70Z04721RBRNQN100_Amendment 0002.pdf

PDF 147 KB Posted

Attached to
REBUILD USCG BASE DETACHMENT AND AIR STATION BORINQUEN, AGUADILLA, PUERTO RICO
Solicitation number
70Z04721RBRNQN100
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Rebuild Base Detachment and Air STA Borinquen Aguadilla, Puerto Rico

THIS AMENDMENT IS ISSUED ONLY TO THOSE OFFERORS UNDER THE NATIONAL MULTIPLE AWARD

CONSTRUCTION IDIQ CONTRACT (NMACC II) USCG DEPARTMENT OF HOMELAND SECURITY

(SEE CONTINUATION SHEET)

NA

Contracting Division USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431

NA

70Z04721RBRNQN100

1 2

08/17/2021

08/02/2021

Solicitation 70Z04721RBRNQN100 IS AMENDED AS FOLLOWS:

Task Order Announcement

Non-Price Submission:

Non-Price Factor 1 – Procurement of Labor and Materials:

ADD after Page Limit: The submission of Critical Path Schedule is not included within the maximum five (5) page limit for this factor and is allowed to be printed and submitted on paper not more than size 11”x17”.

The following question was received in response to the solicitation:

1. Per Non-Price Factor 1, bullet “c” states to provide a critical path schedule.

A. Please advise if this schedule shall be included in the 5 page limit for this factor.

B. Please advise if it will be acceptable to use 11x17 pages for the schedule.

RESPONSE: Per Factor 1, c. The critical path schedule highlighting long lead items and methods of working long lead items into the construction plan to minimize delays does not count toward the 5-page limit. Include schedule as enclosure to your respective narrative. c. The 11x17 format size is acceptable for the schedule.

END OF AMENDMENT

FAILURE TO ACKNOWLEDGE AMENDMENTS MAY BE CAUSE OF REJECTION

OF OFFER.

Amendment 0002 1
Amendment 0002 page 2

File details come from the government source that posted it. Updated .