTERIOR FACE. MODULE SHALL BE DESIGNED & TESTED TO REDUCE THE OUTLET SOUND FROM THE FAN BY A MINIMUM OF 15DBA. THE MATERIALS OF THE MODULES ARE TO BE GALVANIZED SHEET METAL, G90 20 GAGE.
FILTER BOXES
TAG MFR MODEL DIMENSIONS (HxWxD) RATING NOTES FB-1 CAMFIL FARR V-BANK GLIDE/PACK G/P VB 1/2X1 15 1/4x24x27 3/4 MERV 8 INITIAL 0.28" WG PRESSURE DROP OR LESS. PROVIDE
ACCESS FROM BELOW
FB-2 CAMFIL FARR V-BANK GLIDE/PACK G/P VB 1/2X1 15 1/4x24x27 3/4 MERV 8 INITIAL 0.28" WG PRESSURE DROP OR LESS. PROVIDE
ACCESS FROM BELOW
DIFFUSERS, GRILLES AND LOUVERS
TAG TYPE MFG MODEL SIZE MOUNTING FINISH
1 SIDEWALL SUPPLY TITUS 355ZRL SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT 2 CEILING 4-WAY SUPPY TITUS MCD SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT 3 CEILING RETURN TITUS 355ZRL SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT 4 SIDEWALL RETURN TITUS 355ZRL SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT
5 OUTDOOR LOUVER RUSKIN ELF375DX SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT, WEATHER-PROOFING PER
ARCHITECT INCLUDE 3/16" BUG SCREEN
EXPANSION TANK
TAG MFR MODEL VOLUME/ACCEPT. VOLUME (GAL) DIMENSIONS (DIAMxHT) EXP-1 AMTROL AX-180V 90/34 24"x60"
JONATHAN HELLER
07/07/2014 No.13805
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
CONTROLS
TAG MFR MODEL NOTES
OAM-1 EBTRON GTA116-PD MONITOR INCOMING OUTSIDE AIR QUANTITY
BSC-1 TEKMAR BOILER CONTROL 284 INCLUDE MODBUS CONNECTION, SEE SEQUENCE FOR SETUP T-1-18 --- --- ZONE SENSOR WITH TEMPERATURE DISPLAY AND LIMITED OVERRIDE CAPABILITY
T-19-22 MITSUBISHI PAR-31 MAA PROGRAMMABLE THERMOSTATS
T-23 HONEYWELL TH115 A LINE VOLTAGE T-STAT
ELECTRIC HEATER
TAG MFR MODEL OUTPUT (W) VOLTS/ PHASE NOTES
EH-1 KING 2CB1203BW 350 208/1PH USE LINE VOLTAGE PROGRAMMABLE THERMOSTAT T-23 (5-1-1)
ACCESSORY ITEMS
TAG MFR MODEL SIZE NOTES
MV-1 HONEYWELL V5013F MIXING 1" CONNECTIONS USE MC-1 TO CONTROL THIS VALVE
MC-1 LK ACASO AUTOMIX 10 5 NM TORQUE
ACTUATOR
SETUP ON OUTDOOR RESET, WATER TEMP SET TO 105F WHEN OUTSIDE IS 15 DEG F
JONATHAN HELLER
07/07/2014 No.13805
B
C
D
E
A
2 3 4 5 6 7 81
B
C
D
E
A
EXIST. STORAGE
EXIST. STORAGE
EXIST. STORAGE
EXIST. STORAGE
EXIST.FIRE SUPPRESSION EQUIP.
EXIST.STORAGE
EXIST. LAUNDRY
EXIST. TOILET
EXIST. OFFICE
EXIST. ELEVATOR
EXIST. WAREHOUSE ENTRY
EXIST. STAIRS
FIRST FLOOR MECHANCIAL DEMOLITION PLAN1
SCALE IN FEET
8 0 8 16
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
N O R T H
(E) AIR COMPRESSOR
TO BE REMOVED
REMOVE ELECTRIC
BASEBOARD
REMOVE WALL EXHAUST FAN, AN ALL
ASSOCIATED APPURTENANCES,
PATCH WALL TO MATCH EXISTING
REMOVE OIL FIRED UNIT
HEATER, STACK AND
ASSOCIATED APPURTENANCES
REMOVE FUEL OIL TANK AND
PIPING. IF TANK IS IN GOOD
USABLE CONDITION, TURN OVER
TO CONTRACTING OFFICER. IF
TANK IS IN POOR CONDITION,
LEGALLY DISPOSE OF TANK.
REMOVE ELECTRIC
BASEBOARD
REMOVE CEILING EXHAUST
FAN, DUCTWORK AND WALL
CAP REMOVE CEILING EXHAUST
FAN, DUCTWORK AND WALL
CAPREMOVE ELECTRIC
BASEBOARD
REMOVE OIL FIRED UNIT HEATER,
STACK AND ASSOCIATED
APPURTENANCES
DEMO GENERAL NOTES
JONATHAN HELLER
07/07/2014 No.13805
DN
C
D
E
A
2 3 4 5 6 7 81
B
D
E
A
C
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
REMOVE ELECTRIC
UNIT HEATER
REMOVE OIL FIRED UNIT
HEATER, STACK AND
ASSOCIATED APPURTENANCES,
PATCH CEILING AND ROOF TO
MATCH EXISTING
REMOVE OIL FIRED UNIT
HEATER, STACK AND
ASSOCIATED
APPURTENANCES, PATCH
CEILING AND ROOF TO
MATCH EXISTING
REMOVE WALL EXHAUST FAN,
DUCTWORK, BDD AND ALL
ASSOCIATED APPURTENANCES
REMOVE STACK, PATCH
CEILING AND ROOF TO
MATCH EXISTING
REMOVE STACK, PATCH
CEILING AND ROOF TO
MATCH EXISTING
DEMO GENERAL NOTES
SECOND FLOOR MECHANCIAL DEMOLITION PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
JONATHAN HELLER
07/07/2014 No.13805
RECEPTION
STOR.
LG CONFERENCE RM
SM CONFERENCE
STOR
KITCHEN
MEN
WOMEN
HALL
LEO OFFICE
OFFICE
QUIET
JAN
SUPPLY
MUD ROOM
RANGER
ENTRY VEST.
OFFICE
OPEN OFFICE
TELECOM
SPRINKLER
STAIR 2
ELEV
MECH
BOILER
STAIR 1
106MAIL
LOBBY
102 PELLET
ELECT
1 3 4 6
A
B
C
2 5 7
M3.2
M3.1
M3.2
T-20
T-19
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
OFFICE - FIRST FLOOR MECHANCIAL PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
JONATHAN HELLER
07/07/2014 No.13805
1 3 4 6
A
B
C
2 5 7
OPEN OFFICE
WOMEN
MEN
DISPATCH
OPEN OFFICE
OFFICE
QUIET
OFFICE
STAIR
STOR
SM MTG.
3.25x11" EXHAUST
RISER FROM BELOW
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
OFFICE - SECOND FLOOR MECHANCIAL PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
JONATHAN HELLER
07/07/2014 No.13805
1 3 4 62 5 7
LG CONFERENCE RM
SM CONFERENCE
STOR.
STOR
KITCHEN
MEN
WOMEN
HALL
RECEPTION
LEO OFFICE
OFFICE
QUIET
JAN
SUPPLY
MUD ROOM
RANGER
ENTRY VEST.
OFFICE
OPEN OFFICE
123 TELECOM
SPRINKLER
STAIR 2
HALL
ELEV
MECH
BOILER
STAIR 1
106MAIL
LOBBY
PELLET
ELECT
RM-1 RM-2
RM-3
RM-5
T-1
T-2 T-3
T-4
T-5
T-6 T-7
T-8
T-10
T-11
T-19
T-20
RM-4
T-9
215'
230'
150' 190'
145'
150'
195'
180'
225'
215' 260'
270'235'
150'
150'
365'
240' 120'
120'
140'
325'
320'
330'
330'
330'
310'
310'
260'
200'
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
OFFICE - FIRST FLOOR RADIANT PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
MANIFOLD ZONE TUBE
TYPE LOOP# TUBE
SPACING
LOOP
LENGTH
FLOW
(GPM)
HEAD
LOSS
(FT)
VALVE
TURNS
RM-1 T-1 PEXa 1/2" 1 9 150 0.5 2.7 2.41 T-1 PEXa 1/2" 2 9 195 0.5 3.4 3.11 T-1 PEXa 1/2" 3 9 180 0.5 3.2 2.88 T-2 PEXa 1/2" 4 9 225 0.5 4.6 3.58 T-2 PEXa 1/2" 5 9 215 0.5 4.4 3.42 T-3 PEXa 1/2" 6 9 235 0.5 4.2 3.66 T-3 PEXa 1/2" 7 9 270 0.5 4.8 4.2 T-3 PEXa 1/2" 8 9 260 0.5 4.6 4.04
RM-2 T-4 PEXa 1/2" 1 9 365 0.3 2.9 4.2 T-4 PEXa 1/2" 2 9 240 0.3 2.2 3.16 T-4 PEXa 1/2" 3 9 120 0.3 1 1.5 T-4 PEXa 1/2" 4 9 120 0.3 1 1.44
RM-3 T-5 PEXa 1/2" 1 9 215 0.9 10.4 3.93 T-5 PEXa 1/2" 2 9 230 0.9 11.1 4.2 T-6 PEXa 1/2" 3 9 150 0.5 3.1 2.92 T-7 PEXa 1/2" 4 9 190 0.9 8.8 3.56 T-8 PEXa 1/2" 5 9 155 0.4 1.7 2.83
RM-4 T-9 PEXa 1/2" 1 9 325 0.5 5 4.14 T-9 PEXa 1/2" 2 9 320 0.5 5 4.07 T-9 PEXa 1/2" 3 9 330 0.5 5.1 4.2 T-9 PEXa 1/2" 4 9 330 0.5 5.1 4.2 T-9 PEXa 1/2" 5 9 330 0.5 5.1 4.2 T-9 PEXa 1/2" 6 9 310 0.5 4.8 4.2 T-9 PEXa 1/2" 7 9 310 0.5 4.8 4.2 T-9 PEXa 1/2" 8 9 260 0.5 4.3 3.56 T-9 PEXa 1/2" 9 9 200 0.5 2.9 2.8 T-9 PEXa 1/2" 10 9 140 0.5 2.1 2.48
RM-5 T-10 PEXa 1/2" 1 9 150 0.5 3 4.07 T-11 PEXa 1/2" 2 9 150 0.4 1.6 4.2
JONATHAN HELLER
07/07/2014 No.13805
1 3 4
A
B
C
2 5 7
QUIET
MEN
WOMEN
OFFICE
SM MTG.
OFFICE
212DISPATCH
STOR
HALLWAY
OPEN OFFICE
OPEN OFFICE
STAIR 2
RM-6
RM-7
RM-8
T-12
T-13
T-14
T-15
T-16
T-17
T-18
215'
200'
140'
195'
260'
275'
200'
200' 140'
295'
195'
205'
220'
330'
330'
330'
330'
330'
330'
330'
330'
330'
330'
250'
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
OFFICE - SECOND FLOOR RADIANT PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
MANIFOLD ZONE TUBE
TYPE LOOP# TUBE
SPACING
LOOP
LENGTH
FLOW
(GPM)
HEAD
LOSS
(FT)
VALVE
TURNS
RM-6 T-12 PEXa 1/2" 1 9 215 0.6 4.8 4.2 T-12 PEXa 1/2" 2 9 200 0.6 4.6 4.01 T-13 PEXa 1/2" 3 9 140 0.3 1.3 2.67 T-14 PEXa 1/2" 4 9 195 0.5 3.6 3.91
RM-7 T-15 PEXa 1/2" 1 9 220 0.5 3.7 4.13 T-15 PEXa 1/2" 2 9 200 0.5 3.4 2.75 T-15 PEXa 1/2" 3 9 200 0.5 3.4 3.03 T-15 PEXa 1/2" 4 9 205 0.5 3.5 3.03 T-16 PEXa 1/2" 5 9 195 0.4 2.9 2.82 T-16 PEXa 1/2" 6 9 295 0.4 4.2 4.2 T-16 PEXa 1/2" 7 9 270 0.4 3.8 3.72 T-16 PEXa 1/2" 8 9 275 0.4 4.1 3.92
RM-8 T-17 PEXa 1/2" 1 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 2 9 250 0.5 4.6 3.25 T-17 PEXa 1/2" 3 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 4 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 5 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 6 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 7 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 8 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 9 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 10 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 11 9 330 0.5 5.9 4.2 T-18 PEXa 1/2" 12 9 133 0.4 1.9 1.69
JONATHAN HELLER
07/07/2014 No.13805
R E
F
1 3 4 6
A
B
C
2 5 7
LG CONFERENCE RM
SM CONFERENCE
STOR.
STOR
KITCHEN
MEN
WOMEN
HALL
RECEPTION
LEO OFFICE
OFFICE
QUIET
JAN
SUPPLY
MUD ROOM
RANGER
ENTRY VEST.
OFFICE
OPEN OFFICE
123 TELECOM
SPRINKLER
STAIR 2
HALL
ELEV
MECH
BOILER
STAIR 1
106MAIL
LOBBY
PELLET
ELECT
RM-3
RM-1
RM-2
RM-4
RM-8
RM-5
RM-6
DN
DN
DN
DN
DN
UPUP
UP
RM-7
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
HYDRONIC PIPING LAYOUT1
SCALE IN FEET
8 0 8 16
MANIFOLD FLOW (GPM) HEAD LOSS
(FT)
HEATING LOAD
(BTU/hr)
DISTANCE TO
MANIFOLD (FT)
RM-1 4.1 4.8 16,813 105
RM-2 1.2 2.9 5,071 85
RM-3 3.7 11.1 15,054 100
RM-4 4.6 5.1 19,126 70
RM-5 0.9 3 3,742 40
RM-6 2 4.8 7,473 115
RM-7 3.7 5.1 13,977 115
RM-8 6 5.9 22,566 25
TOTALS 26.2 11.1 103,822
JONATHAN HELLER
07/07/2014 No.13805
1A
3A
4A
5A
6A
2A
AABBCCDD
WATERSHED/FISH/WILDLIFE
CAGE
REDOUBT & FALLS
LAKE CAGE
ARCHEOLOGY CAGE
ENG CAGE
PLANNING S.O.
S.S.S.
WILDERNESS & LANDS
LEO
SOILS/FISH/WILDLIFE
S.O.
DISPATCH CAGE
MAINT. CAGE
DEV. REC
AUTO SHOP
FIRE
REC/LANDS S.O. CAGE
TRAILS & CABINS
CAGE
T-22
T-21
T-23
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
SHOP BUILDING - MECHANCIAL PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
JONATHAN HELLER
07/07/2014 No.13805
AIR SEPARATOR
WITH BLEED VALVE
GROUNDED PELLET FEEDER HOSE
AND RELIEF HOSE (2 TOTAL)
B-1
PELLET DAY HOPPER
WITH SCREW AUGER
FEEDER
HWS-1
FLOW SWITCH
(ALARM DDC
ON FLOW)
CITY
MAKEUP
WATER
TEMP GAUGE
(TYP)
OHP-1
OHP-2
OHP-3
RM-1 RM-2 RM-3 RM-5RM-4
RM-6 RM-7 RM-8
PRESSURE
GAUGE (TYP)
T-7
TELESTAT
(TYP)
MOTORIZED TWO
WAY VALVE
T-1
T-17
T-2
T-3
T-4 T-5
T-6
T-8
T-10
T-11 T-9
T-12
T-13
T-14
T-18
T-15
T-16
PMP-1
PMP-2
IMMERSION
TEMP. PROBE (TYP)
STRAINER (TYP)
TEMPERATURE PRESSURE
RELIEF VALVE. ROUTE TO
FLOOR DRAIN
PMP-3
SHEET NOTES
1. MANIFOLD INCLUDES TELESTATS FOR INDIVIDUAL
RADIANT TUBE FLOW CONTROL. PAIR WITH T-STATS AS
SHOWN. SEE DETAIL 3/M3.3 FOR DETAILS.
2. MANIFOLD FLOW IS CONTROLLED BY MECHANICALLY
OPERATED TWO WAY VALVE.
3. SPLIT OFFICE 212 ZONE FROM MANIFOLD. CONTROL
WITH TWO WAY VALVE.
4. ALL LOWER LEVEL MANIFOLD SUPPLY PIPING TO INCLUDE
AUTOMATIC AIR VENTS IN MECHANICAL ROOM.
5. SEE PLUMBING SCHEDULE FOR HYDRONIC MAKEUP
ACCESSORIES (RPBP-2, PRV-2, WM-2).
FM-1
WM-2
EXP-1
AUTOMATIC
AIR VENT
AIR VENTS
(TYP ALL MANIFOLDS)
GLYCOL FILL FUNNEL
PURGE VALVE
BSC-1
MV-1
OUTDOOR
AIR
SENSOR
2"
4" 3
4"
2" 1
2" 1 2" 1
2"
4" 3 4"
4" 3
4" 3 4" 3
4" 3 4" 3
4"
1" 1"
2"
2"
2"
2"
2"
2"
2"
4"
FM-2
T-2
T-1
T-4
T-3
WATER METER
PELLET
RADIANT MIXING
CONTROLLER
MC-1
4"
(TYP)
2"
2"
2"
RPBP-2
PRV-2
BTUM-2
BTUM-1
GENERAL NOTES
A. FOR ITEM NOT SCHEDULED ON M.2 & M0.3, SEE
CONTROL DRAWING M4.0. EXAMPLE: BTU METERS
B. RM - RADIANT MANIFOLD
C. FM - FUEL METER
HYDRONIC HEAT PLANT SCHEMATIC
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
JONATHAN HELLER
07/07/2014 No.13805
OFFICE
MECH
BOILER
PELLET
130 B-1
HWS-1
OHP-3
OHP-2
OHP-1
PMP-2
PMP-3
CITY MAKE
UP WATER
EXP-1
RPBP, PRV, FLOW METER, ETC.
INSTALL BELOW HYDRONIC
SUPPLY AND RETURN LINES
PMP-1
ELECTRICAL
PANEL AND CLEARANCE
HYDRONIC HEADER
MV-1
OAS-1
ALL PIPES ON INSIDE
OF EXTERIOR WALL. ROUTE
ABOVE DOOR HEADER
ROUTE AS CLOSE TO
CEILING AS POSSIBLE
CONTROLS STATION
BOILER EXHAUST, 6"
SLOPE 1/4" PER FOOT
M3.1
REFER TO ARCH SHEETS
FOR PELLET STORAGE
ROOM DETAILS
PELLET DEDUSTER
BOILER COMBUSTION AIR 6",
INTAKE ABOVE HEAT PUMPS
FM-2
FM-13' AFF
4' AFF
5.5' AFF
INSTALL AUTOMATIC AIR VENTS FOR ALL
LOWER LEVEL LOOPS IN THIS LOCATION (TYP)
PER SHEET M3.0, SHEET NOTE 4.
ROUTE WATER TO FLOOR SINK
CITY MAKE-UP WATER
CONTROLS STATION
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
ENLARGED MECH ROOM1
SCALE IN FEET
4 0 4 8
MECH ROOM PIPING2
SCALE: NTS
JONATHAN HELLER
07/07/2014 No.13805
AB
SF-1 FB-1
M-1
IHP-4
OHP-4
T-20
T-19
FIRST FLOOR DUCTING DETAIL2
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
NOT USED1
TELECOM 126 SECTION3
SCALE IN FEET
4 0 4 8
SCALE: NTS
JONATHAN HELLER
07/07/2014 No.13805
NOTES:
1) DUCT SUPPORTS TO BE DESIGNED BY
LICENSED AK STRUCTURAL ENGINEER.
SUBMITTED AS DEFERRED SUBMITTAL
1. DUCT
2. SHEET-METAL STRAP 1" WIDE OF SAME
METAL GAUGE AS DUCT
3. ANGLE - NOT LESS THAN 1"x1"x 18", SIZED
TO MATCH DUCT
4. SHEET-METAL BAND 1" WIDE OF SAME
METAL GAUGE AS DUCT
5. ALL-THREAD HANGER ROD WITH
ACCESSORIES AS USED FOR LIGHT PIPE
HANGER
CLAMP
UNISTRUT
UNISTRUT
CLAMP PIPING
CRUSH RESISTANT
INSULATION
NOTES:
1) USE ZSI CUSH-A-THERM INSULATED
PIPING CLAMP OR EQUIVALENT
2) PIPE SUPPORTS TO BE DESIGNED BY
LICENSED AK STRUCTURAL ENGINEER.
SUBMITTED AS DEFERRED SUBMITTAL
HANGER ROD
BALANCING VALVE
RETURN MANIFOLD
MOUNTING BRACKETS
BALANCING COVER
AND BALANCING VALVE
BALANCING VALVE
PEXa TUBING
END CAP
SUPPLY
MANIFOLD
THERMAL ACTUATOR
VALVE HEAD
END CAP WITH
VENT AND DRAIN
NOTE:
RADIANT MANIFOLDS 2,4,8 (RM-2,4,8) DO NOT
INCLUDE ZONAL TELESTATS OR THERMAL ACTUATORS.
MECHANICAL TWO-WAY VALVES TO CONTROL MANIFOLD FLOW.
2" PEX TUBING
AT 9" SPACING
BASE MATERIAL
SLAB INSULATION
CONCRETE TOPPING SLAB
EXISTING
CONCRETE SLAB
FOAM STAPLES OR TIED
TO CONCRETE STEEL GRID
SLAB EDGE
INSULATION
SLAB EDGE
INSULATION
2" PEX TUBING
AT 9" SPACINGBASE MATERIAL
SLAB INSULATION
CONCRETE SLAB
FOAM STAPLES OR TIED
TO CONCRETE STEEL GRID
2" PEX TUBING
AT 9" SPACING
EXISTING 1 14"
PLYWOOD SUBFLOOR
STAPLE
POURED UNDERLAYMENT
FLOOR JOIST
RIGID INSULATION
PIPE SUPPORT DETAIL2
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
DUCT SUPPORT DETAIL1RADIANT MANIFOLD DETAIL3
SCALE: NTSSCALE: NTSSCALE: NTS
RADIANT FLOOR CONSTRUCTIONS4
SCALE: NTS
JONATHAN HELLER
07/07/2014 No.13805
CT (TYP)
6200 6200 6200 6200
WM-1
(COLD WATER)
BTUM-1
(RADIANT)
BTUM-2
(BIOMASS
BOILER)
DHW-1
SMART CT
(TYP)
MAIN POWER
RECEPTACLES
(COMPUTER)
UPS INTERIOR/EXTERIOR
LIGHTING
RECEPTACLES
(NON-COMPUTER)
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
MEASUREMENT & VERIFICATION SCHEDULE
METERED ITEM DESCRIPTION PANEL DEVICE MEASUREMENT ITEM UNITS NOTES
MAIN POWER ENERGY MAIN ELECTRICAL PANEL MONITORING MAIN ION 7550 INTEGRATED DISPLAY TOTAL OFFICE BUILDING ENERGY KWH MONITOR MAIN EMERGENCY POWER ENERGY EMERGENCY POWER PANEL MONITORING BACKUP ION 6200 REMOTE DISPLAY METER EMERGENCY POWER ENERGY KWH MONITOR EMERGENCY POWER ENERGY USAGE
HVAC ENERGY HVAC SUBPANEL M1 ION 6200 REMOTE DISPLAY METER HVAC ENERGY KWH ALL HVAC ENERGY. INCLUDE BTUM-1 AND IHP/OHP-4 ENERGY INTERIOR/EXTERIOR LIGHTING ENERGY LIGHTING SUBPANEL LP1 ION 6200 REMOTE DISPLAY METER INTERIOR/EXTERIOR LIGHTING ENERGY KWH ALL LIGHTING ENERGY FROM MAIN OFFICE BUILDING
RECEPTACLE-COMPUTERS ENERGY CT AROUND COMPUTER RECEPTACLE SUBPANEL P1 ION 6200 REMOTE DISPLAY METER COMPUTER RECEPTACLE ENERGY KWH ALL COMPUTER PLUG LOADS RECEPTACLE-NON-COMPUTERS ENERGY CT AROUND NON-COMPUTER RECEPTACLE SUBPANEL CP1 ION 6200 REMOTE DISPLAY METER NON-COMPUTER RECEPTACLE ENERGY KWH ALL NON-COMPUTER PLUG LOADS
TELECOM ROOM SMART CT WITH DISPLAY NET1 SQUARE D POWERLOGIC ENERCEPT TELECOM ROOM PLUG ENERGY KWH ALL TELECOM ROOM PLUG ENERGY USAGE DHW-1 SMART CT WITH DISPLAY SQUARE D POWERLOGIC ENERCEPT DOMESTIC HOT WATER ENERGY KWH KWH USAGE OF HEAT PUMP WATER HEATER
WM-1 NEPTUNE T-10, 1" & TRICON/E3 TRANSMITTER NEPTUNE T-10 AND E3 TRANSMITTER COLD WATER USAGE GALLONS 1" COLD WATER TOTALIZER ON MAIN WATER LINE INTO THE BUILDING. CONTACT CLOSURE
OUTPUT
BTUM-1 ONICON BTU-METER RADIANT FLOOR ONICON SYSTEM-10 RADIANT FLOOR BTU METER KWH BTU METER, SAMPLE EVERY 10 SECONDS, CONVERT TO KWH
FM-1 FLOW METER, 1-1/4" PIPE CONNECTION ONICON F-1100/F-1200 INSERTION
FLOW METER RADIANT FLOOR SUPPLY FLOW RATE GPM AVG 1-1/4" FLOW METER INPUT TO BTUM-1, GPM AVERAGE ACROSS 10 SECOND INTERVAL
T1 SUPPLY IMMERSION TEMPERATURE SENSOR BTU-ST-INSTL36 SUPPLY WATER TEMPERATURE TEMP (F) IMMERSION TEMPERATURE SENSOR, SUPPLY WATER, PAIR WITH BTUM-1 T2 RETURN IMMERSION TEMPERATURE SENSOR BTU-ST-INSTL36 RETURN WATER TEMPERATURE TEMP (F) IMMERSION TEMPERATURE SENSOR, RETURN WATER, PAIR WITH BTUM-1
BTUM-2 ONICON BTU-METER BIOMASS BOILER ONICON SYSTEM-10 BIOMASS BOILER BTU METER KWH BTU METER, SAMPLE EVERY 10 SECONDS, CONVERT TO KWH
FM-2 FLOW METER, 1-1/4" PIPE CONNECTION ONICON F-1100/F-1200 INSERTION
FLOW METER RADIANT FLOOR SUPPLY FLOW RATE GPM AVG 1-1/4" FLOW METER INPUT TO BTUM-2, GPM AVERAGE ACROSS 10 SECOND INTERVAL
T3 SUPPLY IMMERSION TEMPERATURE SENSOR BTU-ST-INSTL36 SUPPLY WATER TEMPERATURE TEMP (F) IMMERSION TEMPERATURE SENSOR, SUPPLY WATER, PAIR WITH BTUM-2 T4 RETURN IMMERSION TEMPERATURE SENSOR BTU-ST-INSTL36 RETURN WATER TEMPERATURE TEMP (F) IMMERSION TEMPERATURE SENSOR, RETURN WATER, PAIR WITH BTUM-2
M&V DIAGRAM1
JONATHAN HELLER
07/07/2014 No.13805
LEGEND &
ABBREVIATIONS
THIS IS A STANDARD LEGEND, SOME SYMBOLS SHOWN
ON LEGEND ARE NOT NECESSARILY ON THE DRAWING.
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
REVISION: BY:
PLUMBING GENERAL NOTES
1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW
EXACT ROUTING OR EVERY OFFSET WHICH MAY BE
REQUIRED. THE PLUMBING CONTRACTOR IS TO
COORDINATE WITH ALL OTHER TRADES AND IS TO
VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.
2. MATERIALS, METHODS, AND INSTALLATION SHALL
COMPLY WITH THE PROVISIONS OF THE LATEST EDITION
OF THE ALASKA BUILDING ENERGY EFFICIENCY
STANDARD, UNIFORM PLUMBING CODE (UPC) WITH
ALASKA STATE AMENDMENTS, INTERNATIONAL BUILDING
CODE (IBC) WITH ALASKA STATE AMENDMENTS,
INTERNATIONAL FIRE CODE (IFC) AND OTHER APPLICABLE
STATE AND LOCAL CODES AND ORDINANCES.
3. PROVIDE EARTHQUAKE RESTRAINT FOR PLUMBING
EQUIPMENT IN ACCORDANCE WITH THE CURRENT IBC.
4. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOOR
SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED
MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND
RATING OF THE FLOOR OR WALL.
PLUMBING NARRATIVE
UTILITY REQUIREMENTS
1. WATER: AN EXISTING 6-INCH WATERLINE IS PROVIDED
TO THE WAREHOUSE BUILDING FOR DOMESTIC AND FIRE
PROTECTION SERVICE. DOMESTIC WATER PEAK FLOW
CALCS ARE ESTIMATED TO BE APPROXIMATELY 20 GPM
REQUIRING A 1.25 INCH MAIN. THE SHOP HAS A
SPRINKLER SERVICE WITH A SEPARATE WATER SERVICE,
SIZE TO BE FIELD VERIFIED.
2. SANITARY SEWER: SANITARY SEWER EXISTS TO EACH
BUILDING, SIZE TO BE FIELD VERIFIED.
3. STORM DRAINS: EXISTING ROOFS ARE SLOPED. ROOF
DRAINAGE IS CONVEYED TO SHEET DRAINAGE,
OVERLAND FLOW OR DRAINAGE DITCHES VIA GUTTERS,
NO RAIN LEADER SYSTEM IS TO BE PROVIDED.
PLUMBING
1. PLUMBING FIXTURES INCLUDING WATER CLOSETS,
URINALS AND LAVATORIES ARE VITREOUS CHINA AND
OF COMMERCIAL QUALITY. FIXTURES ARE WATER
CONSERVATION TYPE. SINKS ARE 18 GAUGE 304SS.
2. FIXTURES AND TRIM MEET ADA-ABA WHERE REQUIRED.
3. DOMESTIC HOT WATER IS GENERATED BY AN ELECTRIC
WATER HEATER (DHW-1). WATER TEMPERATURE SHALL
BE SET TO 140°F. MAIN HOT WATER LINE TO KITCHEN
SINK SHALL BE HEAT TAPED AND SET TO 110°F,
COORDINATE WITH ELECTRICAL.
4. DOMESTIC HOT AND COLD WATER IS TO BE PROVIDED
WITH PIPE INSULATION. ASSUME 1" THICK WALL
INSULATION FOR HOT WATER LINE AND 1/2" THICK WALL.
INSULATION FOR COLD.
PLUMBING FIXTURE SCHEDULE
TAG DESCRIPTION MFR MODEL NOTES W V CW HW
P-1 WATER CLOSET KOHLER K-3999 "HIGHLINE" FLOOR MOUNTED, ADA, 1.28 GPF. PROVIDE WITH
ELONGATED OPEN FRONT SEAT COVER. 4 2 1 -
P-2 URINAL ZURN Z5708.207.00 "NANO PINT" MANUAL FLUSH VALVE.
CARRIER: ZURN Z1221 2 1 1/2 3/4 -
P-3 LAVATORY AMERICAN
STANDARD 0496.221
"OVALYN" UNDER COUNTER, VITREOUS CHINA, GRID DRAIN.
FAUCET: AMERICAN STANDARD 6144.116.002, 0.5 GPM - ADA
INSTALL.
1 1/2 1 1/2 1/2 1/2
P-4 KITCHEN SINK ELKAY HD553602
"LUSTERONE" STAINLESS STEEL, SELF RIMMING.
TWO-COMPARTMENT STAINLESS STEEL COUNTER MOUNT
DROP-IN, 1.5 GPM AERATOR FAUCET WITH SPRAYER.
2 1 1/2 1/2 1/2
P-5 DRINKING FOUNTAIN ELKAY LZWS-EDFPBM117K
"SWIRLFLO" FRONT PUSH BUTTON, HOODED BUBBLER, ADA WALL
MOUNTED WITH INTEGRAL FILTERED BOTTLE FILLER. PROVIDE
ELECTRICAL CONNECTION, 115V/60HZ
2 1 1/2 1/2 -
P-6 JANITORS SINK FIAT MSBID2424 MOLDED STONE WITH INTEGRAL DRAIN. FAUCET: CHICAGO 897
WALL MOUNTED. 3 1 1/2 1/2 1/2
P-7 FLOOR DRAIN J.R. SMITH 2005-P050 DUCO CAST IRON BODY & NICKEL BRONZE HEAD. 2 1 1/2 - -
P-8 AUTOMATIC TRAP
PRIMER J.R. SMITH 2699 PROVIDE WITH ACCESS PANEL. - - 1/2 -
P-9 FLOOR SINK J.R. SMITH 3250 INDIRECT WASTE DRAIN FOR CONDENSATE, RPBP TEST DRAIN, AND ELEVATOR SUMP PUMP. 2 1 1/2 - -
P-10 HOSE BIBB J.R. SMITH 5515
1/4 TURN NON-FREEZE HYDRANT WITH AUTOMATIC DRAINING
INTEGRAL VACUUM BREAKER,
INTEGRAL SERVICE SHUT-OFF VALVE, DUAL CHECK VALVE, AND
STAINLESS STEEL BOX.
- - 3/4 -
DOMESTIC WATER HEATER
TAG LOCATION MFR MODEL
SIZE
(GAL)
HTG CAPACITY
(W)
VOLTS/
PHASE NOTES
DHW-1 FIRST FLOOR
JANITOR CLOSET AO SMITH DSE-50 50 12,000 208 / 3 "CUSTOM Xi" SERIES ELECTRIC WATER HEATER WITH 50 GPH
RECOVERY. SET TO 140°F.
DHW-2 STORAGE BUILDING
BATHROOM ARISTON GL-6+ 6 1,500 120 / 1 POINT OF USE WATER HEATER
ET-1 FIRST FLOOR
JANITOR CLOSET AMTROL ST-12C 6.4 N/A N/A 150 PSIG WORKING PRESSURE.
3.2 GALLON ACCEPT VOLUME.
DATE:
MISCELLANEOUS PLUMBING ACCESSORIES
TAG LOCATION MFR MODEL NOTES
RPBP-1 SPRINKLER ROOM WATTS 009 SERIES NOMINAL 1"
PRV-1 SPRINKLER ROOM WATTS LFN45B-EZ NOMINAL 1" CITY COLD WATER INLET, SET TO 65 PSI
WM-1 SPRINKLER ROOM NEPTUNE TRICON/E3
TRANSMITTER
NOMINAL 1", TOTALZER, 1 PULSE PER 10 GALLONS. SEND
CONTACT CLOSURE TO AEM PANEL IN IT ROOM. REQUIRES DC
SUPPLY VOLTAGE.
RPBP-2 MECHANICAL ROOM WATTS 009 SERIES 3/4" NOMINAL
PRV-2 MECHANICAL ROOM WATTS LF123LP 3/4" HYDRONIC MAKE-UP WATER INLET, SET TO 12 PSI
WM-2 MECHANICAL ROOM NEPTUNE "AQUITY" NOMINAL 3/4". NO PULSE OUTPUT, READER DIAL ONLY.
JONATHAN HELLER
07/07/2014 No.13805
C
D
E
A
2 3 4 5 6 7 81
B
C
D
E
A
EXIST. STORAGE
EXIST. STORAGE
EXIST. STORAGE
EXIST. STORAGE
EXIST.FIRE SUPPRESSION EQUIP.
EXIST.STORAGE
EXIST. LAUNDRY
EXIST. TOILET
EXIST. OFFICE
EXIST. ELEVATOR
EXIST. WAREHOUSE ENTRY
EXIST. STAIRS
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
DEMO GENERAL NOTES
SHEET NOTES
DEMO ALL (E)
W PIPING UP
TO THIS POINT
FIELD VERIFY
LOCATION OF
(E) WASTE LINE
(E) 34" WATER
SERVICE
FIRST FLOOR PLUMBING DEMOLITION PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
JONATHAN HELLER
07/07/2014 No.13805
1 3 4 6
A
B
C
2 5 7
LG CONFERENCE RM
SM CONFERENCE
STOR.
STOR
KITCHEN
MEN
WOMEN
HALL
RECEPTION
LEO OFFICE
OFFICE
QUIET
JAN
SUPPLY
MUD ROOM
RANGER
ENTRY VEST.
OFFICE
OPEN OFFICE
123 TELECOM
SPRINKLER
STAIR 2
HALL
ELEV
MECH
BOILER
STAIR 1
106MAIL
LOBBY
PELLET
ELECT
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
CONNECT11
4" CW
TO (E) WATER
SERVICE. SEE
DETAIL 5/P3.1
4" POC TO (E)
WASTE LINE
FIELD VERIFY
LOCATION OF
(E) W LINE
VTR
FD
SK
SK
DF
GCO GCO
LAV (TYP OF 4)
WC (TYP OF 2)
UR (TYP OF 2)
WC (TYP OF 4)
FD (TYP OF 4)
4" PVC @ 1% SLOPE
4"
2"
2"
SHEET NOTES
1. PLUMBER TO FIELD VERIFY LOCATION OF (E) W
LINE GCO. RELOCATE OUTSIDE OF NEW
BUILDING FOOTPRINT.
2. INDIRECT WASTE FLOOR SINK FOR RPBP TEST
DRAIN, ELEVATOR SUMP PUMP & CONDENSATE.
3. ELEVATOR SUMP (P-5) WASTE LINE UP TO
FIRST FLOOR FRAMING, ROUTE THROUGH
FLOOR JOISTS TO FLOOR SINK IN MECHANICAL
ROOM.
VTR
2"
FD
VTR
OFFICE - FOUNDATION PLUMBING PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
SKFCO
2" TRAP PRIMER LINE
2" TRAP PRIMER LINE
JONATHAN HELLER
07/07/2014 No.13805
R E
F
1 3 4 6
A
B
C
2 5 7
LG CONFERENCE RM
SM CONFERENCE
STOR.
STOR
KITCHEN
MEN
WOMEN
HALL
RECEPTION
LEO OFFICE
OFFICE
QUIET
JAN
SUPPLY
MUD ROOM
RANGER
ENTRY VEST.
OFFICE
OPEN OFFICE
123 TELECOM
SPRINKLER
STAIR 2
HALL
ELEV
MECH
BOILER
STAIR 1
106MAIL
LOBBY
PELLET
ELECT
P2.1
R E
F
STOR.
STOR
KITCHEN
MEN
WOMEN
JAN
MUD ROOM
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
WCO
WCO
MAKEUP WATER
TO BOILER
SHEET NOTES
1. CONNECT NEW11
4" CW TO (E) WATER SERVICE.
SEE DETAIL 5/P3.1.
DF ABV
4"
FD ABV
VTR
VTR
OFFICE - FIRST FLOOR PLUMBING PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
2", ROUTE IN
FLOOR JOISTS
ENLARGED PLUMBING PLAN2
TYP OF 3
TYP OF 2
FCO
TYP OF 2
JONATHAN HELLER
07/07/2014 No.13805
VTR
1 3 4
A
B
C
2 5 7
QUIET
MEN
WOMEN
OFFICE
SM MTG.
OFFICE
212DISPATCH
STOR
HALLWAY
OPEN OFFICE
OPEN OFFICE
STAIR 2
P2.2
MEN
WOMEN
OPEN OFFICE
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
VTR
OFFICE - SECOND FLOOR PLUMBING PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
ENLARGED PLUMBING PLAN2
TYP OF 2
JONATHAN HELLER
07/07/2014 No.13805
1A
3A
4A
5A
6A
2A
AABBCCDD
TRAILS & CABINS CAGE
WATERSHED/FISH/WILDLIFE
CAGE
REDOUBT & FALLS LAKE CAGE
ARCHEOLOGY CAGE
ENG CAGE
PLANNING S.O.
S.S.S.
WILDERNESS & LANDS
LEO
SOILS/FISH/WILDLIFE S.O.
DISPATCH CAGE
MAINT. CAGE
DEV. REC
AUTO SHOP
FIRE
REC/LANDS S.O. CAGE
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
SHEET NOTES
STORAGE BUILDING - PLUMBING PLAN1
SCALE IN FEET
8 0 8 16
N O R T H
JONATHAN HELLER
07/07/2014 No.13805
DHW-1
ECOTOPE
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
SCALE: NTS
PLUMBING RISER DIAGRAM
JONATHAN HELLER
07/07/2014 No.13805
4056 9th Avenue NE Seattle WA 98105
PH: (206) 322-3753
FAX: (206) 325-7270
REVISION SCHEDULE
DATE: REVISION: BY:
TILE OR CARPET COVER PER
FLOOR FINISH
CLEANOUT BOX
FACTORY COATED CAST
IRON BODY, INDEPENDENT OF
CLEANOUT BOX
NOTE: YARD CLEANOUT SIMILAR
W/24" SQ. X 4" CONCRETE PAD
FLUSH WITH FINISH GRADE.
SCORIATED C.O. COVER
Y FITTING OR COMB.
Y AND 1/8 BEND
FINISH FLOOR, FOR
DETAILS SEE ARCH.
CLEANOUT PLUG
FLOOR DRAIN SIZE
AS NOTED ON PLANS
TOPPING SLAB
TILE
WATERPROOF MEMBRANE
1-1/4" EXISTING PLYWOOD SUBFLOOR
FLASHING COLLAR & CLAMP
TO P-TRAP
UNDERDECK
CLAMP
2 X 4 BLOCKING SEE ARCH. DWGS. FOR ROOF
CONSTRUCTION
1" INSULATION W/ VAPOR BARRIER INSTALLED BETWEEN
CEILING PENETRATION AND ROOF PENETRATION
PLUMBING VENT (SIZED PER RISER), FOAM IN
CEILING PENETRATION
TRANSITION
TO 4" MIN.
FLASH & COUNTER FLASH
MAX. OPENING
VENT CAP
10"
12"
FLOOR DRAIN DETAIL VENT THRU THE ROOF DETAILCLEAN OUT DETAIL 2 3
HOT WATER TANK PIPING DETAIL4
SHUTOFF VALVES
COLD WATER CONNECTION5
1" CW POC. USE EXISTING 1"
TAP FITTING OFF F/S SERVICE
UPSIZE TO NEW 11
4"
CW LINE TO BUILDING
TRAP PRIMER
CONNECTION
SCALE: NTS
SCALE: NTSSCALE: NTSSCALE: NTS
SCALE: NTS
TO M&V
SYSTEM
NEW WET PIPE F/S
ALARM VALVE
NEW DRY PIPE F/S
ALARM VALVE
F/S TO ATTIC & BOILER
MECH ROOM
F/S TO BUILDING
(LEVEL 1, FLOOR
FRAMING, LEVEL 2)
DHW-1
ASME T&P VALVE, PROVIDE
SUPPORT, ROUTE TO P-6
CONDENSATE, PROVIDE SUPPORT,
ROUTE TO P-6
HOSE BIBB
DRAIN VALVE
DRAIN PAN
INSULATION PAD
BLOCKING TO ELEVATE DRAIN PAN
TO ALLOW GRAVITY DRAIN MIN 2"
OVER P-6 RIM HEIGHT
EXISTING F/S
SUPPLY
EARTHQUAKE STRAP WATER HEATER
PRESSURE
GAUGE
RPBP-1
PRV-1
WM-1
P
EXP-1
THERMOMETER HEAT TRAP
3/4" THERMOSTATIC
MIXING VALVE SET TO
120°F
HW TO FIXTURES,
INSULATE & PROVIDE HEAT
TAPE SET TO 110°F
JONATHAN HELLER
07/07/2014 No.13805
1"Ø
1"Ø
File details come from the government source that posted it. Updated .