This document contains a past performance questionnaire and information about a forthcoming request for proposal for the Geostationary Extended Observations Sounder instrument.

The past performance questionnaire is a template for evaluators to assess an offeror's relevant experience and performance on six major work elements. These elements include instrument design, analysis, procurement, engineering, testing, operations support, and management. Evaluators are asked to rate an offeror's technical, schedule, cost performance and management on a scale of very high to very low. Additionally, the questionnaire requests information on contract expenditures, cost overruns if applicable, and award fee ratings if the prior contract included award fees.

The request for proposal information provides the solicitation number, title for the Geostationary Extended Observations Sounder instrument, opportunity type as a pre-solicitation notice. The contract scope includes design, development, fabrication, integration, calibration, testing, evaluation, launch support, and 10 years of operations and 5 years of storage support. The procurement will be a full and open competition under NAICS code 541330 with a size standard of $22.5M. The contract type will be cost-plus-award-fee. The period of performance is anticipated as 15 years for each flight model. The anticipated contract and award dates are late August 2023 and late January to early February 2023 respectively.

View the file

Other files

File Type Posted
GXS RFP Cost Exhibits Amendment 1.pdf PDF
Amendment 1 Attachment D GXSUIID.pdf PDF
Amendment 1 Attachment E IMAR.pdf PDF
Amendment 1 Cover page - SF 30.pdf PDF
Amendment 1 - Continuation pages.pdf PDF
Final RFP 80GSFC22R0055 Questions and Responses 2.23.23.pdf PDF
Final Attach R.pdf PDF
Final GXS RFP Cost Exhibits Feb 2023.pdf PDF
Final Attachment A SOW.pdf PDF
Final Attachment B PORD.pdf PDF
Final Attach K SB plan.pdf PDF
GXS 80GSFC22R0055 Final .pdf PDF
Final Attachment M IT ADL.pdf PDF
Final Attach J.pdf PDF
Final Attachment E IMAR.pdf PDF
Final Attachment G EDM.pdf PDF
Final GXS RFP Cover Letter 1.pdf PDF
Final Attachment W OCI Plan.pdf PDF
Final Attach H.pdf PDF
Final Attach V.pdf PDF
Final RFP SF33 GXS.pdf PDF
Final Encl A ITSMP.pdf PDF
Final Attachment D GXSUIID.pdf PDF
Final Attachment C GIRD.pdf PDF
Final Attachment N QASP.pdf PDF
Final Attachment I OCI DRD.pdf PDF
Final Encl B Perf Eval Plan.pdf PDF
Final Attachment F CDRL.pdf PDF
Final Attachment P.pdf PDF
Final Attachment X DEIA Plan.pdf PDF
Final Attach L.pdf PDF
Final RFP WBS Dic Rev.pdf PDF
Final Attach T DEIA DRD.pdf PDF
Final Attachment S CONOPS.pdf PDF
Final Attachment Q GRDDP.pdf PDF
Final Attachment U FPGA.pdf PDF
GXS Instrument DRFP Questions and Responses.pdf PDF
Attachment O GXS WBS dictionary.pdf PDF
Attachment W - OCI Plan.pdf PDF
Enclosure A ITSMP TMPLT.pdf PDF
Attachment S GeoXO_ConOps.pdf PDF
Attachment B GXSPORD.pdf PDF
GXS DRFP 80GSFC22R0055 Final.pdf PDF
Attachment P GXS Rad Upwelling.pdf PDF
Attachment T DEIA Plan DRD.pdf PDF
Attachment R GeoXO REED.pdf PDF
Attachment G EDM.pdf PDF
Attachment V Req Statements List.pdf PDF
Attachment U GeoXO FPGA.pdf PDF
GXS DRFP Cover Letter.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS

Sections 1-3 provide for contract-related descriptive information and identification of the evaluator.

Section 4 lists the major work elements within our Statement of Work (SOW). Please provide your assessment of the “relevant experience” and “performance” associated with our SOW evidenced within the contract for which you are a reference. “Experience” means a contractor who has performed work in the specific SOW Element. “Did not Perform” means that the specific SOW element was not performed under the contract.

Section 5 evaluates the contractor’s technical, schedule, and cost performance and management. (Additional pages may be used for comments if desired). If you cannot answer any questions, please circle “N/R” for Not Rated.

The following definitions are offered for your use in assigning a performance rating for each of the factors in Sections 5 and 6:

Very High

(VH)

The Offeror’s relevant past performance is of exceptional merit;

indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance.

High

(H)

The Offeror’s relevant past performance demonstrates very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance.

Moderate

(M)

The Offeror’s relevant past performance demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance.

Low

(L)

The Offeror’s relevant past performance meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance.

Very Low

(VL)

The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance.

N/R Not Rated

Section 6 provides for evaluation of the contractor’s management of cost and award/incentive fee history.

RETURN THIS QUESTIONNAIRE TO NASA Goddard Space Flight Center BY 3/17/23 at 3:00 pm EDT Attn: Ann Kearney, Code 172 Greenbelt, MD 20771 e-mail: Ann.L.Kearney@nasa.gov

PAST PERFORMANCE QUESTIONNAIRE

1. Contract Information

A. Name of Company/Division Being Evaluated:_____________________

B. Address:_____________________________________________

C. Contractor Cage Code and/or DUNS number

D. Contract Number:_______________________________________

E. Contract Type:_________________________________________

F. Period of Performance (including options): From:______ To:_______

G. Total Contract Value:_____________________________________

H. Award Information: Competitive: Yes___ No___ Basis of Selection: Technical___ Cost/Price___ Other (specify)_________________________

2. Description of Contract

Briefly describe the services provided under this contract:

During the contract performance being evaluated, this firm was the:

Prime Contractor____ Significant Subcontractor ____ Team Member ____ Other (describe)____________________________________________

Does a corporate or business relationship exist between the firm being evaluated and your organization?

Yes ___ No ___. If yes, please describe: ___________________________

3. Evaluator Information

Name: _____________________________________________________ Title: _______________________________________________________ Agency/Company: ____________________________________________ E-mail Address: _______________________________________________ Phone: ______________ Date Questionnaire Completed: _____________ Role in Program/Contract: ______________________________________ Length of Involvement in this Program/ Contract: _____________________

This form contains Source Selection Information when completed. See FAR 3.104. 3

4. SOW Survey Relevance Ratings: Please check the appropriate blocks for Relevance (Performed or Did Not Perform)

SOW ELEMENT

PERFORMED

DID NOT

PERFORM

Flight instrument design meeting performance and interface requirements of all contract documents.

Flight instrument analysis, including defining and implementing a comprehensive flight instrument science data calibration program for the life of the mission.

Parts and material procurement (including long lead parts procurement planning and execution), fabrication and subassembly testing for flight instruments

Systems Management and Engineering, including:

• System studies, trades and risk assessments necessary to develop an instrument system design that meets the system performance specifications

• Flow-down of system/instrument performance requirements into engineering functional requirements, detailed equipment and end item design requirements

• Establishment and maintenance of a system performance and environmental verification program that demonstrates that the system/instrument meets all mandated and derived performance requirements

• Establishment and implementation of a calibration program

Post-delivery support, including, post-delivery GSE and instrument checkout, observatory integration and test support, launch site support, post-launch test support, and mission operations support (including post-launch anomaly support, continuous performance trending, and calibration updates

Subcontract Management and Control System, providing technical direction and effective subcontract management utilizing schedule milestone controls

Resources Management

Staffing and retention of key personnel, Earned Value Management Program and Cost Control

Program Management

Establishment and Implementation of Configuration Management Program

Establishment and Implementation of Risk Management Program

Flight and Ground Test Software Development and Maintenance, including:

• Establishment, maintenance, and implementation of a Software Management Program to execute software development processes and procedures, software tools, reviews, resources, schedules and deliverables required for support of flight instrument integration, the test and verification program, and on-orbit operations

Contamination Control and Analysis, including establishment of a contamination control program and providing the resources necessary to assure that appropriate contamination control is exercised through all phases of instrument manufacture, build-up/assembly, integration and test, and observatory integration and test, launch site processing, and on-orbit operation

This form contains Source Selection Information when completed. See FAR 3.104. 4

5. General Performance Survey

NO PERFORMANCE QUESTIONS

PERFORMANCE RATING

(Please Circle)

QUALITY

1. Quality of services and support provided VH H M L VL N/R

2. Timely identification and mitigation of risks VH H M L VL N/R

3.

Ability to identify and correct performance deficiencies in a timely manner

VH H M L VL N/R

4.

Demonstrated understanding and compliance with mission safety requirements

VH H M L VL N/R

Comment:

SCHEDULE

5.

Timeliness, quality, and accuracy of schedule estimates and reporting

6. Ability to meet/exceed schedule milestones VH H M L VL N/R

COST

7.

Ability to establish realistic cost estimates and adhere to estimated costs

VH H M L VL N/R

8.

Ability to anticipate, identify and control cost growth.

BUSINESS/MANAGEMENT

9.

Communicating/interfacing with Government and overall responsiveness to Government requests

VH H M L VL N/R

10.

Ability to effectively manage the contract including subcontractor performance, if applicable

VH H M L VL N/R

11.

Ability to recruit and retain highly skilled personnel, including ability to fill key vacancies in a timely manner.

VH H M L VL N/R

12.

Adequacy of Contractor’s system(s) for processing task orders and/or changes.

VH H M L VL N/R

13.

Ability to meet Small Business Subcontracting Plan Goals

This form contains Source Selection Information when completed. See FAR 3.104. 5

Section 6:

What is the Contract Value:

Initial Value Current Value Estimated Cost: $___________ $____________

Fee: $___________ $____________

Total Value: $___________ $_____________

What are the total contract expenditures to date (cost/fees to date based on invoices, reports, etc)?

What is the Annual Contract Value to Date (The current contract expenditures to date divided by the number of years of performance to date)?

For example (note, these example numbers may not relate to this specific procurement):

Assume your contract is a current five year contract, is still ongoing, and the latest cost report reflects a cost/fee of $43,500,000 through the first 2 years and 4 months (to date). In this example, current/total Contract Expenditures incurred to Date are $43,500,000 and associated period of performance for those expenditures, expressed in years, is 2.33 years.

Therefore, the Average Annual Cost/Fee Incurred to Date: $18,669,528 ($43,500,000/2.33 years)

Was there a cost overrun? ( ) Yes ( ) No If yes, please explain:

If this was an award fee contract, what are the individual and/or average ratings of performance by your organization? Please attach any available award fee letters or database entries.

Please comment on particularly strong/weak points of Contractor’s performance (technical, schedule, and/or cost). If the Overall Contract Performance Rating below is less than Very High, please provide some explanation in this section on why a higher rating was not provided.

Overall Contract Performance Rating (circle one)

Very High High Moderate Low Very Low

If less than Very High Performance Rating, please explain:

This form contains Source Selection Information when completed. See FAR 3.104. 6

Please add any other comments you may feel are pertinent.

Rater’s Signature Date