9. AF IMT 3000_Material Approval Submittal.pdf

Air Force Form PDF 102 KB Posted

Attached to
Repair Overruns on Center Runway
Solicitation number
FA3099-22-R-0005
Issued by

View the file

Other versions and copies of AF Form 3000

File Revision Posted Attached to
Attachment D AF Form 3000.pdf Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 001 AF IMT 3000 Submittal.pdf Same revision and size as this file Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
G_23 05 93-1 TAB Shops - AF FORM 3000 Submittal_JV.pdf Revision not stated ASOG Complex EMCS Camp Murray, WA
AF IMT 3000 - Material Approval Submittal.pdf Same revision and size as this file Revision not stated Repair Airfield Pavement Spalling
12 AF Form 3000.pdf Revision not stated Construct T-1A Static Display
AF IMT 3000 Material Approval Submittal.pdf Revision not stated Repair Storm Drain Bldg 1788
Appendix C - AF Form 3000.pdf Revision not stated Static Display Aerospace Vehicles Restoration
Attachment 15 - AF Form 3000.pdf Revision not stated Construct Honor Guard Facility, Tyndall AFB, FL
Appendix H - AF Form 3000.pdf Revision not stated Construct AFTP Fence, Louisiana Avenue Bridge
Attachment 2_AF IMT 3000_2003091_VI_ Submittal.pdf Same revision and size as this file Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 2.10 - AF Form 3000 Material Submittals Template.pdf Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 6 - AF Form 3000.pdf Revision not stated Camp Sparta Access Road
Q- AF IMT 3000_Material Approval Submittal.pdf Revision not stated Repair South Deer Fence
J. AF IMT 3000 Material Approval Submittal.pdf Revision not stated Repair_Replace Liner, Wastewater Lagoon One
Attachment 1j Mini-MACC SOW AF IMT 3000 Submittal.pdf Same revision and size as this file Revision not stated JBER Mini-MACC
Attachment 9 AF Form 3000.pdf Revision not stated B729 Parking Lot Improvements, Tyndall AFB, FL
AF Form 3000.pdf Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
15. AF Form 3000 Material Approval Submittal (2 pages) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Attachment 10. AF Form 3000.pdf Revision not stated Repair Beacon Beach Road, Tyndall AFB, FL
Attachment 7 AF Form 3000.pdf Revision not stated Ammo Phase III
Show all 20

Who attaches AF Form 3000

Other files

File Type Posted
1C-01 AF Form 3952 Chemical Hazardous Material Request Authorization Form.pdf PDF
1C-05 LAFB Asbestos Management and Operation Plan (2019).pdf PDF
2. Wage Determination.pdf PDF
1C - LAFB Specific Environmental Specifications.pdf PDF
1C-02 Uniform Hazardous Waste Manifest.pdf PDF
4. AETC 47 - Recovered Materials Determination.pdf PDF
10. EAL Template.pdf PDF
1B - 100 Design Specifications.pdf PDF
1I - UFGS 32 12 15.13 Asphalt Paving for Airfields.pdf PDF
3. Notification of Compliance with Contract Insurance Requirements.pdf PDF
1C-03 AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
1F - DD 1354.pdf PDF
1H - UFC 3-250-03 Standard Practice for Flexible Pave.pdf PDF
1E - Progress Schedule and Progress Report.xlsx XLSX spreadsheet
6. Schedule of Material Submittals.xls XLS spreadsheet
1A - 100 Design Drawings.pdf PDF
1C-07 LAFB SWPPP (FOUO).pdf PDF
8. AF IMT Form 103_Work Clearance Request.pdf PDF
Solicitation - FA309922R0005.pdf PDF
1C-08 Hazmat Usage Log.pdf PDF
1C-06 TCEQ Multi Sector General Permit (TXR050000).pdf PDF
1C-04 TCEQ Construction General Permit (TXR150000).pdf PDF
1G - UFC 3-260-02 Pavement for Airfields.pdf PDF
7. Past Performance Questionnaire.pdf PDF
1D - AETC Installation Excellence Guide.pdf PDF
5. Financial Institution Reference Sheet.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Evaluation and Action

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

Form Approved OMB No 9000-0062 Expires May 31, 2005

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (Contractor)

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

APPROVED

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

TO Contracting Officer:
FROM Contractor:
YYYYMMDD DATE:
CONTRACT NUMBER:
SUBMISSION NUMBER:
RESUBMITTAL: Off
PREVIOUS SUBMISSION NUMBER:
PROJECT NUMBER:
ITEM NORow1:
SPECIFICATION SECTION PARA NODRAWING NORow1:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1:
INITIAL:
ITEM NORow2:
SPECIFICATION SECTION PARA NODRAWING NORow2:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2:
INITIAL_2:
ITEM NORow3:
SPECIFICATION SECTION PARA NODRAWING NORow3:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:
INITIAL_3:
ITEM NORow4:
SPECIFICATION SECTION PARA NODRAWING NORow4:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:
INITIAL_4:
ITEM NORow5:
SPECIFICATION SECTION PARA NODRAWING NORow5:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:
INITIAL_5:
ITEM NORow6:
SPECIFICATION SECTION PARA NODRAWING NORow6:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:
INITIAL_6:
ITEM NORow7:
SPECIFICATION SECTION PARA NODRAWING NORow7:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:
INITIAL_7:
ITEM NORow8:
SPECIFICATION SECTION PARA NODRAWING NORow8:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:
INITIAL_8:
ITEM NORow9:
SPECIFICATION SECTION PARA NODRAWING NORow9:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:
INITIAL_9:
ITEM NORow10:
SPECIFICATION SECTION PARA NODRAWING NORow10:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:
INITIAL_10:
ITEM NORow11:
SPECIFICATION SECTION PARA NODRAWING NORow11:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:
INITIAL_11:
YYYYMMDD DATE_2:
TYPE OR PRINT NAME AND TITLE:
TO Base Civil Engineering Officer:
For Evaluation and Action:
YYYYMMDD DATE_3:
TYPE OR PRINT NAME AND GRADE:
TO AF Contracting Office:
YYYYMMDD DATE_4:
TYPE OR PRINT NAME AND GRADE_2:
TO Contractor:
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN:
YYYYMMDD DATE_5:
TYPE OR PRINT NAME AND GRADE_3:
COMMENTS Number to correspond with applicable Item Number on reverseRow1:
COMMENTS Number to correspond with applicable Item Number on reverseRow2:
COMMENTS Number to correspond with applicable Item Number on reverseRow3:
COMMENTS Number to correspond with applicable Item Number on reverseRow4:
COMMENTS Number to correspond with applicable Item Number on reverseRow5:
COMMENTS Number to correspond with applicable Item Number on reverseRow6:
COMMENTS Number to correspond with applicable Item Number on reverseRow7:
COMMENTS Number to correspond with applicable Item Number on reverseRow8:
COMMENTS Number to correspond with applicable Item Number on reverseRow9:
COMMENTS Number to correspond with applicable Item Number on reverseRow10:
COMMENTS Number to correspond with applicable Item Number on reverseRow11:
COMMENTS Number to correspond with applicable Item Number on reverseRow12:
COMMENTS Number to correspond with applicable Item Number on reverseRow13:
COMMENTS Number to correspond with applicable Item Number on reverseRow14:
COMMENTS Number to correspond with applicable Item Number on reverseRow15:
COMMENTS Number to correspond with applicable Item Number on reverseRow16:
COMMENTS Number to correspond with applicable Item Number on reverseRow17:
COMMENTS Number to correspond with applicable Item Number on reverseRow18:
COMMENTS Number to correspond with applicable Item Number on reverseRow19:
COMMENTS Number to correspond with applicable Item Number on reverseRow20:
Check Box1: Off
Check Box2: Off
Check Box5: Off
Check Box3: Off
Check Box4: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off

File details come from the government source that posted it. Updated .