221429_sf-SUMP_PUMPS_A02.pdf

PDF 471 KB Posted

Attached to
Co-Located Sitka Office Renovation Federal contract opportunity
Solicitation number
AG-0116-S-14-0021
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Section 221429-Sump Pump

View the file

Other files for this federal contract opportunity

Other files attached to Co-Located Sitka Office Renovation, newest first.
File Type Posted
A09.pdf PDF
A08.pdf PDF
Sitka_Amendment_Drawings_Civil_A07.pdf PDF
Sitka_Amendment_Sign_Pages_A07.pdf PDF
A07.pdf PDF
A06.pdf PDF
A05.pdf PDF
Sig-in_sheet.pdf PDF
Pre-Proposal_Site-Visit_Agenda.pdf PDF
A04.pdf PDF
A03.pdf PDF
panel_a_woodshop_A02.pdf PDF
FlagPoleLight_A02.pdf PDF
237219FIXED_PLATE_AIR_A02.pdf PDF
260529_A02.pdf PDF
E1SitkaElecSitePlan-20140730_A02.pdf PDF
235216-BIOMASS_BOILER_A02.pdf PDF
A02.pdf PDF
236200-AIR_TO_WATER_HEAT_PUMPS_A02.pdf PDF
260548_A02.pdf PDF
CreeAreaAREEDGDASpecSheet_A02.pdf PDF
M-P-Drawingreplacement-20140730_A02.pdf PDF
panel_b_autoshop_A02.pdf PDF
211000_SF-Fire-Suppression_Systems_A02.pdf PDF
A01.pdf PDF
Wage_determination.pdf PDF
D60441FINAL_sitka_geotech.pdf PDF
Factor_2_form.pdf PDF
070914_Drawings.pdf PDF
Factor_3_form.pdf PDF
lpta_questionnaire.pdf PDF
SitkaOfficeSiteDev_ACM_LBP_reports.pdf PDF
Factor_1_form.pdf PDF
SITKA_solicitation.pdf PDF
ColocatedSitkaOfficeSiteDev7_8_14.pdf PDF
Sitka_Specifications.pdf PDF
LPTA_Factor_1_form.pdf PDF
lpta_questionnaire.pdf PDF
Technical_Criteria_Pre-Notice.pdf PDF
LPTA_Factor_3_form.pdf PDF
LPTA_Factor_2_form.pdf PDF
DRAFTColocatedSitkaOfficeSiteDev6-14-14.pdf PDF
DRAFT_Sitka_CD_Drawings.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sitka Ranger District Office Renovation Sitka, Alaska 100% Construction Documents May 23, 2014

SECTION 221429 - SUMP PUMPS

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Submittals:

1. Product Data: For each type of product indicated.

a. Include rated capacities, operating characteristics, electrical characteristics, furnished specialties, accessories, and motor horsepower,.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with UL 778 for motor-operated water pumps.

2.2 SUMP PUMPS

A. Submersible Sump Pumps: Factory-assembled and -tested, end-suction, centrifugal sump pumps as defined in HI 1.1-1.2 and HI 1, for automatic operation; with 72-inch- minimum power cord and plug.

1. Basis-of-Design Product: Product indicated on Drawings or a comparable product of one of the following:

a. Barnes; Crane Pumps & Systems.

b. Bell & Gossett Domestic Pump; ITT Corporation.

c. Flo Fab inc.

d. Glentronics, Inc.

e. Goulds Pumps; ITT Corporation.

f. Grundfos Pumps Corp.

g. Liberty Pumps.

h. Little Giant Pump Co.

i. McDonald, A. Y. Mfg. Co.

j. Pentair Pump Group; Hydromatic Pumps.

k. Pentair Pump Group; Myers.

l. Stancor, Inc.

m. Sta-Rite Industries, Inc.

n. Weil Pump Company, Inc.

o. Weinman Division; Crane Pumps & Systems.

p. Zoeller Company.

2. Casing and Impeller: Cast-iron or plastic casing with inlet strainer and metal or plastic impeller.

SUMP PUMPS 221429 - 1

AG-0116-S-14-0021

Amendment 002 http://www.specagent.com/LookUp/?uid=123456834152&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834153&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834154&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834155&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834156&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834157&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834158&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834159&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834160&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834161&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834162&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834163&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834164&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834165&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834166&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456834167&mf=04&src=wd

3. Pump and Motor Shaft: Steel, with factory-sealed, grease-lubricated ball bearings and double-mechanical seals.

4. Motor: Hermetically sealed, capacitor-start type, with built-in overload protection; three-conductor waterproof power cable of length required, and with grounding plug and cable-sealing assembly.

5. Pump Discharge Piping: Factory- or field-fabricated, ASTM A 53/A 53M, Schedule 40 galvanized-steel pipe.

6. Oil Probe: Self cleaning, hermetically sealed stainless steel oil detection probe.

7. Controls: Direct plug-in activation of entire pump and control system from the main control panel. Alarms, lights, silence switch, and remote monitoring circuit for oil, high liquid, and high amperage conditions

2.3 SUMP-PUMP BASINS AND BASIN COVERS

A. Basins: Concrete, watertight, rectangular, basin sump with top flange and sidewall openings for pipe connections.

B. Basin Covers: Fabricate metal cover with openings having gaskets, seals, and bushings; for access to pumps, pump shafts, control rods, discharge piping, vent connections, and power cables.

2.4 MOTORS

A. Comply with NEMA designation, temperature rating, service factor, enclosure type, and efficiency requirements per AHSRAE 90.1.

1. Motor Sizes: Minimum size as indicated. If not indicated, large enough so driven load will not require motor to operate in service factor range above 1.0.

2. Less Than 1/2 HP: Built-in thermal-overload protection.

3. 1/2 to 3 HP: Permanently lubricated ball bearings.

4. 5 HP and Larger: Grease-lubricated ball bearings.

5. Motor shall be non-overloading within full range of pump performance.

6. Electrical: 115V, Single Phase, see drawings.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install sewage pumps according to applicable requirements and manufacturers recommendations.

B. Install pumps with access for periodic maintenance, including removal of motors, impellers, couplings, and accessories.

C. Support pumps and piping so weight of piping is not supported by pump volute.

D. Install electrical connections for power, controls, and devices.

E. Submersible Sewage Pumps: Set pumps on basin floor. Make connections to sanitary drainage piping.

SUMP PUMPS 221429 - 2

AG-0116-S-14-0021

Amendment 002

1. Anchor guide-rail supports to basin or pit bottom and sidewall or cover.

F. Submersible Sump Pumps: Set pumps on basin, pit, or sump floor. Make connections to storm drainage piping.

G. Packaged Drainage Pump Units: Install and make connections to storm drainage piping.

H. Install swing check valve and gate or ball valve on each sewage pump discharge. Include spring-loaded or weighted-lever check valves for piping NPS 2-1/2 and larger.

I. Install swing check valve and gate or ball valve on each sump pump discharge. Include spring-loaded or weighted-lever check valves for piping NPS 2-1/2 and larger.

J. Install swing check valve and gate or ball valve on each automatic, packaged pump discharge.

END OF SECTION 221429

SUMP PUMPS 221429 - 3

AG-0116-S-14-0021

Amendment 002

PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals:
1. Product Data: For each type of product indicated.
a. Include rated capacities, operating characteristics, electrical characteristics, furnished specialties, accessories, and motor horsepower,.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
B. Comply with UL 778 for motor-operated water pumps.
2.2 SUMP PUMPS
A. Submersible Sump Pumps: Factory-assembled and -tested, end-suction, centrifugal sump pumps as defined in HI 1.1-1.2 and HI 1, for automatic operation; with 33T72-inch-33T minimum power cord and plug.
1. Basis-of-Design Product: Product indicated on Drawings or a comparable product of one of the following:
a. 41TBarnes; Crane Pumps & Systems.41T
b. 41TBell & Gossett Domestic Pump; ITT Corporation.41T
c. 41TFlo Fab inc.41T
d. 41TGlentronics, Inc.41T
e. 41TGoulds Pumps; ITT Corporation.41T
f. 41TGrundfos Pumps Corp.41T
g. 41TLiberty Pumps.41T
h. 41TLittle Giant Pump Co.41T
i. 41TMcDonald, A. Y. Mfg. Co.41T
j. 41TPentair Pump Group; Hydromatic Pumps.41T
k. 41TPentair Pump Group; Myers.41T
l. 41TStancor, Inc.41T
m. 41TSta-Rite Industries, Inc.41T
n. 41TWeil Pump Company, Inc.41T
o. 41TWeinman Division; Crane Pumps & Systems.41T
p. 41TZoeller Company.41T
2. Casing and Impeller: Cast-iron or plastic casing with inlet strainer and metal or plastic impeller.
3. Pump and Motor Shaft: Steel, with factory-sealed, grease-lubricated ball bearings and double-mechanical seals.
4. Motor: Hermetically sealed, capacitor-start type, with built-in overload protection; three-conductor waterproof power cable of length required, and with grounding plug and cable-sealing assembly.
5. Pump Discharge Piping: Factory- or field-fabricated, ASTM A 53/A 53M, Schedule 40 galvanized-steel pipe.
6. Oil Probe: Self cleaning, hermetically sealed stainless steel oil detection probe.
7. Controls: Direct plug-in activation of entire pump and control system from the main control panel. Alarms, lights, silence switch, and remote monitoring circuit for oil, high liquid, and high amperage conditions
2.3 SUMP-PUMP BASINS AND BASIN COVERS
A. Basins: Concrete, watertight, rectangular, basin sump with top flange and sidewall openings for pipe connections.
B. Basin Covers: Fabricate metal cover with openings having gaskets, seals, and bushings; for access to pumps, pump shafts, control rods, discharge piping, vent connections, and power cables.
2.4 MOTORS
A. Comply with NEMA designation, temperature rating, service factor, enclosure type, and efficiency requirements per AHSRAE 90.1.
1. Motor Sizes: Minimum size as indicated. If not indicated, large enough so driven load will not require motor to operate in service factor range above 1.0.
2. Less Than 33T1/2 HP33T: Built-in thermal-overload protection.
3. 33T1/2 to 3 HP33T: Permanently lubricated ball bearings.
4. 33T5 HP33T and Larger: Grease-lubricated ball bearings.
5. Motor shall be non-overloading within full range of pump performance.
6. Electrical: 115V, Single Phase, see drawings.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install sewage pumps according to applicable requirements and manufacturers recommendations.
B. Install pumps with access for periodic maintenance, including removal of motors, impellers, couplings, and accessories.
C. Support pumps and piping so weight of piping is not supported by pump volute.
D. Install electrical connections for power, controls, and devices.
E. Submersible Sewage Pumps: Set pumps on basin floor. Make connections to sanitary drainage piping.
1. Anchor guide-rail supports to basin or pit bottom and sidewall or cover.
F. Submersible Sump Pumps: Set pumps on basin, pit, or sump floor. Make connections to storm drainage piping.
G. Packaged Drainage Pump Units: Install and make connections to storm drainage piping.
H. Install swing check valve and gate or ball valve on each sewage pump discharge. Include spring-loaded or weighted-lever check valves for piping 33TNPS 2-1/233T and larger.
I. Install swing check valve and gate or ball valve on each sump pump discharge. Include spring-loaded or weighted-lever check valves for piping 33TNPS 2-1/233T and larger.
J. Install swing check valve and gate or ball valve on each automatic, packaged pump discharge.