Amendment 1 Attachment E IMAR.pdf

PDF 20 MB Posted

Attached to
Request for Proposal Geostationary Extended Observations (GeoXO) Sounder (GXS) Instrument Implementation
Solicitation number
80GSFC22R0055
Issued by

About this file

This document provides details on a forthcoming federal contract opportunity for the Geostationary Extended Observations (GeoXO) Sounder (GXS) Instrument Implementation. The National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) plans to issue a Request for Proposal (RFP) for the implementation phase of the GXS instrument, which will be a hyperspectral infrared instrument flown on GeoXO program geostationary satellites. The contract scope includes design, development, fabrication, integration, calibration, testing, evaluation, launch support, and 10 years of on-orbit operations and 5 years of on-orbit storage for each flight model. The anticipated period of performance is 15 years per flight model. The solicitation is expected to be released in late January to early February 2023 as a full and open competition. The contract type will be cost-plus-award-fee. The anticipated contract award date is late August 2023.

View the file

Other files

File Type Posted
GXS RFP Cost Exhibits Amendment 1.pdf PDF
Amendment 1 Attachment D GXSUIID.pdf PDF
Amendment 1 Cover page - SF 30.pdf PDF
Amendment 1 - Continuation pages.pdf PDF
Final RFP 80GSFC22R0055 Questions and Responses 2.23.23.pdf PDF
Final Attach R.pdf PDF
Final GXS RFP Cost Exhibits Feb 2023.pdf PDF
Final Attachment A SOW.pdf PDF
Final Attachment B PORD.pdf PDF
Final Attach K SB plan.pdf PDF
GXS 80GSFC22R0055 Final .pdf PDF
Final Attachment M IT ADL.pdf PDF
Final Attach J.pdf PDF
Final Attachment E IMAR.pdf PDF
Final Attachment G EDM.pdf PDF
Final GXS RFP Cover Letter 1.pdf PDF
Final Attachment W OCI Plan.pdf PDF
Final Attach H.pdf PDF
Final Attach V.pdf PDF
Final RFP SF33 GXS.pdf PDF
Final Encl A ITSMP.pdf PDF
Final Attachment D GXSUIID.pdf PDF
Final Attachment C GIRD.pdf PDF
Final Attachment N QASP.pdf PDF
Final Attachment I OCI DRD.pdf PDF
Final Encl B Perf Eval Plan.pdf PDF
Final Attachment F CDRL.pdf PDF
Final Attachment P.pdf PDF
Final Attachment X DEIA Plan.pdf PDF
Final Attach L.pdf PDF
Final RFP WBS Dic Rev.pdf PDF
Final Attach T DEIA DRD.pdf PDF
Final Attachment S CONOPS.pdf PDF
Final Attachment Q GRDDP.pdf PDF
Final Exhibit 8 PPQ.pdf PDF
Final Attachment U FPGA.pdf PDF
GXS Instrument DRFP Questions and Responses.pdf PDF
Attachment O GXS WBS dictionary.pdf PDF
Attachment W - OCI Plan.pdf PDF
Enclosure A ITSMP TMPLT.pdf PDF
Attachment S GeoXO_ConOps.pdf PDF
Attachment B GXSPORD.pdf PDF
GXS DRFP 80GSFC22R0055 Final.pdf PDF
Attachment P GXS Rad Upwelling.pdf PDF
Attachment T DEIA Plan DRD.pdf PDF
Attachment R GeoXO REED.pdf PDF
Attachment G EDM.pdf PDF
Attachment V Req Statements List.pdf PDF
Attachment U GeoXO FPGA.pdf PDF
GXS DRFP Cover Letter.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: February 03, 2021 418-XO-IMAR-0026 Responsible Organization: GeoXO Flight Project/Code 418 Version 2.1a

To verify the correct version of this document, please contact the GeoXO Series Configuration Management Office.

Geostationary eXtended Observations (GeoXO) Flight Project

Instrument Mission Assurance Requirements (IMAR) Signature page

Prepared by:

Electronically approved by:

07/21/2022

Kuiana E. Carson Date GeoXO Flight Project, Deputy Chief Safety & Mission Assurance NASA GSFC, Code 383

Reviewed by:

08/04/2022

Joseph M. Spector Date GeoXO Flight Project, Chief Safety & Mission Assurance

NASA GSFC, Code 383

08/08/2022

Steven W. Bidwell Date GeoXO Flight Project, Sys. Engineering Manager NASA GSFC, Code 418

Approved by:

Christopher Wheeler electronically approved for:

08/08/2022

Monica Todirita Date GeoXO Flight Project, Deputy Project Manager NASA GSFC, Code 418

Effective Date: February 03, 2021 418-XO-IMAR-0026 Responsible Organization: GeoXO Flight Project/Code 418 Version 2.1a

To verify the correct version of this document, please contact the GeoXO Series Configuration Management Office.

Document Change Record (DCR)

CCR GeoXO-X00001 Rev: Title: GEO-XO Flight IMAR Baseline Contract # N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-GXIMAR-0026 CCB Date: 10/15/2020 Doc Version: Baseline 1.0 Doc Section: All Contract Mod#: N/A DOORs Version: 1.0 Doc Change Date: 10/15/2020 DOORs ID #: 1.0

CCR GeoXO-X00007 Rev: Title: GXIMAR: Updates to Instrument MAR Contract # N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 02/03/2021 Doc Version: Baseline 1.1 Doc Section: All Contract Mod#: N/A DOORs Version: 1.1 Doc Change Date: 02/03/2021 DOORs ID #: IMAR172 (4.1.0-3), 370 (7.1.0-5) Added: IMAR760 (4.7.0-4)

CM Note: Changed “Geostationary and eXtended Orbits (GEO-XO) Flight Project” to “Geostationary eXtended Observations (GeoXO)”, updated the title page, signature page, and Document Change Record (DCR). Made changes in the acronym from GXIMAR to IMAR. Additionally, updated all references from GEO-XO to GeoXO for v1.1.

CCR GeoXO-X00109 Rev: Title: IMAR: baseline IMAR as v2.0 Contract #: ACX - 80GSFC22CA032; ACX - 80GSFC22CA033; GXI - Phase B; GXS - 80GSFC21CA023; GXS - 80GSFC21CA024; LMX - 80GSFC22CA002; LMX - 80GSFC22CA025; OCX - 80GSFC22CA042; OCX - 80GSFC22CA04 GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 08/08/2021 Doc Version: Baseline 2.0 Doc Section: All Contract Mod#: 2, 3; 11, N/A GXI – Phase B N/A DOORs Version: 2.0 Doc Change Date: Aug. 11, 2022 DOORs ID #: v2.0

CM Note: IMAR is released as Version 2.0 due to major revision and significant changes within the document and the signature page is revised.

CCR GeoXO-X00147 Rev: A Title: IMAR: Updated Changed for reconciliation with GPR 8705.4A Contract #: N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 01/10/2023 Doc Version: Baseline 2.1 Doc Section: 1., 2., 4., 6., 7., 8., 11., 12., 15., 16.

Contract Mod#: N/A DOORs Version: 2.1 Doc Change Date: Jan. 10, 2023 DOORs ID #: v2.1

Modify: IMAR22 (1.7.0-4), 36 (1.9.0-1), 37 (1.9.0-2), 44 (2.1.0-1), 65 (2.2.1.2.0-6), 67 (2.2.1.3.0-7), 168 (7.1.0-7), 177 (4.3.0-1), 182 (4.3.0-6), 199 (4.7.0-1), 204 (4.4.0-2), 222 (4.5.0-5), 294 (6.1.0-2), 309 (6.1.0-3), 369 (7.1.0-6), 370 (7.1.0-9), 371 (7.1.0-12), 372 (7.1.0-10), 441 (8.4), 544 (11.2.0-4), 552 (15.0-1), 611 (12.0-1), 764 (1.6.0-4), 766 (1.7.0-1), 812 (4.1.0-5), 815 (4.3.0-9.0-1), 816 (4.3.0-11), 817 (4.3.0-12), 842 (6.6.0-4), 850 (7.1.0-8), 899 (16.0-1), 906 (1.9.0-4), 915 (4.5.0-3)

Delete: IMAR38, 854, 907, 908, 909

CCR GeoXO-X00169 Rev: Title: IMAR: remove reference to GXISOW Contract #: N/A GeoXO S/C: GeoXO Effectivity: none CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 02/27/2023 Doc Version: Baseline 2.1a Doc Section: 2.1, 5.2, 6.1 Contract Mod#: N/A DOORs Version: 2.1a Doc Change Date: Feb. 27, 2023 DOORs ID #: v2.1a

CM note: CM admin change to remove requirement statement IMAR791, GXISOW898, corrected NASA NASA-STD-8739.8 and NPR 8715.7B.

File details come from the government source that posted it. Updated .