M-P-Drawingreplacement-20140730_A02.pdf

PDF 14 MB Posted

Attached to
Co-Located Sitka Office Renovation Federal contract opportunity
Solicitation number
AG-0116-S-14-0021
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

M-P Drawing Replacement Sheets

View the file

Other files for this federal contract opportunity

Other files attached to Co-Located Sitka Office Renovation, newest first.
File Type Posted
A09.pdf PDF
A08.pdf PDF
Sitka_Amendment_Drawings_Civil_A07.pdf PDF
Sitka_Amendment_Sign_Pages_A07.pdf PDF
A07.pdf PDF
A06.pdf PDF
A05.pdf PDF
Sig-in_sheet.pdf PDF
Pre-Proposal_Site-Visit_Agenda.pdf PDF
A04.pdf PDF
A03.pdf PDF
E1SitkaElecSitePlan-20140730_A02.pdf PDF
panel_a_woodshop_A02.pdf PDF
FlagPoleLight_A02.pdf PDF
237219FIXED_PLATE_AIR_A02.pdf PDF
260529_A02.pdf PDF
235216-BIOMASS_BOILER_A02.pdf PDF
A02.pdf PDF
236200-AIR_TO_WATER_HEAT_PUMPS_A02.pdf PDF
260548_A02.pdf PDF
221429_sf-SUMP_PUMPS_A02.pdf PDF
CreeAreaAREEDGDASpecSheet_A02.pdf PDF
panel_b_autoshop_A02.pdf PDF
211000_SF-Fire-Suppression_Systems_A02.pdf PDF
A01.pdf PDF
Factor_3_form.pdf PDF
lpta_questionnaire.pdf PDF
SitkaOfficeSiteDev_ACM_LBP_reports.pdf PDF
Factor_1_form.pdf PDF
Wage_determination.pdf PDF
D60441FINAL_sitka_geotech.pdf PDF
Factor_2_form.pdf PDF
070914_Drawings.pdf PDF
SITKA_solicitation.pdf PDF
ColocatedSitkaOfficeSiteDev7_8_14.pdf PDF
Sitka_Specifications.pdf PDF
Technical_Criteria_Pre-Notice.pdf PDF
LPTA_Factor_1_form.pdf PDF
lpta_questionnaire.pdf PDF
LPTA_Factor_3_form.pdf PDF
LPTA_Factor_2_form.pdf PDF
DRAFTColocatedSitkaOfficeSiteDev6-14-14.pdf PDF
DRAFT_Sitka_CD_Drawings.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASIS OF DESIGN:

OFFICE BUILDING:

THE OFFICE BUILDING PORTION OF THE PROJECT WILL RENOVATE AN EXISTING WAREHOUSE BUILDING (10,000 SF) AND

ADD ROUGHLY 1000 SQUARE FEET FOR A TOTAL OF 11,115 SQUARE FOOT OF OFFICE SPACE.

THE OFFICE BUILDING ONLY WILL BE A LEED V3.0 SILVER RATED BUILDING WITH AN EXPLICIT FOCUS ON ENERGY AND WATER EFFICIENCY. EQUIPMENT, SPECIFICATIONS AND SEQUENCES HAVE BEEN SELECTED TO OPTIMIZE THE ENERGY PERFORMANCE OF THE BUILDING. CONTRACTORS SHOULD FAMILIARIZE THEMSELVES WITH THE LEED RATING

PROGRAM, SUBMITTALS, AND COMMISSIONING REQUIREMENTS.

THE OFFICE BUILDING PORTION WILL INCLUDE A DIRECT DIGITAL CONTROL(DDC) SYSTEM WITH STANDALONE CONTROLS. THE DDC WILL MONITOR ZONE TEMPERATURE AND CO2 LEVELS AS WELL AS ERV SUPPLY AIR QUANTITIES.

THE BIOMASS BOILER CONTROLS, HEAT PUMP STAGING CONTROLS AND RADIANT FLOOR MIXING CONTROLS SHALL USE INCLUDED CONTROLS (BOILER) OR STANDALONE CONTROLS (HEAT PUMP STAGING AND HOT WATER MIXING).

BUILDING SHALL ALSO INCLUDE A MEASUREMENT AND VERIFICATION (M&V) SYSTEM THAT IS INSTALLED BY CONTRACTOR WITH MAJOR PANEL EQUIPMENT(ION 7550, ION 6200'S) PROVIDED BY OWNER. CONTRACTOR SHALL BUDGET FOR INSTALLATION OF OWNER PROVIDED PANEL AND ALL ACCESSORY ITEMS INCLUDING BUT NOT LIMITED TO (CT'S, SMART CT'S, BTU METERS, FLOW METERS, WATER METERS, IMMERSION TEMPERATURE SENSORS) AS DETAILED

IN M&V SHEET.

THE MAIN OFFICE BUILDING WILL BE HEATED USING A BIOMASS (PELLET WOOD) BOILER AS A PRIMARY HEAT PLANT WITH 3 HYDRONIC HEAT PUMP SYSTEMS AS A BACKUP SYSTEM. A LARGE (400 GALLON) THERMAL STORAGE TANK

WILL BE PROVIDED AND USED TO SUPPLY ALL THERMAL HEATING ENERGY FOR THE PROJECT.

HOT WATER WILL BE DELIVERED TO RADIANT FLOOR ZONES BASED ON OUTDOOR RESET WHICH VARIES THE TEMPERATURE OF THE WATER BASED ON THE OUTDOOR TEMPERATURE. ALL PRIMARY RADIANT FLOOR PUMPING TO BE VARIABLE SPEED SET TO MAINTAIN CONSTANT PRESSURE. ALL ZONES WILL USE 2-WAY ZONES VALVES CONTROLLED BY DDC. THE HYDRONIC SYSTEM WILL INCLUDE A 35% SOLUTION OF PROPYLENE GLYCOL IN WATER FOR FREEZE

PROTECT.

VENTILATION WILL BE SERVED FROM A CENTRAL ENERGY RECOVERY VENTILATION (ERV) SYSTEM SETUP TO VENTILATE THE OFFICE SPACE BASED ON CO2 CONTROL. THIS ONE ERV SYSTEM WILL DO ALL OF THE BUILDING'S AIR EXCHANGE AND EXHAUST FUNCTIONS. SUPPLY AIRFLOW TO THE BUILDING WILL BE MONITORED VIA THE DDC SYSTEM. ZONAL CO2 SENSORS WILL BE SETUP TO DISPLAY CO2 LEVELS AND TRIGGER ERV SPEED CHANGES AS REQUIRED TO MEET

ACCEPTABLE INDOOR AIR QUALITY

OCCUPANTS SHOULD HAVE CONTROL OF ZONE TEMPERATURES, OPERABLE WINDOWS AND CEILING FANS.

COMFORT COOLING WILL USE OPERABLE WINDOWS, CEILING FANS AND A SLIGHTLY NEGATIVE PRESSURE ERV SYSTEM TO PROVIDE SOME COOLING RELIEF. THE MAIN OFFICE PORTION WILL NOT BE MECHANICALLY COOLED FOR THIS

PROJECT

SHOP BUILDING:

THE EXISTING WOOD/AUTO SHOP SHALL REMODELED TO A STORAGE/AUTO SHOP. THE SHOP BUILDING IS ROUGHLY 3,065 SQUARE FEET. SHOP BUILDING WILL KEPT AT FREEZE PROTECT TEMPERATURES OF 40 DEG F. THIS IS ACCOMPLISHED USING A STANDALONE THERMOSTAT WIRED INTO A RELAY TO POWER ON OFF THE HEAT PUMPS.

VENTILATION SYSTEMS WILL BE SERVED USING A HEAT RECOVERY VENTILATION SYSTEM POWERED ON OCCUPANCY.

THE AUTO SHOP BUILDING WILL USE OPERABLE BAY DOOR AND OPERABLE WINDOWS FOR VENTILATION SYSTEMS.

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

JONATHAN HELLER

07/07/2014 No.13805

AG-0116-S-14-0021

Amendment 002

M

M

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

BIOMASS HEAT PLANT

TAG MFR MODEL OUTPUT

kBTU/hr

CAPACITY,

GAL EWT LWT GPM VOLT/PH WATTS NOTES

B-1 FROLING P4-MODEL 32 30-109 33 115 170 26 (PEAK) 240/1PH 1200

BOILER TO INCLUDE LATEST REVISION TOUCH-SCREEN DASHBOARD, INCLUSIVE DAY

HOPPER, GROUNDED PELLET FEEDER HOSES, BUFFER TANK SENSOR MANAGEMENT

PACKAGE, FLUE COLLAR ADAPTOR, OUTSIDE AIR COLLAR. INCLUDE THE FOLLOWING

ACCESSORY ITEMS: VISUALIZATION SOFTWARE, PELLET DEDUSTER

INDOOR HEAT PUMPS

TAG LOCATION/

SERVICE MFR MODEL INDOOR

UNIT TYPE

OUTDOOR

UNIT

HEAT CAPACITY

(BTUH)

COOL CAPACITY

(BTUH)

VOLTS/

PHASE

POWER

(W) MCA

WEIGHT

(LBS) NOTES

IHP-4 TELECOM

ROOM 126 MITSUBISHI PKA-A18HA4 DUCTLESS OHP-4 --- 18,000 208/1 PH 30 1 29 POWER PROVIDED BY OHP-4, STAGE 2 SERVER ROOM COOLING.

PAIR WITH T-19. SEE SEQUENCE SPEC FOR SETPOINTS

IHP-5 STORAGE MITSUBISHI PKA-A24KA4 DUCTLESS OHP-5 26,000 24,000 208/1 PH 56 1 46 POWER PROVIDED BY OHP-5. PAIR WITH T-21. ROUTE CONDENSATE

TO APPROVED LOCATION, INCLUDE PUMP IF NECESSARY

IHP-6 AUTO SHOP MITSUBISHI PKA-A24KA4 DUCTLESS OHP-6 26,000 24,000 208/1 PH 56 1 46 POWER PROVIDED BY OHP-6. PAIR WITH T-22. ROUTE CONDENSATE

TO APPROVED LOCATION, INCLUDE PUMP IF NECESSARY

IHP-7 TELECOM

ROOM 126 MITSUBISHI PKA-A18HA4 DUCTLESS OHP-7 --- 18,000 208/1 PH 30 1 29 POWER PROVIDED BY OHP-7, STAGE 3 SERVER ROOM COOLING.

PAIR WITH T-20. SEE SEQUENCE SPEC FOR SETPOINTS

OUTDOOR HEAT PUMPS

TAG SERVICE MFR MODEL

HEAT CAPACITY

@ 17F (BTUH)

COOL CAPACITY

(BTUH) SEER COP VOLTS/

PHASE MCA MOCP

WEIGHT

(LBS) NOTES

OHP-1 HEAT PUMP BOILER/RADIANT

FLOOR DAIKIN EDLQ054BA6VJU 30,100 --- ---

4.07 (@

47°F) 208/1 PH 26.5 30 397

OHP-2 HEAT PUMP BOILER/RADIANT

FLOOR DAIKIN EDLQ054BA6VJU 30,100 --- ---

4.07 (@

47°F) 208/1 PH 26.5 30 397

OHP-3 HEAT PUMP BOILER/RADIANT

FLOOR DAIKIN EDLQ054BA6VJU 30,100 --- ---

4.07 (@

47°F) 208/1 PH 26.5 30 397

OHP-4 TELECOM ROOM AC MITSUBISHI PUY-A18NHA4-BS --- 18,000 15.3 --- 208/1 PH 13 20 89

LOCATE CONDENSOR UNIT IN SHOP BUILDING (REFER TO

SHEET M2.5 FOR LOCATION). SEA COAST MODEL

OHP-5 STORAGE/SHOP MITSUBISHI PUZ-A24NHA4-BS 18,000 24,000 17 2.4 (@

17°F) 208/1 PH 18 30 165 SEA COAST MODEL

OHP-6 STORAGE/SHOP MITSUBISHI PUZ-A24NHA4-BS 18,000 24,000 17 2.4 (@

17°F) 208/1 PH 18 30 165 SEA COAST MODEL

OHP-7 TELECOM ROOM AC MITSUBISHI PUY-A18NHA4-BS --- 18,000 15.3 --- 208/1 PH 13 20 89 INSTALL WITH LOW AMBIENT COOLING BAFFLE. SEA

COAST MODEL

STORAGE TANKS

TAG MFR MODEL SIZE (GAL) DIMENSIONS (IN) NOTES

HWS-1 JOHN WOOD COMPANY 400JWHST 400 95.25x36 (H x D) ASME RATED. FIELD WRAP STORAGE TANK WITH R-14 INSULATION JACKET. INSULATE ALL CONNECTIONS AND HOT WATER

PIPING PER SPECIFICATIONS

PUMPS

TAG MFR MODEL

FLOW

(GPM)

HEAD (FT

WG) HP

PIPE

CONNECTION (IN)

MOTOR

TYPE

POWER

(W) MCA VOLTS/

PHASE

WEIGHT

(LB) NOTES

PMP-1 GRUNDFOS UP 15-42 12 5.5 1/25 1.5 PSC 85 0.74 120/1PH 7.3 BOILER CIRCULATION. CONTROLLED FROM BOILER

PMP-2 GRUNDFOS MAGNA3 40-120

FN

26.2 (MAX) 30 3/4 1.25 ECM 16-422 0.19-1.89 208/1PH 36.9

PRIMARY HYDRONIC PUMP. VARIABLE SPEED MOTOR TO BE CONTROLLED

USING AUTOADAPT PRESSURE CONTROL

PMP-3 GRUNDFOS UP 43-110 F 26.2 30 3/4 1.5 PSC 590 5.1 115/1PH 41.2 BACKUP HYDRONIC PUMP. SINGLE SPEED. MANUAL BACKUP

PMP-4 LITTLE GIANT VCMX-20ULST 0.7 15 1/30 0.125 PSC 93 1.5 115/1PH 5.5

IHP-4,7 CONDENSATE PUMP, WIRE INTO EMERGENCY POWER CIRCUIT, SEE

P2.1 FOR ROUTING DETAILS

PMP-5 STANCOR SE50 74 37 1/2 2 PSC --- --- 115/1PH --- ELEVATOR SUMP PUMP. SEE P2.0 FOR ROUTING DETAILS. SEND ALARM

SIGNAL TO DDC

PMP-6,7 BLUE DIAMOND MAXIBLUE 0.06 16.5 --- --- PSC --- --- 115/1PH 1.5 INSTALL WITH RESOVOIR SENSING OPTION

JONATHAN HELLER

07/07/2014 No.13805

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

MOTORIZED DAMPERS

TAG MFR MODEL

FLOW

(CFM)

VOLTS/

PHASE

POWER (W) NOTES

M-1 RUSKIN CD40 1400 24V/1PH 5W POWER, 1.5W HOLDING ERV-1 SUPPLY. INCLUDE BLADE EDGE SEAL. FAIL OPEN M-2 RUSKIN CD40 1400 24V/1PH 5W POWER, 1.5W HOLDING ERV-1 EXHAUST. INCLUDE BLADE EDGE SEAL. FAIL OPEN

M-3 RUSKIN CD40 300 24V/1PH 5W POWER, 1.5W HOLDING ERV-2 SUPPLY. INCLUDE BLADE EDGE SEAL. FAIL OPEN. DAMPERS OPEN WITH

RELAY FROM ERV POWER

M-4 RUSKIN CD40 300 24V/1PH 5W POWER, 1.5W HOLDING ERV-2 SUPPLY. INCLUDE BLADE EDGE SEAL. FAIL OPEN. DAMPERS OPEN WITH

RELAY FROM ERV POWER

ENERGY RECOVERY VENTILATOR

TAG MFR MODEL FLOW (CFM) RECOVERY EFF. VOLTS/ PHASE POWER (W) WEIGHT (LBS) NOTES

ERV-1 BPE (CORE ONLY) XE-MIR-2000 1400 80% --- --- 376

ERV-2 LOSSNAY LGH-F300RX3-E 300 70% 208/1 PH 260 73 SET TO EXTRA HIGH. CYCLE ON OCCUPANCY SENSOR (REFER TO SHEET M2.5 FOR SENSOR LOCATIONS)

FANS

TAG MFR MODEL FLOW (CFM) SP (") VOLTS/ PHASE PEAK WATTS OPERATING WATTS WEIGHT (LBS) NOTES

SF-1 ZIEHL-ABEGG/TMI GR35C-ZIK.DC.CR 1400 1.5 208/1PH 1350 566 39.6 1,2

EF-1 ZIEHL-ABEGG/TMI GR35C-ZIK.DC.CR 1400 1.5 208/1PH 1350 566 39.6 1,2

NOTE:

1) ECM, DIRECT DRIVE. CONTROL PER SEQUENCE OF OPERATIONS. PROVIDE VARIABLE SPEED CONTROLS, MANUAL CONTROL OF FAN AND A DDC INPUT. SEE FAN SPEC FOR DETAILS.

2) FANS ARE TO BE MOUNTED WITHIN A SELF CONTAINED INDEPENDENT MODULE. THE ASSEMBLY OF THIS MODULE IS TO BE DOUBLE WALL CONSTRUCTION. THE INNER LINING IS TO BE PERFORATED METAL CONTAINING ACOUSTICALLY RATED INSULATION, AND THE MODULE ASSEMBLY IS TO HAVE A SOLID EXTERIOR FACE. MODULE SHALL BE DESIGNED & TESTED TO REDUCE THE OUTLET SOUND FROM THE FAN BY A MINIMUM OF 15DBA. THE MATERIALS OF THE MODULES ARE TO BE GALVANIZED SHEET METAL, G90 20 GAGE.

FILTER BOXES

TAG MFR MODEL DIMENSIONS (HxWxD) RATING NOTES FB-1 CAMFIL FARR V-BANK GLIDE/PACK G/P VB 1/2X1 15 1/4x24x27 3/4 MERV 8 INITIAL 0.28" WG PRESSURE DROP OR LESS. PROVIDE

ACCESS FROM BELOW

FB-2 CAMFIL FARR V-BANK GLIDE/PACK G/P VB 1/2X1 15 1/4x24x27 3/4 MERV 8 INITIAL 0.28" WG PRESSURE DROP OR LESS. PROVIDE

ACCESS FROM BELOW

DIFFUSERS, GRILLES AND LOUVERS

TAG TYPE MFG MODEL SIZE MOUNTING FINISH

1 SIDEWALL SUPPLY TITUS 355ZRL SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT 2 CEILING 4-WAY SUPPY TITUS MCD SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT 3 CEILING RETURN TITUS 355ZRL SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT 4 SIDEWALL RETURN TITUS 355ZRL SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT

5 OUTDOOR LOUVER RUSKIN ELF375DX SEE DRAWINGS SURFACE COLOR AS SELECTED BY ARCHITECT, WEATHER-PROOFING PER

ARCHITECT INCLUDE 3/16" BUG SCREEN

EXPANSION TANK

TAG MFR MODEL VOLUME/ACCEPT. VOLUME (GAL) DIMENSIONS (DIAMxHT) EXP-1 AMTROL AX-180V 90/34 24"x60"

JONATHAN HELLER

07/07/2014 No.13805

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

CONTROLS

TAG MFR MODEL NOTES

OAM-1 EBTRON GTA116-PD MONITOR INCOMING OUTSIDE AIR QUANTITY

BSC-1 TEKMAR BOILER CONTROL 284 INCLUDE MODBUS CONNECTION, SEE SEQUENCE FOR SETUP T-1-18 --- --- ZONE SENSOR WITH TEMPERATURE DISPLAY AND LIMITED OVERRIDE CAPABILITY

T-19-22 MITSUBISHI PAR-31 MAA PROGRAMMABLE THERMOSTATS

T-23 HONEYWELL TH115 A LINE VOLTAGE T-STAT

ELECTRIC HEATER

TAG MFR MODEL OUTPUT (W) VOLTS/ PHASE NOTES

EH-1 KING 2CB1203BW 350 208/1PH USE LINE VOLTAGE PROGRAMMABLE THERMOSTAT T-23 (5-1-1)

ACCESSORY ITEMS

TAG MFR MODEL SIZE NOTES

MV-1 HONEYWELL V5013F MIXING 1" CONNECTIONS USE MC-1 TO CONTROL THIS VALVE

MC-1 LK ACASO AUTOMIX 10 5 NM TORQUE

ACTUATOR

SETUP ON OUTDOOR RESET, WATER TEMP SET TO 105F WHEN OUTSIDE IS 15 DEG F

JONATHAN HELLER

07/07/2014 No.13805

B

C

D

E

A

2 3 4 5 6 7 81

B

C

D

E

A

EXIST. STORAGE

EXIST. STORAGE

EXIST. STORAGE

EXIST. STORAGE

EXIST.FIRE SUPPRESSION EQUIP.

EXIST.STORAGE

EXIST. LAUNDRY

EXIST. TOILET

EXIST. OFFICE

EXIST. ELEVATOR

EXIST. WAREHOUSE ENTRY

EXIST. STAIRS

FIRST FLOOR MECHANCIAL DEMOLITION PLAN1

SCALE IN FEET

8 0 8 16

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

N O R T H

(E) AIR COMPRESSOR

TO BE REMOVED

REMOVE ELECTRIC

BASEBOARD

REMOVE WALL EXHAUST FAN, AN ALL

ASSOCIATED APPURTENANCES,

PATCH WALL TO MATCH EXISTING

REMOVE OIL FIRED UNIT

HEATER, STACK AND

ASSOCIATED APPURTENANCES

REMOVE FUEL OIL TANK AND

PIPING. IF TANK IS IN GOOD

USABLE CONDITION, TURN OVER

TO CONTRACTING OFFICER. IF

TANK IS IN POOR CONDITION,

LEGALLY DISPOSE OF TANK.

REMOVE ELECTRIC

BASEBOARD

REMOVE CEILING EXHAUST

FAN, DUCTWORK AND WALL

CAP REMOVE CEILING EXHAUST

FAN, DUCTWORK AND WALL

CAPREMOVE ELECTRIC

BASEBOARD

REMOVE OIL FIRED UNIT HEATER,

STACK AND ASSOCIATED

APPURTENANCES

DEMO GENERAL NOTES

JONATHAN HELLER

07/07/2014 No.13805

DN

C

D

E

A

2 3 4 5 6 7 81

B

D

E

A

C

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

REMOVE ELECTRIC

UNIT HEATER

REMOVE OIL FIRED UNIT

HEATER, STACK AND

ASSOCIATED APPURTENANCES,

PATCH CEILING AND ROOF TO

MATCH EXISTING

REMOVE OIL FIRED UNIT

HEATER, STACK AND

ASSOCIATED

APPURTENANCES, PATCH

CEILING AND ROOF TO

MATCH EXISTING

REMOVE WALL EXHAUST FAN,

DUCTWORK, BDD AND ALL

ASSOCIATED APPURTENANCES

REMOVE STACK, PATCH

CEILING AND ROOF TO

MATCH EXISTING

REMOVE STACK, PATCH

CEILING AND ROOF TO

MATCH EXISTING

DEMO GENERAL NOTES

SECOND FLOOR MECHANCIAL DEMOLITION PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

JONATHAN HELLER

07/07/2014 No.13805

RECEPTION

STOR.

LG CONFERENCE RM

SM CONFERENCE

STOR

KITCHEN

MEN

WOMEN

HALL

LEO OFFICE

OFFICE

QUIET

JAN

SUPPLY

MUD ROOM

RANGER

ENTRY VEST.

OFFICE

OPEN OFFICE

TELECOM

SPRINKLER

STAIR 2

ELEV

MECH

BOILER

STAIR 1

106MAIL

LOBBY

102 PELLET

ELECT

1 3 4 6

A

B

C

2 5 7

M3.2

M3.1

M3.2

T-20

T-19

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

OFFICE - FIRST FLOOR MECHANCIAL PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

JONATHAN HELLER

07/07/2014 No.13805

1 3 4 6

A

B

C

2 5 7

OPEN OFFICE

WOMEN

MEN

DISPATCH

OPEN OFFICE

OFFICE

QUIET

OFFICE

STAIR

STOR

SM MTG.

3.25x11" EXHAUST

RISER FROM BELOW

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

OFFICE - SECOND FLOOR MECHANCIAL PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

JONATHAN HELLER

07/07/2014 No.13805

1 3 4 62 5 7

LG CONFERENCE RM

SM CONFERENCE

STOR.

STOR

KITCHEN

MEN

WOMEN

HALL

RECEPTION

LEO OFFICE

OFFICE

QUIET

JAN

SUPPLY

MUD ROOM

RANGER

ENTRY VEST.

OFFICE

OPEN OFFICE

123 TELECOM

SPRINKLER

STAIR 2

HALL

ELEV

MECH

BOILER

STAIR 1

106MAIL

LOBBY

PELLET

ELECT

RM-1 RM-2

RM-3

RM-5

T-1

T-2 T-3

T-4

T-5

T-6 T-7

T-8

T-10

T-11

T-19

T-20

RM-4

T-9

215'

230'

150' 190'

145'

150'

195'

180'

225'

215' 260'

270'235'

150'

150'

365'

240' 120'

120'

140'

325'

320'

330'

330'

330'

310'

310'

260'

200'

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

OFFICE - FIRST FLOOR RADIANT PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

MANIFOLD ZONE TUBE

TYPE LOOP# TUBE

SPACING

LOOP

LENGTH

FLOW

(GPM)

HEAD

LOSS

(FT)

VALVE

TURNS

RM-1 T-1 PEXa 1/2" 1 9 150 0.5 2.7 2.41 T-1 PEXa 1/2" 2 9 195 0.5 3.4 3.11 T-1 PEXa 1/2" 3 9 180 0.5 3.2 2.88 T-2 PEXa 1/2" 4 9 225 0.5 4.6 3.58 T-2 PEXa 1/2" 5 9 215 0.5 4.4 3.42 T-3 PEXa 1/2" 6 9 235 0.5 4.2 3.66 T-3 PEXa 1/2" 7 9 270 0.5 4.8 4.2 T-3 PEXa 1/2" 8 9 260 0.5 4.6 4.04

RM-2 T-4 PEXa 1/2" 1 9 365 0.3 2.9 4.2 T-4 PEXa 1/2" 2 9 240 0.3 2.2 3.16 T-4 PEXa 1/2" 3 9 120 0.3 1 1.5 T-4 PEXa 1/2" 4 9 120 0.3 1 1.44

RM-3 T-5 PEXa 1/2" 1 9 215 0.9 10.4 3.93 T-5 PEXa 1/2" 2 9 230 0.9 11.1 4.2 T-6 PEXa 1/2" 3 9 150 0.5 3.1 2.92 T-7 PEXa 1/2" 4 9 190 0.9 8.8 3.56 T-8 PEXa 1/2" 5 9 155 0.4 1.7 2.83

RM-4 T-9 PEXa 1/2" 1 9 325 0.5 5 4.14 T-9 PEXa 1/2" 2 9 320 0.5 5 4.07 T-9 PEXa 1/2" 3 9 330 0.5 5.1 4.2 T-9 PEXa 1/2" 4 9 330 0.5 5.1 4.2 T-9 PEXa 1/2" 5 9 330 0.5 5.1 4.2 T-9 PEXa 1/2" 6 9 310 0.5 4.8 4.2 T-9 PEXa 1/2" 7 9 310 0.5 4.8 4.2 T-9 PEXa 1/2" 8 9 260 0.5 4.3 3.56 T-9 PEXa 1/2" 9 9 200 0.5 2.9 2.8 T-9 PEXa 1/2" 10 9 140 0.5 2.1 2.48

RM-5 T-10 PEXa 1/2" 1 9 150 0.5 3 4.07 T-11 PEXa 1/2" 2 9 150 0.4 1.6 4.2

JONATHAN HELLER

07/07/2014 No.13805

1 3 4

A

B

C

2 5 7

QUIET

MEN

WOMEN

OFFICE

SM MTG.

OFFICE

212DISPATCH

STOR

HALLWAY

OPEN OFFICE

OPEN OFFICE

STAIR 2

RM-6

RM-7

RM-8

T-12

T-13

T-14

T-15

T-16

T-17

T-18

215'

200'

140'

195'

260'

275'

200'

200' 140'

295'

195'

205'

220'

330'

330'

330'

330'

330'

330'

330'

330'

330'

330'

250'

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

OFFICE - SECOND FLOOR RADIANT PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

MANIFOLD ZONE TUBE

TYPE LOOP# TUBE

SPACING

LOOP

LENGTH

FLOW

(GPM)

HEAD

LOSS

(FT)

VALVE

TURNS

RM-6 T-12 PEXa 1/2" 1 9 215 0.6 4.8 4.2 T-12 PEXa 1/2" 2 9 200 0.6 4.6 4.01 T-13 PEXa 1/2" 3 9 140 0.3 1.3 2.67 T-14 PEXa 1/2" 4 9 195 0.5 3.6 3.91

RM-7 T-15 PEXa 1/2" 1 9 220 0.5 3.7 4.13 T-15 PEXa 1/2" 2 9 200 0.5 3.4 2.75 T-15 PEXa 1/2" 3 9 200 0.5 3.4 3.03 T-15 PEXa 1/2" 4 9 205 0.5 3.5 3.03 T-16 PEXa 1/2" 5 9 195 0.4 2.9 2.82 T-16 PEXa 1/2" 6 9 295 0.4 4.2 4.2 T-16 PEXa 1/2" 7 9 270 0.4 3.8 3.72 T-16 PEXa 1/2" 8 9 275 0.4 4.1 3.92

RM-8 T-17 PEXa 1/2" 1 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 2 9 250 0.5 4.6 3.25 T-17 PEXa 1/2" 3 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 4 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 5 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 6 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 7 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 8 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 9 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 10 9 330 0.5 5.9 4.2 T-17 PEXa 1/2" 11 9 330 0.5 5.9 4.2 T-18 PEXa 1/2" 12 9 133 0.4 1.9 1.69

JONATHAN HELLER

07/07/2014 No.13805

R E

F

1 3 4 6

A

B

C

2 5 7

LG CONFERENCE RM

SM CONFERENCE

STOR.

STOR

KITCHEN

MEN

WOMEN

HALL

RECEPTION

LEO OFFICE

OFFICE

QUIET

JAN

SUPPLY

MUD ROOM

RANGER

ENTRY VEST.

OFFICE

OPEN OFFICE

123 TELECOM

SPRINKLER

STAIR 2

HALL

ELEV

MECH

BOILER

STAIR 1

106MAIL

LOBBY

PELLET

ELECT

RM-3

RM-1

RM-2

RM-4

RM-8

RM-5

RM-6

DN

DN

DN

DN

DN

UPUP

UP

RM-7

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

HYDRONIC PIPING LAYOUT1

SCALE IN FEET

8 0 8 16

MANIFOLD FLOW (GPM) HEAD LOSS

(FT)

HEATING LOAD

(BTU/hr)

DISTANCE TO

MANIFOLD (FT)

RM-1 4.1 4.8 16,813 105

RM-2 1.2 2.9 5,071 85

RM-3 3.7 11.1 15,054 100

RM-4 4.6 5.1 19,126 70

RM-5 0.9 3 3,742 40

RM-6 2 4.8 7,473 115

RM-7 3.7 5.1 13,977 115

RM-8 6 5.9 22,566 25

TOTALS 26.2 11.1 103,822

JONATHAN HELLER

07/07/2014 No.13805

1A

3A

4A

5A

6A

2A

AABBCCDD

WATERSHED/FISH/WILDLIFE

CAGE

REDOUBT & FALLS

LAKE CAGE

ARCHEOLOGY CAGE

ENG CAGE

PLANNING S.O.

S.S.S.

WILDERNESS & LANDS

LEO

SOILS/FISH/WILDLIFE

S.O.

DISPATCH CAGE

MAINT. CAGE

DEV. REC

AUTO SHOP

FIRE

REC/LANDS S.O. CAGE

TRAILS & CABINS

CAGE

T-22

T-21

T-23

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

SHOP BUILDING - MECHANCIAL PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

JONATHAN HELLER

07/07/2014 No.13805

AIR SEPARATOR

WITH BLEED VALVE

GROUNDED PELLET FEEDER HOSE

AND RELIEF HOSE (2 TOTAL)

B-1

PELLET DAY HOPPER

WITH SCREW AUGER

FEEDER

HWS-1

FLOW SWITCH

(ALARM DDC

ON FLOW)

CITY

MAKEUP

WATER

TEMP GAUGE

(TYP)

OHP-1

OHP-2

OHP-3

RM-1 RM-2 RM-3 RM-5RM-4

RM-6 RM-7 RM-8

PRESSURE

GAUGE (TYP)

T-7

TELESTAT

(TYP)

MOTORIZED TWO

WAY VALVE

T-1

T-17

T-2

T-3

T-4 T-5

T-6

T-8

T-10

T-11 T-9

T-12

T-13

T-14

T-18

T-15

T-16

PMP-1

PMP-2

IMMERSION

TEMP. PROBE (TYP)

STRAINER (TYP)

TEMPERATURE PRESSURE

RELIEF VALVE. ROUTE TO

FLOOR DRAIN

PMP-3

SHEET NOTES

1. MANIFOLD INCLUDES TELESTATS FOR INDIVIDUAL

RADIANT TUBE FLOW CONTROL. PAIR WITH T-STATS AS

SHOWN. SEE DETAIL 3/M3.3 FOR DETAILS.

2. MANIFOLD FLOW IS CONTROLLED BY MECHANICALLY

OPERATED TWO WAY VALVE.

3. SPLIT OFFICE 212 ZONE FROM MANIFOLD. CONTROL

WITH TWO WAY VALVE.

4. ALL LOWER LEVEL MANIFOLD SUPPLY PIPING TO INCLUDE

AUTOMATIC AIR VENTS IN MECHANICAL ROOM.

5. SEE PLUMBING SCHEDULE FOR HYDRONIC MAKEUP

ACCESSORIES (RPBP-2, PRV-2, WM-2).

FM-1

WM-2

EXP-1

AUTOMATIC

AIR VENT

AIR VENTS

(TYP ALL MANIFOLDS)

GLYCOL FILL FUNNEL

PURGE VALVE

BSC-1

MV-1

OUTDOOR

AIR

SENSOR

2"

4" 3

4"

2" 1

2" 1 2" 1

2"

4" 3 4"

4" 3

4" 3 4" 3

4" 3 4" 3

4"

1" 1"

2"

2"

2"

2"

2"

2"

2"

4"

FM-2

T-2

T-1

T-4

T-3

WATER METER

PELLET

RADIANT MIXING

CONTROLLER

MC-1

4"

(TYP)

2"

2"

2"

RPBP-2

PRV-2

BTUM-2

BTUM-1

GENERAL NOTES

A. FOR ITEM NOT SCHEDULED ON M.2 & M0.3, SEE

CONTROL DRAWING M4.0. EXAMPLE: BTU METERS

B. RM - RADIANT MANIFOLD

C. FM - FUEL METER

HYDRONIC HEAT PLANT SCHEMATIC

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

JONATHAN HELLER

07/07/2014 No.13805

OFFICE

MECH

BOILER

PELLET

130 B-1

HWS-1

OHP-3

OHP-2

OHP-1

PMP-2

PMP-3

CITY MAKE

UP WATER

EXP-1

RPBP, PRV, FLOW METER, ETC.

INSTALL BELOW HYDRONIC

SUPPLY AND RETURN LINES

PMP-1

ELECTRICAL

PANEL AND CLEARANCE

HYDRONIC HEADER

MV-1

OAS-1

ALL PIPES ON INSIDE

OF EXTERIOR WALL. ROUTE

ABOVE DOOR HEADER

ROUTE AS CLOSE TO

CEILING AS POSSIBLE

CONTROLS STATION

BOILER EXHAUST, 6"

SLOPE 1/4" PER FOOT

M3.1

REFER TO ARCH SHEETS

FOR PELLET STORAGE

ROOM DETAILS

PELLET DEDUSTER

BOILER COMBUSTION AIR 6",

INTAKE ABOVE HEAT PUMPS

FM-2

FM-13' AFF

4' AFF

5.5' AFF

INSTALL AUTOMATIC AIR VENTS FOR ALL

LOWER LEVEL LOOPS IN THIS LOCATION (TYP)

PER SHEET M3.0, SHEET NOTE 4.

ROUTE WATER TO FLOOR SINK

CITY MAKE-UP WATER

CONTROLS STATION

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

ENLARGED MECH ROOM1

SCALE IN FEET

4 0 4 8

MECH ROOM PIPING2

SCALE: NTS

JONATHAN HELLER

07/07/2014 No.13805

AB

SF-1 FB-1

M-1

IHP-4

OHP-4

T-20

T-19

FIRST FLOOR DUCTING DETAIL2

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

NOT USED1

TELECOM 126 SECTION3

SCALE IN FEET

4 0 4 8

SCALE: NTS

JONATHAN HELLER

07/07/2014 No.13805

NOTES:

1) DUCT SUPPORTS TO BE DESIGNED BY

LICENSED AK STRUCTURAL ENGINEER.

SUBMITTED AS DEFERRED SUBMITTAL

1. DUCT

2. SHEET-METAL STRAP 1" WIDE OF SAME

METAL GAUGE AS DUCT

3. ANGLE - NOT LESS THAN 1"x1"x 18", SIZED

TO MATCH DUCT

4. SHEET-METAL BAND 1" WIDE OF SAME

METAL GAUGE AS DUCT

5. ALL-THREAD HANGER ROD WITH

ACCESSORIES AS USED FOR LIGHT PIPE

HANGER

CLAMP

UNISTRUT

UNISTRUT

CLAMP PIPING

CRUSH RESISTANT

INSULATION

NOTES:

1) USE ZSI CUSH-A-THERM INSULATED

PIPING CLAMP OR EQUIVALENT

2) PIPE SUPPORTS TO BE DESIGNED BY

LICENSED AK STRUCTURAL ENGINEER.

SUBMITTED AS DEFERRED SUBMITTAL

HANGER ROD

BALANCING VALVE

RETURN MANIFOLD

MOUNTING BRACKETS

BALANCING COVER

AND BALANCING VALVE

BALANCING VALVE

PEXa TUBING

END CAP

SUPPLY

MANIFOLD

THERMAL ACTUATOR

VALVE HEAD

END CAP WITH

VENT AND DRAIN

NOTE:

RADIANT MANIFOLDS 2,4,8 (RM-2,4,8) DO NOT

INCLUDE ZONAL TELESTATS OR THERMAL ACTUATORS.

MECHANICAL TWO-WAY VALVES TO CONTROL MANIFOLD FLOW.

2" PEX TUBING

AT 9" SPACING

BASE MATERIAL

SLAB INSULATION

CONCRETE TOPPING SLAB

EXISTING

CONCRETE SLAB

FOAM STAPLES OR TIED

TO CONCRETE STEEL GRID

SLAB EDGE

INSULATION

SLAB EDGE

INSULATION

2" PEX TUBING

AT 9" SPACINGBASE MATERIAL

SLAB INSULATION

CONCRETE SLAB

FOAM STAPLES OR TIED

TO CONCRETE STEEL GRID

2" PEX TUBING

AT 9" SPACING

EXISTING 1 14"

PLYWOOD SUBFLOOR

STAPLE

POURED UNDERLAYMENT

FLOOR JOIST

RIGID INSULATION

PIPE SUPPORT DETAIL2

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

DUCT SUPPORT DETAIL1RADIANT MANIFOLD DETAIL3

SCALE: NTSSCALE: NTSSCALE: NTS

RADIANT FLOOR CONSTRUCTIONS4

SCALE: NTS

JONATHAN HELLER

07/07/2014 No.13805

CT (TYP)

6200 6200 6200 6200

WM-1

(COLD WATER)

BTUM-1

(RADIANT)

BTUM-2

(BIOMASS

BOILER)

DHW-1

SMART CT

(TYP)

MAIN POWER

RECEPTACLES

(COMPUTER)

UPS INTERIOR/EXTERIOR

LIGHTING

RECEPTACLES

(NON-COMPUTER)

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

MEASUREMENT & VERIFICATION SCHEDULE

METERED ITEM DESCRIPTION PANEL DEVICE MEASUREMENT ITEM UNITS NOTES

MAIN POWER ENERGY MAIN ELECTRICAL PANEL MONITORING MAIN ION 7550 INTEGRATED DISPLAY TOTAL OFFICE BUILDING ENERGY KWH MONITOR MAIN EMERGENCY POWER ENERGY EMERGENCY POWER PANEL MONITORING BACKUP ION 6200 REMOTE DISPLAY METER EMERGENCY POWER ENERGY KWH MONITOR EMERGENCY POWER ENERGY USAGE

HVAC ENERGY HVAC SUBPANEL M1 ION 6200 REMOTE DISPLAY METER HVAC ENERGY KWH ALL HVAC ENERGY. INCLUDE BTUM-1 AND IHP/OHP-4 ENERGY INTERIOR/EXTERIOR LIGHTING ENERGY LIGHTING SUBPANEL LP1 ION 6200 REMOTE DISPLAY METER INTERIOR/EXTERIOR LIGHTING ENERGY KWH ALL LIGHTING ENERGY FROM MAIN OFFICE BUILDING

RECEPTACLE-COMPUTERS ENERGY CT AROUND COMPUTER RECEPTACLE SUBPANEL P1 ION 6200 REMOTE DISPLAY METER COMPUTER RECEPTACLE ENERGY KWH ALL COMPUTER PLUG LOADS RECEPTACLE-NON-COMPUTERS ENERGY CT AROUND NON-COMPUTER RECEPTACLE SUBPANEL CP1 ION 6200 REMOTE DISPLAY METER NON-COMPUTER RECEPTACLE ENERGY KWH ALL NON-COMPUTER PLUG LOADS

TELECOM ROOM SMART CT WITH DISPLAY NET1 SQUARE D POWERLOGIC ENERCEPT TELECOM ROOM PLUG ENERGY KWH ALL TELECOM ROOM PLUG ENERGY USAGE DHW-1 SMART CT WITH DISPLAY SQUARE D POWERLOGIC ENERCEPT DOMESTIC HOT WATER ENERGY KWH KWH USAGE OF HEAT PUMP WATER HEATER

WM-1 NEPTUNE T-10, 1" & TRICON/E3 TRANSMITTER NEPTUNE T-10 AND E3 TRANSMITTER COLD WATER USAGE GALLONS 1" COLD WATER TOTALIZER ON MAIN WATER LINE INTO THE BUILDING. CONTACT CLOSURE

OUTPUT

BTUM-1 ONICON BTU-METER RADIANT FLOOR ONICON SYSTEM-10 RADIANT FLOOR BTU METER KWH BTU METER, SAMPLE EVERY 10 SECONDS, CONVERT TO KWH

FM-1 FLOW METER, 1-1/4" PIPE CONNECTION ONICON F-1100/F-1200 INSERTION

FLOW METER RADIANT FLOOR SUPPLY FLOW RATE GPM AVG 1-1/4" FLOW METER INPUT TO BTUM-1, GPM AVERAGE ACROSS 10 SECOND INTERVAL

T1 SUPPLY IMMERSION TEMPERATURE SENSOR BTU-ST-INSTL36 SUPPLY WATER TEMPERATURE TEMP (F) IMMERSION TEMPERATURE SENSOR, SUPPLY WATER, PAIR WITH BTUM-1 T2 RETURN IMMERSION TEMPERATURE SENSOR BTU-ST-INSTL36 RETURN WATER TEMPERATURE TEMP (F) IMMERSION TEMPERATURE SENSOR, RETURN WATER, PAIR WITH BTUM-1

BTUM-2 ONICON BTU-METER BIOMASS BOILER ONICON SYSTEM-10 BIOMASS BOILER BTU METER KWH BTU METER, SAMPLE EVERY 10 SECONDS, CONVERT TO KWH

FM-2 FLOW METER, 1-1/4" PIPE CONNECTION ONICON F-1100/F-1200 INSERTION

FLOW METER RADIANT FLOOR SUPPLY FLOW RATE GPM AVG 1-1/4" FLOW METER INPUT TO BTUM-2, GPM AVERAGE ACROSS 10 SECOND INTERVAL

T3 SUPPLY IMMERSION TEMPERATURE SENSOR BTU-ST-INSTL36 SUPPLY WATER TEMPERATURE TEMP (F) IMMERSION TEMPERATURE SENSOR, SUPPLY WATER, PAIR WITH BTUM-2 T4 RETURN IMMERSION TEMPERATURE SENSOR BTU-ST-INSTL36 RETURN WATER TEMPERATURE TEMP (F) IMMERSION TEMPERATURE SENSOR, RETURN WATER, PAIR WITH BTUM-2

M&V DIAGRAM1

JONATHAN HELLER

07/07/2014 No.13805

LEGEND &

ABBREVIATIONS

THIS IS A STANDARD LEGEND, SOME SYMBOLS SHOWN

ON LEGEND ARE NOT NECESSARILY ON THE DRAWING.

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

REVISION: BY:

PLUMBING GENERAL NOTES

1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW

EXACT ROUTING OR EVERY OFFSET WHICH MAY BE

REQUIRED. THE PLUMBING CONTRACTOR IS TO

COORDINATE WITH ALL OTHER TRADES AND IS TO

VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.

2. MATERIALS, METHODS, AND INSTALLATION SHALL

COMPLY WITH THE PROVISIONS OF THE LATEST EDITION

OF THE ALASKA BUILDING ENERGY EFFICIENCY

STANDARD, UNIFORM PLUMBING CODE (UPC) WITH

ALASKA STATE AMENDMENTS, INTERNATIONAL BUILDING

CODE (IBC) WITH ALASKA STATE AMENDMENTS,

INTERNATIONAL FIRE CODE (IFC) AND OTHER APPLICABLE

STATE AND LOCAL CODES AND ORDINANCES.

3. PROVIDE EARTHQUAKE RESTRAINT FOR PLUMBING

EQUIPMENT IN ACCORDANCE WITH THE CURRENT IBC.

4. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOOR

SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED

MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND

RATING OF THE FLOOR OR WALL.

PLUMBING NARRATIVE

UTILITY REQUIREMENTS

1. WATER: AN EXISTING 6-INCH WATERLINE IS PROVIDED

TO THE WAREHOUSE BUILDING FOR DOMESTIC AND FIRE

PROTECTION SERVICE. DOMESTIC WATER PEAK FLOW

CALCS ARE ESTIMATED TO BE APPROXIMATELY 20 GPM

REQUIRING A 1.25 INCH MAIN. THE SHOP HAS A

SPRINKLER SERVICE WITH A SEPARATE WATER SERVICE,

SIZE TO BE FIELD VERIFIED.

2. SANITARY SEWER: SANITARY SEWER EXISTS TO EACH

BUILDING, SIZE TO BE FIELD VERIFIED.

3. STORM DRAINS: EXISTING ROOFS ARE SLOPED. ROOF

DRAINAGE IS CONVEYED TO SHEET DRAINAGE,

OVERLAND FLOW OR DRAINAGE DITCHES VIA GUTTERS,

NO RAIN LEADER SYSTEM IS TO BE PROVIDED.

PLUMBING

1. PLUMBING FIXTURES INCLUDING WATER CLOSETS,

URINALS AND LAVATORIES ARE VITREOUS CHINA AND

OF COMMERCIAL QUALITY. FIXTURES ARE WATER

CONSERVATION TYPE. SINKS ARE 18 GAUGE 304SS.

2. FIXTURES AND TRIM MEET ADA-ABA WHERE REQUIRED.

3. DOMESTIC HOT WATER IS GENERATED BY AN ELECTRIC

WATER HEATER (DHW-1). WATER TEMPERATURE SHALL

BE SET TO 140°F. MAIN HOT WATER LINE TO KITCHEN

SINK SHALL BE HEAT TAPED AND SET TO 110°F,

COORDINATE WITH ELECTRICAL.

4. DOMESTIC HOT AND COLD WATER IS TO BE PROVIDED

WITH PIPE INSULATION. ASSUME 1" THICK WALL

INSULATION FOR HOT WATER LINE AND 1/2" THICK WALL.

INSULATION FOR COLD.

PLUMBING FIXTURE SCHEDULE

TAG DESCRIPTION MFR MODEL NOTES W V CW HW

P-1 WATER CLOSET KOHLER K-3999 "HIGHLINE" FLOOR MOUNTED, ADA, 1.28 GPF. PROVIDE WITH

ELONGATED OPEN FRONT SEAT COVER. 4 2 1 -

P-2 URINAL ZURN Z5708.207.00 "NANO PINT" MANUAL FLUSH VALVE.

CARRIER: ZURN Z1221 2 1 1/2 3/4 -

P-3 LAVATORY AMERICAN

STANDARD 0496.221

"OVALYN" UNDER COUNTER, VITREOUS CHINA, GRID DRAIN.

FAUCET: AMERICAN STANDARD 6144.116.002, 0.5 GPM - ADA

INSTALL.

1 1/2 1 1/2 1/2 1/2

P-4 KITCHEN SINK ELKAY HD553602

"LUSTERONE" STAINLESS STEEL, SELF RIMMING.

TWO-COMPARTMENT STAINLESS STEEL COUNTER MOUNT

DROP-IN, 1.5 GPM AERATOR FAUCET WITH SPRAYER.

2 1 1/2 1/2 1/2

P-5 DRINKING FOUNTAIN ELKAY LZWS-EDFPBM117K

"SWIRLFLO" FRONT PUSH BUTTON, HOODED BUBBLER, ADA WALL

MOUNTED WITH INTEGRAL FILTERED BOTTLE FILLER. PROVIDE

ELECTRICAL CONNECTION, 115V/60HZ

2 1 1/2 1/2 -

P-6 JANITORS SINK FIAT MSBID2424 MOLDED STONE WITH INTEGRAL DRAIN. FAUCET: CHICAGO 897

WALL MOUNTED. 3 1 1/2 1/2 1/2

P-7 FLOOR DRAIN J.R. SMITH 2005-P050 DUCO CAST IRON BODY & NICKEL BRONZE HEAD. 2 1 1/2 - -

P-8 AUTOMATIC TRAP

PRIMER J.R. SMITH 2699 PROVIDE WITH ACCESS PANEL. - - 1/2 -

P-9 FLOOR SINK J.R. SMITH 3250 INDIRECT WASTE DRAIN FOR CONDENSATE, RPBP TEST DRAIN, AND ELEVATOR SUMP PUMP. 2 1 1/2 - -

P-10 HOSE BIBB J.R. SMITH 5515

1/4 TURN NON-FREEZE HYDRANT WITH AUTOMATIC DRAINING

INTEGRAL VACUUM BREAKER,

INTEGRAL SERVICE SHUT-OFF VALVE, DUAL CHECK VALVE, AND

STAINLESS STEEL BOX.

- - 3/4 -

DOMESTIC WATER HEATER

TAG LOCATION MFR MODEL

SIZE

(GAL)

HTG CAPACITY

(W)

VOLTS/

PHASE NOTES

DHW-1 FIRST FLOOR

JANITOR CLOSET AO SMITH DSE-50 50 12,000 208 / 3 "CUSTOM Xi" SERIES ELECTRIC WATER HEATER WITH 50 GPH

RECOVERY. SET TO 140°F.

DHW-2 STORAGE BUILDING

BATHROOM ARISTON GL-6+ 6 1,500 120 / 1 POINT OF USE WATER HEATER

ET-1 FIRST FLOOR

JANITOR CLOSET AMTROL ST-12C 6.4 N/A N/A 150 PSIG WORKING PRESSURE.

3.2 GALLON ACCEPT VOLUME.

DATE:

MISCELLANEOUS PLUMBING ACCESSORIES

TAG LOCATION MFR MODEL NOTES

RPBP-1 SPRINKLER ROOM WATTS 009 SERIES NOMINAL 1"

PRV-1 SPRINKLER ROOM WATTS LFN45B-EZ NOMINAL 1" CITY COLD WATER INLET, SET TO 65 PSI

WM-1 SPRINKLER ROOM NEPTUNE TRICON/E3

TRANSMITTER

NOMINAL 1", TOTALZER, 1 PULSE PER 10 GALLONS. SEND

CONTACT CLOSURE TO AEM PANEL IN IT ROOM. REQUIRES DC

SUPPLY VOLTAGE.

RPBP-2 MECHANICAL ROOM WATTS 009 SERIES 3/4" NOMINAL

PRV-2 MECHANICAL ROOM WATTS LF123LP 3/4" HYDRONIC MAKE-UP WATER INLET, SET TO 12 PSI

WM-2 MECHANICAL ROOM NEPTUNE "AQUITY" NOMINAL 3/4". NO PULSE OUTPUT, READER DIAL ONLY.

JONATHAN HELLER

07/07/2014 No.13805

C

D

E

A

2 3 4 5 6 7 81

B

C

D

E

A

EXIST. STORAGE

EXIST. STORAGE

EXIST. STORAGE

EXIST. STORAGE

EXIST.FIRE SUPPRESSION EQUIP.

EXIST.STORAGE

EXIST. LAUNDRY

EXIST. TOILET

EXIST. OFFICE

EXIST. ELEVATOR

EXIST. WAREHOUSE ENTRY

EXIST. STAIRS

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

DEMO GENERAL NOTES

SHEET NOTES

DEMO ALL (E)

W PIPING UP

TO THIS POINT

FIELD VERIFY

LOCATION OF

(E) WASTE LINE

(E) 34" WATER

SERVICE

FIRST FLOOR PLUMBING DEMOLITION PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

JONATHAN HELLER

07/07/2014 No.13805

1 3 4 6

A

B

C

2 5 7

LG CONFERENCE RM

SM CONFERENCE

STOR.

STOR

KITCHEN

MEN

WOMEN

HALL

RECEPTION

LEO OFFICE

OFFICE

QUIET

JAN

SUPPLY

MUD ROOM

RANGER

ENTRY VEST.

OFFICE

OPEN OFFICE

123 TELECOM

SPRINKLER

STAIR 2

HALL

ELEV

MECH

BOILER

STAIR 1

106MAIL

LOBBY

PELLET

ELECT

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

CONNECT11

4" CW

TO (E) WATER

SERVICE. SEE

DETAIL 5/P3.1

4" POC TO (E)

WASTE LINE

FIELD VERIFY

LOCATION OF

(E) W LINE

VTR

FD

SK

SK

DF

GCO GCO

LAV (TYP OF 4)

WC (TYP OF 2)

UR (TYP OF 2)

WC (TYP OF 4)

FD (TYP OF 4)

4" PVC @ 1% SLOPE

4"

2"

2"

SHEET NOTES

1. PLUMBER TO FIELD VERIFY LOCATION OF (E) W

LINE GCO. RELOCATE OUTSIDE OF NEW

BUILDING FOOTPRINT.

2. INDIRECT WASTE FLOOR SINK FOR RPBP TEST

DRAIN, ELEVATOR SUMP PUMP & CONDENSATE.

3. ELEVATOR SUMP (P-5) WASTE LINE UP TO

FIRST FLOOR FRAMING, ROUTE THROUGH

FLOOR JOISTS TO FLOOR SINK IN MECHANICAL

ROOM.

VTR

2"

FD

VTR

OFFICE - FOUNDATION PLUMBING PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

SKFCO

2" TRAP PRIMER LINE

2" TRAP PRIMER LINE

JONATHAN HELLER

07/07/2014 No.13805

R E

F

1 3 4 6

A

B

C

2 5 7

LG CONFERENCE RM

SM CONFERENCE

STOR.

STOR

KITCHEN

MEN

WOMEN

HALL

RECEPTION

LEO OFFICE

OFFICE

QUIET

JAN

SUPPLY

MUD ROOM

RANGER

ENTRY VEST.

OFFICE

OPEN OFFICE

123 TELECOM

SPRINKLER

STAIR 2

HALL

ELEV

MECH

BOILER

STAIR 1

106MAIL

LOBBY

PELLET

ELECT

P2.1

R E

F

STOR.

STOR

KITCHEN

MEN

WOMEN

JAN

MUD ROOM

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

WCO

WCO

MAKEUP WATER

TO BOILER

SHEET NOTES

1. CONNECT NEW11

4" CW TO (E) WATER SERVICE.

SEE DETAIL 5/P3.1.

DF ABV

4"

FD ABV

VTR

VTR

OFFICE - FIRST FLOOR PLUMBING PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

2", ROUTE IN

FLOOR JOISTS

ENLARGED PLUMBING PLAN2

TYP OF 3

TYP OF 2

FCO

TYP OF 2

JONATHAN HELLER

07/07/2014 No.13805

VTR

1 3 4

A

B

C

2 5 7

QUIET

MEN

WOMEN

OFFICE

SM MTG.

OFFICE

212DISPATCH

STOR

HALLWAY

OPEN OFFICE

OPEN OFFICE

STAIR 2

P2.2

MEN

WOMEN

OPEN OFFICE

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

VTR

OFFICE - SECOND FLOOR PLUMBING PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

ENLARGED PLUMBING PLAN2

TYP OF 2

JONATHAN HELLER

07/07/2014 No.13805

1A

3A

4A

5A

6A

2A

AABBCCDD

TRAILS & CABINS CAGE

WATERSHED/FISH/WILDLIFE

CAGE

REDOUBT & FALLS LAKE CAGE

ARCHEOLOGY CAGE

ENG CAGE

PLANNING S.O.

S.S.S.

WILDERNESS & LANDS

LEO

SOILS/FISH/WILDLIFE S.O.

DISPATCH CAGE

MAINT. CAGE

DEV. REC

AUTO SHOP

FIRE

REC/LANDS S.O. CAGE

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

SHEET NOTES

STORAGE BUILDING - PLUMBING PLAN1

SCALE IN FEET

8 0 8 16

N O R T H

JONATHAN HELLER

07/07/2014 No.13805

DHW-1

ECOTOPE

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

SCALE: NTS

PLUMBING RISER DIAGRAM

JONATHAN HELLER

07/07/2014 No.13805

4056 9th Avenue NE Seattle WA 98105

PH: (206) 322-3753

FAX: (206) 325-7270

REVISION SCHEDULE

DATE: REVISION: BY:

TILE OR CARPET COVER PER

FLOOR FINISH

CLEANOUT BOX

FACTORY COATED CAST

IRON BODY, INDEPENDENT OF

CLEANOUT BOX

NOTE: YARD CLEANOUT SIMILAR

W/24" SQ. X 4" CONCRETE PAD

FLUSH WITH FINISH GRADE.

SCORIATED C.O. COVER

Y FITTING OR COMB.

Y AND 1/8 BEND

FINISH FLOOR, FOR

DETAILS SEE ARCH.

CLEANOUT PLUG

FLOOR DRAIN SIZE

AS NOTED ON PLANS

TOPPING SLAB

TILE

WATERPROOF MEMBRANE

1-1/4" EXISTING PLYWOOD SUBFLOOR

FLASHING COLLAR & CLAMP

TO P-TRAP

UNDERDECK

CLAMP

2 X 4 BLOCKING SEE ARCH. DWGS. FOR ROOF

CONSTRUCTION

1" INSULATION W/ VAPOR BARRIER INSTALLED BETWEEN

CEILING PENETRATION AND ROOF PENETRATION

PLUMBING VENT (SIZED PER RISER), FOAM IN

CEILING PENETRATION

TRANSITION

TO 4" MIN.

FLASH & COUNTER FLASH

MAX. OPENING

VENT CAP

10"

12"

FLOOR DRAIN DETAIL VENT THRU THE ROOF DETAILCLEAN OUT DETAIL 2 3

HOT WATER TANK PIPING DETAIL4

SHUTOFF VALVES

COLD WATER CONNECTION5

1" CW POC. USE EXISTING 1"

TAP FITTING OFF F/S SERVICE

UPSIZE TO NEW 11

4"

CW LINE TO BUILDING

TRAP PRIMER

CONNECTION

SCALE: NTS

SCALE: NTSSCALE: NTSSCALE: NTS

SCALE: NTS

TO M&V

SYSTEM

NEW WET PIPE F/S

ALARM VALVE

NEW DRY PIPE F/S

ALARM VALVE

F/S TO ATTIC & BOILER

MECH ROOM

F/S TO BUILDING

(LEVEL 1, FLOOR

FRAMING, LEVEL 2)

DHW-1

ASME T&P VALVE, PROVIDE

SUPPORT, ROUTE TO P-6

CONDENSATE, PROVIDE SUPPORT,

ROUTE TO P-6

HOSE BIBB

DRAIN VALVE

DRAIN PAN

INSULATION PAD

BLOCKING TO ELEVATE DRAIN PAN

TO ALLOW GRAVITY DRAIN MIN 2"

OVER P-6 RIM HEIGHT

EXISTING F/S

SUPPLY

EARTHQUAKE STRAP WATER HEATER

PRESSURE

GAUGE

RPBP-1

PRV-1

WM-1

P

EXP-1

THERMOMETER HEAT TRAP

3/4" THERMOSTATIC

MIXING VALVE SET TO

120°F

HW TO FIXTURES,

INSULATE & PROVIDE HEAT

TAPE SET TO 110°F

JONATHAN HELLER

07/07/2014 No.13805

1"Ø

1"Ø