PRICE PROPOSAL FORM Revision 02 Amendment 0008 Rebuild Base Detachment and Air Station Borinquen
PROJECT 1106258
TASK ORDER ANNOUNCEMENT # 70Z04721RBRNQN100:
The contractor shall provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required to design and construct the items as listed below. These items shall be deemed to include all costs required for the specified work to be completed in accordance with the plans and specifications. Sites: Air Station, CG Exchange, and the Housing Area
BASE ITEM 0001:
· Scope Element 1 – Electrical and Telecomm Distribution
Design $_________________
Construction $____________
Total Amount $___________
| · Scope Element 2 – Water Distribution |
| Design $_________________ |
· Scope Element 4 – Storm Water Improvements
Design $_________________
· Scope Element 5 – Partial Sanitary Sewer Improvements
Design $____________
Allowance Amount $___________
Total Amount $________________
| Scope Element 5 Allowance Items |
| Unit of Measure |
| Quantity |
| Unit |
Cost ($) Total Allowance ($)
| New 8" Diameter Sanitary Sewer Main |
| LF |
| 1,550 |
| New 12" Diameter Sanitary Sewer Main |
| LF |
| 92 |
| Relocate 8" Diameter PVC Force Main |
| LF |
| 175 |
| Remove Lift Station |
| EA |
| 01 |
| New Sanitary Sewer Manhole |
| EA |
| 10 |
Replace 4" Sanitary Sewer Lateral and Cleanout (2’ from building wall to main)
| EA |
| 151 |
| Replace 6" Diameter Sanitary Sewer Main |
| LF |
| 177 |
| Replace 8" Diameter Sanitary Sewer Main |
| LF |
| 509 |
| Replace 10" Diameter Sanitary Sewer Main |
| LF |
| 32 |
| Replace 15" Diameter Sanitary Sewer Main |
| LF |
| 24 |
| Replace 24" Diameter Sanitary Sewer Main |
| LF |
| 548 |
| Replace Sanitary Sewer Manhole |
| EA |
| 65 |
| · Scope Element 6 – Site Improvements and Demolition |
| Design $_________________ |
| · Scope Element 7 – CG Exchange (CGX) Resiliency Repairs |
| Design $_________________ |
TOTAL BASE ITEM 0001: $
OPTION 0001:
Scope Element 3 – Water and Electrical Resiliency Provide a separate design and construction cost for the items in Scope Element 3.
Design $_________________
OPTION 0002:
Scope Element 8: Remainder of Sanitary Sewer Improvements.
Provide a separate design and construction cost for the items in Scope Element 8.
Design $_________________
Allowance Amount $_________
Total $__________________
| Scope Element 8 Allowance Items |
| Unit of Measure |
| Quantity |
| Unit |
Cost ($) Total Allowance ($)
| Line 8" Dia. Sanitary Sewer Main with CIPP |
| LF |
| 7,500 |
| Line 10" Dia. Sanitary Sewer Main with CIPP |
| LF |
| 425 |
| Line 12" Dia. Sanitary Sewer Main with CIPP |
| LF |
| 1,273 |
| Line 15" Dia. Sanitary Sewer Main with CIPP |
| LF |
| 234 |
| Line 24" Dia. Sanitary Sewer Main with CIPP |
| LF |
| 2,239 |
TOTAL (TOTAL OF ALL BASE and OPTION ITEMS)
NMACC II Contractors are required to provide pricing for Option Item 0001 and Option Item 0002. If awarded, the option item(s) shall be exercised within 180 calendar days of award. Options will be considered in accordance with FAR 52.217-5 Evaluation of Options (July 1990). If awarded, the option item(s) shall be exercised within 180 calendar days of award and completed within the contract performance period of 1028 calendar day