Final RFP 80GSFC22R0055 Questions and Responses 2.23.23.pdf

PDF 224 KB Posted

Attached to
Request for Proposal Geostationary Extended Observations (GeoXO) Sounder (GXS) Instrument Implementation
Solicitation number
80GSFC22R0055
Issued by

About this file

This document contains responses to questions from offerors on a Request for Proposal for the Geostationary Extended Observations Sounder instrument implementation. The solicitation seeks the design, development, fabrication, integration, calibration, testing, evaluation, launch support, and 10 years of operations and 5 years of storage for two flight model instruments. Key details include that the contract type will be cost-plus-award-fee, with optional line items for an additional flight model and spare. The anticipated period of performance is 15 years per instrument. The draft RFP is planned for release in December 2022 with questions due by the specified date, and the final RFP planned for January to February 2023. The soliciting agency is NASA Goddard Space Flight Center. Offerors should monitor the Sam.gov website for solicitation documents and amendments.

View the file

Other files

File Type Posted
GXS RFP Cost Exhibits Amendment 1.pdf PDF
Amendment 1 Attachment D GXSUIID.pdf PDF
Amendment 1 Attachment E IMAR.pdf PDF
Amendment 1 Cover page - SF 30.pdf PDF
Amendment 1 - Continuation pages.pdf PDF
Final Attach R.pdf PDF
Final GXS RFP Cost Exhibits Feb 2023.pdf PDF
Final Attachment A SOW.pdf PDF
Final Attachment B PORD.pdf PDF
Final Attach K SB plan.pdf PDF
GXS 80GSFC22R0055 Final .pdf PDF
Final Attachment M IT ADL.pdf PDF
Final Attach J.pdf PDF
Final Attachment E IMAR.pdf PDF
Final Attachment G EDM.pdf PDF
Final GXS RFP Cover Letter 1.pdf PDF
Final Attachment W OCI Plan.pdf PDF
Final Attach H.pdf PDF
Final Attach V.pdf PDF
Final RFP SF33 GXS.pdf PDF
Final Encl A ITSMP.pdf PDF
Final Attachment D GXSUIID.pdf PDF
Final Attachment C GIRD.pdf PDF
Final Attachment N QASP.pdf PDF
Final Attachment I OCI DRD.pdf PDF
Final Encl B Perf Eval Plan.pdf PDF
Final Attachment F CDRL.pdf PDF
Final Attachment P.pdf PDF
Final Attachment X DEIA Plan.pdf PDF
Final Attach L.pdf PDF
Final RFP WBS Dic Rev.pdf PDF
Final Attach T DEIA DRD.pdf PDF
Final Attachment S CONOPS.pdf PDF
Final Attachment Q GRDDP.pdf PDF
Final Exhibit 8 PPQ.pdf PDF
Final Attachment U FPGA.pdf PDF
GXS Instrument DRFP Questions and Responses.pdf PDF
Attachment O GXS WBS dictionary.pdf PDF
Attachment W - OCI Plan.pdf PDF
Enclosure A ITSMP TMPLT.pdf PDF
Attachment S GeoXO_ConOps.pdf PDF
Attachment B GXSPORD.pdf PDF
GXS DRFP 80GSFC22R0055 Final.pdf PDF
Attachment P GXS Rad Upwelling.pdf PDF
Attachment T DEIA Plan DRD.pdf PDF
Attachment R GeoXO REED.pdf PDF
Attachment G EDM.pdf PDF
Attachment V Req Statements List.pdf PDF
Attachment U GeoXO FPGA.pdf PDF
GXS DRFP Cover Letter.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GXS Instrument Implementation

Final RFP 80GSFC22R0055

Questions and Responses

5 Final GXS RFP Cost Exhibits, pg 9):

This page is titled Exhibit 3A Labor Dollars. Should this be Exhibit

3C Labor Dollars?

The Cost Exhibit, page 9 is mislabled and should read “Exhibit 3C Labor Dollars”. The Cost Exhibit will be updated.

6 Final Attachment E IMAR, ID IMAR791:

IMAR791 contains a reference to GXISOW898. Was this reference of only the GXISOW intentional or should it also reference the similar requirement in the GXSSOW

(GXSSOW805)?

Attachment E, IMAR will be updated to be inclusive of GXSSOW805.

7 (Final Attachment D GXSUIID, ID GXSUIID145):

GXSUIID145 references 418-XO-GXIGIRD-0025, which is an older version of the IMAR. Can you confirm this reference should be 418-XO-GIRD-0041 GeoXO GIRD?

Attachment D, GXSUIID will be updated to refer to the correct version of the GIRD.

(Final Attachment B PORD & Final Attachment G EDM):

Final Attachment G EDM states in the definition for Qualification

Unit that, “Qualification is achieved through either a Protoflight or Prototype test program. For GeoXO, the Qualification Unit is the Protoflight Unit.” The underlined statement appears to conflict with GXSPORD1222 & GXSPORD1223 that reference qualification with “a non-flight prototype”. Please clarify which takes precedence.

There is no precedence. The statement in Attachment G does not prohibit prototype qualification on prototype EDU/EDMs, such as GXSPORD1222 requires under certain conditions.

9 Should the contractor include storage costs for the instrument(s) at our facility or should we assume immediate shipment upon completion to the spacecraft provider?

You should not assume immediate shipment upon completion to the spacecraft provider.

Attachment A, GeoXO GXS Statement of Work (418-XO-GXSSOW-113) discusses storage in Section 6.4.2.0-1 and specifies “The Contractor shall store the Instrument FM at the Contractor's facility until needed at the Spacecraft Contractor's facility. The period of ground storage will be no more than five years”.

File details come from the government source that posted it. Updated .