1E - Progress Schedule and Progress Report.xlsx

XLSX spreadsheet 147 KB Posted

Attached to
Repair Overruns on Center Runway
Solicitation number
FA3099-22-R-0005
Issued by

View the file

Other files

File Type Posted
1C-01 AF Form 3952 Chemical Hazardous Material Request Authorization Form.pdf PDF
1C-05 LAFB Asbestos Management and Operation Plan (2019).pdf PDF
9. AF IMT 3000_Material Approval Submittal.pdf PDF
2. Wage Determination.pdf PDF
1C - LAFB Specific Environmental Specifications.pdf PDF
1C-02 Uniform Hazardous Waste Manifest.pdf PDF
4. AETC 47 - Recovered Materials Determination.pdf PDF
10. EAL Template.pdf PDF
1B - 100 Design Specifications.pdf PDF
1I - UFGS 32 12 15.13 Asphalt Paving for Airfields.pdf PDF
3. Notification of Compliance with Contract Insurance Requirements.pdf PDF
1C-03 AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
1F - DD 1354.pdf PDF
1H - UFC 3-250-03 Standard Practice for Flexible Pave.pdf PDF
6. Schedule of Material Submittals.xls XLS spreadsheet
1A - 100 Design Drawings.pdf PDF
1C-07 LAFB SWPPP (FOUO).pdf PDF
8. AF IMT Form 103_Work Clearance Request.pdf PDF
Solicitation - FA309922R0005.pdf PDF
1C-08 Hazmat Usage Log.pdf PDF
1C-06 TCEQ Multi Sector General Permit (TXR050000).pdf PDF
1C-04 TCEQ Construction General Permit (TXR150000).pdf PDF
1G - UFC 3-260-02 Pavement for Airfields.pdf PDF
7. Past Performance Questionnaire.pdf PDF
1D - AETC Installation Excellence Guide.pdf PDF
5. Financial Institution Reference Sheet.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK SHEET

1. CONTRACT NUMBER:
2. STARTING DATE:
3. COMPLETION DATE:
4. PURCHASE REQUEST NO.:
5. PROJECT NUMBER:
6. ACTUAL START DATE:
7. ACTUAL COMPLETION DATE:
8. PROJECT TITLE:
9. SUBMITTED BY:
10. CONTRACT AMOUNT:
TIME CALCULATION
START DATENUMBER OF DAYS GIVENCOMPLETION DATE
31-Dec-99031-Dec-99
NO.WORK ELEMENTSLINE $ AMOUNTPERCENTAGE OF CONTRACT
1ERROR:#DIV/0!
2ERROR:#DIV/0!
3ERROR:#DIV/0!$43,488.12
4ERROR:#DIV/0!
5ERROR:#DIV/0!ERROR:#REF!
6ERROR:#DIV/0!ERROR:#REF!3401.86
7ERROR:#DIV/0!
8ERROR:#DIV/0!
9ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
10ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
11ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
12ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
13ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
14ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
15ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
16ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
17ERROR:#DIV/0!
18ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
19ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
20ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
21ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
22ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
23ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
24ERROR:#DIV/0!
25ERROR:#DIV/0!
26ERROR:#DIV/0!
27ERROR:#DIV/0!ERROR:#REF!ERROR:#REF!
28ERROR:#DIV/0!
29ERROR:#DIV/0!
30ERROR:#DIV/0!
31ERROR:#DIV/0!
32ERROR:#DIV/0!
33ERROR:#DIV/0!
34ERROR:#DIV/0!
35ERROR:#DIV/0!
36ERROR:#DIV/0!
37ERROR:#DIV/0!
38ERROR:#DIV/0!
39ERROR:#DIV/0!
40ERROR:#DIV/0!
41ERROR:#DIV/0!
TOTAL WORK0.00ERROR:#DIV/0!

WORK SHEET (2)

1. CONTRACT NUMBER:FA3099-09-D-0001-0002
2. STARTING DATE:25-Jan-10
3. COMPLETION DATE:23-Jun-10
4. PURCHASE REQUEST NO.:
5. PROJECT NUMBER:MXDP-1037
6. ACTUAL START DATE:
7. ACTUAL COMPLETION DATE:
8. PROJECT TITLE:Re-Route Arantz & 7th St
9. SUBMITTED BY:Jody Spear
10. CONTRACT AMOUNT:$480,407.79
TIME CALCULATION
START DATENUMBER OF DAYS GIVENCOMPLETION DATE
25-Jan-1015023-Jun-10
LINE NO.WORK ELEMENTSLINE $ AMOUNTESTIMATED PERCENTAGE OF CONTRACTPERCENTAGE OF CONTRACT
A1.2044090954
1BOND$9,420.001.96%0.00%9420
2MOBILIZATION$13,606.002.83%0.00%$16,387.19
3DESIGN SERVICES$60,000.0012.49%0.00%$72,264.55
4TESTING OF ASBESTOS / LEAD$2,000.000.42%0.00%$2,408.82
5TRAFFIC CONTROL / SAFETY PLAN$11,298.002.35%0.00%$13,607.41
6LOCATE EXISTING UTILITIES$7,500.001.56%0.00%$9,033.07
7RELOCATE EXISTING ELECTRICAL$20,000.004.16%0.00%$24,088.18
8RELOCATE EXISTING GAS$6,200.001.29%0.00%$7,467.34
9RELOCATE EXISTING WATER & FIRE HYDRANT$17,500.003.64%0.00%$21,077.16
10DEMO OF TEMPORARY LIVING FACILITY$16,000.003.33%0.00%$19,270.55
11DEMO OF CONCRETE FOUNDATION/ DRIVEWAYS$13,500.002.81%0.00%$16,259.52
12DEMO OF ROADWAY$19,912.004.14%0.00%$23,982.19
13DEMO OF LANDSCAPING / TREES$11,500.002.39%0.00%$13,850.70
14CLEARING / CLEANING$15,500.003.23%0.00%$18,668.34
15EROSION CONTROL$12,354.002.57%0.00%$14,879.27
16RECONSTRUCT NEW ROAD SUB GRADE$26,896.005.60%0.00%$32,393.79
17RECONSTRUCT OF BASE MATERIAL$12,726.002.65%0.00%$18,327.89
18RECONSTRUCT NEW ASPHALT$66,146.0013.77%0.00%$79,666.84
19RECONSTRUCT OF CURBS / GUTTERS$24,535.005.11%0.00%$29,550.18
20RECONSTRUCT OF NEW SIDE WALKS$12,172.002.53%0.00%$14,660.07
21INSTALL NEW PAVEMENT MARKINGS$4,905.001.02%0.00%$8,079.18
22SIGNAGE$5,000.001.04%0.00%$3,021.47
23PLANT TREES/ SCRUBS$5,000.001.04%0.00%$6,022.05
24GRADING OF TOPSOIL$3,000.000.62%0.00%$3,613.23
25HYDRO MULCH$2,000.000.42%0.00%$533.50
26CLOSE OUT DOCUMENTATION$0.000.00%0.00%$1,875.32
TOTAL WORK$398,670.0082.99%0.00%480407.79040002

PROGRESS SCHEDULE

CONTRACT PROGRESS SCHEDULENOTICE TO PROCEED:
(SEE CONTRACTOR'S INSTRUCTIONS ON REVERSE)
1. CONTRACT NO.8. PROJECT TITLE11. APPROVAL RECOMMENDED BY:
00DATE SIGNEDINSTALLATIONS ENGINEER'S SIGNATURE
2. STARTING DATEDecember 31, 1899
3. COMPLETION DATEDecember 31, 18999. SUBMITTED BY:
4. PURCHASE REQUEST NO.0DATE SIGNED10. CONTRACTOR'S NAME & ADDRESSCONTRACTOR'S SIGNATURE12. APPROVED BY:
5. PROJECT NO.0DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATEDecember 31, 1899
7. ACTUAL COMPLETION DATE
Report ---------->
LINE NO.WORK ELEMENTS%29-Feb14-Mar28-Mar11-Apr25-Apr9-May23-May15-Jun29-Jun13-Jul27-Jul10-Aug24-Aug7-Sep21-Sep5-Oct19-Oct2-Nov16-Nov30-Nov14-Dec28-Dec11-Jan25-Jan8-Feb13-Feb27-Feb13-Mar27-Mar10-Apr24-Apr8-May22-May5-Jun19-Jun3-Jul17-Jul31-Jul14-Aug28-Aug11-Sep25-Sep9-Oct23-Oct
ABCD13-Mar27-Mar10-Apr24-Apr8-May22-May5-Jun28-Jun12-Jul26-Jul9-Aug23-Aug6-Sep20-Sep4-Oct18-Oct1-Nov15-Nov29-Nov13-Dec27-Dec10-Jan24-Jan7-Feb12-Feb26-Feb12-Mar26-Mar9-Apr23-Apr7-May21-May4-Jun18-Jun2-Jul16-Jul30-Jul13-Aug27-Aug10-Sep24-Sep8-Oct22-Oct5-Nov
10ERROR:#DIV/0!0.00%
0.00%
20ERROR:#DIV/0!0.00%
0.00%
30ERROR:#DIV/0!0.00%
0.00%
40ERROR:#DIV/0!0.00%
0.00%
50ERROR:#DIV/0!0.00%
0.00%
60ERROR:#DIV/0!0.00%
0.00%
70ERROR:#DIV/0!0.00%
0.00%
80ERROR:#DIV/0!0.00%
0.00%
90ERROR:#DIV/0!0.00%
0.00%
100ERROR:#DIV/0!0.00%
0.00%
110ERROR:#DIV/0!0.00%
0.00%
120ERROR:#DIV/0!0.00%
0.00%
130ERROR:#DIV/0!0.00%
0.00%
140ERROR:#DIV/0!0.00%
0.00%
150ERROR:#DIV/0!0.00%
0.00%
160ERROR:#DIV/0!0.00%
0.00%
170ERROR:#DIV/0!0.00%
0.00%
180ERROR:#DIV/0!0.00%
0.00%
190ERROR:#DIV/0!0.00%
0.00%
200ERROR:#DIV/0!0.00%
0.00%
210ERROR:#DIV/0!0.00%
0.00%
220ERROR:#DIV/0!0.00%
0.00%
230ERROR:#DIV/0!0.00%
0.00%
240ERROR:#DIV/0!0.00%
0.00%
250ERROR:#DIV/0!0.00%
0.00%
260ERROR:#DIV/0!0.00%
0.00%
270ERROR:#DIV/0!0.00%
0.00%
280ERROR:#DIV/0!0.00%
0.00%
290ERROR:#DIV/0!0.00%
0.00%
300ERROR:#DIV/0!0.00%
0.00%
310ERROR:#DIV/0!0.00%
0.00%
320ERROR:#DIV/0!0.00%
0.00%
330ERROR:#DIV/0!0.00%
0.00%
340ERROR:#DIV/0!0.00%
0.00%
350ERROR:#DIV/0!0.00%
0.00%
360ERROR:#DIV/0!0.00%
0.00%
370ERROR:#DIV/0!0.00%
0.00%
380ERROR:#DIV/0!0.00%
0.00%
390ERROR:#DIV/0!0.00%
0.00%
400ERROR:#DIV/0!0.00%
0.00%
410ERROR:#DIV/0!0.00%
0.00%
SCHEDULED COMPLETIONWKLY ------------------>ERROR:#DIV/0!0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
TOTAL ---------------->0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL COMPLETIONWKLY ------------------>0.00%
TOTAL ---------------->

Data matches "Actual Completion Total" for Progress Chart

PROGRESS CHART

Actual 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scheduled 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PROGRESS REPORT

CONTRACT PROGRESS REPORTPROJECT TITLE:Progress Schedule
0Column
CONTRACTORADDRESSL
Precision Construction Group, LLC8621 Glenmont Dr, North Richland Hills, TX, 76182
REPORTPERIOD COVERED:PROJECT NO.CONTRACT NO.COMPLETION DATE
NO:FROM:TO:0031-Dec-99
339-Oct22-Oct1 Last Period1 This Period2 Last Period2 This Period3 Last Period3 This Period4 Last Period4 This Period5 Last Period5 This Period6 Last Period6 This Period7 Last Period7 This Period8 Last Period8 This Period9 Last Period9 This Period10 Last Period10 This Period
NO.WORK ELEMENT% OF TOTAL JOB% LAST PERIOD% THIS PERIODTOTAL % COMPLETEL0L0.00%L0L0.00%L0L0.00%L0L0.00%L0L0.00%L0L0.00%L0L0.00%L0L0.00%L0L0.00%L0L
10ERROR:#DIV/0!0.00%0.00%0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M0.00%M
20ERROR:#DIV/0!0.00%0.00%0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N0.00%N
30ERROR:#DIV/0!0.00%0.00%0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O0.00%O
40ERROR:#DIV/0!0.00%0.00%0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P0.00%P
50ERROR:#DIV/0!0.00%0.00%0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q0.00%Q
60ERROR:#DIV/0!0.00%0.00%0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R0.00%R
70ERROR:#DIV/0!0.00%0.00%0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S0.00%S
80ERROR:#DIV/0!0.00%0.00%0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T0.00%T
90ERROR:#DIV/0!0.00%0.00%0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U0.00%U
100ERROR:#DIV/0!0.00%0.00%0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V0.00%V
110ERROR:#DIV/0!0.00%0.00%0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W0.00%W
120ERROR:#DIV/0!0.00%0.00%0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X0.00%X
130ERROR:#DIV/0!0.00%0.00%0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y0.00%Y
140ERROR:#DIV/0!0.00%0.00%0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z0.00%Z
150ERROR:#DIV/0!0.00%0.00%0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA0.00%AA
160ERROR:#DIV/0!0.00%0.00%0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB0.00%AB
170ERROR:#DIV/0!0.00%0.00%0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC0.00%AC
180ERROR:#DIV/0!0.00%0.00%0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD0.00%AD
190ERROR:#DIV/0!0.00%0.00%0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE0.00%AE
200ERROR:#DIV/0!0.00%0.00%0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF0.00%AF
210ERROR:#DIV/0!0.00%0.00%0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG0.00%AG
220ERROR:#DIV/0!0.00%0.00%0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH0.00%AH
230ERROR:#DIV/0!0.00%0.00%0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI0.00%AI
240ERROR:#DIV/0!0.00%0.00%0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ0.00%AJ
250ERROR:#DIV/0!0.00%0.00%0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK0.00%AK
260ERROR:#DIV/0!0.00%0.00%0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL0.00%AL
270ERROR:#DIV/0!0.00%0.00%0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM0.00%AM
280ERROR:#DIV/0!0.00%0.00%0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN0.00%AN
290ERROR:#DIV/0!0.00%0.00%0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO0.00%AO
300ERROR:#DIV/0!0.00%0.00%0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP0.00%AP
310ERROR:#DIV/0!0.00%0.00%0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ0.00%AQ
320ERROR:#DIV/0!0.00%0.00%0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR0.00%AR
330ERROR:#DIV/0!0.00%0.00%0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS0.00%AS
340ERROR:#DIV/0!0.00%0.00%0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT0.00%AT
350ERROR:#DIV/0!0.00%0.00%0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU0.00%AU
360ERROR:#DIV/0!0.00%0.00%0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV0.00%AV
370ERROR:#DIV/0!0.00%0.00%0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW0.00%AW
380ERROR:#DIV/0!0.00%0.00%0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX0.00%AX
390ERROR:#DIV/0!0.00%0.00%0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY0.00%AY
400ERROR:#DIV/0!0.00%0.00%0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ0.00%AZ
410ERROR:#DIV/0!0.00%0.00%0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA0.00%BA
TOTALERROR:#DIV/0!0.00%0.00%0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB0.00%BB
REMARKSBC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC0.00%BC
Scheduled0.00%ActualBD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD0.00%BD
BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE0.00%BE
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may beBF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF0.00%BF
used for computing progress payments.BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG0.00%BG
PROGRESS OR COMPLETION CERTIFICATEBH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH0.00%BH
I hereby certify that the contractor has satisfactory completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR
CONTRACTOR
TYPE NAME AND TITLESIGNATUREDATE
BASE CIVIL ENGINEER
TYPE NAME AND TITLESIGNATUREDATE
REVIEWED BY OR CONTRACTING OFFICER
TYPE NAME AND TITLESIGNATUREDATE

This is the start of the file's text. The full file is on GovTribe.