7. Past Performance Questionnaire.pdf

PDF 80 KB Posted

Attached to
Repair Overruns on Center Runway
Solicitation number
FA3099-22-R-0005
Issued by

View the file

Other files

File Type Posted
1C-01 AF Form 3952 Chemical Hazardous Material Request Authorization Form.pdf PDF
1C-05 LAFB Asbestos Management and Operation Plan (2019).pdf PDF
9. AF IMT 3000_Material Approval Submittal.pdf PDF
2. Wage Determination.pdf PDF
1C - LAFB Specific Environmental Specifications.pdf PDF
1C-02 Uniform Hazardous Waste Manifest.pdf PDF
4. AETC 47 - Recovered Materials Determination.pdf PDF
10. EAL Template.pdf PDF
1B - 100 Design Specifications.pdf PDF
1I - UFGS 32 12 15.13 Asphalt Paving for Airfields.pdf PDF
3. Notification of Compliance with Contract Insurance Requirements.pdf PDF
1C-03 AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
1F - DD 1354.pdf PDF
1H - UFC 3-250-03 Standard Practice for Flexible Pave.pdf PDF
1E - Progress Schedule and Progress Report.xlsx XLSX spreadsheet
6. Schedule of Material Submittals.xls XLS spreadsheet
1A - 100 Design Drawings.pdf PDF
1C-07 LAFB SWPPP (FOUO).pdf PDF
8. AF IMT Form 103_Work Clearance Request.pdf PDF
Solicitation - FA309922R0005.pdf PDF
1C-08 Hazmat Usage Log.pdf PDF
1C-06 TCEQ Multi Sector General Permit (TXR050000).pdf PDF
1C-04 TCEQ Construction General Permit (TXR150000).pdf PDF
1G - UFC 3-260-02 Pavement for Airfields.pdf PDF
1D - AETC Installation Excellence Guide.pdf PDF
5. Financial Institution Reference Sheet.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

SECTION A: CONTRACTOR INFORMATION

1. Contractor’s Name and Address:

2. Point of Contact:

3. Phone Number:

4. Contract Number: Contract Type:

5. Project Title:

6. Period of Performance:

SECTION B: RESPONDENT INFORMATION (To Be Completed By Evaluation Respondent)

1. Respondent’s Company Name & Address:

2. Respondent’s Name:

3. Phone Number: Fax Number:

E-Mail:

4. Contract Number: Contract Type:

5. Award Amount: Final Amount:

6. Project Title:

7. Period of Performance:

C. Email COMPLETED QUESTIONNAIRE FORM TO: Ms. Tacy Boje at tacy.boje.1@us.af.mil or to Lt Candice Arcuri at candice.arcuri@us.af.mil

THIS FORM MUST BE RETURNED NO LATER THAN: Proposal due date at 2:30PM Central Standard Time.

D. PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 6 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2.

1 2 3 4 5 6 Unsatisfactory Marginal None Satisfactory Very Good Exceptional

Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.

Performance did not meet some contractual requirements.

There were problems, some of a serious nature, for which corrective action was only marginally effective.

No record of past performance or the record is inconclusive.

Performance met contract requirements.

There were some minor problems and corrective actions taken by the contractor were satisfactory.

Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems which the contractor resolved in a timely, effective manner.

Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner

1. Developed realistic progress schedules and completed the project within 1 2 3 4 5 6 N/A the established schedule.

COMMENTS/REMARKS:________________________________________________________________________

2. Provided experienced superintendent, managers, and supervisors, with 1 2 3 4 5 6 N/A the technical and administrative abilities to meet requirements.

COMMENTS/REMARKS:________________________________________________________________________

3. Adequately controlled performance of subcontractors. 1 2 3 4 5 6 N/A COMMENTS/REMARKS:________________________________________________________________________

4. Provided effective quality control which resulted in a quality finished product. 1 2 3 4 5 6 N/A COMMENTS/REMARKS:________________________________________________________________________

5. Provided submittals in a timely manner. Submittals were 1 2 3 4 5 6 N/A well researched and clearly identified the proposed item.

COMMENTS/REMARKS:________________________________________________________________________

6. Identified problems as they occurred. Suggested approaches to resolving problems. 1 2 3 4 5 6 N/A Displayed initiative and cooperation in solving problems. Provided adequate information and pricing for change orders and negotiated them in good faith.

COMMENTS/REMARKS:________________________________________________________________________

7. Provided timely resolution of punch list items and closeout documentation. 1 2 3 4 5 6 N/A COMMENTS/REMARKS:________________________________________________________________________

8. Was the contractor assessed liquidated damages? YES NO (If Yes, briefly explain the circumstances)

9. Based on the contractor’s overall performance, would you rehire this contractor? YES NO

OVERALL PERFORMANCE RATING ___________________________________________________

Signature of Rater: ________________________________________________________ Date: ________________

1 Contractors Name and Address 1:
1 Contractors Name and Address 2:
1 Contractors Name and Address 3:
1 Contractors Name and Address 4:
2 Point of Contact:
3 Phone Number:
4 Contract Number:
Contract Type:
e:
od of Performance:
1:
2:
3:
4:
2 Respondents Name:
3 Phone Number_2:
Fax Number:
EMail:
4 Contract Number_2:
Contract Type_2:
5 Award Amount:
Amount:
e_2:
od of Performance_2:
No record of past performance or the record s nconclusive:
c progress schedules and comp:
COMMENTSREMARKS:
and administrat:
COMMENTSREMARKS_2:
led performance of subcontractors:
COMMENTSREMARKS_3:
4 Provided effective quality control wh:
COMMENTSREMARKS_4:
l researched and clearly identified the proposed item:
COMMENTSREMARKS_5:
ng for change orders and negot:
COMMENTSREMARKS_6:
COMMENTSREMARKS 1:
COMMENTSREMARKS 2:
If Yes br 1:
If Yes br 2:
OVERALL PERFORMANCE RATING:
gnature of Rater:
Date:

File details come from the government source that posted it. Updated .