PRICE PROPOSAL FORM Revision 02 Amendment 0008 Rebuild Base Detachment and Air Station Borinquen

PROJECT 1106258

TASK ORDER ANNOUNCEMENT # 70Z04721RBRNQN100:

The contractor shall provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required to design and construct the items as listed below. These items shall be deemed to include all costs required for the specified work to be completed in accordance with the plans and specifications. Sites: Air Station, CG Exchange, and the Housing Area

BASE ITEM 0001:

· Scope Element 1 – Electrical and Telecomm Distribution

Design $_________________

Construction $____________

Total Amount $___________

· Scope Element 2 – Water Distribution
Design $_________________

· Scope Element 4 – Storm Water Improvements

Design $_________________

· Scope Element 5 – Partial Sanitary Sewer Improvements

Design $____________

Allowance Amount $___________

Total Amount $________________

Scope Element 5 Allowance Items
Unit of Measure
Quantity
Unit

Cost ($) Total Allowance ($)

New 8" Diameter Sanitary Sewer Main
LF
1,550
New 12" Diameter Sanitary Sewer Main
LF
92
Relocate 8" Diameter PVC Force Main
LF
175
Remove Lift Station
EA
01
New Sanitary Sewer Manhole
EA
10

Replace 4" Sanitary Sewer Lateral and Cleanout (2’ from building wall to main)

EA
151
Replace 6" Diameter Sanitary Sewer Main
LF
177
Replace 8" Diameter Sanitary Sewer Main
LF
509
Replace 10" Diameter Sanitary Sewer Main
LF
32
Replace 15" Diameter Sanitary Sewer Main
LF
24
Replace 24" Diameter Sanitary Sewer Main
LF
548
Replace Sanitary Sewer Manhole
EA
65
· Scope Element 6 – Site Improvements and Demolition
Design $_________________
· Scope Element 7 – CG Exchange (CGX) Resiliency Repairs
Design $_________________

TOTAL BASE ITEM 0001: $

OPTION 0001:

Scope Element 3 – Water and Electrical Resiliency Provide a separate design and construction cost for the items in Scope Element 3.

Design $_________________

OPTION 0002:

Scope Element 8: Remainder of Sanitary Sewer Improvements.

Provide a separate design and construction cost for the items in Scope Element 8.

Design $_________________

Allowance Amount $_________

Total $__________________

Scope Element 8 Allowance Items
Unit of Measure
Quantity
Unit

Cost ($) Total Allowance ($)

Line 8" Dia. Sanitary Sewer Main with CIPP
LF
7,500
Line 10" Dia. Sanitary Sewer Main with CIPP
LF
425
Line 12" Dia. Sanitary Sewer Main with CIPP
LF
1,273
Line 15" Dia. Sanitary Sewer Main with CIPP
LF
234
Line 24" Dia. Sanitary Sewer Main with CIPP
LF
2,239

TOTAL (TOTAL OF ALL BASE and OPTION ITEMS)

NMACC II Contractors are required to provide pricing for Option Item 0001 and Option Item 0002. If awarded, the option item(s) shall be exercised within 180 calendar days of award. Options will be considered in accordance with FAR 52.217-5 Evaluation of Options (July 1990). If awarded, the option item(s) shall be exercised within 180 calendar days of award and completed within the contract performance period of 1028 calendar day