Amendment 1 Attachment E IMAR.pdf
PDF 20 MB Posted
- Attached to
- Request for Proposal Geostationary Extended Observations (GeoXO) Sounder (GXS) Instrument Implementation
- Solicitation number
- 80GSFC22R0055
About this file
This document provides details on a forthcoming federal contract opportunity for the Geostationary Extended Observations (GeoXO) Sounder (GXS) Instrument Implementation. The National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) plans to issue a Request for Proposal (RFP) for the implementation phase of the GXS instrument, which will be a hyperspectral infrared instrument flown on GeoXO program geostationary satellites. The contract scope includes design, development, fabrication, integration, calibration, testing, evaluation, launch support, and 10 years of on-orbit operations and 5 years of on-orbit storage for each flight model. The anticipated period of performance is 15 years per flight model. The solicitation is expected to be released in late January to early February 2023 as a full and open competition. The contract type will be cost-plus-award-fee. The anticipated contract award date is late August 2023.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: February 03, 2021 418-XO-IMAR-0026 Responsible Organization: GeoXO Flight Project/Code 418 Version 2.1a
To verify the correct version of this document, please contact the GeoXO Series Configuration Management Office.
Geostationary eXtended Observations (GeoXO) Flight Project
Instrument Mission Assurance Requirements (IMAR) Signature page
Prepared by:
Electronically approved by:
07/21/2022
Kuiana E. Carson Date GeoXO Flight Project, Deputy Chief Safety & Mission Assurance NASA GSFC, Code 383
Reviewed by:
08/04/2022
Joseph M. Spector Date GeoXO Flight Project, Chief Safety & Mission Assurance
NASA GSFC, Code 383
08/08/2022
Steven W. Bidwell Date GeoXO Flight Project, Sys. Engineering Manager NASA GSFC, Code 418
Approved by:
Christopher Wheeler electronically approved for:
08/08/2022
Monica Todirita Date GeoXO Flight Project, Deputy Project Manager NASA GSFC, Code 418
Effective Date: February 03, 2021 418-XO-IMAR-0026 Responsible Organization: GeoXO Flight Project/Code 418 Version 2.1a
To verify the correct version of this document, please contact the GeoXO Series Configuration Management Office.
Document Change Record (DCR)
CCR GeoXO-X00001 Rev: Title: GEO-XO Flight IMAR Baseline Contract # N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-GXIMAR-0026 CCB Date: 10/15/2020 Doc Version: Baseline 1.0 Doc Section: All Contract Mod#: N/A DOORs Version: 1.0 Doc Change Date: 10/15/2020 DOORs ID #: 1.0
CCR GeoXO-X00007 Rev: Title: GXIMAR: Updates to Instrument MAR Contract # N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 02/03/2021 Doc Version: Baseline 1.1 Doc Section: All Contract Mod#: N/A DOORs Version: 1.1 Doc Change Date: 02/03/2021 DOORs ID #: IMAR172 (4.1.0-3), 370 (7.1.0-5) Added: IMAR760 (4.7.0-4)
CM Note: Changed “Geostationary and eXtended Orbits (GEO-XO) Flight Project” to “Geostationary eXtended Observations (GeoXO)”, updated the title page, signature page, and Document Change Record (DCR). Made changes in the acronym from GXIMAR to IMAR. Additionally, updated all references from GEO-XO to GeoXO for v1.1.
CCR GeoXO-X00109 Rev: Title: IMAR: baseline IMAR as v2.0 Contract #: ACX - 80GSFC22CA032; ACX - 80GSFC22CA033; GXI - Phase B; GXS - 80GSFC21CA023; GXS - 80GSFC21CA024; LMX - 80GSFC22CA002; LMX - 80GSFC22CA025; OCX - 80GSFC22CA042; OCX - 80GSFC22CA04 GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 08/08/2021 Doc Version: Baseline 2.0 Doc Section: All Contract Mod#: 2, 3; 11, N/A GXI – Phase B N/A DOORs Version: 2.0 Doc Change Date: Aug. 11, 2022 DOORs ID #: v2.0
CM Note: IMAR is released as Version 2.0 due to major revision and significant changes within the document and the signature page is revised.
CCR GeoXO-X00147 Rev: A Title: IMAR: Updated Changed for reconciliation with GPR 8705.4A Contract #: N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 01/10/2023 Doc Version: Baseline 2.1 Doc Section: 1., 2., 4., 6., 7., 8., 11., 12., 15., 16.
Contract Mod#: N/A DOORs Version: 2.1 Doc Change Date: Jan. 10, 2023 DOORs ID #: v2.1
Modify: IMAR22 (1.7.0-4), 36 (1.9.0-1), 37 (1.9.0-2), 44 (2.1.0-1), 65 (2.2.1.2.0-6), 67 (2.2.1.3.0-7), 168 (7.1.0-7), 177 (4.3.0-1), 182 (4.3.0-6), 199 (4.7.0-1), 204 (4.4.0-2), 222 (4.5.0-5), 294 (6.1.0-2), 309 (6.1.0-3), 369 (7.1.0-6), 370 (7.1.0-9), 371 (7.1.0-12), 372 (7.1.0-10), 441 (8.4), 544 (11.2.0-4), 552 (15.0-1), 611 (12.0-1), 764 (1.6.0-4), 766 (1.7.0-1), 812 (4.1.0-5), 815 (4.3.0-9.0-1), 816 (4.3.0-11), 817 (4.3.0-12), 842 (6.6.0-4), 850 (7.1.0-8), 899 (16.0-1), 906 (1.9.0-4), 915 (4.5.0-3)
Delete: IMAR38, 854, 907, 908, 909
CCR GeoXO-X00169 Rev: Title: IMAR: remove reference to GXISOW Contract #: N/A GeoXO S/C: GeoXO Effectivity: none CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 02/27/2023 Doc Version: Baseline 2.1a Doc Section: 2.1, 5.2, 6.1 Contract Mod#: N/A DOORs Version: 2.1a Doc Change Date: Feb. 27, 2023 DOORs ID #: v2.1a
CM note: CM admin change to remove requirement statement IMAR791, GXISOW898, corrected NASA NASA-STD-8739.8 and NPR 8715.7B.
File details come from the government source that posted it. Updated .