This document consists of an amendment to a request for proposal and a related federal contract opportunity notice. The amendment updates attachments and provisions related to requirements for a Geostationary Extended Observations Sounder instrument to fly on NASA's GeoXO program satellites. Key details include updating interface documents and assurance requirements, revising subcontract and staffing approach language, and adjusting cost volume exhibits. The federal contract opportunity is for the implementation phase of the GeoXO Sounder instrument and includes tasks to design, develop, integrate, test, evaluate, and support the instrument through launch and operations. The anticipated contract award date is late August 2023 for a cost-plus-award-fee contract to develop one flight model instrument and options for an additional flight model and spare. The period of performance is anticipated to be 15 years of on-orbit operations and storage for each flight model.

View the file

Other files

File Type Posted
GXS RFP Cost Exhibits Amendment 1.pdf PDF
Amendment 1 Attachment D GXSUIID.pdf PDF
Amendment 1 Attachment E IMAR.pdf PDF
Amendment 1 Cover page - SF 30.pdf PDF
Final RFP 80GSFC22R0055 Questions and Responses 2.23.23.pdf PDF
Final Attach R.pdf PDF
Final GXS RFP Cost Exhibits Feb 2023.pdf PDF
Final Attachment A SOW.pdf PDF
Final Attachment B PORD.pdf PDF
Final Attach K SB plan.pdf PDF
GXS 80GSFC22R0055 Final .pdf PDF
Final Attachment M IT ADL.pdf PDF
Final Attach J.pdf PDF
Final Attachment E IMAR.pdf PDF
Final Attachment G EDM.pdf PDF
Final GXS RFP Cover Letter 1.pdf PDF
Final Attachment W OCI Plan.pdf PDF
Final Attach H.pdf PDF
Final Attach V.pdf PDF
Final RFP SF33 GXS.pdf PDF
Final Encl A ITSMP.pdf PDF
Final Attachment D GXSUIID.pdf PDF
Final Attachment C GIRD.pdf PDF
Final Attachment N QASP.pdf PDF
Final Attachment I OCI DRD.pdf PDF
Final Encl B Perf Eval Plan.pdf PDF
Final Attachment F CDRL.pdf PDF
Final Attachment P.pdf PDF
Final Attachment X DEIA Plan.pdf PDF
Final Attach L.pdf PDF
Final RFP WBS Dic Rev.pdf PDF
Final Attach T DEIA DRD.pdf PDF
Final Attachment S CONOPS.pdf PDF
Final Attachment Q GRDDP.pdf PDF
Final Exhibit 8 PPQ.pdf PDF
Final Attachment U FPGA.pdf PDF
GXS Instrument DRFP Questions and Responses.pdf PDF
Attachment O GXS WBS dictionary.pdf PDF
Attachment W - OCI Plan.pdf PDF
Enclosure A ITSMP TMPLT.pdf PDF
Attachment S GeoXO_ConOps.pdf PDF
Attachment B GXSPORD.pdf PDF
GXS DRFP 80GSFC22R0055 Final.pdf PDF
Attachment P GXS Rad Upwelling.pdf PDF
Attachment T DEIA Plan DRD.pdf PDF
Attachment R GeoXO REED.pdf PDF
Attachment G EDM.pdf PDF
Attachment V Req Statements List.pdf PDF
Attachment U GeoXO FPGA.pdf PDF
GXS DRFP Cover Letter.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80GSFC22R0055

Amendment Number 1

1. Attachment D, GXS Unique Instrument Interface Document (UIID) is hereby updated to change the reference to the General Interface Requirements Document

(GIRD) from 418-XO-GXIGIRD-0025 to 418-XO-GIRD-0041. The updated document is attached to this amendment.

2. Attachment E, Instrument Mission Assurance Requirements (IMAR) is hereby updated to remove references to the GXISOW, correct NASA-STD-8739.8 in

IMAR233 and correct title for NPR 8715.7B. The updated document is attached to this amendment.

3. Section I, Clause 52.244-2 is hereby revised below:

FROM:

52.244-2 SUBCONTRACTS (JUN 2020)

(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer's written consent before placing the following subcontracts: Professional and consultant costs as defined in FAR 31.205-33

TO:

52.244-2 SUBCONTRACTS (JUN 2020)

(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer's written consent before placing the following subcontracts: focal plane array/detector, optical elements, radiator, mechanisms, cryocoolers (if applicable),

4. Section J.1, LIST OF ATTACHMENTS (FEB 2016) is hereby revised to update the following attachments:

Attachment Description

No. of Pages

(including the cover page)

D GXS Unique Instrument Interface Document

418-XO-GXSUIID-0030, Version 1.6a

E Instrument Mission Assurance Requirements

418-XO-IMAR-0026, Version 2.1a

5. The following sections of provision L.13, GSFC 52.215-210 MISSION

SUITABILITY VOLUME INSTRUCTIONS (SEP 2020), is hereby revised below:

A.3 System Performance

FROM:

The Offeror shall discuss the spatial performance, including Ensquared Energy, spatial response uniformity, and spatial uniformity of data. The discussion should include, but it is not limited to, system budgets for all design elements, beginning of life and end-of life.

TO:

The Offeror shall discuss the spatial performance, including Ensquared Energy. The discussion should include, but it is not limited to, system budgets for all design elements, beginning of life and end-of life.

The Offeror shall discuss the radiometric performance including SNR/NEDT, repeatability, coherent noise, and absolute accuracy/stability. The discussion should include, but is not limited to, throughput budgets for all design elements, throughput budgets for contamination, performance in zones of reduced data quality. The Offeror shall specify where data becomes degraded and where data becomes unusable.

The Offeror shall discuss the radiometric performance including SNR/NEDT, repeatability, absolute and relative accuracy, and stability. The discussion should include, but is not limited to, throughput budgets for all design elements, throughput budgets for contamination, performance in zones of reduced data quality. The Offeror shall specify where data becomes degraded and where data becomes unusable.

B.6 Staffing

The Offeror shall discuss the proposed staffing levels, personnel categories, hours and skill mix proposed under the contract and how the labor skill mix will be employed to accomplish the work in an effective and efficient manner. All discussions must be clear and concise and refer to the appropriate SOW activity. Additionally, provide any staffing reach-back or supplemental capabilities to minimize staffing disruptions throughout contract performance. The staffing approach shall include a discussion of how the staffing is adequate to conduct the 5 GXS builds.

The staffing approach shall also address any shared resources.

The Offeror shall discuss the proposed staffing levels, personnel categories, hours and skill mix proposed under the contract and how the labor skill mix will be employed to accomplish the work in an effective and efficient manner. All discussions must be clear and concise and refer to the appropriate SOW activity. Additionally, provide any staffing reach-back or supplemental capabilities to minimize staffing disruptions throughout contract performance. The staffing approach shall include a discussion of how the staffing is adequate to conduct the 3 GXS builds.

The staffing approach shall also address any shared resources.

6. The following section of provision L.14, GSFC 52.215-221 COST VOLUME

INSTRUCTIONS (JUL 2020), paragraphs (b)(4) and (6) are hereby revised below:

(4) PRIME OFFEROR AND SIGNIFICANT SUBCONTRACTORS SUMMARY OF

ESTIMATED COST PLUS MAXIMUM AVAILABLE AWARD FEE BY ELEMENTS OF

COST

Exhibit 3 summarizes the proposed total direct labor hours, total estimated cost and maximum available award fee by Government Fiscal Year (GFY), for the base contract and each option.

(Separate exhibit to be submitted for the base contract and each option). This exhibit also includes a separate section for the reporting of special studies. Note that special studies dollars will only be included in this one exhibit. Offerors shall include the Government Cost Plus Award

Fee estimate amount of $25,000,000 for special studies, which is the maximum amount the

Government may order for special task support specified in H.13 Special Task Support

Requirements.

TO:

(4) PRIME OFFEROR AND SIGNIFICANT SUBCONTRACTORS SUMMARY OF

ESTIMATED COST PLUS MAXIMUM AVAILABLE AWARD FEE BY ELEMENTS OF

COST

Exhibit 3 summarizes the proposed total direct labor hours, total estimated cost and maximum available award fee by Government Fiscal Year (GFY), for the base contract and each option.

(Separate exhibit to be submitted for the base contract and each option). Please note that a base fee is not applicable to this procurement and if proposed will not be considered (refer to Clause

B.2 1852.216-85 Estimated Cost and Award Fee). This exhibit also includes a separate section for the reporting of special studies. Note that special studies dollars will only be included in this one exhibit. Offerors shall include the Government Cost Plus Award Fee estimate amount of

$25,000,000 for special studies, which is the maximum amount the Government may order for special task support specified in H.13 Special Task Support Requirements.

(6) PRIME OFFEROR AND SIGNIFICANT SUBCONTRACTORS TOTAL DIRECT LABOR

HOURS, LABOR COSTS AND NON-LABOR DETAIL BY WBS

Exhibit 3B summarizes the Direct Labor Hours by WBS, Exhibit 3C summarizes the Direct

Labor Costs by WBS, and Exhibit 3D summarizes the Non-Labor Costs by WBS.

TO:

(6) PRIME OFFEROR AND SIGNIFICANT SUBCONTRACTORS TOTAL DIRECT LABOR

HOURS, LABOR COSTS AND NON-LABOR DETAIL BY WBS

Exhibit 3B summarizes the Direct Labor Hours by WBS, and Exhibit 3C summarizes the Direct

Labor Costs by WBS.

7. The Cost Exhibits are revised as follows: The updated document is attached to this amendment.

Exhibit 3A Labor Dollars is revised to read Exhibit 3C Labor Dollars

--End of Amendment Number 1--